Show Job Controls
Bid Cobra

PARMER US 70 (0052-01-043)

Items: 110

County: PARMER
Length: 9.6960 MILES
Highway: US 70
District: LUBBOCK
Control Number: 0052-01-043
DBE Goal: 0.0%
Project: C 52-1-43
Guaranty: $100,000.00
Time: 325 WORKING DAYS
Engineer's Estimate: $28,903,376.27
Date: 05/01/2025 (1 year ago)
Contract Number: 5253002
Type: OVERLAY
Project ID: A00127651
Project Description: OVERLAY
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (8)
E
Engineer's Estimate
$28,903,376.27
$29,652,484.76
Over/Under Est: 2.59% $749,108.49
$29,920,088.72
Over/Under Est: 3.52% $1,016,712.45
Amt Left: 0.9% $267,603.96
Over/Under Est: 6.29% $1,816,611.50
Amt Left: 3.6% $1,067,503.01
Delta: -2.67% -$799,899.05
$31,366,141.69
Over/Under Est: 8.52% $2,462,765.42
Amt Left: 5.78% $1,713,656.93
Delta: -2.10% -$646,153.92
$34,221,486.80
Over/Under Est: 18.4% $5,318,110.53
Amt Left: 15.41% $4,569,002.04
Delta: -9.10% -$2,855,345.11
$35,975,099.12
Over/Under Est: 24.47% $7,071,722.85
Amt Left: 21.32% $6,322,614.36
Delta: -5.12% -$1,753,612.32
Over/Under Est: 28.9% $8,354,339.70
Amt Left: 25.65% $7,605,231.21
Delta: -3.57% -$1,282,616.85
$37,506,456.00
Over/Under Est: 29.76% $8,603,079.73
Amt Left: 26.49% $7,853,971.24
Delta: -0.67% -$248,740.03
Subcontractor Percentage Amount
HJC FARMS, INC. 13.43% $3,982,328.70
INDUSTRIAL FABRICS, INC. 6.77% $2,007,473.22
TRP CONSTRUCTION GROUP, LLC 2.96% $877,713.55
W. S. CONSTRUCTION COMPANY 1.57% $465,544.01
APOLLO CONSTRUCTORS, INC. 1.01% $299,490.10
A BROTHERS MILLING, LLC 0.99% $293,559.60
MARCOMS CONSTRUCTION LLC 0.74% $219,428.39
FC TRAFFIC CONTROL, INC. 0.31% $91,922.70
J. H. ODEN CONTRACTING COMPANY 0.29% $85,992.21
SURFACE PREPARATION TECHNOLOGIES, LLC 0.09% $26,687.24
BARRICADES UNLIMITED 0.01% $2,965.25
Total: 28.17% $8,353,104.97

Bid Items & Bid Tabulations

110 Total 0 of 110
PARMER  |  US 70  |  LUBBOCK  |  0052-01-043  |  05/01/2025  |  $28,903,376.27  |  C 52-1-43  |  OVERLAY  |  325 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
A. L. HELMCAMP, INC.
DUININCK, INC.
JAMES HAMILTON CONSTRUCTION CO.
J. LEE MILLIGAN, INC.
GILVIN-TERRILL, LTD.
RK HALL, LLC
KIEWIT INFRASTRUCTURE SOUTH CO.
WEBBER, LLC
REMOV CONC (PAV)
SY 634.000 $11.400 $35.000 $23.500 $40.000 $46.250 $40.000 $37.700 $51.120 $19.000
REMOV CONC (MEDIANS)
SY 303.000 $95.000 $45.000 $23.500 $40.000 $48.750 $40.000 $37.880 $74.460 $19.000
REMOV CONC (DRIVEWAYS)
SY 358.000 $28.500 $40.000 $20.000 $45.000 $45.000 $40.000 $40.080 $32.050 $17.000
RMV (10"-14") TRT/UNTRT BASE & ASPH PAV
SY 7,981.000 $5.700 $9.000 $11.000 $14.200 $13.750 $10.000 $13.140 $22.720 $12.000
RMV (6") TRT/UNTRT BASE & ASPH PAV
SY 1,078.000 $19.000 $12.000 $9.000 $14.200 $13.500 $10.000 $11.310 $16.780 $10.000
OBLITERATING ABANDONED ROAD
STA 10.000 $2,375.000 $1,500.000 $2,700.000 $4,500.000 $1,940.000 $2,500.000 $2,502.870 $8,420.130 $1,175.000
EXCAV (ROADWAY)
CY 5,000.000 $60.000 $38.000 $21.000 $15.000 $40.000 $20.000 $21.960 $37.520 $38.000
SUBGR WIDEN (DC)
STA 328.340 $712.500 $700.000 $530.000 $600.000 $1,125.000 $2,500.000 $995.550 $1,160.990 $1,417.000
BACKFILL (TY B)
STA 1,021.600 $142.500 $145.000 $115.000 $400.000 $109.000 $250.000 $154.310 $100.000 $40.000
BLADING
STA 1,031.600 $114.000 $110.000 $105.000 $300.000 $104.000 $130.000 $138.930 $100.000 $102.000
PRIME COAT (MC-30)
GAL 6,643.400 $6.180 $5.000 $4.900 $5.000 $7.200 $12.500 $7.830 $8.170 $6.000
EMULS ASPH (EROSN CONT)(CSS-1H)
GAL 210,469.930 $3.500 $4.800 $2.650 $3.750 $2.250 $3.750 $3.710 $2.470 $3.000
FOG SEAL (CSS-1H)
GAL 6,172.000 $5.700 $5.500 $3.650 $4.000 $3.400 $4.250 $4.660 $2.990 $8.000
D-GR HMA TY-B PG70-28
TON 11,087.970 $130.000 $176.000 $165.000 $160.000 $163.750 $155.500 $223.150 $183.270 $188.000
D-GR HMA TY-C SAC-B PG70-28
TON 7,490.530 $159.000 $166.000 $165.000 $162.000 $155.000 $180.500 $210.130 $166.240 $206.000
D-GR HMA TY-D SAC-B PG70-28
TON 20,218.960 $140.000 $170.000 $145.000 $160.000 $150.000 $205.500 $199.900 $179.430 $202.000
TACK COAT
GAL 74,772.420 $5.300 $4.500 $3.350 $4.500 $3.600 $6.000 $4.830 $4.220 $4.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-28
TON 40,887.880 $170.000 $189.000 $185.000 $150.000 $195.000 $180.500 $244.760 $227.460 $203.000
TACK COAT
GAL 19,732.370 $6.180 $4.500 $3.500 $4.500 $3.850 $6.000 $5.330 $4.410 $4.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(2")
SY 2,724.260 $28.500 $28.000 $40.000 $27.000 $40.750 $60.000 $27.410 $30.160 $64.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 8,172.750 $76.000 $76.000 $60.000 $60.000 $60.500 $70.000 $73.440 $82.370 $192.000
PLANE ASPH CONC PAV(0" TO 2")
SY 424,818.250 $2.000 $1.250 $2.050 $1.400 $1.850 $2.000 $2.340 $1.660 $2.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 160.000 $380.000 $360.000 $360.000 $380.000 $361.000 $300.000 $386.400 $442.630 $350.000
RIPRAP (CONC)(CL A)
CY 162.580 $950.000 $640.000 $730.000 $660.000 $837.000 $700.000 $896.000 $972.110 $730.000
RIPRAP (MOW STRIP)(5 IN)
CY 4,231.960 $500.000 $580.000 $460.000 $610.000 $575.000 $440.000 $616.000 $564.510 $558.000
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 18.000 $788.500 $950.000 $940.000 $1,740.000 $1,750.000 $1,000.000 $952.000 $1,627.730 $952.000
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
LF 6.000 $888.250 $1,300.000 $1,300.000 $1,860.000 $1,780.000 $1,275.000 $1,008.000 $1,669.820 $1,080.000
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
LF 5.500 $441.750 $1,450.000 $1,400.000 $1,900.000 $1,925.000 $1,500.000 $1,008.000 $1,756.080 $1,085.000
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
LF 15.000 $745.750 $1,400.000 $1,400.000 $2,150.000 $2,130.000 $1,500.000 $1,064.000 $1,835.100 $1,220.000
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
LF 5.500 $1,282.500 $1,500.000 $1,500.000 $2,200.000 $2,000.000 $1,450.000 $1,176.000 $2,105.600 $1,370.000
RC PIPE (CL III)(24 IN)
LF 16.000 $142.500 $170.000 $165.000 $205.000 $210.000 $200.000 $168.000 $227.390 $153.000
SET (TY I)(S= 3 FT)(HW= 2 FT)(6:1)(C)
EA 7.000 $1,900.000 $19,000.000 $18,500.000 $23,150.000 $17,100.000 $18,000.000 $8,960.000 $25,802.780 $19,185.000
SET (TY I)(S= 3 FT)(HW= 3 FT)(4:1)(C)
EA 1.000 $10,188.750 $29,000.000 $29,500.000 $23,250.000 $16,300.000 $30,000.000 $10,080.000 $26,465.140 $19,285.000
SET (TY I)(S= 3 FT)(HW= 3 FT)(6:1)(C)
EA 1.000 $9,500.000 $24,000.000 $24,000.000 $32,600.000 $19,000.000 $25,000.000 $13,440.000 $39,330.760 $27,915.000
SET (TY I)(S= 4 FT)(HW= 2 FT)(4:1)(C)
EA 1.000 $3,800.000 $15,000.000 $15,000.000 $16,650.000 $14,800.000 $15,000.000 $11,200.000 $19,463.310 $13,195.000
SET (TY I)(S= 5 FT)(HW= 2 FT)(6:1)(C)
EA 4.000 $12,350.000 $13,000.000 $12,500.000 $14,720.000 $16,500.000 $12,000.000 $10,640.000 $17,202.070 $11,420.000
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1)(C)
EA 1.000 $13,300.000 $24,000.000 $23,500.000 $24,570.000 $16,700.000 $24,000.000 $13,440.000 $28,004.710 $20,505.010
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 2.000 $2,375.000 $2,200.000 $2,100.000 $5,460.000 $4,500.000 $2,500.000 $2,240.000 $5,534.720 $3,567.250
CLEAN EXIST CULVERTS
EA 26.000 $2,850.000 $3,700.000 $3,700.000 $4,400.000 $2,050.000 $3,650.000 $2,240.000 $5,131.890 $4,055.000
MOBILIZATION
LS 1.000 $2,852,000.000 $1,900,000.000 $2,900,000.000 $2,550,000.000 $3,100,000.000 $3,400,000.000 $1,798,754.950 $4,093,988.070 $3,750,600.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 29.000 $11,400.000 $11,950.000 $15,000.000 $34,000.000 $35,000.000 $70,000.000 $18,356.200 $35,000.000 $103,246.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 1,000.000 $104.500 $25.000 $105.000 $50.000 $76.000 $40.000 $88.380 $81.590 $94.000
TMA (STATIONARY)
DAY 1,250.000 $199.500 $95.000 $260.000 $300.000 $310.000 $180.000 $592.290 $552.000 $100.000
TMA (MOBILE OPERATION)
DAY 165.000 $247.000 $95.000 $940.000 $900.000 $105.000 $500.000 $1,188.130 $1,032.770 $100.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 231.000 $57.000 $35.000 $52.500 $31.000 $50.000 $50.000 $56.000 $64.150 $51.000
CONSTRUCTION EXITS (REMOVE)
SY 231.000 $9.500 $5.000 $15.500 $8.000 $15.000 $15.000 $16.800 $19.240 $16.000
SANDBAGS FOR EROSION CONTROL
EA 600.000 $9.500 $18.000 $21.000 $20.000 $13.000 $20.000 $22.400 $25.660 $21.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 6,680.000 $11.400 $8.000 $8.350 $7.000 $8.000 $8.000 $8.960 $10.260 $9.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 3,340.000 $2.850 $1.500 $1.550 $3.500 $6.000 $1.500 $1.680 $1.920 $2.000
INTERSECTIONS (ACP)
SY 6,061.000 $57.000 $100.000 $125.000 $120.000 $72.000 $100.000 $121.900 $123.530 $132.000
DRIVEWAYS (CONC)
SY 358.000 $109.250 $280.000 $150.000 $250.000 $100.000 $145.000 $140.000 $274.340 $345.000
DRIVEWAYS (ACP)
SY 3,192.000 $76.000 $48.000 $66.500 $122.000 $26.000 $60.000 $161.480 $52.050 $66.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 154,300.000 $0.240 $0.250 $0.080 $0.220 $0.350 $0.170 $0.300 $0.120 $0.100
CABLE BARRIER SYS(INSTL)(TL-4)(20 '-0")
LF 89,320.000 $14.750 $15.000 $16.500 $17.700 $15.200 $16.000 $16.240 $20.530 $15.000
CABLE BARRIER TERM SEC (INSTL)(TL-4)
EA 76.000 $2,850.000 $3,600.000 $4,700.000 $4,990.000 $3,600.000 $4,500.000 $3,864.000 $5,773.380 $3,495.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 2.000 $351.500 $230.000 $230.000 $240.000 $525.000 $220.000 $246.400 $282.250 $223.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 2.000 $760.000 $580.000 $575.000 $600.000 $890.000 $550.000 $616.000 $705.640 $558.000
IN RD IL (TY SA) 40T-12-12(250W EQ)LED
EA 20.000 $8,550.000 $6,500.000 $6,400.000 $6,740.000 $6,400.000 $8,000.000 $6,860.000 $7,858.210 $6,204.000
CONDT (HDPE) (2")
LF 3,520.000 $14.250 $15.000 $15.000 $16.000 $15.200 $12.000 $16.240 $18.600 $15.000
CONDT (HDPE) (2") BORE
LF 520.000 $33.250 $32.000 $31.500 $33.000 $31.350 $18.000 $33.600 $38.490 $31.000
ELEC CONDR (NO.6) BARE
LF 4,040.000 $2.610 $3.000 $2.750 $2.900 $2.800 $3.000 $2.970 $3.400 $2.700
ELEC CONDR (NO.6) INSULATED
LF 8,080.000 $2.990 $3.200 $3.150 $3.300 $3.150 $3.500 $3.360 $3.850 $3.050
GROUND BOX TY A (122311)W/APRON
EA 2.000 $1,900.000 $1,300.000 $1,300.000 $1,375.000 $1,310.000 $1,500.000 $1,400.000 $1,603.720 $1,266.000
ELC SRV TY A 120/240 060(NS)SS(E)SP(O)
EA 2.000 $9,500.000 $9,000.000 $9,000.000 $9,460.000 $9,000.000 $8,500.000 $9,632.000 $11,033.570 $8,710.000
ALUMINUM SIGNS (TY G)
SF 96.000 $33.250 $32.000 $31.500 $33.000 $37.000 $30.000 $33.600 $38.490 $31.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 69.000 $760.000 $750.000 $750.000 $780.000 $940.000 $750.000 $800.800 $917.330 $725.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 26.000 $522.500 $920.000 $910.000 $957.000 $1,090.000 $900.000 $974.400 $1,116.190 $882.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 54.000 $855.000 $810.000 $805.000 $847.000 $1,000.000 $800.000 $862.400 $987.890 $780.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 3.000 $1,045.000 $1,000.000 $995.000 $1,045.000 $1,200.000 $950.000 $1,064.000 $1,218.820 $963.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 28.000 $1,140.000 $1,200.000 $1,200.000 $1,210.000 $1,400.000 $1,100.000 $1,232.000 $1,411.270 $1,115.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 2.000 $997.500 $900.000 $890.000 $935.000 $1,230.000 $850.000 $952.000 $1,090.530 $861.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000 $1,140.000 $1,100.000 $1,000.000 $1,090.000 $1,465.000 $1,000.000 $1,108.800 $1,270.140 $1,003.000
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
EA 5.000 $1,235.000 $1,100.000 $1,000.000 $1,090.000 $1,700.000 $1,000.000 $1,108.800 $1,270.140 $1,003.000
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 2.000 $1,235.000 $1,100.000 $1,000.000 $1,090.000 $1,600.000 $1,000.000 $1,108.800 $1,270.140 $1,003.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 24.000 $522.500 $720.000 $715.000 $754.000 $835.000 $700.000 $767.200 $878.840 $694.000
REMOVE SM RD SN SUP&AM
EA 203.000 $95.000 $110.000 $105.000 $110.000 $105.000 $100.000 $112.000 $128.300 $102.000
INSTALL LRSS (STRUCT STEEL)
LB 548.600 $6.180 $8.000 $7.850 $8.500 $10.000 $13.000 $8.400 $9.620 $8.000
REMOVE LRSA
EA 1.000 $760.000 $1,300.000 $1,300.000 $1,320.000 $1,570.000 $1,100.000 $1,344.000 $1,539.570 $1,216.000
INSTL DEL ASSM (D-DY)SZ 1(YFLX)GND
EA 76.000 $142.500 $95.000 $94.000 $100.000 $157.000 $100.000 $100.800 $115.470 $92.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 60.000 $142.500 $95.000 $94.000 $100.000 $157.000 $100.000 $100.800 $115.470 $92.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 148.000 $23.750 $16.000 $15.500 $16.500 $16.000 $15.000 $16.800 $19.240 $16.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 25,540.000 $0.480 $0.310 $0.310 $0.330 $0.310 $0.300 $0.340 $0.310 $0.300
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 217,255.000 $0.480 $0.310 $0.300 $0.320 $0.300 $0.290 $0.320 $0.270 $0.300
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 29,020.000 $0.950 $0.360 $0.370 $0.380 $0.370 $0.350 $0.390 $0.460 $0.350
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 217,255.000 $0.480 $0.310 $0.300 $0.320 $0.300 $0.290 $0.320 $0.270 $0.300
WK ZN PAV MRK REMOV (REFL) TY I-A
EA 6,252.000 $4.750 $4.500 $4.500 $4.700 $4.500 $4.300 $4.820 $6.410 $4.350
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 6,204.000 $4.750 $4.500 $4.500 $4.700 $4.500 $4.300 $4.820 $6.410 $4.350
WK ZN PAV MRK REMOV (TRAF BTN) TY W
EA 18,557.000 $9.500 $4.000 $3.900 $4.100 $3.950 $3.750 $4.200 $5.770 $3.800
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
EA 18,696.000 $9.500 $4.000 $3.900 $4.100 $3.950 $3.750 $4.200 $5.770 $3.800
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 9,113.000 $1.660 $1.250 $1.550 $1.250 $1.500 $1.250 $2.260 $2.570 $1.550
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 320.000 $1.430 $1.250 $1.550 $1.200 $1.550 $1.250 $2.440 $2.570 $1.550
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 1,702.000 $0.950 $1.100 $1.050 $1.100 $1.050 $1.000 $1.120 $2.180 $1.050
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 28,140.000 $1.140 $1.000 $0.940 $1.000 $0.940 $0.900 $1.010 $1.800 $0.950
TY I HIGH PERF PM (W)6"(BRK)(100MIL)
LF 25,560.000 $0.670 $0.750 $0.730 $0.770 $0.730 $0.700 $0.780 $0.980 $0.750
TY I HIGH PERF PM (Y)6"(SLD)(100MIL)
LF 104,980.000 $0.480 $0.700 $0.680 $0.720 $0.680 $0.650 $0.730 $0.950 $0.700
PREFAB PM TY C (W)(24")(SLD)
LF 525.000 $19.000 $18.000 $18.000 $17.700 $17.800 $17.500 $19.060 $15.400 $17.250
PREFAB PM TY C (W)(ARROW)
EA 88.000 $237.500 $240.000 $235.000 $250.000 $235.000 $225.000 $252.000 $224.520 $228.000
PREFAB PM TY C (W)(36")(YLD TRI)
EA 210.000 $33.250 $60.000 $59.000 $62.000 $59.000 $56.500 $63.280 $60.940 $58.000
REFL PAV MRKR TY II-A-A
EA 398.000 $3.800 $5.300 $5.250 $5.500 $5.250 $5.000 $5.600 $6.410 $5.100
REFL PAV MRKR TY II-C-R
EA 1,787.000 $4.750 $4.500 $4.200 $4.400 $4.200 $4.000 $4.480 $6.410 $4.050
ELIM EXT PM & MRKS (6")
LF 538,760.000 $0.600 $0.300 $0.680 $0.700 $0.700 $0.650 $0.730 $0.730 $0.700
ELIM EXT PM & MRKS (8")
LF 27,240.000 $1.430 $0.900 $0.890 $0.930 $0.900 $0.850 $0.950 $0.730 $0.900
PAV SURF PREP FOR MRK (24")
LF 525.000 $11.400 $2.200 $2.100 $2.200 $2.100 $2.000 $2.240 $1.150 $2.050
PAV SURF PREP FOR MRK (ARROW)
EA 88.000 $142.500 $32.000 $31.500 $33.000 $31.350 $30.000 $33.600 $44.900 $30.400
PAV SURF PREP FOR MRK (36")(YLD TRI)
EA 210.000 $23.750 $5.500 $5.250 $5.500 $5.250 $5.000 $5.600 $25.660 $5.100
FULL - WIDTH MOWING
CYC 6.000 $5,700.000 $5,000.000 $5,100.000 $4,600.000 $30,000.000 $16,000.000 $15,000.000 $8,420.580 $5,065.000
LITTER REMOVAL
CYC 6.000 $2,850.000 $7,500.000 $4,300.000 $2,815.000 $20,000.000 $4,525.000 $15,000.000 $15,914.600 $3,925.000
REINFORCED FAB FOR ASPH PVMNT OVERLAYS
SY 323,897.020 $6.800 $6.500 $6.800 $6.900 $6.500 $7.000 $7.130 $8.120 $7.000
ASPH FOR REINF FAB (PG76-28)
GAL 48,584.550 $4.750 $5.000 $3.500 $5.000 $3.850 $6.000 $5.810 $5.370 $6.000
TEMP SPEED MONITOR SYS
EA 2.000 $12,825.000 $12,000.000 $8,900.000 $16,500.000 $31,265.000 $20,000.000 $13,200.240 $22,963.590 $20,560.000
Totals: $28,903,376.271 $29,652,484.762 $29,920,088.710 $30,719,987.760 $31,366,141.686 $34,221,486.538 $35,975,099.101 $37,257,715.978 $37,506,456.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
RAILROAD FLAGGING: RAILROAD FORCE ACCOUNT WORK (NON-PART) $18,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $25,900.00
PUBLIC UTILITY FORCE ACCT WORK (NON- PART) $10,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $150,000.00
ENVIRONMENTAL: CONTRACTOR FORCE ACCOUNT WORK (NONPART) $10,000.00
Total: $213,900.00