Show Job Controls
Bid Cobra

TERRY SH 137 (0380-04-025)

Items: 90

County: TERRY
Length: 0.0000 MILES
Highway: SH 137
District: LUBBOCK
Control Number: 0380-04-025
DBE Goal: 0.0%
Project: C 380-4-25
Guaranty: $0.00
Time: 195 WORKING DAYS
Engineer's Estimate: $27,831,213.47
Date: 10/09/2025 (8 months ago)
Contract Number: 10253202
Type: SUPER 2
Project ID: A00132096
Project Description: SUPER 2 HIGHWAY
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
SEVE SISNEROS
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$27,831,213.47
$22,303,962.17
Over/Under Est: -19.86% -$5,527,251.30
$22,737,174.31
Over/Under Est: -18.3% -$5,094,039.16
Amt Left: 1.94% $433,212.14
Over/Under Est: -15.72% -$4,374,124.03
Amt Left: 5.17% $1,153,127.27
Delta: -3.17% -$719,915.13
$23,512,697.36
Over/Under Est: -15.52% -$4,318,516.11
Amt Left: 5.42% $1,208,735.19
Delta: -0.24% -$55,607.92
Over/Under Est: 3.56% $991,918.67
Amt Left: 29.23% $6,519,169.97
Delta: -22.59% -$5,310,434.78
Subcontractor Percentage Amount
INDUSTRIAL FABRICS, INC. 8.62% $1,936,467.20
TRP CONSTRUCTION GROUP, LLC 3.13% $703,148.76
W. S. CONSTRUCTION COMPANY 2.86% $642,493.76
MARCOMS CONSTRUCTION LLC 0.57% $128,049.46
J. H. ODEN CONTRACTING COMPANY 0.39% $87,612.79
SURFACE PREPARATION TECHNOLOGIES, LLC 0.16% $35,943.71
FC TRAFFIC CONTROL, INC. 0.13% $29,204.26
BARRICADES UNLIMITED 0.01% $2,246.48
Total: 15.87% $3,565,166.42

Bid Items & Bid Tabulations

90 Total 0 of 90
TERRY  |  SH 137  |  LUBBOCK  |  0380-04-025  |  10/09/2025  |  $27,831,213.47  |  C 380-4-25  |  SUPER 2  |  195 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
A. L. HELMCAMP, INC.
DUININCK, INC.
JAMES HAMILTON CONSTRUCTION CO.
RK HALL, LLC
KIEWIT INFRASTRUCTURE SOUTH CO.
RMV (0"-12") TRT/UNTRT BASE & ASPH PAV
SY 39,522.230 $11.000 $2.500 $4.850 $1.300 $6.650 $3.580
BACKFILL (TY B)
STA 873.800 $225.000 $115.000 $125.000 $400.000 $128.740 $33.310
BLADING
STA 873.800 $180.000 $115.000 $52.500 $300.000 $219.040 $32.980
PRIME COAT (MC-30)
GAL 11,433.330 $6.000 $5.750 $4.850 $4.600 $4.670 $5.480
EMULS ASPH (EROSN CONT)(CSS-1H)
GAL 186,582.930 $3.750 $2.500 $2.100 $2.000 $3.860 $2.030
FOG SEAL (CSS-1H)
GAL 26,435.100 $5.000 $4.000 $2.100 $2.400 $3.910 $2.310
D-GR HMA TY-D SAC-B PG70-28
TON 27,811.640 $150.000 $134.000 $130.000 $137.000 $125.500 $141.370
STONE-MTRX-ASPH SMA-D SAC-A PG76-28
TON 46,271.320 $180.000 $159.750 $168.500 $140.000 $164.210 $212.420
TACK COAT
GAL 17,331.530 $6.000 $3.500 $1.000 $3.700 $4.700 $3.660
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
SY 12,233.200 $38.000 $25.000 $30.000 $35.000 $26.750 $35.110
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 8,155.470 $60.000 $62.000 $60.000 $80.000 $61.050 $72.620
PLANE ASPH CONC PAV(0" TO 3")
SY 26,025.000 $3.700 $3.000 $3.400 $3.700 $3.360 $3.070
CUT & RESTORE ASPH PAVING
SY 551.020 $230.000 $220.000 $95.000 $260.000 $105.900 $310.500
CEM STABIL BKFL
CY 380.180 $290.000 $270.000 $275.000 $360.000 $292.790 $512.370
RC PIPE (CL III)(18 IN)
LF 32.000 $100.000 $100.000 $100.000 $115.000 $106.470 $175.000
RC PIPE (CL III)(24 IN)
LF 1,854.000 $150.000 $100.000 $125.000 $165.000 $133.090 $162.960
RC PIPE (CL III)(36 IN)
LF 48.000 $240.000 $240.000 $200.000 $284.000 $212.940 $323.940
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 2.000 $1,700.000 $1,700.000 $1,900.000 $2,800.000 $1,969.690 $3,000.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 68.000 $2,500.000 $1,800.000 $2,400.000 $4,020.000 $2,555.270 $4,000.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 4.000 $2,900.000 $2,000.000 $2,400.000 $4,020.000 $2,555.270 $3,274.340
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 4.000 $4,100.000 $2,600.000 $5,500.000 $6,960.000 $5,855.820 $6,402.080
CLEAN EXIST CULVERTS
EA 7.000 $2,500.000 $2,800.000 $3,000.000 $5,530.000 $3,675.000 $12,061.800
REMOV STR (PIPE)
EA 20.000 $850.000 $1,600.000 $500.000 $3,500.000 $532.350 $1,766.120
MOBILIZATION
LS 1.000 $2,530,000.000 $1,800,000.000 $1,400,000.000 $1,881,000.000 $1,000,000.000 $2,682,854.930
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $15,000.000 $5,500.000 $27,000.000 $36,000.000 $18,520.210 $50,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 682.000 $70.000 $22.000 $100.000 $90.000 $30.970 $71.070
TMA (STATIONARY)
DAY 382.000 $200.000 $260.000 $250.000 $320.000 $523.550 $508.160
TMA (MOBILE OPERATION)
DAY 40.000 $250.000 $200.000 $900.000 $900.000 $795.100 $959.090
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 222.000 $30.000 $46.000 $44.000 $25.000 $52.500 $52.250
CONSTRUCTION EXITS (REMOVE)
SY 222.000 $10.000 $19.000 $18.000 $5.000 $10.500 $21.380
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 7,340.000 $8.000 $9.000 $9.000 $7.500 $7.350 $10.690
BIODEG EROSN CONT LOGS (REMOVE)
LF 3,630.000 $2.000 $2.000 $2.000 $4.000 $1.050 $2.380
INTERSECTIONS (ACP)
SY 6,852.000 $115.000 $31.000 $36.500 $52.000 $38.740 $67.580
DRIVEWAYS (CONC)
SY 509.170 $150.000 $120.000 $180.000 $210.000 $191.640 $204.310
DRIVEWAYS (ACP)
SY 542.480 $75.000 $35.000 $79.000 $78.000 $60.980 $85.730
TURNOUTS (ACP)
SY 688.400 $120.000 $170.000 $79.500 $157.000 $223.540 $365.460
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 174,760.000 $0.180 $0.200 $0.110 $0.200 $0.150 $0.070
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
LF 87,380.000 $0.190 $0.200 $0.120 $0.240 $0.150 $0.100
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 17.000 $330.000 $250.000 $240.000 $264.000 $252.000 $285.020
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 13.000 $350.000 $290.000 $275.000 $302.000 $288.750 $326.580
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 7.000 $730.000 $580.000 $550.000 $605.000 $577.500 $653.160
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 23.000 $750.000 $740.000 $700.000 $770.000 $735.000 $831.300
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 19.000 $850.000 $840.000 $800.000 $880.000 $840.000 $950.060
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 47.000 $870.000 $840.000 $800.000 $880.000 $840.000 $950.060
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 11.000 $1,000.000 $930.000 $890.000 $980.000 $934.500 $1,056.940
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 3.000 $1,160.000 $930.000 $890.000 $980.000 $934.500 $1,056.940
REMOVE SM RD SN SUP&AM
EA 89.000 $110.000 $110.000 $100.000 $110.000 $105.000 $118.760
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 40.000 $104.000 $84.000 $80.000 $88.000 $84.000 $95.010
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 64,225.000 $0.400 $0.200 $0.170 $0.220 $0.210 $0.240
WK ZN PAV MRK NON-REMOV (W)6"(DOT)
LF 1,800.000 $0.900 $0.300 $0.230 $0.280 $0.260 $0.300
WK ZN PAV MRK NON-REMOV (W)6"(LNDP)
LF 4,500.000 $0.760 $0.300 $0.230 $0.280 $0.260 $0.300
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 329,758.000 $0.310 $0.200 $0.170 $0.220 $0.210 $0.240
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 240.000 $4.000 $11.000 $3.000 $11.000 $10.500 $11.880
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 412,760.000 $0.330 $0.200 $0.170 $0.220 $0.210 $0.240
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 19,708.000 $1.100 $1.000 $1.500 $1.500 $1.760 $2.380
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 20,638.000 $1.250 $1.000 $1.500 $1.500 $1.760 $2.380
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 653.000 $1.320 $1.000 $0.980 $1.100 $1.050 $1.190
REFL PAV MRK TY I (W)6"(LNDP)(100MIL)
LF 1,655.000 $1.150 $1.000 $0.980 $1.100 $1.050 $1.190
TY I HIGH PERF PM (W)6"(BRK)(100MIL)
LF 10,830.000 $0.850 $0.700 $0.680 $0.680 $0.650 $0.740
TY I HIGH PERF PM (W)6"(SLD)(100MIL)
LF 171,076.000 $0.700 $0.600 $0.680 $0.630 $0.600 $0.680
TY I HIGH PERF PM (Y)6"(SLD)(100MIL)
LF 174,328.000 $0.700 $0.600 $0.680 $0.630 $0.600 $0.680
PREFAB PM TY B (W)(6")(DOT)
LF 9.000 $10.150 $11.000 $25.000 $11.000 $10.500 $11.880
PREFAB PM TY B (W)(24")(SLD)
LF 26.000 $35.190 $37.000 $40.000 $38.500 $36.750 $41.570
PREFAB PM TY B (Y)(6")(SLD)
LF 354.000 $7.190 $11.000 $9.500 $11.000 $10.500 $11.880
PREFAB PM TY C (W)(24")(SLD)
LF 525.000 $22.800 $14.000 $13.000 $14.300 $13.650 $15.440
PREFAB PM TY C (W)(LN REDUCT ARROW)
EA 10.000 $455.000 $630.000 $650.000 $660.000 $630.000 $712.540
REFL PAV MRKR TY I-C
EA 556.000 $3.740 $5.000 $4.250 $4.950 $4.730 $5.340
REFL PAV MRKR TY II-A-A
EA 2,180.000 $4.250 $4.000 $3.750 $4.400 $4.200 $4.750
ELIM EXT PM & MRKS (4")
LF 528,160.000 $0.320 $0.600 $0.550 $0.200 $0.680 $0.770
ELIM EXT PM & MRKS (6")
LF 389.000 $0.400 $1.000 $0.650 $0.940 $0.890 $1.010
ELIM EXT PM & MRKS (24")
LF 273.000 $3.570 $1.000 $6.000 $3.850 $3.680 $4.160
PAV SURF PREP FOR MRK (6")
LF 389.000 $0.100 $2.000 $0.550 $2.200 $2.100 $2.380
PAV SURF PREP FOR MRK (24")
LF 26.000 $1.200 $5.000 $5.000 $5.500 $5.250 $5.940
TEMP TRAF SIGNALS
EA 2.000 $87,100.000 $16,300.000 $20,000.000 $8,500.000 $15,751.800 $8,927.920
VEH SIG SEC (12")LED(YEL)
EA 2.000 $315.000 $420.000 $400.000 $1,320.000 $420.000 $475.030
VEH SIG SEC (12")LED(RED)
EA 2.000 $317.000 $420.000 $400.000 $1,320.000 $420.000 $475.030
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 2.000 $8,300.000 $10,400.000 $9,900.000 $10,890.000 $10,395.000 $11,756.960
REMOV RDSD FLSH BCN AM (SOLAR PWRD)
EA 2.000 $1,825.000 $790.000 $755.000 $830.000 $792.750 $896.620
FULL - WIDTH MOWING
CYC 2.000 $10,000.000 $8,500.000 $4,800.000 $4,620.000 $8,208.460 $20,763.790
LITTER REMOVAL
CYC 2.000 $4,000.000 $8,900.000 $4,100.000 $3,300.000 $5,120.350 $14,926.590
REINFORCED FAB FOR ASPH PVMNT OVERLAYS
SY 325,381.670 $6.500 $6.000 $6.300 $6.500 $6.360 $7.700
ASPH FOR REINF FAB (PG76-28)
GAL 48,807.250 $5.000 $4.250 $2.600 $4.200 $4.170 $3.440
TEMP SPEED MONITOR SYS
EA 2.000 $12,700.000 $15,300.000 $7,500.000 $20,500.000 $525.000 $19,131.260
1
SUBGR WIDEN (DC)
SY 57,166.670 $4.000 $0.000 $0.000 $0.000 $5.600 $0.000
1
TACK COAT
GAL 75,757.270 $4.500 $0.000 $0.000 $0.000 $4.700 $0.000
1
D-GR HMA TY-B SAC-B PG70-28
TON 24,653.130 $150.000 $0.000 $0.000 $0.000 $128.870 $0.000
1A
SUBGR WIDEN (DC)
SY 60,025.000 $4.000 $2.000 $3.300 $5.400 $0.000 $6.070
1A
FL BS (CMP IN PLC)(TY A GR 4) (6")
SY 57,166.670 $25.010 $14.000 $15.600 $11.300 $0.000 $16.450
1A
TACK COAT
GAL 67,769.970 $4.500 $1.000 $1.000 $3.700 $0.000 $3.660
1A
D-GR HMA TY-B SAC-B PG70-28
TON 15,284.940 $150.000 $130.000 $137.500 $137.000 $0.000 $132.660
Totals: $32,098,757.749 $22,303,962.155 $22,737,174.312 $23,457,089.433 $23,512,697.370 $28,823,132.152
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $139,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $14,000.00
Total: $153,000.00