CORYELL SH 36 (0184-01-070)

Items: 58

County: CORYELL
Length: N/A
Highway: SH 36
District: WACO
Control Number: 0184-01-070
DBE Goal: N/A
Project: F 2024(331)
Guaranty: N/A
Time: 195 WORKING DAYS
Engineer's Estimate: $13,792,007.79
Date: 11/01/2023 (2 years ago)
Contract Number: N/A
Type: SURFACING/ROADWAY RESTORATION
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$13,792,007.79
$8,907,042.00
Over/Under Est: -35.42% -$4,884,965.79
Over/Under Est: -30.42% -$4,195,742.68
Amt Left: 7.74% $689,223.11
Over/Under Est: -30.34% -$4,184,686.54
Amt Left: 7.86% $700,279.25
Delta: -0.12% -$11,056.14
Over/Under Est: 8.77% $1,210,211.39
Amt Left: 68.43% $6,095,177.18
Delta: -56.15% -$5,394,897.93
Subcontractor Percentage Amount
STRUCTURAL INTEGRITY GROUP LLC 11.57% $1,039,722.06
JADAN ENTERPRISES 5.69% $511,323.99
LINEAR TRAFFIC MARKINGS LLC 2.45% $220,165.86
HIGHWAY TRAFFIC CONTROL & SERVICES, LLC 0.43% $38,641.36
TEXOP CONSTRUCTION 0.27% $24,263.18
PROFESSIONAL TRAFFIC CONTROL LLC 0.23% $20,668.63
HOUSTON SAWING & DRILLING 0.06% $5,391.82
DALLAS LITE AND BARRICADE, INC. 0.03% $2,695.91
NEXT CONSTRUCTION SOLUTIONS LLC 0.01% $898.64
ELITE STRIPING, LLC 0.00% $0.00
Total: 20.74% $1,863,771.45

Bid Items & Bid Tabulations

58 Total 0 of 58
CORYELL  |  SH 36  |  WACO  |  0184-01-070  |  11/01/2023  |  $13,792,007.79  |  F 2024(331)  |  SURF/ROADWAY RESTOR  |  195 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BIG CREEK CONSTRUCTION, LTD.
KNIFE RIVER CORPORATION - SOUTH
TEXAS MATERIALS GROUP, INC.
KIEWIT INFRASTRUCTURE SOUTH CO.
BACKFILL (TY A)
STA 514.900 $354.000 $250.000 $180.000 $184.700 $354.500
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 5,000.000 $82.000 $65.000 $69.000 $65.000 $142.850
PLANE ASPH CONC PAV (2" TO 6")
SY 5,233.000 $15.000 $5.000 $6.750 $9.350 $7.650
PLANE ASPH CONC PAV(2" TO 4 1/2" MICRO)
SY 9,040.000 $3.000 $3.000 $7.000 $7.550 $10.680
PLANE ASPH CONC PAV (0" TO 2" MICRO)
SY 355,980.000 $2.900 $2.000 $2.100 $2.350 $3.010
TEMPORARY SPL SHORING
SF 1,513.000 $46.000 $50.000 $52.000 $40.000 $57.520
CONC STR REPAIR (STANDARD)
SF 400.000 $341.000 $150.000 $143.000 $135.000 $172.570
RIPRAP (CONC)(5 IN)
CY 21.200 $715.000 $1,100.000 $1,050.000 $800.000 $958.720
RIPRAP (MOW STRIP)(4 IN)
CY 189.400 $631.000 $750.000 $740.000 $600.000 $830.890
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 1,386.800 $52.000 $50.000 $44.000 $30.000 $38.350
SET (TY I)(S=10 FT)(HW=8FT)(3:1)(C)
EA 2.000 $11,110.000 $40,000.000 $34,000.000 $33,750.000 $53,688.200
SET (TY I)(S= 5 FT)(HW= 7 FT)(3:1) (C)
EA 2.000 $17,500.000 $35,000.000 $26,000.000 $28,000.000 $25,565.810
REMOV STR (WINGWALL)
EA 4.000 $2,040.000 $3,000.000 $3,000.000 $1,000.000 $5,340.100
MOBILIZATION
LS 1.000 $1,192,841.090 $420,000.000 $700,000.000 $528,000.000 $1,658,419.550
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 13.000 $6,500.000 $5,000.000 $25,000.000 $4,100.000 $42,058.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 360.000 $20.000 $30.000 $40.000 $50.300 $53.100
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 360.000 $15.000 $30.000 $30.000 $43.300 $35.920
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 360.000 $18.000 $30.000 $40.000 $50.300 $50.410
INTERSECTIONS (ACP)
SY 1,951.000 $40.000 $21.000 $35.000 $25.000 $42.860
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 104,930.000 $0.500 $0.200 $0.260 $0.170 $0.140
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 21,270.000 $0.500 $0.200 $0.260 $0.250 $0.140
MTL W-BEAM GD FEN (STEEL POST)
LF 2,150.000 $40.000 $35.000 $31.000 $28.750 $38.670
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 12.000 $2,330.000 $3,000.000 $2,950.000 $3,200.000 $3,419.430
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000 $1,575.000 $1,500.000 $1,200.000 $1,100.000 $1,789.610
REMOVE METAL BEAM GUARD FENCE
LF 1,275.000 $4.800 $3.000 $3.250 $3.000 $2.560
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 12.000 $285.000 $250.000 $300.000 $250.000 $255.660
GUARDRAIL END TREATMENT (INSTALL)
EA 22.000 $3,340.000 $3,500.000 $2,950.000 $2,775.000 $4,186.400
GUARDRAIL END TREATMENT (REMOVE)
EA 12.000 $345.000 $500.000 $300.000 $250.000 $255.660
CRASH CUSH ATTEN (MOVE & RESET)
EA 4.000 $2,115.000 $2,500.000 $1,500.000 $1,240.000 $3,195.730
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $1,270.000 $1,500.000 $1,000.000 $830.000 $1,278.290
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 4.000 $10,220.000 $8,000.000 $8,500.000 $7,915.000 $8,948.030
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 50.000 $44.000 $45.000 $45.000 $40.000 $51.130
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 13,560.000 $0.900 $0.700 $0.420 $0.390 $0.500
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 101,350.000 $0.700 $0.650 $0.400 $0.340 $0.430
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 1,540.000 $1.000 $1.000 $0.530 $0.650 $0.830
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 96,310.000 $0.700 $0.650 $0.400 $0.340 $0.430
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 6,608.000 $1.600 $1.500 $1.400 $1.000 $2.560
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 2,414.000 $1.600 $1.500 $1.400 $1.000 $2.560
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 994.000 $1.300 $1.000 $1.580 $1.000 $1.280
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,540.000 $0.800 $1.000 $1.160 $0.810 $1.040
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 180.000 $6.200 $10.000 $21.060 $8.000 $10.230
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 13,560.000 $1.000 $0.650 $0.740 $0.600 $0.770
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 101,350.000 $0.900 $0.600 $0.740 $0.570 $0.730
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 12,040.000 $1.000 $0.600 $0.740 $0.600 $0.770
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 96,310.000 $1.000 $0.600 $0.740 $0.570 $0.730
PREFAB PAV MRK TY C (W) (ARROW)
EA 11.000 $270.000 $200.000 $285.000 $199.000 $254.380
PREFAB PAV MRK TY C (W) (DBL ARROW)
EA 2.000 $370.000 $350.000 $410.000 $340.000 $434.620
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 3.000 $480.000 $450.000 $885.000 $450.000 $575.230
PREFAB PAV MRK TY C (W) (WORD)
EA 6.000 $325.000 $300.000 $415.000 $300.000 $383.490
REFL PAV MRKR TY I-C
EA 34.000 $6.800 $4.000 $5.270 $3.480 $4.450
REFL PAV MRKR TY II-A-A
EA 2,544.000 $7.800 $4.000 $5.270 $3.400 $4.350
SP MIXES SP-C SAC-A PG76-22
TON 39,733.000 $176.000 $110.000 $125.000 $131.000 $185.750
UNDERSEAL COURSE
GAL 90,303.000 $5.100 $4.000 $0.010 $3.750 $4.890
POLYESTER POLYMER CONC OVERLAY (1")
SY 9,040.000 $117.000 $130.000 $121.000 $115.000 $140.610
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 90.000 $10,000.000 $120.000 $125.000 $33.000 $310.040
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $150.000 $11,500.000 $19,500.000 $11,700.000 $27,903.320
TMA (STATIONARY)
DAY 280.000 $150.000 $202.000 $50.000 $182.000 $587.220
TMA (MOBILE OPERATION)
HR 360.000 $50.000 $25.000 $20.000 $20.000 $110.580
Totals: $13,792,007.790 $8,907,042.000 $9,596,265.110 $9,607,321.250 $15,002,219.190