HARRIS SL 8 (3256-02-121)

Items: 66

County: HARRIS
Length: 1.8340 MILES
Highway: SL 8
District: HOUSTON
Control Number: 3256-02-121
DBE Goal: 0.0%
Project: F 2026(604)
Guaranty: $46,000.00
Time: 56 WORKING DAYS
Engineer's Estimate: $2,286,187.03
Date: 05/07/2026 (4 weeks ago)
Contract Number: 5263221
Type: RESURFACE ROADWAY
Project ID: A00215811
Contract Type: Federal
Project Description: BASE REPAIR, SEAL COAT, 2-INCH SP D OVERLAY, AND PAVEMENT MARKINGS (FRONTAGE ROADS)
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
PHILLIP GARLIN
NYEMB NYEMB
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$2,286,187.03
$2,254,485.54
Over/Under Est: -1.39% -$31,701.49
Over/Under Est: -0.42% -$9,628.88
Amt Left: 0.98% $22,072.61
$2,758,532.20
Over/Under Est: 20.66% $472,345.17
Amt Left: 22.36% $504,046.66
Delta: -21.17% -$481,974.05
$3,212,944.97
Over/Under Est: 40.54% $926,757.94
Amt Left: 42.51% $958,459.43
Delta: -16.47% -$454,412.77
Over/Under Est: 45.12% $1,031,590.62
Amt Left: 47.16% $1,063,292.11
Delta: -3.26% -$104,832.68

Bid Items & Bid Tabulations

66 Total 0 of 66
HARRIS  |  SL 8  |  HOUSTON  |  3256-02-121  |  05/07/2026  |  $2,286,187.03  |  F 2026(604)  |  RESURF ROADWAY  |  56 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ENVIRONMENTAL ALLIES, INC.
TEXAS MATERIALS GROUP, INC.
HAYDEN PAVING, INC.
ISI CONTRACTING, INC.
DURWOOD GREENE CONSTRUCTION CO.
REMOV CONC (MOWSTRIP)
LF 1,000.000 $22.000 $20.000 $13.000 $25.000 $13.000 $35.000
REMOV CONC (MEDIANS)
CY 10.000 $20.000 $75.000 $176.000 $30.000 $167.000 $250.000
REMOV CONC (CURB)
LF 401.000 $12.000 $4.000 $78.000 $70.000 $74.000 $25.000
BACKFILL (TY A OR B)
STA 160.000 $200.000 $315.000 $175.000 $150.000 $1,800.000 $400.000
ASPH (AC-20-5TR OR AC-20XP)
GAL 24,691.000 $4.000 $4.500 $3.500 $5.500 $4.560 $6.000
AGGR (TY-PB, GR-4)(SAC-B)
CY 528.000 $130.000 $305.000 $225.000 $350.000 $283.840 $275.000
SP MIXES SP-D SAC-A PG76-22
TON 7,544.000 $153.000 $140.000 $153.000 $175.000 $177.580 $195.000
TACK COAT
GAL 7,544.000 $3.500 $3.650 $0.100 $3.000 $4.190 $4.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 2,357.000 $75.000 $72.500 $88.000 $120.000 $108.490 $85.000
PLANE ASPH CONC PAV(0" TO 2")
SY 666.000 $6.000 $12.250 $13.000 $5.500 $32.090 $20.000
PLANE CONC PAV(0" TO 2")
SY 2,549.370 $10.000 $7.850 $20.000 $14.000 $13.950 $35.000
FULL - DEPTH REPAIR CPJR (8")
CY 175.000 $1,200.000 $1,500.000 $1,200.000 $900.000 $1,150.000 $2,500.000
RIPRAP (CONC) (CL B) (6 IN)
CY 10.000 $550.000 $525.000 $865.000 $750.000 $820.000 $1,500.000
RIPRAP (MOW STRIP)(4 IN)
CY 42.000 $833.000 $750.000 $711.000 $800.000 $1,161.000 $1,200.000
CLEANING AND SEALING EXISTING JOINTS
LF 100.000 $45.000 $40.000 $27.500 $30.000 $26.000 $185.000
ADJUSTING MANHOLES
EA 1.000 $2,000.000 $750.000 $369.000 $4,300.000 $601.320 $2,555.000
MOBILIZATION
LS 1.000 $207,835.000 $100,238.090 $47,000.000 $95,000.000 $290,000.000 $250,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $8,000.000 $8,000.000 $1,150.000 $26,000.000 $32,420.680 $12,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 28.000 $160.000 $125.000 $127.000 $250.000 $179.800 $500.000
TMA (STATIONARY)
DAY 62.000 $330.000 $250.000 $445.000 $750.000 $550.000 $450.000
TMA (MOBILE OPERATION)
DAY 4.000 $170.000 $350.000 $360.000 $800.000 $804.320 $450.000
CONC CURB (MONO) (TY II)
LF 401.000 $20.000 $9.000 $211.000 $150.000 $16.320 $90.000
CONC SIDEWALKS (6")
SY 10.000 $100.000 $175.000 $896.000 $115.000 $118.460 $350.000
MTL W-BEAM GD FEN (TIM POST)
LF 587.500 $26.000 $26.000 $27.500 $30.000 $26.000 $32.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $1,200.000 $1,300.000 $1,635.000 $1,500.000 $1,493.000 $1,950.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 37.500 $75.000 $128.000 $111.000 $150.000 $93.000 $125.000
REMOVE METAL BEAM GUARD FENCE
LF 625.000 $3.000 $2.650 $3.750 $2.350 $10.000 $4.000
REMOVE TERMINAL ANCHOR SECTION
EA 5.000 $325.000 $365.000 $363.000 $410.000 $430.000 $250.000
GUARDRAIL END TREATMENT (INSTALL)
EA 5.000 $2,400.000 $3,700.000 $3,425.000 $4,400.000 $3,510.000 $3,950.000
GUARDRAIL END TREATMENT (REMOVE)
EA 5.000 $300.000 $365.000 $290.000 $410.000 $430.000 $300.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 3.000 $25.000 $27.500 $37.000 $30.000 $41.840 $35.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 14.000 $25.000 $27.500 $32.000 $30.000 $41.840 $35.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 4,530.000 $0.370 $0.420 $0.400 $0.450 $0.790 $0.450
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 14,589.000 $0.320 $0.350 $0.350 $0.380 $0.790 $0.400
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 2,634.000 $0.700 $0.550 $0.500 $0.550 $1.940 $0.700
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 1,434.000 $4.170 $2.750 $2.150 $2.350 $9.950 $3.000
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 12.000 $80.000 $75.000 $53.000 $60.000 $193.760 $65.000
WK ZN PAV MRK NON-REMOV (W)(DBL ARW)
EA 8.000 $100.000 $75.000 $53.000 $60.000 $277.540 $75.000
WK ZN PAV MRK NON-REMOV (W)(UTURN ARW)
EA 4.000 $114.350 $75.000 $53.000 $60.000 $235.650 $90.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 14.000 $100.000 $75.000 $53.000 $60.000 $235.650 $80.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 10,150.000 $0.300 $0.350 $0.350 $0.350 $0.790 $0.400
WK ZN PAV MRK REMOV (REFL) TY I-A
EA 52.000 $4.500 $5.250 $5.250 $7.000 $7.850 $7.000
WK ZN PAV MRK REMOV (REFL) TY II-C-R
EA 339.000 $4.000 $5.250 $5.250 $7.000 $7.850 $7.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 3,006.000 $1.300 $1.400 $0.700 $3.500 $2.360 $3.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 208.000 $0.550 $1.400 $0.700 $3.500 $2.040 $3.000
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 38.000 $2.250 $1.250 $1.050 $1.200 $5.240 $5.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,442.000 $1.150 $1.250 $1.050 $1.200 $2.040 $1.500
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 330.000 $3.650 $3.750 $3.700 $4.100 $4.190 $5.000
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
LF 1,040.000 $2.000 $1.100 $1.050 $1.200 $2.040 $1.500
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 463.000 $3.250 $3.750 $3.700 $4.100 $4.190 $5.000
RE PM TY III (W)(6")(SLD)
LF 360.000 $1.500 $5.250 $5.250 $5.800 $1.940 $15.000
RE PM TY III (W)(6")(BRK)
LF 450.000 $1.500 $5.250 $5.250 $5.800 $1.940 $15.000
RE PM TY III (W)(8")(SLD)
LF 192.000 $2.000 $5.250 $5.250 $5.800 $3.090 $22.000
ALL-WTHER PM TY I (W)6"(SLD)(100MIL)
LF 13,989.000 $0.850 $0.900 $0.750 $0.850 $0.990 $0.900
ALL-WTHER PM TY I (W)6"(BRK)(100MIL)
LF 4,130.000 $0.850 $0.900 $0.750 $0.850 $1.410 $0.900
ALL-WTHER PM TY I (W)6"(DOT)(100MIL)
LF 52.000 $5.000 $0.900 $0.750 $0.850 $5.240 $0.900
ALL-WTHER PM TY I (Y)6"(SLD)(100MIL)
LF 9,946.000 $0.820 $0.900 $0.750 $0.850 $0.990 $0.900
PREFAB PM TY C (W)(24")(SLD)
LF 1,434.000 $12.600 $15.500 $16.000 $18.000 $16.500 $20.000
PREFAB PM TY C (W)(ARROW)
EA 6.000 $210.000 $265.000 $264.000 $290.000 $288.020 $300.000
PREFAB PM TY C (W)(DBL ARROW)
EA 4.000 $314.000 $285.000 $264.000 $290.000 $434.640 $400.000
PREFAB PM TY C (W)(UTURN ARROW)
EA 2.000 $322.000 $285.000 $264.000 $290.000 $434.640 $450.000
PREFAB PM TY C (W)(LN REDUCT ARROW)
EA 3.000 $546.000 $450.000 $422.000 $465.000 $675.530 $600.000
PREFAB PM TY C (W)(WORD)
EA 7.000 $275.000 $285.000 $264.000 $290.000 $413.700 $350.000
REFL PAV MRKR TY I-A
EA 43.000 $6.250 $6.350 $6.350 $7.000 $7.590 $7.000
REFL PAV MRKR TY II-C-R
EA 339.000 $5.000 $6.350 $6.350 $7.000 $7.330 $7.000
SPALLING REPAIR (HYDRAULIC CEMENT)
CF 34.000 $400.000 $575.000 $243.000 $265.000 $230.000 $600.000
Totals: $2,286,187.030 $2,254,485.544 $2,276,558.150 $2,758,532.200 $3,212,944.972 $3,317,777.650
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
CONTRACTOR FORCE ACCOUNT WORK (PART) $2,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $12,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $2,000.00
Total: $16,000.00