6502-36-001
|
ROBERTSON
|
BRYAN
|
$357,300
|
SH0006
|
MMC - A00221779
|
06/10/2026
|
04/20/2026
|
HOT MIX
|
BIG CREEK CONSTRUCTION, LTD.
($330,664)
|
|
|
6502-35-001
|
BURLESON
|
BRYAN
|
$225,600
|
SH0036
|
MMC - A00221778
|
06/09/2026
|
04/20/2026
|
HOT MIX
|
BIG CREEK CONSTRUCTION, LTD.
($212,600)
|
|
|
0337-01-053
|
WILLIAMSON
|
AUSTIN
|
$7,329,606
|
SH 29
|
CC 337-1-53
|
06/03/2026
|
02/02/2026
|
INTERS IMPRVS WITH RIGHT AND/OR LEFT...
|
DAN WILLIAMS COMPANY
($7,574,102)
|
|
|
1068-03-025
|
TARRANT
|
FORT WORTH
|
$1,720,788
|
SS 341
|
F 2026(533)
|
06/03/2026
|
04/01/2026
|
RESURF ROADWAY
|
NORTHEASTERN PAVERS, LLC
($1,490,461)
|
|
|
1601-02-036
|
PARKER
|
FORT WORTH
|
$8,270,039
|
FM 1884
|
F 2026(807)
|
06/03/2026
|
04/01/2026
|
REHAB EXIST ROADWAY
|
NORTHEASTERN PAVERS, LLC
($5,970,810)
|
|
|
1683-01-040
|
FORT BEND
|
HOUSTON
|
$2,859,279
|
FM 1640
|
F 2026(544)
|
06/03/2026
|
04/01/2026
|
RESURF ROADWAY
|
DURWOOD GREENE CONSTRUCTION CO.
($3,065,936)
|
|
|
0019-01-146
|
JOHNSON
|
FORT WORTH
|
$20,058,072
|
SH 174
|
CM 2026(406)
|
06/02/2026
|
04/01/2026
|
WIDEN ROAD - ADD LANES
|
REYES TX, INC.
($19,812,334)
|
|
|
0050-12-002
|
HARRIS
|
HOUSTON
|
$785,715
|
BU 290L
|
F 2026(450)
|
06/02/2026
|
04/01/2026
|
PREVENT MAINT
|
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
($733,755)
|
|
|
0190-05-078
|
SMITH
|
TYLER
|
$1,960,952
|
US 69
|
F 2026(646)
|
06/02/2026
|
04/01/2026
|
INTERS IMPRVS WITH RIGHT AND/OR LEFT...
|
ICOS MANAGEMENT, LLC
($2,362,671)
|
|
|
0216-03-034
|
GUADALUPE
|
SAN ANTONIO
|
$2,982,000
|
FM 466
|
C 216-3-34
|
06/02/2026
|
04/01/2026
|
RESURF ROADWAY
|
HUNTER INDUSTRIES, LTD.
($2,728,902)
|
|
|
0261-01-053
|
ELLIS
|
DALLAS
|
$5,220,420
|
US 67
|
F 2026(653)
|
06/02/2026
|
04/01/2026
|
REHAB EXIST ROADWAY
|
FOUTSCO PAVING COMPANY, LLC
($5,325,296)
|
|
|
0274-02-032
|
LAMPASAS
|
BROWNWOOD
|
$5,557,277
|
US 183
|
STP 2026(645)HES
|
06/02/2026
|
04/01/2026
|
WIDEN ROAD - ADD SHOULDERS
|
BIG CREEK CONSTRUCTION, LTD.
($4,510,688)
|
|
|
0581-02-162
|
DALLAS
|
DALLAS
|
$17,965,405
|
SL 12
|
F 2026(709)
|
06/02/2026
|
04/01/2026
|
REHAB EXIST ROADWAY
|
AUSTIN BRIDGE & ROAD SERVICES, LP
($19,588,668)
|
|
|
1179-02-041
|
PARKER
|
FORT WORTH
|
$13,679,045
|
FM 920
|
F 2026(648)
|
06/02/2026
|
04/01/2026
|
INTERS IMPRVS WITH RIGHT AND/OR LEFT...
|
FOUTSCO PAVING COMPANY, LLC
($8,486,108)
|
|
|
6500-39-001
|
HENDERSON
|
TYLER
|
$1,086,902
|
SH0031
|
RMC - A00220775
|
06/02/2026
|
04/22/2026
|
MILL AND INLAY
|
BIG CREEK CONSTRUCTION, LTD.
($977,218)
|
|
|
6500-41-001
|
GREGG
|
TYLER
|
$3,489,919
|
IH0020
|
RMC - A00220777
|
06/02/2026
|
04/27/2026
|
MILL AND INLAY
|
DREWERY CONSTRUCTION COMPANY, INCORPORATED
($2,670,044)
|
|
|
6500-18-001
|
TARRANT
|
FORT WORTH
|
$760,692
|
IH0820
|
MMC - A00220698
|
05/20/2026
|
03/28/2026
|
HOT MIX
|
EUROVIA ATLANTIC COAST LLC
($784,000)
|
|
|
6501-87-001
|
JIM WELLS
|
CORPUS CHRISTI
|
$339,000
|
US0281
|
MMC - A00221590
|
05/19/2026
|
04/09/2026
|
HOT-MIX COLD-LAID
|
BRAUNTEX MATERIALS, INC.
($297,000)
|
|
|
6501-88-001
|
REFUGIO
|
CORPUS CHRISTI
|
$480,000
|
US0077
|
MMC - A00221591
|
05/19/2026
|
04/09/2026
|
HOT-MIX COLD-LAID
|
BRAUNTEX MATERIALS, INC.
($468,600)
|
|
|
6495-92-001
|
HAYS
|
AUSTIN
|
$938,785
|
RM0150
|
RMC - A00219000
|
05/13/2026
|
02/02/2026
|
ASPH PAVMT REPAIR
|
LONE STAR PAVING COMPANY
($890,314)
|
|
|
6495-94-001
|
WHARTON
|
YOAKUM
|
$839,069
|
US0059
|
RMC - A00219004
|
05/11/2026
|
02/23/2026
|
ADD TURN LANE
|
HUNTER INDUSTRIES, LTD.
($933,297)
|
|
|
0018-01-102
|
LA SALLE
|
LAREDO
|
$27,692,721
|
IH 35
|
F 2026(635)
|
05/07/2026
|
03/02/2026
|
PREVENT MAINT
|
HUNTER INDUSTRIES, LTD.
($24,814,865)
|
|
|
0073-02-092
|
BEXAR
|
SAN ANTONIO
|
$1,278,677
|
SS 536
|
F 2026(363)
|
05/07/2026
|
03/02/2026
|
SURF/ROADWAY RESTOR
|
H. L. ZUMWALT CONSTRUCTION, INC.
($1,105,677)
|
|
|
0110-01-052
|
WALKER
|
BRYAN
|
$2,628,065
|
SH 75
|
STP 2026(528)HES
|
05/07/2026
|
03/02/2026
|
INSTL SAFETY LIGHTING AND TURN BAY
|
BIG CREEK CONSTRUCTION, LTD.
($2,980,129)
|
|
|
0138-06-049
|
NACOGDOCHES
|
LUFKIN
|
$3,029,651
|
US 259
|
F 2026(530)
|
05/07/2026
|
03/02/2026
|
RESURF ROADWAY
|
MADDEN CONTRACTING COMPANY, LLC.
($2,886,840)
|
|
|
3256-02-121
|
HARRIS
|
HOUSTON
|
$2,286,187
|
SL 8
|
F 2026(604)
|
05/07/2026
|
03/02/2026
|
RESURF ROADWAY
|
ENVIRONMENTAL ALLIES, INC.
($2,254,486)
|
|
|
6488-81-001
|
ROBERTSON
|
BRYAN
|
$2,801,463
|
SH0006
|
RMC - A00217203
|
05/07/2026
|
03/28/2026
|
MILL AND INLAY
|
LONE STAR PAVING COMPANY
($2,266,508)
|
|
|
0177-14-038
|
MONTGOMERY
|
HOUSTON
|
$4,713,675
|
SL 494
|
F 2026(598)
|
05/06/2026
|
03/02/2026
|
SURF/ROADWAY RESTOR
|
DURWOOD GREENE CONSTRUCTION CO.
($5,153,278)
|
|
|
0209-01-076
|
MCLENNAN
|
WACO
|
$9,476,549
|
US 77
|
F 2026(605)
|
05/06/2026
|
03/02/2026
|
RESURF ROADWAY
|
BIG CREEK CONSTRUCTION, LTD.
($5,957,588)
|
|
|
0389-02-059
|
CHAMBERS
|
BEAUMONT
|
$4,682,082
|
SH 146
|
CM 2026(567)
|
05/06/2026
|
03/02/2026
|
REGIONAL GOODS MOVEMENT PROGRAM
|
R CONSTRUCTION CIVIL, LLC
($4,355,659)
|
|
|
0747-05-042
|
JOHNSON
|
FORT WORTH
|
$18,645,847
|
FM 157
|
C 747-5-42
|
05/06/2026
|
03/02/2026
|
RECON EXIST ROADWAY
|
ED BELL CONSTRUCTION COMPANY
($17,138,491)
|
|
|
0915-00-313
|
BEXAR
|
SAN ANTONIO
|
$6,145,410
|
VARIOUS
|
F 2026(631)
|
05/06/2026
|
03/02/2026
|
REPAIR ROADWAY
|
CLARK CONSTRUCTION OF TEXAS, INC.
($4,426,974)
|
|
|
1186-02-028
|
BASTROP
|
AUSTIN
|
$3,339,794
|
FM 969
|
STP 2026(607)VRU
|
05/06/2026
|
03/02/2026
|
HAZARD ELIM & SAFETY
|
HUNTER INDUSTRIES, LTD.
($3,189,429)
|
|
|
1410-01-026
|
AUSTIN
|
YOAKUM
|
$2,755,374
|
FM 1456
|
STP 2026(573)HES
|
05/06/2026
|
03/02/2026
|
HAZARD ELIM & SAFETY
|
BIG CREEK CONSTRUCTION, LTD.
($2,587,895)
|
|
|
6500-78-001
|
HENDERSON
|
TYLER
|
$1,826,000
|
US0175
|
MMC - A00220936
|
05/06/2026
|
03/28/2026
|
HOT MIX
|
BIG CREEK CONSTRUCTION, LTD.
($1,561,000)
|
|
|
6498-51-001
|
NACOGDOCHES
|
LUFKIN
|
$850,000
|
FM0343
|
MMC - A00220018
|
04/28/2026
|
02/11/2026
|
HOT MIX/TY C, D/SP C/NACOGDOCHES
|
LONGVIEW ASPHALT, INC.
($880,050)
|
|
|
6499-92-001
|
BROWN
|
BROWNWOOD
|
$276,048
|
US0377
|
MMC - A00220540
|
04/22/2026
|
03/05/2026
|
HOT MIX
|
BIG CREEK CONSTRUCTION, LTD.
($202,600)
|
|
|
6499-98-001
|
RAINS
|
PARIS
|
$637,000
|
US0069
|
MMC - A00220566
|
04/16/2026
|
03/05/2026
|
DENSE GRADED HOT MIX
|
RK HALL, LLC
($609,315)
|
|
|
6500-13-001
|
HUNT
|
PARIS
|
$649,750
|
IH0030
|
MMC - A00220625
|
04/16/2026
|
03/06/2026
|
DENSE GRADED HOT MIX
|
RK HALL, LLC
($617,190)
|
|
|
6500-30-001
|
BEE
|
CORPUS CHRISTI
|
$630,000
|
US0181
|
MMC - A00220727
|
04/14/2026
|
03/28/2026
|
HOT MIX
|
BOBCAT MATERIALS LLC
($607,250)
|
|
|
0094-02-147
|
TARRANT
|
FORT WORTH
|
$5,591,882
|
SH 10
|
F 2026(494)
|
04/08/2026
|
02/02/2026
|
RESURF ROADWAY
|
EUROVIA ATLANTIC COAST LLC
($5,358,724)
|
|
|
0114-10-108
|
WASHINGTON
|
BRYAN
|
$6,122,429
|
US 290
|
F 2025(700)
|
04/08/2026
|
02/02/2026
|
MILL AND INLAY
|
DURWOOD GREENE CONSTRUCTION CO.
($6,537,278)
|
|
|
0197-02-138
|
DALLAS
|
DALLAS
|
$3,844,434
|
US 175
|
F 2026(476)
|
04/08/2026
|
02/02/2026
|
CONSTRUCT RAMPS
|
AUSTIN BRIDGE & ROAD SERVICES, LP
($3,975,784)
|
|
|
0683-05-017
|
HAYS
|
AUSTIN
|
$10,113,847
|
RM 12
|
F 2026(517)
|
04/08/2026
|
02/02/2026
|
PREVENT MAINT
|
DEAN WORD COMPANY, LTD.
($10,020,820)
|
|
|
1016-04-021
|
ROCKWALL
|
DALLAS
|
$3,419,170
|
FM 548
|
F 2026(472)
|
04/08/2026
|
02/02/2026
|
RESURF ROADWAY
|
ICOS MANAGEMENT, LLC
($3,381,745)
|
|
|
1745-01-020
|
WALLER
|
HOUSTON
|
$848,686
|
FM 1887
|
F 2026(394)
|
04/08/2026
|
02/02/2026
|
RESURF ROADWAY
|
KNIFE RIVER CORPORATION - SOUTH
($1,140,623)
|
|
|
6489-29-001
|
ELLIS
|
DALLAS
|
$1,437,046
|
BU0287S
|
RMC - A00217348
|
04/08/2026
|
01/09/2026
|
FLEXIBLE PAVMT STRUCT REPAIR
|
KNIFE RIVER CORPORATION - SOUTH
($1,143,764)
|
|
|
0016-08-049
|
BEXAR
|
SAN ANTONIO
|
$4,814,214
|
SL 368
|
F 2026(535)
|
04/07/2026
|
02/02/2026
|
RESURF ROADWAY
|
CLARK CONSTRUCTION OF TEXAS, INC.
($3,947,711)
|
|
|
0337-02-054
|
WILLIAMSON
|
AUSTIN
|
$2,566,159
|
SH 29
|
F 2026(519)
|
04/07/2026
|
02/02/2026
|
PREVENT MAINT
|
LONE STAR PAVING COMPANY
($2,388,456)
|
|
|
0986-03-015
|
WILLIAMSON
|
AUSTIN
|
$1,713,955
|
FM 619
|
F 2026(520)
|
04/07/2026
|
02/02/2026
|
PREVENT MAINT
|
LONE STAR PAVING COMPANY
($1,567,487)
|
|
|
1062-04-063
|
HARRIS
|
HOUSTON
|
$1,578,950
|
FM 2100
|
F 2026(483)
|
04/07/2026
|
02/02/2026
|
REHAB EXIST ROADWAY
|
FORDE CONSTRUCTION COMPANY, INC.
($1,798,696)
|
|
|
1330-02-052
|
TARRANT
|
FORT WORTH
|
$8,810,552
|
FM 1187
|
F 2026(493)
|
04/07/2026
|
02/02/2026
|
RESURF ROADWAY
|
JAGOE-PUBLIC COMPANY
($5,395,974)
|
|
|
6498-46-001
|
LAMPASAS
|
BROWNWOOD
|
$388,000
|
US0281
|
MMC - A00220013
|
03/24/2026
|
02/10/2026
|
HOT MIX
|
BIG CREEK CONSTRUCTION, LTD.
($193,750)
|
|
|
6494-67-001
|
FAYETTE
|
YOAKUM
|
$579,800
|
US0077
|
MMC - A00218634
|
03/24/2026
|
01/09/2026
|
AGGREGATE
|
BRAUNTEX MATERIALS, INC.
($552,000)
|
|
|
6494-68-001
|
DEWITT
|
YOAKUM
|
$984,000
|
US0183
|
MMC - A00218636
|
03/24/2026
|
01/09/2026
|
HOT MIX
|
BRAUNTEX MATERIALS, INC.
($936,000)
|
|
|
6494-69-001
|
LAVACA
|
YOAKUM
|
$977,500
|
US0077
|
MMC - A00218638
|
03/24/2026
|
01/09/2026
|
HOT MIX
|
BRAUNTEX MATERIALS, INC.
($943,000)
|
|
|
6494-72-001
|
GONZALES
|
YOAKUM
|
$977,500
|
US0183
|
MMC - A00218642
|
03/24/2026
|
01/09/2026
|
HOT MIX
|
BRAUNTEX MATERIALS, INC.
($862,500)
|
|
|
6494-73-001
|
GONZALES
|
YOAKUM
|
$400,000
|
US0183
|
MMC - A00218643
|
03/24/2026
|
01/09/2026
|
HOT-MIX COLD-LAID
|
BRAUNTEX MATERIALS, INC.
($405,000)
|
|
|
0009-02-076
|
DALLAS
|
DALLAS
|
$934,435
|
SH 78
|
F 2026(447)
|
03/05/2026
|
01/09/2026
|
HWY IMPRV
|
PALMER HALL CONSTRUCTION
($1,098,618)
|
|
|
0932-02-059
|
JEFFERSON
|
BEAUMONT
|
$1,293,489
|
FM 365
|
STP 2026(409)HES
|
03/05/2026
|
01/09/2026
|
HAZARD ELIM & SAFETY
|
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
($1,134,406)
|
|
|
3544-04-011
|
BEXAR
|
SAN ANTONIO
|
$3,287,115
|
SH 211
|
F 2026(463)
|
03/05/2026
|
01/09/2026
|
RESURF ROADWAY
|
BOBCAT SERVICES, INC.
($2,498,078)
|
|
|
3545-02-013
|
HAYS
|
AUSTIN
|
$2,510,764
|
FM 110
|
F 2026(423)
|
03/05/2026
|
01/09/2026
|
PREVENT MAINT
|
DEAN WORD COMPANY, LTD.
($1,570,963)
|
|
|
0237-05-047
|
DUVAL
|
LAREDO
|
$21,994,703
|
SH 44
|
F 2026(420)
|
03/04/2026
|
01/09/2026
|
REHAB EXIST ROADWAY
|
HUNTER INDUSTRIES, LTD.
($18,216,991)
|
|
|
0421-02-034
|
MEDINA
|
SAN ANTONIO
|
$1,990,896
|
SH 173
|
F 2026(464)
|
03/04/2026
|
01/09/2026
|
RESURF ROADWAY
|
CLARK CONSTRUCTION OF TEXAS, INC.
($1,524,647)
|
|
|
0542-06-053
|
LIVE OAK
|
CORPUS CHRISTI
|
$5,608,038
|
US 59
|
F 2026(421)
|
03/04/2026
|
01/09/2026
|
SURF/ROADWAY RESTOR
|
HUNTER INDUSTRIES, LTD.
($5,311,274)
|
|
|
0724-02-024
|
BOSQUE
|
WACO
|
$17,109,785
|
FM 219
|
BR 2026(416)
|
03/04/2026
|
01/09/2026
|
REPLACE BRIDGE AND APPROACHES
|
KNIFE RIVER CORPORATION - SOUTH
($14,455,829)
|
|
|
0978-02-084
|
GALVESTON
|
HOUSTON
|
$3,895,210
|
FM 517
|
F 2026(298)
|
03/04/2026
|
01/09/2026
|
SURF/ROADWAY RESTOR
|
ELITE KINGS CONSTRUCTION, LLC
($3,316,075)
|
|
|
1776-02-021
|
HAYS
|
AUSTIN
|
$2,310,564
|
FM 2001
|
F 2026(422)
|
03/04/2026
|
01/09/2026
|
PREVENT MAINT
|
LONE STAR PAVING COMPANY
($1,788,338)
|
|
|
2883-01-004
|
MEDINA
|
SAN ANTONIO
|
$16,198,822
|
FM 2790
|
STP 2026(404)HES
|
03/04/2026
|
01/09/2026
|
REHAB EXIST ROADWAY
|
DEAN WORD COMPANY, LTD.
($11,778,114)
|
|
|
6494-44-001
|
WHARTON
|
YOAKUM
|
$978,250
|
US0059
|
MMC - A00218602
|
02/17/2026
|
12/01/2025
|
HOT MIX
|
QUALITY HOT MIX, INC.
($962,125)
|
|
|
6494-46-001
|
AUSTIN
|
YOAKUM
|
$999,750
|
IH0010
|
MMC - A00218604
|
02/17/2026
|
12/01/2025
|
HOT MIX
|
QUALITY HOT MIX, INC.
($967,500)
|
|
|
6494-49-001
|
MATAGORDA
|
YOAKUM
|
$987,000
|
SH0035
|
MMC - A00218609
|
02/17/2026
|
12/01/2025
|
HOT MIX
|
QUALITY HOT MIX, INC.
($955,500)
|
|
|
6494-50-001
|
MATAGORDA
|
YOAKUM
|
$247,500
|
SH0035
|
MMC - A00218610
|
02/17/2026
|
12/01/2025
|
HOT-MIX COLD-LAID
|
QUALITY HOT MIX, INC.
($235,000)
|
|
|
6494-51-001
|
COLORADO
|
YOAKUM
|
$990,000
|
SH0071
|
MMC - A00218611
|
02/17/2026
|
12/01/2025
|
HOT MIX
|
BRAUNTEX MATERIALS, INC.
($880,000)
|
|
|
6494-52-001
|
COLORADO
|
YOAKUM
|
$450,000
|
SH0071
|
MMC - A00218612
|
02/17/2026
|
12/01/2025
|
HOT-MIX COLD-LAID
|
BRAUNTEX MATERIALS, INC.
($417,500)
|
|
|
0026-06-033
|
COLORADO
|
YOAKUM
|
$5,159,024
|
US 90
|
BR 2026(338)
|
02/05/2026
|
12/01/2025
|
BRIDGE REPL
|
R CONSTRUCTION CIVIL, LLC
($3,715,521)
|
|
|
0048-03-099
|
ELLIS
|
DALLAS
|
$6,141,865
|
US 77
|
F 2024(968)
|
02/05/2026
|
12/01/2025
|
REHAB EXIST ROADWAY
|
PEACHTREE CONSTRUCTION, LTD.
($5,401,081)
|
|
|
0057-05-033
|
FREESTONE
|
BRYAN
|
$1,370,336
|
US 84
|
STP 2026(114)HES
|
02/05/2026
|
12/01/2025
|
INTERS IMPRVS ADDING RIGHT TURN LANE...
|
BIG CREEK CONSTRUCTION, LTD.
($1,716,130)
|
|
|
0338-12-011
|
LIBERTY
|
BEAUMONT
|
$3,429,352
|
SH 105
|
STP 2026(337)MM
|
02/05/2026
|
12/01/2025
|
SURF/ROADWAY RESTOR
|
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
($2,780,143)
|
|
|
0366-02-096
|
GUADALUPE
|
SAN ANTONIO
|
$4,974,110
|
SH 123
|
F 2026(379)
|
02/05/2026
|
12/01/2025
|
RESURF ROADWAY
|
CLARK CONSTRUCTION OF TEXAS, INC.
($4,323,419)
|
|
|
0446-06-018
|
AUSTIN
|
YOAKUM
|
$6,432,146
|
FM 1093
|
BR 2026(339)
|
02/05/2026
|
12/01/2025
|
BRIDGE REPL
|
R CONSTRUCTION CIVIL, LLC
($4,981,962)
|
|
|
0902-39-048
|
PALO PINTO
|
FORT WORTH
|
$689,691
|
SH 16
|
C 902-39-48
|
02/05/2026
|
12/01/2025
|
REHAB EXIST ROADWAY
|
JAGOE-PUBLIC COMPANY
($324,932)
|
|
|
0976-01-047
|
HARRIS
|
HOUSTON
|
$3,786,658
|
FM 865
|
F 2026(301)
|
02/05/2026
|
12/01/2025
|
SURF/ROADWAY RESTOR
|
ENVIRONMENTAL ALLIES, INC.
($4,112,543)
|
|
|
1755-03-010
|
WILLIAMSON
|
AUSTIN
|
$3,092,708
|
FM 3405
|
STP 2026(347)HES
|
02/05/2026
|
12/01/2025
|
HAZARD ELIM & SAFETY
|
AARON CONCRETE CONTRACTORS, LLC
($2,760,448)
|
|
|
6494-87-001
|
BROWN
|
BROWNWOOD
|
$1,499,179
|
US0377
|
RMC - A00218660
|
02/05/2026
|
12/04/2025
|
MILL AND INLAY
|
ALLEN KELLER COMPANY
($1,025,505)
|
|
|
0015-11-075
|
TRAVIS
|
AUSTIN
|
$2,158,947
|
SL 275
|
F 2026(329)
|
02/04/2026
|
12/01/2025
|
PREVENT MAINT
|
ALLEN KELLER COMPANY
($2,185,903)
|
|
|
0017-09-106
|
BEXAR
|
SAN ANTONIO
|
$18,518,603
|
IH 35
|
F 2026(375)
|
02/04/2026
|
12/01/2025
|
RESURF ROADWAY
|
LONE STAR PAVING COMPANY
($15,028,560)
|
|
|
0150-05-051
|
BURNET
|
AUSTIN
|
$3,213,452
|
SH 29
|
F 2026(153)
|
02/04/2026
|
12/01/2025
|
PREVENT MAINT
|
LONE STAR PAVING COMPANY
($2,897,632)
|
|
|
0495-03-068
|
VAN ZANDT
|
TYLER
|
$7,363,416
|
IH 20
|
F 2026(334)
|
02/04/2026
|
12/01/2025
|
REHAB EXIST ROADWAY
|
AUSTIN BRIDGE & ROAD SERVICES, LP
($6,229,536)
|
|
|
2921-01-010
|
ELLIS
|
DALLAS
|
$25,389,268
|
SS 394
|
CM 2026(320)
|
02/04/2026
|
12/01/2025
|
CONSTRUCT NEW ROAD
|
MARIO SINACOLA & SONS EXCAVATING, INC.
($18,932,077)
|
|
|
3047-02-012
|
WALLER
|
HOUSTON
|
$4,422,423
|
FM 529
|
F 2026(169)
|
02/04/2026
|
12/01/2025
|
SURF/ROADWAY RESTOR
|
DURWOOD GREENE CONSTRUCTION CO.
($3,274,774)
|
|
|
6491-80-001
|
HILL
|
WACO
|
$820,761
|
FM0308
|
RMC - A00217949
|
01/14/2026
|
10/01/2025
|
BASE FAILURE PAVMT REPAIR
|
BIG CREEK CONSTRUCTION, LTD.
($734,700)
|
|
|
6492-19-001
|
BELL
|
WACO
|
$671,014
|
US0190
|
RMC - A00218027
|
01/14/2026
|
10/01/2025
|
BASE FAILURE PAVMT REPAIR
|
BIG CREEK CONSTRUCTION, LTD.
($527,000)
|
|
|
6492-20-001
|
CORYELL
|
WACO
|
$736,525
|
US0084
|
RMC - A00218028
|
01/14/2026
|
11/01/2025
|
BASE FAILURE PAVMT REPAIR
|
BIG CREEK CONSTRUCTION, LTD.
($555,360)
|
|
|
6493-72-001
|
BELL
|
WACO
|
$788,902
|
US0190
|
MMC - A00218381
|
01/14/2026
|
11/19/2025
|
HOT MIX
|
BIG CREEK CONSTRUCTION, LTD.
($761,450)
|
|
|
6489-61-001
|
NAVARRO
|
DALLAS
|
$537,800
|
SH0031
|
MMC - A00217504
|
01/14/2026
|
11/01/2025
|
ASPH
|
KNIFE RIVER CORPORATION - SOUTH
($527,900)
|
|
|
0177-03-109
|
LIBERTY
|
BEAUMONT
|
$1,089,707
|
US 59
|
STP 2026(283)MM
|
01/07/2026
|
11/01/2025
|
PREVENT MAINT
|
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
($859,788)
|
|
|
0271-16-169
|
HARRIS
|
HOUSTON
|
$2,406,629
|
IH 610
|
F 2B25(337)
|
01/07/2026
|
11/01/2025
|
SURF/ROADWAY RESTOR
|
ELITE KINGS CONSTRUCTION, LLC
($2,017,346)
|
|
|
0817-01-035
|
DENTON
|
DALLAS
|
$1,495,318
|
FM 428
|
F 2026(227)
|
01/07/2026
|
11/01/2025
|
INSTL TRAF SIGNAL AND LEFT TURN LANE...
|
QUALITY EXCAVATION, LLC
($1,537,357)
|
|
|
0890-05-009
|
ANDERSON
|
TYLER
|
$1,940,375
|
FM 3309
|
F 2026(218)
|
01/07/2026
|
11/01/2025
|
REHAB EXIST ROADWAY
|
BAKER & COMPANY CONSTRUCTION, LLC
($1,861,683)
|
|
|
6491-85-001
|
FALLS
|
WACO
|
$1,743,375
|
SH0014
|
MMC - A00217955
|
01/07/2026
|
10/01/2025
|
HOT MIX
|
BIG CREEK CONSTRUCTION, LTD.
($1,531,500)
|
|
|
6494-27-001
|
KERR
|
SAN ANTONIO
|
$1,849,462
|
FM0394
|
RMC - A00218569
|
01/07/2026
|
12/01/2025
|
BASE REPAIR WITH SEAL COAT AND/OR OV...
|
CLARK CONSTRUCTION OF TEXAS, INC.
($1,989,197)
|
|
|
6494-40-001
|
BEXAR
|
SAN ANTONIO
|
$1,622,507
|
IH0037
|
RMC - A00218598
|
01/07/2026
|
12/01/2025
|
BASE REPAIR WITH SEAL COAT AND/OR OV...
|
CLARK CONSTRUCTION OF TEXAS, INC.
($1,555,323)
|
|
|
6494-43-001
|
FRIO
|
SAN ANTONIO
|
$1,980,954
|
FM0462
|
RMC - A00218601
|
01/07/2026
|
12/01/2025
|
BASE REPAIR WITH SEAL COAT AND/OR OV...
|
CLARK CONSTRUCTION OF TEXAS, INC.
($1,957,502)
|
|
|
0054-06-114
|
BROWN
|
BROWNWOOD
|
$1,977,368
|
US 67
|
F 2026(208)
|
01/06/2026
|
11/01/2025
|
RESURF ROADWAY
|
BIG CREEK CONSTRUCTION, LTD.
($1,931,829)
|
|
|
0178-02-090
|
BRAZORIA
|
HOUSTON
|
$8,963,328
|
SH 35
|
F 2026(236)
|
01/06/2026
|
11/01/2025
|
SURF/ROADWAY RESTOR
|
DURWOOD GREENE CONSTRUCTION CO.
($8,773,976)
|
|
|
0190-03-089
|
WOOD
|
TYLER
|
$4,100,162
|
SH 37
|
C 190-3-89
|
01/06/2026
|
11/01/2025
|
HAZARD ELIM & SAFETY
|
BAKER & COMPANY CONSTRUCTION, LLC
($4,058,410)
|
|
|
0211-06-068
|
FAYETTE
|
YOAKUM
|
$4,163,925
|
US 77
|
C 211-6-68
|
01/06/2026
|
11/01/2025
|
REHAB EXIST ROADWAY
|
HUNTER INDUSTRIES, LTD.
($4,335,114)
|
|
|
0492-04-047
|
SMITH
|
TYLER
|
$2,636,546
|
FM 756
|
F 2026(219)
|
01/06/2026
|
11/01/2025
|
RESURF ROADWAY
|
DREWERY CONSTRUCTION COMPANY, INCORPORATED
($3,056,756)
|
|
|
0542-01-100
|
WEBB
|
LAREDO
|
$20,635,134
|
US 59
|
F 2026(262)
|
01/06/2026
|
11/01/2025
|
RESURF ROADWAY
|
ANDERSON COLUMBIA CO., INC.
($16,415,512)
|
|
|
1259-02-022
|
MONTGOMERY
|
HOUSTON
|
$4,888,552
|
FM 1097
|
F 2026(261)
|
01/06/2026
|
11/01/2025
|
SURF/ROADWAY RESTOR
|
DURWOOD GREENE CONSTRUCTION CO.
($4,872,185)
|
|
|
3516-01-020
|
PARKER
|
FORT WORTH
|
$10,552,189
|
FM 3325
|
F 2026(350)
|
01/06/2026
|
11/01/2025
|
REHAB EXIST ROADWAY
|
NORTHEASTERN PAVERS, LLC
($6,252,903)
|
|
|
6491-83-001
|
MCLENNAN
|
WACO
|
$2,968,650
|
SH0006
|
MMC - A00217953
|
01/06/2026
|
10/01/2025
|
HOT MIX
|
BIG CREEK CONSTRUCTION, LTD.
($2,710,700)
|
|
|
6492-14-001
|
DALLAS
|
DALLAS
|
$2,100,509
|
IH0045
|
RMC - A00218004
|
01/06/2026
|
11/07/2025
|
FLEXIBLE PAVMT STRUCT REPAIR
|
PEACHTREE CONSTRUCTION, LTD.
($2,016,811)
|
|
|
6493-71-001
|
BOSQUE
|
WACO
|
$1,585,950
|
SH0022
|
MMC - A00218380
|
01/06/2026
|
11/19/2025
|
HOT MIX
|
BIG CREEK CONSTRUCTION, LTD.
($1,416,100)
|
|
|
6495-27-001
|
JEFFERSON
|
BEAUMONT
|
$806,500
|
US0069
|
MMC - A00218715
|
12/17/2025
|
11/14/2025
|
HOT MIX
|
AMERICAN MATERIALS, INC.
($856,500)
|
|
|
0322-01-052
|
BASTROP
|
AUSTIN
|
$2,706,232
|
SH 95
|
F 2026(151)
|
12/03/2025
|
10/01/2025
|
RESURF ROADWAY
|
LONE STAR PAVING COMPANY
($2,047,396)
|
|
|
0508-01-400
|
HARRIS
|
HOUSTON
|
$2,558,143
|
IH 10
|
C 508-1-400
|
12/03/2025
|
10/01/2025
|
SURF/ROADWAY RESTOR
|
ENVIRONMENTAL ALLIES, INC.
($2,868,252)
|
|
|
1014-04-018
|
COLLIN
|
DALLAS
|
$6,545,696
|
FM 1777
|
F 2026(257)
|
12/03/2025
|
10/01/2025
|
REHAB EXIST ROADWAY
|
D. L. LENNON INCORPORATED - CONTRACTOR
($5,803,762)
|
|
|
0135-02-075
|
COLLIN
|
DALLAS
|
$2,616,883
|
US 380
|
C 135-2-75
|
12/02/2025
|
10/01/2025
|
PREVENT MAINT
|
AUSTIN BRIDGE & ROAD SERVICES, LP
($1,800,680)
|
|
|
0574-02-023
|
NAVARRO
|
DALLAS
|
$7,745,075
|
FM 636
|
C 574-2-23
|
12/02/2025
|
10/01/2025
|
REHAB EXSISITNG ROADWAY
|
BIG CREEK CONSTRUCTION, LTD.
($6,087,367)
|
|
|
0833-13-014
|
BURLESON
|
BRYAN
|
$2,394,608
|
FM 2039
|
BR 2026(258)
|
12/02/2025
|
10/01/2025
|
BRIDGE REPL
|
LARRY YOUNG PAVING, INC.
($2,315,333)
|
|
|
0912-70-098
|
HARRIS
|
HOUSTON
|
$1,794,658
|
PR 138
|
C 912-70-98
|
12/02/2025
|
10/01/2025
|
SURF/ROADWAY RESTOR
|
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
($1,740,088)
|
|
|
1122-04-017
|
WILSON
|
SAN ANTONIO
|
$11,652,395
|
FM 1344
|
C 1122-4-17
|
12/02/2025
|
10/01/2025
|
REHAB EXIST ROADWAY
|
HUNTER INDUSTRIES, LTD.
($9,689,291)
|
|
|
2150-04-099
|
WEBB
|
LAREDO
|
$4,320,912
|
FM 1472
|
STP 2026(175)HRR
|
12/02/2025
|
10/01/2025
|
INTERS IMPRVS WITH RIGHT AND/OR LEFT...
|
ANDERSON COLUMBIA CO., INC.
($3,866,338)
|
|
|
6489-89-001
|
JOHNSON
|
FORT WORTH
|
$942,250
|
IH0035W
|
MMC - A00217544
|
11/19/2025
|
09/11/2025
|
HOT MIX
|
NORTHEASTERN PAVERS, LLC
($910,250)
|
|
|
0028-04-083
|
LIBERTY
|
BEAUMONT
|
$6,408,891
|
US 90
|
STP 2026(107)MM
|
11/06/2025
|
09/01/2025
|
SURF/ROADWAY RESTOR
|
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
($4,088,177)
|
|
|
0108-01-030
|
VAN ZANDT
|
TYLER
|
$14,999,624
|
SH 19
|
F 2026(119)
|
11/06/2025
|
09/01/2025
|
HWY IMPRV
|
BIG CREEK CONSTRUCTION, LTD.
($11,187,838)
|
|
|
0117-05-063
|
MADISON
|
BRYAN
|
$2,371,533
|
SH 21
|
STP 2026(122)HES
|
11/06/2025
|
09/01/2025
|
EXTENDING/ADDING A TWLTL
|
BIG CREEK CONSTRUCTION, LTD.
($2,014,433)
|
|
|
0805-04-038
|
HAYS
|
AUSTIN
|
$3,180,793
|
RM 3237
|
STP 2B25(191)HRR
|
11/06/2025
|
09/01/2025
|
HAZARD ELIM & SAFETY
|
DEAN WORD COMPANY, LTD.
($1,989,311)
|
|
|
1978-01-058
|
TARRANT
|
FORT WORTH
|
$11,406,087
|
FM 1938
|
STP 2026(171)MM
|
11/06/2025
|
09/01/2025
|
INSTL RAISED MEDIAN
|
RAGLE CONSTRUCTION, INC.
($9,907,252)
|
|
|
0273-04-045
|
WILLIAMSON
|
AUSTIN
|
$19,572,840
|
US 183
|
F 2026(117)
|
11/05/2025
|
09/01/2025
|
HWY IMPRV
|
JOE BLAND CONSTRUCTION LLC
($14,639,581)
|
|
|
0315-06-047
|
WASHINGTON
|
BRYAN
|
$3,399,652
|
SH 105
|
BR 2026(048)
|
11/05/2025
|
09/01/2025
|
BRIDGE REPL
|
LARRY YOUNG PAVING, INC.
($2,813,308)
|
|
|
0334-01-048
|
WILLIAMSON
|
AUSTIN
|
$5,142,434
|
FM 112
|
C 334-1-48
|
11/05/2025
|
09/01/2025
|
WIDEN ROAD - ADD SHOULDERS
|
POSILLICO CIVIL, INC.
($4,482,347)
|
|
|
0495-01-082
|
KAUFMAN
|
DALLAS
|
$12,242,999
|
SS 557
|
F 2026(074)
|
11/05/2025
|
09/01/2025
|
RESURF ROADWAY
|
O. TREVINO CONSTRUCTION, LLC
($8,281,477)
|
|
|
6491-57-001
|
ANDERSON
|
TYLER
|
$1,573,500
|
US0079
|
MMC - A00217882
|
11/05/2025
|
09/25/2025
|
HOT MIX
|
BIG CREEK CONSTRUCTION, LTD.
($1,572,500)
|
|
|
0272-06-031
|
LAMPASAS
|
BROWNWOOD
|
$71,860,981
|
US 183
|
F 2025(996)
|
10/09/2025
|
08/01/2025
|
WIDEN ROAD - ADD LANES AND SHOULDERS
|
BIG CREEK CONSTRUCTION, LTD.
($54,760,409)
|
|
|
0382-03-038
|
LIMESTONE
|
WACO
|
$18,679,272
|
SH 7
|
C 382-3-38
|
10/09/2025
|
08/01/2025
|
REHAB EXIST ROADWAY
|
BIG CREEK CONSTRUCTION, LTD.
($13,941,159)
|
|
|
0508-03-111
|
CHAMBERS
|
BEAUMONT
|
$964,484
|
IH 10
|
STP 2B25(164)MM
|
10/09/2025
|
08/01/2025
|
SURF/ROADWAY RESTOR
|
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
($822,842)
|
|
|
0902-90-213
|
TARRANT
|
FORT WORTH
|
$527,107
|
JOHN MCCAIN RD
|
STP 2022(380)HES
|
10/09/2025
|
08/01/2025
|
HWY IMPRV
|
GREY SKY CONSTRUCTION LLC
($538,838)
|
|
|
1179-02-037
|
PARKER
|
FORT WORTH
|
$8,229,059
|
FM 920
|
C 1179-2-37
|
10/09/2025
|
08/01/2025
|
RESURF ROADWAY
|
JAGOE-PUBLIC COMPANY
($5,006,549)
|
|
|
2017-01-010
|
FAYETTE
|
YOAKUM
|
$6,837,358
|
FM 2145
|
BR 2026(013)
|
10/09/2025
|
08/01/2025
|
REHAB EXIST ROADWAY
|
DEAN WORD COMPANY, LTD.
($5,752,555)
|
|
|
6482-90-001
|
HAYS
|
AUSTIN
|
$2,107,100
|
SH0021
|
MMC - A00214891
|
10/09/2025
|
09/02/2025
|
HOT-MIX COLD-LAID
|
LONE STAR PAVING COMPANY
($2,040,450)
|
|
|
0007-06-281
|
EASTLAND
|
BROWNWOOD
|
$8,646,115
|
IH 20
|
C 7-6-281
|
10/08/2025
|
08/01/2025
|
SURF/ROADWAY RESTOR
|
RAGLE CONSTRUCTION, INC.
($7,760,919)
|
|
|
0048-03-100
|
ELLIS
|
DALLAS
|
$5,520,734
|
SH 342
|
F 2026(071)
|
10/08/2025
|
08/01/2025
|
MILL AND INLAY
|
AUSTIN BRIDGE & ROAD SERVICES, LP
($5,190,650)
|
|
|
0048-06-037
|
HILL
|
WACO
|
$4,084,369
|
SS 579
|
C 48-6-37
|
10/08/2025
|
08/01/2025
|
SURF/ROADWAY RESTOR
|
KNIFE RIVER CORPORATION - SOUTH
($3,553,261)
|
|
|
0172-05-128
|
ELLIS
|
DALLAS
|
$18,123,363
|
US 287
|
C 172-5-128
|
10/08/2025
|
08/01/2025
|
REHAB EXIST ROADWAY
|
FOUTSCO PAVING COMPANY, LLC
($17,308,925)
|
|
|
0192-02-064
|
BRAZORIA
|
HOUSTON
|
$2,289,654
|
SH 6
|
STP 2B25(163)MM
|
10/08/2025
|
08/01/2025
|
SURF/ROADWAY RESTOR
|
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
($1,826,598)
|
|
|
1073-01-021
|
BASTROP
|
AUSTIN
|
$8,424,891
|
FM 696
|
C 1073-1-21
|
10/08/2025
|
08/01/2025
|
PREVENT MAINT
|
DEAN WORD COMPANY, LTD.
($6,445,912)
|
|
|
1181-04-049
|
JOHNSON
|
FORT WORTH
|
$5,966,546
|
FM 917
|
C 1181-4-49
|
10/08/2025
|
08/01/2025
|
RESURF ROADWAY
|
NORTHEASTERN PAVERS, LLC
($4,574,923)
|
|
|
3510-05-050
|
HARRIS
|
HOUSTON
|
$8,730,472
|
SH 99
|
CC 3510-5-50
|
10/08/2025
|
08/01/2025
|
CONSTRUCT FRONTAGE ROADS
|
SER CONSTRUCTION PARTNERS, LLC
($6,547,219)
|
|
|
6486-98-001
|
DEWITT
|
YOAKUM
|
$540,000
|
US0183
|
MMC - A00216496
|
09/22/2025
|
07/01/2025
|
HOT-MIX COLD-LAID
|
BRAUNTEX MATERIALS, INC.
($504,000)
|
|
|
0073-10-053
|
ATASCOSA
|
SAN ANTONIO
|
$24,964,139
|
IH 37
|
STP 2B25(149)TP
|
09/05/2025
|
07/01/2025
|
SURF/ROADWAY RESTOR
|
LONE STAR PAVING COMPANY
($17,520,874)
|
|
|
0289-04-034
|
SAN SABA
|
BROWNWOOD
|
$13,990,091
|
SH 16
|
C 289-4-34
|
09/05/2025
|
07/01/2025
|
REHAB EXIST ROADWAY
|
ALLEN KELLER COMPANY
($11,074,629)
|
|
|
0747-01-018
|
ELLIS
|
DALLAS
|
$11,197,531
|
FM 667
|
C 747-1-18
|
09/05/2025
|
07/01/2025
|
REHAB EXIST ROADWAY
|
KNIFE RIVER CORPORATION - SOUTH
($9,501,431)
|
|
|
1500-01-028
|
FRIO
|
SAN ANTONIO
|
$3,688,493
|
FM 1582
|
C 1500-1-28
|
09/05/2025
|
07/01/2025
|
RESURF ROADWAY
|
HUNTER INDUSTRIES, LTD.
($2,460,101)
|
|
|
1534-01-021
|
BLANCO
|
AUSTIN
|
$742,494
|
RM 1623
|
F 2B25(131)
|
09/05/2025
|
07/01/2025
|
SEAL COAT
|
HUNTER INDUSTRIES, LTD.
($507,633)
|
|
|
0171-05-096
|
TARRANT
|
FORT WORTH
|
$9,912,447
|
SH 199
|
C 171-5-96
|
09/04/2025
|
07/01/2025
|
RESURF ROADWAY
|
FOUTSCO PAVING COMPANY, LLC
($8,888,716)
|
|
|
0188-04-052
|
BRAZORIA
|
HOUSTON
|
$5,767,746
|
SH 36
|
F 2B25(020)
|
09/04/2025
|
07/01/2025
|
RESURF ROADWAY
|
DURWOOD GREENE CONSTRUCTION CO.
($4,988,997)
|
|
|
0581-01-171
|
DALLAS
|
DALLAS
|
$6,747,051
|
SL 12
|
C 581-1-171
|
09/04/2025
|
07/01/2025
|
RECON EXIST ROADWAY
|
FOUTSCO PAVING COMPANY, LLC
($6,104,473)
|
|
|
0717-01-025
|
PARKER
|
FORT WORTH
|
$1,373,017
|
FM 113
|
C 717-1-25
|
09/04/2025
|
07/01/2025
|
RECON EXIST ROADWAY
|
JAY MILLS CONTRACTING, INCORPORATED
($1,351,259)
|
|
|
0805-03-022
|
CALDWELL
|
AUSTIN
|
$2,839,355
|
FM 713
|
F 2B25(130)
|
09/04/2025
|
07/01/2025
|
SEAL COAT
|
LONE STAR PAVING COMPANY
($2,233,729)
|
|
|
1494-03-004
|
KAUFMAN
|
DALLAS
|
$1,309,319
|
FM 3486
|
C 1494-3-4
|
09/04/2025
|
07/01/2025
|
REHAB EXIST ROADWAY
|
FOUTSCO PAVING COMPANY, LLC
($1,036,225)
|
|
|
3623-01-004
|
CORYELL
|
WACO
|
$12,372,592
|
SH 9
|
C 3623-1-4
|
09/04/2025
|
07/01/2025
|
CONSTRUCT RAMPS
|
BIG CREEK CONSTRUCTION, LTD.
($7,187,653)
|
|
|
6482-89-001
|
BLANCO
|
AUSTIN
|
$2,657,600
|
US0281
|
MMC - A00214887
|
09/04/2025
|
07/30/2025
|
HOT-MIX COLD-LAID
|
BRAUNTEX MATERIALS, INC.
($2,556,200)
|
|
|
0151-01-052
|
BURNET
|
AUSTIN
|
$12,526,241
|
SH 29
|
STP 2025(951)HES
|
08/08/2025
|
06/02/2025
|
RECON EXIST ROADWAY
|
ALLEN KELLER COMPANY
($10,701,288)
|
|
|
0522-01-026
|
KAUFMAN
|
DALLAS
|
$3,638,914
|
SH 243
|
STP 2025(970)HES
|
08/08/2025
|
06/02/2025
|
HWY IMPRV
|
A. L. HELMCAMP, INC.
($3,537,961)
|
|
|
2264-01-012
|
ELLIS
|
DALLAS
|
$7,053,217
|
FM 2377
|
STP 2025(972)HES
|
08/08/2025
|
06/02/2025
|
REHAB EXIST ROADWAY
|
KNIFE RIVER CORPORATION - SOUTH
($6,535,505)
|
|
|
6476-96-001
|
HARRIS
|
HOUSTON
|
$2,154,550
|
IH0010
|
RMC - A00212912
|
08/08/2025
|
06/02/2025
|
ASPH PAVMT REPAIR
|
MC2 CIVIL, LLC
($1,994,500)
|
|
|
6480-12-001
|
PALO PINTO
|
FORT WORTH
|
$6,752,621
|
IH0020
|
RMC - A00214046
|
08/08/2025
|
05/22/2025
|
FLEXIBLE PAVMT STRUCT REPAIR
|
NORTHEASTERN PAVERS, LLC
($6,554,076)
|
|
|
6482-34-001
|
WILLIAMSON
|
AUSTIN
|
$22,291,642
|
SH0130
|
RMC - A00214716
|
08/08/2025
|
06/17/2025
|
ACP OVERLAY
|
ALLEN KELLER COMPANY
($13,801,280)
|
|
|
0172-08-106
|
ELLIS
|
DALLAS
|
$1,051,195
|
US 287
|
STP 2025(973)HES
|
08/07/2025
|
06/02/2025
|
INTERS IMPRV
|
BIG CREEK CONSTRUCTION, LTD.
($1,120,429)
|
|
|
0384-01-024
|
CALDWELL
|
AUSTIN
|
$2,154,843
|
SH 142
|
F 2025(950)
|
08/07/2025
|
06/02/2025
|
RESURF ROADWAY
|
HUNTER INDUSTRIES, LTD.
($1,719,623)
|
|
|
0408-02-048
|
AUSTIN
|
YOAKUM
|
$13,648,001
|
SH 159
|
C 408-2-48
|
08/07/2025
|
06/02/2025
|
SURF/ROADWAY RESTOR
|
BIG CREEK CONSTRUCTION, LTD.
($12,637,640)
|
|
|
0443-02-023
|
KAUFMAN
|
DALLAS
|
$4,926,222
|
SH 198
|
STP 2025(969)HES
|
08/07/2025
|
06/02/2025
|
HWY IMPRV
|
A. L. HELMCAMP, INC.
($5,180,452)
|
|
|
6482-35-001
|
TRAVIS
|
AUSTIN
|
$17,510,932
|
SH0130
|
RMC - A00214718
|
08/07/2025
|
06/25/2025
|
ACP OVERLAY
|
LONE STAR PAVING COMPANY
($12,111,218)
|
|
|
6487-58-001
|
BROWN
|
BROWNWOOD
|
$233,600
|
US0377
|
MMC - A00216735
|
07/24/2025
|
06/18/2025
|
HOT-MIX COLD-LAID
|
VALUE DRILLING COMPANY INC
($240,000)
|
|
|
6486-09-001
|
ROBERTSON
|
BRYAN
|
$435,000
|
SH0006
|
MMC - A00216197
|
07/09/2025
|
05/22/2025
|
HOT MIX
|
BIG CREEK CONSTRUCTION, LTD.
($411,000)
|
|
|
2134-01-031
|
ROBERTSON
|
BRYAN
|
$25,133,872
|
FM 2293
|
F 2025(891)
|
07/02/2025
|
05/01/2025
|
REHAB EXIST ROADWAY
|
KNIFE RIVER CORPORATION - SOUTH
($18,180,795)
|
|
|
3586-02-007
|
WEBB
|
LAREDO
|
$30,716,267
|
SH 255
|
F 2025(886)
|
07/02/2025
|
05/01/2025
|
REHAB EXIST ROADWAY
|
CK NEWBERRY, LLC
($26,042,350)
|
|
|
6466-11-001
|
HARRIS
|
HOUSTON
|
$3,266,122
|
IH0610
|
RMC - A00208608
|
07/02/2025
|
04/23/2025
|
ASPH PAVMT REPAIR
|
FORDE CONSTRUCTION COMPANY, INC.
($2,239,840)
|
|
|
6479-76-001
|
MCLENNAN
|
WACO
|
$2,280,115
|
US0084
|
MMC - A00213921
|
07/02/2025
|
05/01/2025
|
HOT MIX
|
BIG CREEK CONSTRUCTION, LTD.
($2,004,625)
|
|
|
6482-39-001
|
TARRANT
|
FORT WORTH
|
$4,368,584
|
IH0030
|
RMC - A00214734
|
07/02/2025
|
05/22/2025
|
FLEXIBLE PAVMT STRUCT REPAIR
|
AUSTIN BRIDGE & ROAD SERVICES, LP
($3,130,822)
|
|
|
6484-72-001
|
ERATH
|
FORT WORTH
|
$2,161,934
|
US0377
|
MMC - A00215557
|
07/02/2025
|
04/23/2025
|
HOT MIX
|
NORTHEASTERN PAVERS, LLC
($2,037,000)
|
|
|
6484-76-001
|
PARKER
|
FORT WORTH
|
$723,300
|
IH0020
|
MMC - A00215570
|
07/02/2025
|
05/30/2025
|
HOT MIX
|
KIEWIT INFRASTRUCTURE SOUTH CO.
($598,000)
|
|
|
0017-01-025
|
BEXAR
|
SAN ANTONIO
|
$5,388,451
|
SL 353
|
C 17-1-25
|
07/01/2025
|
05/01/2025
|
RESURF ROADWAY
|
CLARK CONSTRUCTION OF TEXAS, INC.
($3,232,999)
|
|
|
0267-02-043
|
FAYETTE
|
YOAKUM
|
$4,057,944
|
SH 159
|
BR 2025(849)
|
07/01/2025
|
05/01/2025
|
BRIDGE REPL
|
ACME BRIDGE COMPANY, INC.
($4,282,480)
|
|
|
0521-01-057
|
BEXAR
|
SAN ANTONIO
|
$7,796,634
|
SL 13
|
C 521-1-57
|
07/01/2025
|
05/01/2025
|
RESURF ROADWAY
|
CLARK CONSTRUCTION OF TEXAS, INC.
($5,240,622)
|
|
|
6479-75-001
|
HILL
|
WACO
|
$2,071,682
|
SH0031
|
MMC - A00213920
|
07/01/2025
|
05/01/2025
|
HOT MIX
|
BIG CREEK CONSTRUCTION, LTD.
($1,959,150)
|
|
|
6480-05-001
|
TARRANT
|
FORT WORTH
|
$4,940,462
|
IH0820
|
RMC - A00214015
|
07/01/2025
|
05/01/2025
|
FLEXIBLE PAVMT STRUCT REPAIR
|
FOUTSCO PAVING COMPANY, LLC
($4,210,079)
|
|
|
6480-94-001
|
KAUFMAN
|
DALLAS
|
$3,717,674
|
FM0148
|
RMC - A00214310
|
07/01/2025
|
05/01/2025
|
FLEXIBLE PAVMT STRUCT REPAIR
|
FOUTSCO PAVING COMPANY, LLC
($2,959,052)
|
|
|
6484-97-001
|
GRIMES
|
BRYAN
|
$783,650
|
FM0244
|
RMC - A00215732
|
06/12/2025
|
04/29/2025
|
SPOT BASE REPAIR
|
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
($362,890)
|
|
|
6483-77-001
|
FREESTONE
|
BRYAN
|
$505,000
|
IH0045
|
MMC - A00215286
|
06/11/2025
|
04/04/2025
|
HOT MIX
|
BIG CREEK CONSTRUCTION, LTD.
($442,000)
|
|
|
6484-98-001
|
WASHINGTON
|
BRYAN
|
$490,650
|
FM1948
|
RMC - A00215733
|
06/11/2025
|
04/29/2025
|
SPOT BASE REPAIR
|
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
($230,840)
|
|
|
6481-64-001
|
FORT BEND
|
HOUSTON
|
$550,821
|
US0059
|
RMC - A00214483
|
06/10/2025
|
03/01/2025
|
ASPH PAVMT REPAIR
|
FORDE CONSTRUCTION COMPANY, INC.
($534,900)
|
|
|
6483-00-001
|
BRAZOS
|
BRYAN
|
$866,860
|
SH0006
|
RMC - A00214913
|
06/10/2025
|
03/17/2025
|
MILL AND INLAY
|
KNIFE RIVER CORPORATION - SOUTH
($814,128)
|
|
|
6483-78-001
|
LEON
|
BRYAN
|
$606,000
|
IH0045
|
MMC - A00215287
|
06/10/2025
|
04/04/2025
|
HOT MIX
|
BIG CREEK CONSTRUCTION, LTD.
($539,000)
|
|
|
6484-02-001
|
FREESTONE
|
BRYAN
|
$783,650
|
FM0416
|
RMC - A00215344
|
06/10/2025
|
04/09/2025
|
SPOT BASE REPAIR
|
KNIFE RIVER CORPORATION - SOUTH
($403,575)
|
|
|
0274-01-040
|
MILLS
|
BROWNWOOD
|
$5,573,792
|
US 183
|
STP 2025(667)HES
|
06/05/2025
|
04/01/2025
|
HAZARD ELIM & SAFETY
|
BIG CREEK CONSTRUCTION, LTD.
($4,457,730)
|
|
|
0586-01-069
|
BRAZORIA
|
HOUSTON
|
$2,384,508
|
SH 332
|
F 2025(672)
|
06/05/2025
|
04/01/2025
|
SURF/ROADWAY RESTOR
|
DURWOOD GREENE CONSTRUCTION CO.
($2,104,777)
|