PARKER FM 113 (0717-01-025)

Items: 52

County: PARKER
Length: 0.1510 MILES
Highway: FM 113
District: FORT WORTH
Control Number: 0717-01-025
DBE Goal: 0.0%
Project: C 717-1-25
Guaranty: $27,000.00
Time: 126 WORKING DAYS
Engineer's Estimate: $1,373,017.00
Date: 09/04/2025 (9 months ago)
Contract Number: 9253028
Type: RECONSTRUCT EXISTING ROADWAY
Project ID: A00065038
Project Description: REALIGN FM 113 (2 TO 2 LANES)
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
KOREY CORBURN
DOUGLAS BATES
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$1,373,017.00
Over/Under Est: -1.58% -$21,758.44
$1,409,313.90
Over/Under Est: 2.64% $36,296.90
Amt Left: 4.3% $58,055.34
$1,698,687.90
Over/Under Est: 23.72% $325,670.90
Amt Left: 25.71% $347,429.34
Delta: -20.53% -$289,374.00
Over/Under Est: 28.78% $395,164.21
Amt Left: 30.85% $416,922.65
Delta: -4.09% -$69,493.31
Subcontractor Percentage Amount
NORTHEASTERN PAVERS, LLC 31.59% $426,862.58
MARCOMS CONSTRUCTION LLC 1.74% $23,511.90
WIMS ENVIRONMENTAL CONSTRUCTION, LTD. 1.36% $18,377.12
TRP CONSTRUCTION GROUP, LLC 0.68% $9,188.56
Total: 35.37% $477,940.16

Bid Items & Bid Tabulations

52 Total 0 of 52
PARKER  |  FM 113  |  FORT WORTH  |  0717-01-025  |  09/04/2025  |  $1,373,017.00  |  C 717-1-25  |  RECON EXIST ROADWAY  |  126 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JAY MILLS CONTRACTING, INCORPORATED
PRATER DIRT WORK LLC
JAGOE-PUBLIC COMPANY
TEXAS MATERIALS GROUP, INC.
PREPARING ROW
STA 10.000 $9,000.000 $4,000.000 $3,500.000 $500.000 $100.000
REMOV CONC (PAV)
SY 620.000 $16.000 $18.000 $22.500 $5.000 $25.000
REMOV CONC (TRAFFIC BARRIER)
LF 50.000 $125.000 $32.000 $40.000 $50.000 $25.000
RMV (12"-16") TRT/UNTRT BASE & ASPH PAV
SY 3,575.000 $10.000 $16.000 $15.000 $20.000 $14.500
EXCAV (ROADWAY)
CY 900.000 $60.000 $20.000 $28.000 $60.000 $25.000
EMBANK (FNL)(OC)(TY C1)
CY 5,000.000 $31.000 $30.000 $32.000 $60.000 $45.000
COMPOST MANUF TOPSOIL (4")
SY 5,726.000 $5.000 $1.650 $3.000 $4.000 $2.110
BROADCAST SEED (PERM_RURAL_SAND)
SY 5,726.000 $1.000 $0.540 $0.500 $0.250 $0.360
BROADCAST SEED (TEMP_WARM)
SY 5,726.000 $1.000 $0.320 $0.500 $0.150 $0.330
VEGETATIVE WATERING
TGL 202.000 $70.000 $25.000 $115.000 $95.000 $50.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 1,547.000 $90.000 $72.000 $60.000 $70.000 $160.000
CEMENT
TON 55.000 $420.000 $390.000 $250.000 $325.000 $220.000
CEMENT TRT (EXIST MATL)(8")
SY 3,843.000 $10.000 $5.500 $15.000 $12.000 $8.000
PRIME COAT(MC-30 OR AE-P)
GAL 1,370.000 $10.000 $8.000 $13.000 $2.000 $5.000
D-GR HMA TY-B PG64-22
TON 1,200.000 $147.000 $154.000 $175.000 $170.000 $220.000
TACK COAT
GAL 840.000 $6.000 $0.010 $13.000 $1.000 $4.250
SP MIXES SP-C SAC-A PG70-28
TON 492.000 $180.000 $302.500 $225.000 $205.000 $265.000
PLANE & TEXT ASPH CONC PAV(0" TO 2")
SY 470.000 $3.000 $10.000 $30.000 $3.000 $5.000
RIPRAP (CONC)(4 IN)
CY 33.000 $1,000.000 $750.000 $780.000 $1,500.000 $735.000
RC PIPE (CL III)(24 IN)
LF 140.000 $106.000 $95.000 $128.000 $180.000 $120.000
RC PIPE (CL V)(24 IN)
LF 110.000 $180.000 $110.000 $144.000 $230.000 $135.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 2.000 $2,430.000 $2,500.000 $3,000.000 $3,900.000 $2,800.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 6.000 $1,950.000 $2,500.000 $3,000.000 $3,900.000 $2,800.000
REMOV STR (BOX CULVERT)
LF 90.000 $200.000 $40.000 $128.000 $42.000 $120.000
MOBILIZATION
LS 1.000 $124,819.000 $130,000.000 $130,000.000 $188,800.000 $175,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $8,000.000 $12,000.000 $6,500.000 $20,000.000 $25,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,650.000 $13,000.000 $8,000.000 $10,000.000 $18,000.000
TMA (STATIONARY)
DAY 64.000 $215.000 $204.000 $400.000 $150.000 $10.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 45.000 $50.000 $67.000 $59.000 $50.000 $55.018
ROCK FILTER DAMS (REMOVE)
LF 45.000 $20.000 $17.600 $25.000 $25.000 $20.940
TEMP SEDMT CONT FENCE (INSTALL)
LF 440.000 $4.000 $3.850 $6.100 $5.000 $5.720
TEMP SEDMT CONT FENCE (REMOVE)
LF 440.000 $1.000 $1.100 $1.000 $1.500 $0.900
CONC CURB & GUTTER (TY II)
LF 200.000 $68.000 $37.500 $57.000 $145.000 $53.000
DRIVEWAYS (ACP)
SY 668.000 $70.000 $163.000 $125.000 $100.000 $165.000
CONC SIDEWALKS (4")
SY 243.000 $75.000 $83.000 $98.000 $85.000 $92.000
CONC SIDEWALKS (5")
SY 276.000 $85.000 $88.000 $102.000 $200.000 $96.000
CURB RAMPS (TY 7)
EA 7.000 $2,600.000 $3,000.000 $3,850.000 $4,000.000 $3,600.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 1.000 $320.000 $242.000 $425.000 $250.000 $1,000.000
ALUMINUM SIGNS (TY A)
SF 4.000 $50.000 $33.000 $350.000 $40.000 $1,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 14.000 $720.000 $825.000 $900.000 $800.000 $800.000
REMOVE SM RD SN SUP&AM
EA 6.000 $150.000 $110.000 $500.000 $110.000 $500.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 14.000 $75.000 $82.500 $110.000 $100.000 $150.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 94.000 $10.000 $11.000 $16.000 $12.000 $10.000
REFL PAV MRK TY I (W)(RR XING)(100MIL)
EA 4.000 $540.000 $660.000 $810.000 $625.000 $600.000
RE PM TY II (W) 6" (SLD)
LF 1,530.000 $2.000 $0.610 $0.750 $0.750 $0.550
RE PM TY II (W) 24" (SLD)
LF 94.000 $5.000 $1.100 $2.350 $1.250 $1.000
RE PM TY II (Y) 6" (SLD)
LF 1,970.000 $2.000 $0.610 $0.750 $0.750 $0.550
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 1,530.000 $2.000 $1.100 $2.850 $1.250 $1.000
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 1,970.000 $2.000 $1.100 $2.850 $1.250 $1.000
REFL PAV MRKR TY II-A-A
EA 35.000 $5.000 $8.800 $14.000 $9.000 $8.000
ELIM EXT PM & MRKS (12")
LF 12.000 $3.000 $5.500 $150.000 $6.000 $5.000
SOLAR POWERED LED ROADSIDE SIGN
EA 2.000 $4,000.000 $6,050.000 $7,000.000 $6,000.000 $10,000.000
Totals: $1,373,017.000 $1,351,258.560 $1,409,313.900 $1,698,687.900 $1,768,181.210
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
RAILROAD FORCE ACCOUNT WORK (NON-PART) $464,857.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $5,000.00
RAILROAD FLAGGING: RAILROAD FORCE ACCOUNT WORK (NON-PART) $16,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $20,000.00
Total: $505,857.00