BRAZORIA SH 6 (0192-02-064)

Items: 81

County: BRAZORIA
Length: 0.0000 MILES
Highway: SH 6
District: HOUSTON
Control Number: 0192-02-064
DBE Goal: 0.0%
Project: STP 2B25(163)MM
Guaranty: $46,000.00
Time: 50 WORKING DAYS
Engineer's Estimate: $2,289,653.50
Date: 10/08/2025 (8 months ago)
Contract Number: 10253020
Type: SURFACING/ROADWAY RESTORATION
Project ID: A00188706
Contract Type: Federal
Project Description: SPALL REPAIR/FULL DEPTH REPAIR, 2-INCH SUPERPAVE OVERLAY, AND PAVEMENT MARKINGS
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
MARIA APONTE
RAJENDRA HADA
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$2,289,653.50
Over/Under Est: -20.22% -$463,055.37
Over/Under Est: -7.03% -$161,041.25
Amt Left: 16.53% $302,014.12
Over/Under Est: 7.34% $168,122.73
Amt Left: 34.55% $631,178.10
Delta: -15.46% -$329,163.98
Subcontractor Percentage Amount
CPAVE, INC. 22.47% $410,436.60
USA AMTECH, INC. 9.91% $181,015.87
TRP CONSTRUCTION GROUP, LLC 6.70% $122,382.07
J. H. ODEN CONTRACTING COMPANY 1.93% $35,253.34
THIRD COAST SERVICES LLC 0.62% $11,324.91
LONESTAR TRAFFIC SAFETY, LLC 0.40% $7,306.39
Total: 42.03% $767,719.18

Bid Items & Bid Tabulations

81 Total 0 of 81
BRAZORIA  |  SH 6  |  HOUSTON  |  0192-02-064  |  10/08/2025  |  $2,289,653.50  |  STP 2B25(163)MM  |  SURF/ROADWAY RESTOR  |  50 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
TEXAS MATERIALS GROUP, INC.
DURWOOD GREENE CONSTRUCTION CO.
PREP ROW (TREE PRUNE AND TRIM)
STA 13.000 $1,500.000 $1,000.000 $973.000 $600.000
REMOV CONC (DRIVEWAYS)
SY 354.000 $15.000 $25.000 $40.000 $70.000
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 75.000 $15.000 $22.000 $46.000 $70.000
REMOV CONC (CURB)
LF 240.000 $6.000 $12.000 $48.000 $10.000
RMV (7"-11") TRT/UNTRT BASE & ASPH PAV
SY 189.000 $14.000 $11.000 $46.000 $140.000
EXCAV (CHANNEL)
CY 20.000 $25.000 $55.000 $327.000 $70.000
EXCAV (SPECIAL)
CY 203.740 $30.000 $40.000 $95.000 $70.000
EMBANK (FNL)(DC)(TY C)
CY 54.990 $25.000 $40.000 $264.000 $100.000
COMPOST MANUF TOPSOIL (4")
SY 2,149.000 $2.000 $12.000 $7.000 $1.500
BROADCAST SEED (OPT1)
SY 2,149.000 $1.500 $2.500 $1.590 $0.500
STRAW/HAY MULCH
SY 2,149.000 $0.250 $3.500 $1.250 $0.500
VEGETATIVE WATERING
TGL 57.000 $145.000 $20.000 $105.000 $45.000
ASPH (AC-20XP)
GAL 17,351.000 $7.500 $4.550 $4.000 $4.200
AGGR (TY-PB OR PL, GR-4)(SAC-B)
CY 320.000 $300.000 $290.000 $303.000 $305.000
SP MIXES SP-D SAC-A PG76-22
TON 4,133.000 $168.000 $138.000 $170.000 $185.000
TACK COAT
GAL 3,720.000 $4.000 $3.750 $4.500 $3.500
FLEXIBLE PAVEMENT STRUCTURE REPAIR(14")
SY 206.000 $150.000 $145.000 $25.000 $125.000
PLANE & TEXT ASPH CONC PAV(2")
SY 3,232.000 $6.000 $9.300 $10.000 $14.000
PLAN & TEXT CONC PAV(0" TO 2")
SY 2,100.000 $20.000 $15.000 $10.000 $27.000
FULL - DEPTH REPAIR CRCP (8")
CY 70.000 $550.000 $2,000.000 $2,198.000 $1,100.000
FULL - DEPTH REPAIR CPCD (8")
CY 20.000 $550.000 $2,000.000 $2,216.000 $900.000
CONC STR REPAIR (STANDARD)
SF 2,000.000 $195.000 $107.000 $123.000 $100.000
RIPRAP (CONC)(4 IN)
CY 4.000 $675.000 $1,100.000 $801.000 $1,500.000
CLEANING AND SEALING EXISTING JOINTS
LF 5,377.000 $20.000 $4.500 $5.000 $17.000
ADJUSTING MANHOLES
EA 1.000 $1,100.000 $3,000.000 $1,897.000 $2,000.000
ADJUSTING MANHOLES (UTILITY BOX)
EA 11.000 $1,050.000 $1,750.000 $1,717.000 $900.000
ADJUSTING MANHOLES (CAP)
EA 5.000 $2,450.000 $1,650.000 $286.000 $1,100.000
ADJUSTING INLETS (CAP)
EA 1.000 $3,300.000 $3,500.000 $1,874.000 $2,000.000
MOBILIZATION
LS 1.000 $201,000.000 $100,000.000 $175,000.000 $224,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $20,000.000 $4,000.000 $2,465.000 $17,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 42.000 $150.000 $65.000 $183.000 $400.000
TMA (STATIONARY)
DAY 52.000 $290.000 $230.000 $377.000 $400.000
TMA (MOBILE OPERATION)
DAY 15.000 $398.000 $125.000 $769.000 $400.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 52.000 $5.000 $10.000 $11.500 $22.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 100.000 $6.500 $10.000 $13.750 $25.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 152.000 $1.250 $10.000 $4.500 $6.000
CONC CURB (DOWELED)
LF 224.000 $40.000 $35.000 $57.100 $95.000
CONC CURB (DOWEL)
LF 27.000 $40.000 $110.000 $57.100 $95.000
DRIVEWAYS (CONC)
SY 596.000 $90.000 $110.000 $126.000 $275.000
CONC SIDEWALKS (5")
SY 662.000 $80.000 $100.000 $103.000 $220.000
CURB RAMPS (TY 1)
EA 1.000 $2,350.000 $2,500.000 $3,434.000 $3,400.000
CURB RAMPS (TY 2)
EA 3.000 $3,000.000 $3,000.000 $3,663.000 $7,500.000
CURB RAMPS (TY 5)
EA 2.000 $4,200.000 $3,300.000 $3,996.830 $7,200.000
CURB RAMPS (TY 21)
EA 1.000 $4,400.000 $3,200.000 $4,064.500 $9,300.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 36.000 $659.000 $700.000 $798.000 $720.000
IN SM RD SN SUP&AM TY10BWG(2)SA(P)
EA 2.000 $1,565.000 $1,100.000 $1,224.000 $1,264.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 2.000 $1,600.000 $1,200.000 $1,263.000 $1,260.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 13.000 $600.000 $750.000 $800.000 $700.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 720.000 $0.650 $0.500 $0.500 $0.380
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 6,334.000 $0.800 $0.550 $0.590 $0.420
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 6,310.000 $0.900 $1.000 $1.100 $0.700
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 3,184.000 $4.000 $1.250 $1.100 $1.500
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 34.000 $120.000 $125.000 $137.500 $95.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 34.000 $140.000 $135.000 $149.000 $100.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 2,772.000 $0.650 $0.500 $0.600 $0.400
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 3,155.000 $1.400 $2.000 $2.000 $2.100
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 600.000 $2.600 $2.000 $2.200 $3.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,592.000 $8.900 $15.000 $13.750 $15.000
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
LF 496.000 $1.000 $2.000 $2.000 $2.100
REFL PAV MRK TY I (Y)(ISLAND)(100MIL)
SF 5,168.000 $10.000 $2.000 $2.000 $1.750
RE PM TY III (W)(4")(SLD)
LF 360.000 $0.500 $2.500 $2.500 $2.750
RE PM TY III (W)(24")(SLD)
LF 177.000 $8.000 $0.300 $14.560 $17.000
RE PM TY III (Y)(4")(SLD)
LF 1,386.000 $0.500 $2.500 $2.750 $2.750
ALL-WTHER PM TY I (W)6"(BRK)(100MIL)
LF 3,975.000 $0.750 $1.000 $1.000 $1.750
PAVEMENT SLER 24"
LF 177.000 $2.000 $0.250 $0.300 $0.400
PREFAB PM TY C (W)(ARROW)
EA 17.000 $317.000 $280.000 $313.000 $350.000
PREFAB PM TY C (W)(WORD)
EA 17.000 $305.000 $350.000 $373.500 $375.000
REFL PAV MRKR TY I-C
EA 362.000 $6.500 $6.500 $7.000 $7.000
ELIM EXT PM & MRKS (6")
LF 1,680.000 $1.250 $0.750 $0.750 $0.750
ELIM EXT PM & MRKS (8")
LF 362.000 $1.800 $1.250 $1.500 $1.350
ELIM EXT PM & MRKS (ARROW)
EA 2.000 $102.000 $90.000 $80.000 $90.000
ELIM EXT PM & MRKS (WORD)
EA 2.000 $105.000 $90.000 $80.000 $90.000
ELIM EXT PM & MRKS (ISLAND)
SF 654.000 $5.000 $0.100 $0.060 $0.500
PAV SURF PREP FOR MRK (4")
LF 1,496.000 $0.250 $0.050 $0.050 $0.050
PAV SURF PREP FOR MRK (6")
LF 3,935.000 $0.150 $0.060 $0.070 $0.080
PAV SURF PREP FOR MRK (8")
LF 496.000 $0.200 $0.080 $0.100 $0.100
PAV SURF PREP FOR MRK (12")
LF 600.000 $0.400 $0.120 $0.150 $0.200
PAV SURF PREP FOR MRK (24")
LF 1,769.000 $0.800 $0.250 $0.300 $0.500
PAV SURF PREP FOR MRK (ARROW)
EA 17.000 $25.000 $5.500 $5.750 $10.000
PAV SURF PREP FOR MRK (WORD)
EA 17.000 $35.000 $5.500 $5.750 $10.000
RELOCT RDSD FLSH BCN AM (SOLAR PWRD)
EA 3.000 $2,000.000 $4,000.000 $5,941.000 $5,000.000
Totals: $2,289,653.500 $1,826,598.130 $2,128,612.250 $2,457,776.230
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $3,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $8,334.00
Total: $12,334.00