Bid Cobra

MEDINA FM 2790 (2883-01-004)

Items: 150

County: MEDINA
Length: 5.7280 MILES
Highway: FM 2790
District: SAN ANTONIO
Control Number: 2883-01-004
DBE Goal: 0.0%
Project: STP 2026(404)HES
Guaranty: $100,000.00
Time: 224 WORKING DAYS
Engineer's Estimate: $16,198,822.06
Date: 03/04/2026 (3 months ago)
Contract Number: 3263007
Type: REHABILITATE EXISTING ROADWAY
Project ID: A00197420
Contract Type: Federal
Project Description: REHABILITATE AND WIDEN NARROW ROADWAY TO ADD SHOULDERS
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
FRANCES MERECKA
ENRIQUE MANUEL GONZALEZ
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (9)
E
Engineer's Estimate
$16,198,822.06
$11,778,114.45
Over/Under Est: -27.29% -$4,420,707.61
$11,904,133.95
Over/Under Est: -26.51% -$4,294,688.11
Amt Left: 1.07% $126,019.50
Over/Under Est: -25.92% -$4,199,207.46
Amt Left: 1.88% $221,500.15
Delta: -0.80% -$95,480.65
$13,272,108.58
Over/Under Est: -18.07% -$2,926,713.48
Amt Left: 12.68% $1,493,994.13
Delta: -10.60% -$1,272,493.98
Over/Under Est: -17.52% -$2,838,410.37
Amt Left: 13.43% $1,582,297.24
Delta: -0.67% -$88,303.11
Over/Under Est: -13.66% -$2,212,341.26
Amt Left: 18.75% $2,208,366.35
Delta: -4.69% -$626,069.11
$14,280,197.50
Over/Under Est: -11.84% -$1,918,624.56
Amt Left: 21.24% $2,502,083.05
Delta: -2.10% -$293,716.70
$14,542,659.03
Over/Under Est: -10.22% -$1,656,163.03
Amt Left: 23.47% $2,764,544.58
Delta: -1.84% -$262,461.53
Over/Under Est: 6.17% $998,856.39
Amt Left: 46.01% $5,419,564.00
Delta: -18.26% -$2,655,019.42

Bid Items & Bid Tabulations

150 Total 0 of 150
MEDINA  |  FM 2790  |  SAN ANTONIO  |  2883-01-004  |  03/04/2026  |  $16,198,822.06  |  STP 2026(404)HES  |  REHAB EXIST ROADWAY  |  224 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DEAN WORD COMPANY, LTD.
HUNTER INDUSTRIES, LTD.
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
D & D CONTRACTORS, INC.
TEXAS MATERIALS GROUP, INC.
E-Z BEL CONSTRUCTION, LLC
3LW CIVIL LLC
J3 COMPANY, LLC
ANDERSON COLUMBIA CO., INC.
PREPARING ROW
STA 308.000 $4,500.000 $800.000 $388.080 $202.150 $139.150 $140.000 $2,400.000 $1,124.340 $1,770.000 $500.000
REMOV CONC (RIPRAP)
SY 152.000 $18.000 $56.050 $13.080 $27.080 $14.690 $35.000 $21.000 $13.440 $30.000 $35.000
REMOV CONC (DRIVEWAYS)
SY 2,266.000 $19.000 $25.600 $16.350 $22.100 $14.690 $30.000 $18.000 $10.880 $29.000 $28.000
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 571.000 $20.000 $30.700 $13.080 $13.920 $14.690 $29.000 $21.000 $3.930 $25.000 $35.000
REMOV CONC (CURB)
LF 293.000 $6.000 $12.300 $9.810 $3.830 $14.690 $13.000 $12.500 $3.530 $10.000 $35.000
RMV (2"-6") TRT/UNTRT BASE & ASPH PAV
SY 7,882.000 $7.000 $4.350 $2.770 $3.210 $9.560 $7.600 $7.250 $3.170 $6.000 $8.000
RMV (7"-11") TRT/UNTRT BASE & ASPH PAV
SY 59,324.000 $10.000 $2.700 $5.390 $7.170 $7.140 $8.600 $6.250 $6.920 $6.000 $10.000
EXCAV (ROADWAY)
CY 2,172.000 $17.000 $22.550 $16.350 $16.510 $27.760 $23.000 $24.000 $17.120 $45.000 $20.000
SUBGR WIDEN (OC)
STA 59.000 $450.000 $1,612.100 $725.940 $791.670 $1,147.700 $1,540.000 $1,150.000 $608.760 $1,400.000 $8,000.000
EMBANK (FNL)(OC)(TY C)
CY 3,625.000 $22.000 $25.000 $16.350 $14.230 $16.520 $13.000 $22.000 $13.720 $60.000 $22.000
BROADCAST SEED (PERM_RURAL_CLAY)
SY 209,280.000 $0.750 $0.250 $0.200 $0.190 $0.260 $0.210 $0.200 $0.220 $0.250 $0.240
BROADCAST SEED (TEMP_WARM_COOL)
SY 209,280.000 $0.250 $0.250 $0.320 $0.160 $0.260 $0.210 $0.200 $0.160 $0.250 $0.240
VEGETATIVE WATERING
TGL 3,431.000 $25.000 $1.500 $20.720 $21.930 $15.730 $30.000 $59.000 $75.730 $30.000 $60.000
FL BS (RDWY DEL)(TY A GR 1-2)(FNAL POS)
CY 16,268.000 $65.000 $61.250 $61.910 $50.930 $90.930 $62.750 $75.750 $46.730 $60.000 $82.000
LIME (COM OR QK)(SLURRY) OR QK(DRY)
TON 1,853.000 $308.490 $355.350 $326.350 $349.390 $413.410 $330.000 $365.000 $375.600 $325.000 $500.000
LIME TRT (SUBGRADE) (8")
SY 93,122.000 $2.000 $4.250 $2.860 $2.730 $2.880 $5.220 $3.250 $21.240 $5.000 $6.000
EMULSION (HIGH YIELD)
TON 684.000 $775.000 $1,346.500 $1,309.680 $1,500.070 $1,597.870 $1,295.000 $1,575.000 $32.340 $1,260.000 $800.000
EMUL TRT (NEW BASE) (6")
SY 89,283.000 $4.300 $4.500 $3.300 $3.770 $4.380 $4.220 $6.350 $1.440 $4.000 $6.000
CEMENT
TON 283.000 $242.600 $215.000 $197.950 $225.870 $231.140 $183.000 $255.000 $215.500 $210.000 $450.000
PRIME COAT(MC-30 OR AE-P)
GAL 1,647.000 $3.930 $5.500 $4.510 $6.060 $4.500 $4.350 $3.500 $5.400 $5.000 $10.000
ASPH (RC-250)
GAL 17,860.000 $6.000 $4.550 $4.520 $5.890 $5.200 $4.400 $3.500 $6.240 $5.000 $6.000
AGGR (TY-B, GR-5)(SAC-B)
CY 653.000 $93.960 $117.400 $81.580 $140.170 $225.000 $137.500 $175.000 $270.000 $180.000 $240.000
D-GR HMA TY-B PG64-22
TON 6,719.000 $105.000 $86.050 $82.960 $77.910 $83.000 $80.500 $97.000 $92.160 $85.000 $114.000
SP MIXES SP-C SAC-B PG76-22
TON 13,308.000 $92.000 $95.400 $91.520 $89.580 $94.500 $95.000 $66.500 $102.130 $102.000 $126.000
PLANE ASPH CONC PAV(4" TO 6")
SY 18,458.000 $7.000 $2.200 $2.360 $4.130 $4.100 $3.500 $3.750 $3.270 $4.000 $7.000
PLANE ASPH CONC PAV(2")
SY 2,121.000 $5.000 $5.650 $1.830 $7.650 $3.600 $1.600 $2.000 $2.270 $4.000 $7.000
CUT AND RESTORE PAV (FLEX BASE)
SY 26.000 $209.740 $167.850 $85.000 $130.360 $32.000 $75.000 $40.000 $120.340 $300.000 $38.000
FLOWABLE BACKFILL
CY 15.000 $220.000 $416.250 $376.900 $242.070 $206.670 $157.000 $255.000 $320.060 $300.000 $170.000
TEMPORARY SPL SHORING
SF 288.000 $3.000 $5.200 $63.780 $86.630 $40.340 $66.000 $21.000 $36.010 $40.000 $28.000
CL C CONC (COLLAR)
EA 12.000 $1,256.500 $813.900 $695.820 $1,767.230 $1,331.250 $4,000.000 $1,050.000 $963.230 $2,000.000 $1,100.000
RIPRAP (CONC)(5 IN)
CY 9.000 $609.220 $566.100 $638.660 $1,064.490 $673.440 $600.000 $550.000 $591.140 $650.000 $1,000.000
RIPRAP (CONC)(6 IN)
CY 35.000 $13.130 $565.900 $685.110 $682.760 $722.410 $600.000 $550.000 $516.650 $700.000 $1,100.000
RIPRAP (CONC)(CL A)
CY 6.000 $527.570 $1,075.350 $632.850 $1,068.800 $667.310 $750.000 $1,200.000 $768.260 $800.000 $2,200.000
RIPRAP (MOW STRIP)(4 IN)
CY 152.000 $650.580 $616.350 $679.300 $686.810 $716.280 $560.000 $725.000 $290.410 $650.000 $1,000.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 14.000 $280.000 $529.550 $400.000 $493.260 $257.130 $230.000 $269.000 $230.610 $450.000 $200.000
CMP (GAL STL 24 IN)
LF 27.000 $233.080 $139.850 $98.570 $93.310 $79.590 $97.000 $164.000 $61.570 $250.000 $82.000
CMP AR (GAL STL DES 2)
LF 119.000 $233.000 $62.350 $69.580 $66.800 $73.460 $80.300 $129.000 $70.700 $180.000 $60.000
CMP AR (GAL STL DES 3)
LF 39.000 $112.910 $132.100 $86.980 $134.610 $91.840 $101.000 $391.000 $76.480 $210.000 $90.000
CONC BOX CULV (7 FT X 4 FT)
LF 74.000 $834.140 $1,248.400 $985.740 $958.370 $1,040.760 $1,154.000 $1,175.000 $763.780 $1,200.000 $920.000
RC PIPE (CL III)(12 IN)
LF 1,380.000 $85.000 $67.200 $60.300 $74.880 $63.670 $72.750 $59.000 $52.420 $90.000 $72.000
RC PIPE (CL III)(18 IN)
LF 237.000 $95.000 $73.050 $75.380 $131.010 $79.590 $75.100 $64.000 $68.620 $115.000 $86.000
RC PIPE (CL III)(24 IN)
LF 647.000 $102.740 $90.250 $98.570 $102.560 $104.080 $98.250 $110.000 $68.750 $120.000 $96.000
WINGWALL (FW - 0) (HW=5 FT)
EA 4.000 $18,394.440 $27,966.800 $8,593.360 $17,902.880 $9,073.000 $9,963.000 $19,500.000 $13,549.790 $20,000.000 $12,000.000
WINGWALL (FW - S) (HW=6 FT)
EA 1.000 $20,725.000 $34,433.800 $10,321.310 $17,466.620 $10,897.400 $12,460.000 $38,000.000 $21,687.980 $21,000.000 $11,000.000
WINGWALL (PW - 2) (HW=4 FT)
EA 2.000 $15,000.000 $25,195.100 $16,815.610 $14,190.770 $17,754.180 $11,562.000 $34,000.000 $13,480.180 $25,000.000 $17,000.000
SET (TY II) (12 IN) (RCP) (6: 1) (P)
EA 86.000 $800.000 $1,434.350 $746.850 $1,118.500 $788.530 $1,259.000 $1,200.000 $1,534.560 $1,200.000 $800.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 20.000 $2,200.000 $1,472.850 $1,449.620 $1,263.710 $1,530.540 $1,554.000 $1,350.000 $1,830.120 $1,400.000 $1,400.000
SET (TY II) (24 IN) (CMP) (3: 1) (C)
EA 4.000 $2,399.780 $1,244.300 $2,087.460 $1,214.960 $2,203.970 $2,101.000 $1,150.000 $1,599.610 $1,400.000 $1,700.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 40.000 $2,137.580 $2,806.150 $2,087.460 $1,647.460 $2,203.970 $2,060.000 $1,850.000 $1,940.870 $2,000.000 $2,400.000
SET (TY II) (30 IN) (CMP) (3: 1) (C)
EA 2.000 $2,500.000 $688.800 $2,783.270 $2,011.180 $2,938.630 $1,913.000 $1,350.000 $3,848.360 $1,900.000 $2,200.000
SET (TY II) (30 IN) (CMP) (4: 1) (C)
EA 1.000 $2,500.000 $741.600 $3,247.150 $2,299.930 $3,428.390 $2,018.000 $1,800.000 $3,045.180 $2,000.000 $1,900.000
SET (TY II) (DES 2) (CMP) (4: 1) (C)
EA 4.000 $2,500.000 $1,280.700 $1,391.640 $1,526.500 $1,469.320 $1,290.000 $1,150.000 $2,120.560 $1,800.000 $1,700.000
SET (TY II) (DES 3) (CMP) (3: 1) (C)
EA 4.000 $2,500.000 $1,298.700 $1,507.610 $1,399.340 $1,591.760 $1,377.000 $1,250.000 $1,698.310 $2,000.000 $1,900.000
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 2.000 $862.430 $1,539.100 $3,000.000 $2,028.030 $1,887.450 $1,000.000 $450.000 $636.260 $1,200.000 $500.000
CLEAN EXIST CULVERTS
EA 37.000 $3,913.550 $1,214.100 $1,043.730 $2,205.900 $2,209.730 $2,500.000 $1,635.000 $1,566.630 $1,900.000 $3,200.000
REMOV STR (SET)
EA 108.000 $400.000 $518.900 $52.190 $487.080 $618.990 $902.000 $450.000 $458.020 $600.000 $100.000
REMOV STR (WINGWALL)
EA 19.000 $2,224.250 $1,603.750 $1,043.730 $2,306.670 $1,563.770 $839.000 $1,150.000 $1,549.360 $1,900.000 $650.000
REMOV STR (HEADWALL)
EA 15.000 $2,824.800 $1,603.900 $1,043.730 $1,753.240 $1,980.770 $902.000 $1,050.000 $1,160.570 $2,100.000 $650.000
REMOV STR (PIPE)
LF 1,770.000 $18.750 $23.200 $9.280 $13.180 $20.550 $9.000 $8.500 $26.380 $35.000 $10.000
REMOV STR (SMALL)
EA 1.000 $2,346.090 $1,554.800 $2,899.240 $2,398.340 $557.090 $1,060.000 $1,695.000 $3,409.720 $2,500.000 $1,400.000
MOBILIZATION
LS 1.000 $1,530,829.460 $650,000.000 $834,428.270 $585,713.780 $827,261.800 $985,654.000 $1,330,000.000 $1,568,942.280 $1,300,000.000 $1,520,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 14.000 $11,047.000 $5,601.000 $10,840.500 $4,243.230 $4,369.970 $8,650.000 $4,250.000 $3,715.680 $30,000.000 $10,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 146.000 $53.760 $116.450 $77.310 $57.510 $56.570 $85.000 $225.000 $71.500 $220.000 $60.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $6,914.000 $24,787.350 $5,154.010 $21,031.300 $1,697.050 $11,500.000 $8,300.000 $7,800.000 $8,500.000 $24,000.000
TMA (STATIONARY)
DAY 74.000 $208.020 $416.750 $128.850 $356.900 $303.740 $100.000 $275.000 $212.750 $400.000 $330.000
TMA (MOBILE OPERATION)
DAY 34.000 $139.420 $796.450 $309.240 $548.100 $1,133.820 $400.000 $475.000 $385.630 $950.000 $775.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 651.000 $82.000 $88.000 $50.570 $47.540 $97.950 $80.000 $67.000 $96.000 $85.000 $90.000
ROCK FILTER DAMS (REMOVE)
LF 651.000 $13.500 $6.600 $17.540 $8.160 $7.350 $6.000 $45.250 $7.200 $7.000 $7.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 1,089.000 $28.000 $17.600 $31.220 $21.340 $19.590 $16.000 $37.000 $19.200 $31.000 $17.500
CONSTRUCTION EXITS (REMOVE)
SY 1,089.000 $4.000 $6.600 $8.770 $5.420 $7.350 $6.000 $24.500 $7.200 $9.000 $7.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 6,662.000 $3.970 $3.300 $4.490 $3.760 $3.680 $3.000 $2.750 $3.600 $5.000 $3.250
TEMP SEDMT CONT FENCE (REMOVE)
LF 6,662.000 $0.980 $1.000 $1.700 $0.870 $1.110 $0.900 $1.500 $1.080 $2.000 $1.000
CONSTRUCTING DETOURS
SY 15,089.000 $72.280 $94.900 $85.970 $77.210 $83.000 $79.000 $62.000 $101.540 $100.000 $100.000
ONE-WAY TRAF CONT (PILOT CAR)
HR 240.000 $117.540 $376.900 $99.000 $124.610 $94.290 $148.000 $367.000 $30.580 $100.000 $230.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 12.000 $4,158.090 $10,021.550 $12,473.360 $12,499.780 $14,290.080 $15,300.000 $16,500.000 $15,361.000 $14,000.000 $26,000.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 6,460.000 $36.220 $10.750 $35.000 $58.690 $61.850 $63.000 $24.000 $66.620 $40.000 $90.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 680.000 $58.230 $14.800 $50.000 $69.450 $61.440 $63.000 $35.000 $106.320 $70.000 $100.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 37,260.000 $12.010 $3.150 $11.000 $6.240 $9.850 $9.000 $7.000 $5.920 $5.000 $9.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 3,240.000 $70.510 $3.550 $19.000 $6.260 $8.450 $9.000 $15.000 $14.480 $8.000 $11.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 6,460.000 $12.910 $7.700 $13.000 $11.260 $18.050 $15.000 $15.000 $23.030 $12.000 $15.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 680.000 $21.100 $32.150 $18.000 $11.040 $37.920 $15.000 $33.250 $20.460 $12.000 $15.000
CONC CURB (TY II)
LF 322.000 $13.000 $49.500 $52.250 $33.270 $55.100 $34.000 $31.250 $24.970 $25.000 $100.000
INTERSECTIONS (ACP)
SY 5,686.000 $115.420 $25.900 $39.060 $39.620 $30.000 $50.750 $49.750 $36.000 $44.000 $50.000
DRIVEWAYS (CONC)
SY 2,026.000 $135.000 $103.250 $104.510 $101.620 $110.200 $114.000 $204.000 $67.490 $80.000 $280.000
DRIVEWAYS (ACP)
SY 7,314.000 $45.000 $23.950 $39.060 $55.770 $14.000 $59.250 $37.500 $36.880 $44.000 $60.000
TURNOUTS (ACP)
SY 1,292.000 $53.730 $18.400 $39.060 $73.060 $22.000 $64.250 $35.250 $30.650 $50.000 $50.000
CONC SIDEWALKS (4")
SY 35.000 $70.000 $94.300 $63.870 $183.450 $67.350 $85.000 $89.000 $68.230 $90.000 $200.000
CONC SIDEWALKS (6")
SY 397.000 $115.000 $109.650 $75.480 $113.640 $79.590 $90.000 $131.000 $63.380 $95.000 $220.000
CURB RAMPS (TY 5)
EA 15.000 $3,100.000 $2,853.650 $2,902.990 $1,428.150 $3,061.070 $3,800.000 $1,900.000 $2,419.260 $2,500.000 $4,900.000
CURB RAMPS (TY 7)
EA 6.000 $3,015.000 $2,917.750 $1,683.730 $2,002.720 $1,775.420 $2,500.000 $1,891.000 $2,142.140 $2,500.000 $4,900.000
CURB RAMPS (TY 21)
SY 9.000 $230.000 $3,120.600 $522.540 $2,180.940 $550.990 $4,000.000 $241.000 $1,677.060 $2,500.000 $660.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,026.000 $24.660 $26.300 $23.000 $23.680 $24.490 $29.000 $22.500 $26.860 $30.000 $25.000
SHORT RADIUS (28")
LF 50.000 $60.000 $41.350 $32.000 $35.680 $55.100 $40.000 $32.250 $38.640 $50.000 $35.000
DRIVEWAY TERMINAL ANCHOR SECTION
EA 2.000 $1,520.140 $1,518.150 $1,300.000 $1,369.660 $795.880 $1,500.000 $1,260.000 $1,512.000 $1,500.000 $1,375.000
MTL W-BEAM GD FEN (SPECIAL)
LF 25.000 $66.290 $35.000 $35.000 $33.530 $61.220 $75.000 $28.500 $34.060 $50.000 $30.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 263.000 $80.780 $103.500 $79.000 $132.460 $91.840 $110.000 $126.000 $150.970 $105.000 $140.000
MTL BM GD FEN TRANS (31"-28")(25')
EA 2.000 $650.000 $680.650 $800.000 $982.210 $979.540 $1,000.000 $891.000 $1,069.200 $1,000.000 $1,000.000
REMOVE METAL BEAM GUARD FENCE
LF 175.000 $5.000 $2.750 $2.500 $2.900 $1.830 $3.000 $2.250 $2.700 $4.000 $2.500
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $220.000 $275.050 $250.000 $233.330 $183.660 $500.000 $200.000 $240.000 $673.000 $300.000
GUARDRAIL END TREATMENT (INSTALL)
EA 18.000 $3,002.250 $3,625.650 $3,050.000 $3,628.470 $3,367.170 $3,300.000 $3,431.000 $4,117.200 $3,135.210 $3,800.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 18.000 $300.000 $271.850 $150.000 $219.330 $244.880 $150.000 $275.000 $240.000 $210.000 $165.000
MAILBOX INSTALL-D (WC-POST) TY 3
EA 1.000 $216.970 $326.900 $200.000 $245.580 $275.500 $200.000 $289.000 $270.000 $268.000 $220.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 10.000 $216.970 $766.900 $600.000 $586.830 $673.440 $600.000 $854.000 $66.000 $1,031.000 $655.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 80.000 $720.000 $671.050 $610.000 $613.080 $704.040 $610.000 $768.000 $690.000 $760.000 $665.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 3.000 $795.000 $693.050 $630.000 $744.330 $857.100 $630.000 $853.000 $840.000 $880.000 $700.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 3.000 $1,000.000 $759.050 $690.000 $849.330 $979.540 $690.000 $960.000 $960.000 $1,066.000 $750.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 6.000 $950.000 $814.050 $470.000 $691.830 $61.220 $740.000 $940.000 $780.000 $944.000 $800.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 6.000 $1,015.000 $880.100 $800.000 $796.830 $918.320 $800.000 $1,095.000 $900.000 $1,107.000 $875.000
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
EA 6.000 $2,100.000 $990.100 $900.000 $849.330 $979.540 $900.000 $1,230.000 $960.000 $1,259.000 $1,000.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 4.000 $1,175.000 $1,023.100 $930.000 $954.330 $1,101.980 $930.000 $1,315.000 $1,080.000 $1,393.000 $1,010.000
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
EA 1.000 $1,185.000 $1,034.100 $940.000 $1,059.330 $1,224.420 $940.000 $1,250.000 $1,200.000 $1,350.000 $1,030.000
REMOVE SM RD SN SUP&AM
EA 111.000 $121.000 $110.000 $100.000 $97.660 $104.080 $100.000 $200.000 $102.000 $117.000 $110.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 49.000 $40.000 $13.200 $12.000 $35.770 $30.620 $12.000 $75.000 $30.000 $35.000 $13.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 49.000 $85.000 $66.000 $60.000 $104.020 $110.200 $60.000 $102.000 $108.000 $76.000 $60.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 11.000 $22.000 $11.000 $10.000 $13.730 $6.120 $10.000 $125.000 $6.000 $21.000 $11.000
INSTL DEL ASSM (D-SR)SZ 2(WC)GNDLL
EA 118.000 $95.000 $71.500 $65.000 $124.990 $134.680 $65.000 $105.000 $132.000 $69.000 $75.000
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 110,183.000 $0.780 $0.750 $0.520 $0.940 $1.080 $0.450 $0.700 $0.540 $0.600 $0.350
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 411.000 $6.830 $8.800 $3.480 $8.630 $9.800 $3.000 $8.000 $3.600 $4.000 $13.000
WK ZN PAV MRK REMOV (W)(RR XING)
EA 1.000 $435.710 $660.050 $174.170 $1,059.330 $1,224.420 $150.000 $600.000 $180.000 $158.000 $660.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 50,000.000 $0.830 $0.750 $0.520 $0.930 $1.080 $0.450 $0.700 $0.540 $0.600 $0.350
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 6,460.000 $0.910 $1.600 $1.600 $1.250 $1.300 $1.500 $1.000 $1.800 $2.110 $2.400
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 12,920.000 $1.970 $1.500 $1.600 $1.250 $1.320 $1.500 $1.000 $1.800 $2.110 $2.400
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,452.000 $0.970 $1.000 $0.990 $0.980 $1.110 $0.850 $0.900 $1.020 $1.000 $2.400
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 30.000 $3.600 $4.150 $4.060 $6.520 $3.970 $3.500 $3.750 $4.200 $4.000 $5.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 605.000 $7.000 $8.250 $7.260 $6.980 $7.960 $6.250 $7.500 $7.500 $6.580 $17.500
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 15.000 $145.000 $143.000 $168.360 $202.410 $214.280 $145.000 $130.000 $174.000 $153.000 $165.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 14.000 $165.000 $176.000 $179.970 $223.330 $244.880 $155.000 $160.000 $186.000 $165.000 $300.000
REFL PAV MRK TY I (W)(RR XING)(100MIL)
EA 1.000 $420.000 $632.550 $348.330 $586.830 $673.440 $300.000 $575.000 $360.000 $316.000 $820.000
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 58.000 $3.660 $4.150 $4.640 $5.020 $3.970 $4.000 $3.750 $4.800 $5.000 $2.000
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
LF 59,160.000 $0.630 $0.900 $0.820 $0.850 $0.980 $0.710 $0.800 $0.850 $0.750 $1.000
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
LF 42,093.000 $0.690 $0.900 $0.820 $0.850 $0.980 $0.710 $0.800 $0.850 $0.750 $1.000
RE PROFILE PM TY I(Y)6"(BRK)(100MIL)
LF 3,730.000 $0.710 $1.100 $0.930 $0.870 $0.980 $0.800 $1.000 $0.960 $1.000 $1.000
PAVEMENT SLER 6"
LF 105,514.000 $0.200 $0.250 $0.220 $0.220 $0.250 $0.190 $0.250 $0.230 $0.200 $0.400
PAVEMENT SLER 8"
LF 2,477.000 $0.360 $0.400 $0.350 $0.300 $0.310 $0.300 $0.350 $0.360 $0.400 $0.500
PAVEMENT SLER 12"
LF 88.000 $0.800 $1.400 $0.870 $2.110 $1.230 $0.750 $1.250 $0.900 $0.800 $0.700
PAVEMENT SLER 24"
LF 605.000 $1.500 $2.750 $1.160 $2.250 $2.450 $1.000 $2.500 $1.200 $1.500 $1.200
PAVEMENT SLER (ARROW)
EA 15.000 $50.000 $82.500 $11.610 $84.970 $91.840 $10.000 $75.000 $12.000 $11.000 $25.000
PAVEMENT SLER (WORD)
EA 14.000 $45.000 $110.000 $11.610 $85.420 $91.840 $10.000 $100.000 $12.000 $11.000 $38.000
PAVEMENT SLER (RR XING)
EA 1.000 $170.000 $275.050 $87.080 $250.810 $183.660 $75.000 $250.000 $90.000 $79.000 $38.000
REFL PAV MRKR TY I-C
EA 128.000 $6.000 $4.400 $4.530 $4.400 $4.280 $3.900 $4.000 $4.680 $5.000 $8.000
REFL PAV MRKR TY II-A-A
EA 1,620.000 $3.500 $4.400 $4.180 $3.790 $4.280 $3.600 $4.000 $4.320 $4.000 $8.000
ELIM EXT PM & MRKS (6")
LF 49,330.000 $0.190 $0.400 $0.700 $0.540 $0.620 $0.600 $0.350 $0.720 $0.650 $0.750
ELIM EXT PM & MRKS (24")
LF 156.000 $2.000 $2.750 $2.320 $5.850 $6.120 $2.000 $2.500 $2.400 $3.000 $4.500
FULL - WIDTH MOWING
CYC 4.000 $470.140 $5,653.800 $4,000.000 $4,428.120 $660.410 $5,500.000 $6,750.000 $4,597.680 $6,400.000 $4,800.000
LITTER REMOVAL
CYC 14.000 $4.000 $868.950 $2,000.000 $2,292.130 $2,694.250 $1,500.000 $1,200.000 $2,089.190 $2,400.000 $1,800.000
DEBRIS REMOV-CNTR MED/MN LNS/RAMPS
MI 23.000 $100.000 $174.100 $1,000.000 $948.450 $1,040.220 $600.000 $1,600.000 $584.640 $2,400.000 $1,300.000
CLEAN / SWEEP - CENTER MEDIAN - AREA(1)
CYC 14.000 $3,300.000 $696.200 $5,000.000 $2,414.310 $2,557.730 $1,500.000 $1,600.000 $1,920.480 $2,000.000 $4,350.000
BONDING COURSE
GAL 4,471.000 $305.000 $3.700 $2.790 $7.310 $4.900 $5.000 $3.500 $4.800 $12.000 $5.000
INSTALL BRIDGE IDENTIFICATION NUMBERS
EA 1.000 $478.040 $347.550 $2,500.000 $1,244.640 $170.260 $500.000 $350.000 $101.100 $1,000.000 $1,650.000
RESIDENTIAL DRIVEWAY TEMP SIGNAL SYSTEM
MO 12.000 $4,158.090 $4,987.300 $16,073.820 $16,103.100 $18,134.260 $32,000.000 $20,228.000 $19,849.320 $16,000.000 $23,000.000
Totals: $16,198,822.060 $11,778,114.450 $11,904,133.950 $11,999,614.600 $13,272,108.580 $13,360,411.690 $13,986,480.800 $14,280,197.500 $14,542,659.030 $17,197,678.450
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
RAILROAD FLAGGING: RAILROAD FORCE ACCOUNT WORK (PART) $10,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $18,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $45,000.00
Total: $74,000.00