ELLIS US 67 (0261-01-053)

Items: 68

County: ELLIS
Length: 5.4430 MILES
Highway: US 67
District: DALLAS
Control Number: 0261-01-053
DBE Goal: 0.0%
Project: F 2026(653)
Guaranty: $95,000.00
Time: 133 WORKING DAYS
Engineer's Estimate: $5,220,420.28
Date: 06/02/2026 (8 days ago)
Contract Number: 6263015
Type: REHABILITATE EXISTING ROADWAY
Project ID: A00209489
Contract Type: Federal
Project Description: FLEXIBLE PAVEMENT REPAIR, MILL, OVERLAY AND SLOPE REPAIR
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
JUAN PAREDES
NOLAN DELHIERRO
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$5,220,420.28
Over/Under Est: 2.01% $104,876.12
Over/Under Est: 5.84% $304,687.37
Amt Left: 3.75% $199,811.25
Over/Under Est: 7.84% $409,039.39
Amt Left: 5.71% $304,163.27
Delta: -1.89% -$104,352.02
Over/Under Est: 9.56% $499,013.63
Amt Left: 7.4% $394,137.51
Delta: -1.60% -$89,974.24
Over/Under Est: 16.34% $852,776.16
Amt Left: 14.04% $747,900.04
Delta: -6.19% -$353,762.53
Over/Under Est: 33.7% $1,759,370.67
Amt Left: 31.07% $1,654,494.55
Delta: -14.93% -$906,594.51

Bid Items & Bid Tabulations

68 Total 0 of 68
ELLIS  |  US 67  |  DALLAS  |  0261-01-053  |  06/02/2026  |  $5,220,420.28  |  F 2026(653)  |  REHAB EXIST ROADWAY  |  133 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FOUTSCO PAVING COMPANY, LLC
NORTHEASTERN PAVERS, LLC
TEXAS MATERIALS GROUP, INC.
AUSTIN BRIDGE & ROAD SERVICES, LP
PEACHTREE CONSTRUCTION, LTD.
ED BELL CONSTRUCTION COMPANY
EXCAV (ROADWAY)
CY 11,133.000 $19.000 $18.000 $15.000 $13.000 $15.000 $9.800 $28.000
EMBANK (FNL)(DC)(TY C2)
CY 14,388.000 $35.000 $30.000 $20.000 $18.000 $20.000 $29.500 $56.000
BACKFILL (TY A)
STA 375.280 $175.000 $150.000 $600.000 $220.000 $161.780 $425.000 $725.000
BLOCK SODDING
SY 4,160.000 $9.500 $5.000 $7.000 $5.200 $5.550 $5.750 $7.000
HYDRO MULCH SEED (TEMP_WARM_COOL)
SY 4,160.000 $0.750 $0.600 $1.500 $0.600 $1.100 $1.100 $0.500
VEGETATIVE WATERING
TGL 1,237.680 $6.000 $20.000 $50.000 $0.010 $50.000 $40.000 $2.100
SP MIXES SP-C SAC-B PG70-22
TON 15,278.000 $122.000 $111.000 $132.000 $139.500 $143.800 $143.000 $150.000
TACK COAT
GAL 15,278.000 $2.000 $1.000 $0.010 $3.000 $4.600 $1.000 $0.010
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 2,246.000 $110.000 $110.000 $105.000 $135.000 $135.000 $138.500 $115.000
PLANE & TEXT ASPH CONC PAV(0" TO 2")
SY 138,883.000 $2.000 $0.750 $2.500 $3.000 $2.000 $3.250 $2.750
FLOWABLE BACKFILL
CY 26.000 $400.000 $350.000 $300.000 $260.000 $189.780 $424.000 $665.000
TEMPORARY SPL SHORING
SF 10,534.000 $38.590 $37.000 $55.000 $49.350 $50.000 $40.600 $40.000
CL A CONC (FLUME)
CY 31.600 $1,000.000 $880.000 $700.000 $620.000 $620.000 $848.000 $700.000
CL B CONC (FLUME)
CY 3.380 $1,000.000 $1,405.000 $700.000 $620.000 $620.000 $1,590.000 $1,725.000
CL C CONC (RAIL FOUNDATION)
CY 114.000 $800.000 $600.000 $775.000 $680.000 $680.000 $795.000 $700.000
RETAINING WALL (MSE)
SF 3,532.000 $91.000 $85.000 $85.000 $76.000 $110.000 $114.300 $115.000
RIPRAP (MOW STRIP)(4 IN)
CY 142.750 $500.000 $650.000 $750.000 $645.000 $645.000 $795.000 $705.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 15.000 $130.000 $250.000 $275.000 $250.000 $250.000 $318.000 $425.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 14.000 $180.000 $250.000 $275.000 $250.000 $250.000 $318.000 $450.000
RAIL (TY T551)
LF 640.000 $57.000 $220.000 $100.000 $90.000 $90.000 $148.400 $80.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 13.000 $900.000 $2,500.000 $2,500.000 $2,100.000 $2,100.000 $1,100.000 $1,700.000
REMOV STR (PIPE)
EA 2.000 $600.000 $500.000 $600.000 $500.000 $500.000 $1,600.000 $2,000.000
MOBILIZATION
LS 1.000 $513,408.640 $550,000.000 $510,000.000 $540,000.000 $634,000.000 $590,000.000 $628,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $10,000.000 $69,000.000 $5,000.000 $35,000.000 $17,500.000 $22,000.000 $52,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $20,000.000 $10,000.000 $20,000.000 $15,000.000 $2,500.000 $12,500.000 $12,000.000
TMA (STATIONARY)
DAY 92.000 $200.000 $1.000 $300.000 $0.010 $1.000 $175.000 $300.000
TMA (MOBILE OPERATION)
HR 352.000 $300.000 $1.000 $0.010 $0.010 $1.000 $39.800 $87.500
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 115.000 $50.000 $72.000 $135.000 $72.000 $115.500 $122.000 $74.550
ROCK FILTER DAMS (REMOVE)
LF 115.000 $9.000 $12.000 $60.000 $12.000 $50.000 $52.000 $42.600
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 112.000 $30.000 $40.000 $60.000 $40.000 $51.800 $53.000 $37.280
CONSTRUCTION EXITS (REMOVE)
SY 112.000 $10.000 $10.000 $26.000 $10.000 $22.000 $23.000 $18.640
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,460.000 $2.500 $4.250 $3.750 $4.250 $3.150 $3.250 $4.260
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,460.000 $1.000 $1.000 $1.600 $1.000 $1.350 $1.450 $2.130
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 420.000 $5.000 $6.000 $8.000 $6.000 $6.500 $7.000 $5.860
BIODEG EROSN CONT LOGS (REMOVE)
LF 420.000 $1.000 $1.000 $3.000 $1.000 $2.250 $2.350 $2.930
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 530.000 $13.500 $40.000 $40.000 $33.000 $15.340 $33.920 $15.750
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 483.000 $2.000 $15.000 $10.000 $7.500 $17.080 $9.650 $2.130
MTL W-BEAM GD FEN (TIM POST)
LF 1,925.000 $24.000 $22.500 $27.000 $25.000 $22.500 $23.750 $25.040
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 1.000 $1,776.000 $1,800.000 $2,200.000 $3,100.000 $1,800.000 $1,930.000 $2,104.440
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 7.000 $250.000 $1,200.000 $1,500.000 $1,200.000 $1,200.000 $1,290.000 $1,618.800
TL-3 31" SHORT RADIUS (COMPLETE)
EA 1.000 $2,400.000 $25,000.000 $30,000.000 $25,000.000 $25,000.000 $26,200.000 $28,424.850
REMOVE METAL BEAM GUARD FENCE
LF 1,550.000 $3.000 $2.750 $3.250 $2.750 $2.750 $2.850 $2.930
REMOVE TERMINAL ANCHOR SECTION
EA 7.000 $125.000 $200.000 $250.000 $200.000 $200.000 $212.000 $292.880
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 $300.000 $2,950.000 $3,500.000 $2,950.000 $2,950.000 $3,165.000 $3,461.250
GUARDRAIL END TREATMENT (REMOVE)
EA 6.000 $250.000 $250.000 $300.000 $250.000 $250.000 $268.000 $292.880
CRASH CUSH ATTEN (STKPL)
EA 1.000 $850.000 $2,500.000 $3,000.000 $2,500.000 $489.990 $2,676.000 $1,756.320
PIPE UNDERDRAINS (TY 8) (6")
LF 640.000 $25.000 $25.000 $55.000 $45.000 $45.000 $26.500 $50.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GF2
EA 16.000 $20.000 $25.000 $30.000 $25.000 $25.000 $25.000 $58.580
INSTL DEL ASSM (D-SY)SZ 1(YFLX)GF2
EA 8.000 $20.000 $25.000 $30.000 $25.000 $25.000 $25.000 $58.580
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 7,610.000 $1.000 $0.300 $0.550 $0.250 $0.550 $2.350 $2.400
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 5,614.000 $0.750 $0.660 $0.550 $0.550 $0.550 $2.350 $2.400
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 236.000 $0.750 $4.800 $6.500 $4.000 $6.500 $7.650 $7.720
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 2,850.000 $1.500 $1.200 $1.000 $0.840 $0.500 $2.500 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 86.000 $1.000 $1.200 $1.000 $0.840 $2.250 $2.500 $1.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 5,614.000 $1.000 $1.010 $0.850 $0.840 $0.850 $0.960 $0.960
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 1,269.000 $2.250 $3.350 $3.600 $2.790 $3.600 $4.450 $4.470
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 236.000 $6.500 $8.270 $6.450 $6.890 $6.450 $6.850 $6.870
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 2.000 $150.000 $203.000 $125.000 $170.000 $125.000 $147.000 $149.100
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
EA 2.000 $230.000 $239.000 $180.000 $200.000 $180.000 $208.000 $207.680
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 1.000 $230.000 $204.000 $150.000 $170.000 $150.000 $158.000 $159.750
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 340.000 $3.750 $3.600 $3.600 $3.000 $3.600 $4.400 $4.470
PAVEMENT SLER 6"
LF 1,110.000 $0.250 $0.300 $0.200 $0.250 $0.200 $0.210 $0.210
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 7,610.000 $1.000 $0.650 $0.600 $0.540 $0.600 $0.580 $0.590
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 36,501.000 $0.750 $0.640 $0.600 $0.530 $0.600 $0.520 $0.530
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 38,994.000 $1.000 $0.640 $0.600 $0.530 $0.600 $0.520 $0.530
REFL PAV MRKR TY II-C-R
EA 737.000 $5.000 $4.800 $4.450 $4.000 $4.450 $4.250 $4.260
ELIM EXT PM & MRKS (4")
LF 1,110.000 $0.750 $1.200 $0.500 $1.000 $0.500 $1.050 $1.070
PAV SURF PREP FOR MRK (6")
LF 1,110.000 $0.400 $0.600 $0.250 $0.500 $0.250 $1.050 $1.070
Totals: $5,220,420.280 $5,325,296.400 $5,525,107.650 $5,629,459.667 $5,719,433.908 $6,073,196.440 $6,979,790.948
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
Total: $25,000.00