BEXAR SL 368 (0016-08-049)

Items: 92

County: BEXAR
Length: 0.0000 MILES
Highway: SL 368
District: SAN ANTONIO
Control Number: 0016-08-049
DBE Goal: 0.0%
Project: F 2026(535)
Guaranty: $96,000.00
Time: 203 WORKING DAYS
Engineer's Estimate: $4,814,213.78
Date: 04/07/2026 (2 months ago)
Contract Number: 4263004
Type: RESURFACE ROADWAY
Project ID: A00197417
Contract Type: Federal
Project Description: MILL AND INLAY, BASE REPAIR AND PAVEMENT MARKINGS
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
CHRISTEN LONGORIA
CITLALI TAPIA
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$4,814,213.78
$3,947,711.24
Over/Under Est: -18% -$866,502.54
Over/Under Est: 1.57% $75,736.85
Amt Left: 23.87% $942,239.39
Over/Under Est: 2.98% $143,300.99
Amt Left: 25.58% $1,009,803.53
Delta: -1.38% -$67,564.14
$5,210,369.72
Over/Under Est: 8.23% $396,155.94
Amt Left: 31.98% $1,262,658.48
Delta: -5.10% -$252,854.95
Over/Under Est: 11.14% $536,234.23
Amt Left: 35.53% $1,402,736.77
Delta: -2.69% -$140,078.29
Over/Under Est: 18.22% $876,954.43
Amt Left: 44.16% $1,743,456.97
Delta: -6.37% -$340,720.20

Bid Items & Bid Tabulations

92 Total 0 of 92
BEXAR  |  SL 368  |  SAN ANTONIO  |  0016-08-049  |  04/07/2026  |  $4,814,213.78  |  F 2026(535)  |  RESURF ROADWAY  |  203 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CLARK CONSTRUCTION OF TEXAS, INC.
TEXAS MATERIALS GROUP, INC.
LONE STAR PAVING COMPANY
ALLEN KELLER COMPANY
HUNTER INDUSTRIES, LTD.
DEAN WORD COMPANY, LTD.
FURN & PLACE TOPSOIL (4")
SY 3,403.000 $4.000 $7.500 $5.400 $4.000 $5.340 $4.400 $6.100
BLOCK SODDING
SY 3,403.000 $6.000 $7.500 $6.950 $7.320 $6.870 $6.700 $8.100
VEGETATIVE WATERING
TGL 58.000 $150.000 $75.000 $55.000 $117.060 $139.170 $23.100 $66.700
D-GR HMA TY-D PG76-22 (LEVEL-UP)
TON 1,290.000 $92.000 $69.760 $127.000 $199.000 $113.710 $84.680 $100.000
SP MIXES SP-C SAC-B HPG
TON 13,866.000 $92.000 $117.870 $137.000 $139.000 $124.740 $129.800 $161.700
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 38,047.000 $33.000 $25.550 $27.000 $26.000 $29.640 $32.540 $32.300
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 14,256.000 $39.000 $39.500 $41.150 $40.500 $44.980 $48.650 $47.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(16")
SY 437.000 $165.000 $73.190 $116.000 $130.500 $128.800 $134.920 $145.500
PLANE ASPH CONC PAV(0" TO 0.5" MICRO)
SY 120,572.000 $0.500 $0.200 $0.900 $0.500 $0.940 $0.550 $0.500
PLANE ASPH CONC PAV(2")
SY 120,572.000 $2.000 $1.250 $2.330 $2.000 $1.470 $2.200 $2.000
CLEAN EXIST CULVERTS
EA 4.000 $3,650.000 $2,500.000 $3,100.000 $2,666.160 $2,798.430 $3,200.000 $3,244.800
MOBILIZATION
LS 1.000 $301,293.720 $34,310.680 $146,000.000 $185,000.000 $495,000.000 $396,903.680 $200,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 13.000 $15,000.000 $1,623.000 $6,700.000 $1,645.000 $3,159.940 $4,041.570 $10,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $7,600.000 $100.000 $1,000.000 $7,500.000 $11,489.350 $2,706.250 $14,698.000
TMA (STATIONARY)
DAY 196.000 $180.000 $50.000 $25.000 $250.000 $142.060 $81.190 $248.100
TMA (MOBILE OPERATION)
HR 56.000 $85.000 $25.000 $50.000 $100.000 $73.560 $119.080 $82.900
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 369.000 $64.000 $36.500 $54.000 $51.960 $52.910 $46.350 $60.600
ROCK FILTER DAMS (REMOVE)
LF 369.000 $12.000 $3.000 $7.000 $19.950 $6.910 $10.300 $8.100
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 112.000 $22.000 $0.010 $22.400 $43.880 $22.130 $25.750 $25.300
CONSTRUCTION EXITS (REMOVE)
SY 112.000 $5.000 $0.010 $6.800 $15.130 $6.720 $10.300 $7.600
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,914.000 $3.500 $6.500 $3.500 $6.360 $3.460 $3.140 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,914.000 $1.000 $1.000 $0.250 $1.590 $0.250 $1.030 $0.500
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,499.000 $7.500 $3.250 $7.450 $9.450 $7.360 $4.890 $8.600
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,499.000 $1.000 $0.500 $1.000 $1.590 $0.990 $2.060 $1.000
MTL W-BEAM GD FEN (TIM POST)
LF 412.500 $27.000 $27.500 $25.550 $27.600 $29.790 $26.650 $30.300
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 3.000 $1,200.000 $1,200.000 $1,280.000 $2,037.430 $1,205.340 $1,623.000 $1,842.900
REMOVE METAL BEAM GUARD FENCE
LF 375.000 $2.850 $4.000 $6.000 $2.280 $2.970 $4.000 $4.600
REMOVE TERMINAL ANCHOR SECTION
EA 6.000 $250.000 $300.000 $548.000 $262.680 $217.360 $285.000 $323.800
GUARDRAIL END TREATMENT (INSTALL)
EA 5.000 $3,200.000 $3,500.000 $3,580.000 $3,638.960 $3,507.340 $3,592.000 $4,078.900
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $330.000 $250.000 $405.000 $277.530 $326.040 $315.000 $357.700
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 67.000 $720.000 $720.000 $615.000 $615.000 $657.010 $615.000 $698.200
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 10.000 $805.000 $750.000 $845.000 $845.000 $854.610 $845.000 $959.400
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 5.000 $950.000 $885.000 $950.000 $950.000 $958.340 $950.000 $1,079.100
RELOCATE SM RD SN SUP&AM(SIGN ONLY)
EA 1.000 $600.000 $400.000 $500.000 $200.000 $217.360 $225.000 $851.800
REMOVE SM RD SN SUP&AM
EA 82.000 $113.000 $120.000 $107.000 $107.000 $108.680 $107.000 $121.800
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)
EA 43.000 $95.000 $85.000 $95.000 $95.000 $47.420 $95.000 $108.100
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 18.000 $40.000 $65.000 $24.400 $30.000 $29.640 $30.000 $33.900
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 1.000 $98.000 $65.000 $95.000 $95.000 $58.290 $95.000 $108.100
INSTL OM SM RD SIGN (1-OM-PW)Y
EA 68.000 $50.000 $65.000 $15.000 $15.000 $34.580 $15.000 $17.200
INSTL OM SM RD SIGN (1-OM-PW)R
EA 13.000 $50.000 $65.000 $15.000 $15.000 $34.580 $15.000 $17.200
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 6,746.000 $0.250 $0.350 $0.370 $0.370 $0.360 $0.370 $0.500
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 14,547.000 $0.250 $0.350 $0.220 $0.220 $0.220 $0.220 $0.300
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 3,141.000 $0.600 $0.400 $0.540 $0.540 $0.540 $0.540 $0.600
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 1,102.000 $5.000 $5.000 $3.400 $3.400 $3.360 $3.400 $4.000
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 28.000 $150.000 $100.000 $130.000 $130.000 $128.440 $130.000 $147.500
WK ZN PAV MRK NON-REMOV (W)(UTURN ARW)
EA 1.000 $150.000 $110.000 $215.000 $215.000 $212.420 $215.000 $244.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 16.000 $150.000 $125.000 $130.000 $130.000 $128.440 $130.000 $147.500
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 710.000 $0.300 $0.350 $0.370 $0.370 $0.360 $0.370 $0.500
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 4,996.000 $0.300 $0.350 $0.220 $0.220 $0.220 $0.220 $0.300
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 932.000 $1.500 $0.520 $1.000 $1.000 $3.230 $1.630 $1.500
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 6,696.000 $1.500 $0.520 $1.000 $1.000 $3.270 $1.630 $1.500
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 47.000 $1.200 $2.500 $1.600 $1.600 $1.580 $1.600 $2.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 9,052.000 $0.950 $0.950 $0.900 $0.900 $0.890 $0.900 $1.000
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 112.000 $3.250 $2.500 $3.750 $3.750 $3.700 $3.750 $4.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 4,556.000 $8.000 $5.000 $7.250 $7.250 $7.170 $7.250 $8.100
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 91.000 $150.000 $125.000 $130.000 $130.000 $128.440 $130.000 $147.500
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
EA 2.000 $230.000 $135.000 $200.000 $200.000 $197.600 $200.000 $227.300
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
EA 3.000 $470.000 $225.000 $250.000 $250.000 $247.000 $250.000 $283.900
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 65.000 $190.000 $135.000 $160.000 $160.000 $158.080 $160.000 $181.900
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 18.000 $53.000 $25.000 $57.000 $57.000 $56.320 $57.000 $64.700
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 128.000 $8.000 $5.000 $7.250 $7.250 $7.170 $7.250 $8.100
PAVEMENT SLER 6"
LF 46,573.000 $0.250 $0.200 $0.220 $0.220 $0.220 $0.220 $0.300
PAVEMENT SLER 8"
LF 9,052.000 $0.400 $0.350 $0.500 $0.500 $0.490 $0.500 $0.500
PAVEMENT SLER 12"
LF 112.000 $1.050 $2.000 $1.800 $1.800 $1.780 $1.800 $2.000
PAVEMENT SLER 24"
LF 4,684.000 $2.500 $4.000 $2.600 $2.600 $2.560 $2.600 $3.000
PAVEMENT SLER (ARROW)
EA 91.000 $45.000 $50.000 $83.000 $82.500 $81.510 $82.500 $93.500
PAVEMENT SLER (WORD)
EA 65.000 $45.000 $65.000 $95.000 $95.000 $93.860 $95.000 $108.100
PAVEMENT SLER (UTURN ARROW)
EA 2.000 $55.000 $60.000 $115.000 $115.000 $113.620 $115.000 $130.900
PAVEMENT SLER (LN REDUCT ARROW)
EA 3.000 $145.000 $125.000 $140.000 $140.000 $138.320 $140.000 $159.100
PAVEMENT SLER (YLD TRI)
EA 18.000 $20.000 $15.000 $32.000 $32.000 $31.620 $32.000 $36.400
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 7,969.000 $0.560 $0.850 $0.700 $0.700 $0.690 $0.700 $1.000
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 30,399.000 $0.560 $0.850 $0.650 $0.650 $0.650 $0.650 $0.700
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
LF 1,506.000 $0.560 $0.850 $0.700 $0.700 $0.690 $0.700 $1.000
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 6,652.000 $0.560 $0.850 $0.650 $0.650 $0.650 $0.650 $0.700
REFL PAV MRKR TY I-C
EA 530.000 $3.750 $5.000 $4.000 $4.000 $3.950 $4.000 $4.600
REFL PAV MRKR TY II-A-A
EA 1,502.000 $3.750 $5.000 $4.000 $4.000 $3.950 $4.000 $4.600
REFL PAV MRKR TY II-C-R
EA 625.000 $3.750 $5.000 $4.000 $4.000 $3.950 $4.000 $4.600
ELIM EXT PM & MRKS (6")
LF 53.000 $2.000 $1.000 $1.000 $1.000 $0.990 $1.000 $1.000
PAV SURF PREP FOR MRK (6")
LF 46,573.000 $0.250 $0.010 $0.020 $0.020 $0.020 $0.020 $0.020
PAV SURF PREP FOR MRK (8")
LF 9,052.000 $0.200 $0.020 $0.050 $0.050 $0.050 $0.050 $0.100
PAV SURF PREP FOR MRK (12")
LF 112.000 $0.500 $0.030 $0.250 $0.250 $0.250 $0.250 $0.500
PAV SURF PREP FOR MRK (24")
LF 4,684.000 $1.500 $0.060 $0.500 $0.500 $0.490 $0.500 $0.500
PAV SURF PREP FOR MRK (ARROW)
EA 97.000 $25.000 $1.000 $11.500 $11.500 $11.360 $11.500 $13.100
PAV SURF PREP FOR MRK (UTURN ARR)
EA 2.000 $25.000 $1.000 $16.500 $16.500 $16.310 $16.500 $18.700
PAV SURF PREP FOR MRK (WORD)
EA 65.000 $45.000 $1.000 $13.500 $13.500 $13.330 $13.500 $15.200
PAV SURF PREP FOR MRK (36")(YLD TRI)
EA 18.000 $10.500 $1.000 $5.500 $5.500 $5.430 $5.500 $6.100
PAV SURF PREP FOR MRK (RPM)
EA 2,657.000 $1.250 $1.000 $0.700 $0.700 $0.690 $0.700 $1.000
REMOVAL OF SIGNAL HEAD ASSM
EA 6.000 $150.000 $275.000 $200.000 $1,400.000 $1,383.180 $293.390 $1,589.800
INSTALL OF SIGNAL HEAD ASSM
EA 6.000 $600.000 $350.000 $1,685.000 $1,400.000 $1,383.180 $2,471.770 $1,589.800
LITTER REMOVAL
CYC 20.000 $2,500.000 $100.000 $250.000 $500.000 $873.180 $2,357.430 $875.500
DEBRIS REMOV-CNTR MED/MN LNS/RAMPS
CYC 20.000 $3,700.000 $1.000 $250.000 $500.000 $873.180 $2,357.430 $302.600
UNDERSEAL COURSE
GAL 28,414.000 $4.000 $0.010 $3.700 $3.750 $5.430 $4.620 $4.800
Totals: $4,814,213.780 $3,947,711.240 $4,889,950.625 $4,957,514.770 $5,210,369.715 $5,350,448.005 $5,691,168.210
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $2,500.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $3,300.00
Total: $10,800.00