TARRANT JOHN MCCAIN RD (0902-90-213)

Items: 48

County: TARRANT
Length: 0.1870 MILES
Highway: JOHN MCCAIN RD
District: FORT WORTH
Control Number: 0902-90-213
DBE Goal: 0.0%
Project: STP 2022(380)HES
Guaranty: $11,000.00
Time: 56 WORKING DAYS
Engineer's Estimate: $527,106.86
Date: 10/09/2025 (8 months ago)
Contract Number: 10253228
Type: HIGHWAY IMPROVEMENT
Project ID: A00178840
Contract Type: Federal
Project Description: BRIDGE WIDENING, SIGNING, GEOMETRY
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
DANIEL POOLE
RAUL OROZCO
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$527,106.86
$538,838.00
Over/Under Est: 2.23% $11,731.14
Over/Under Est: 11.29% $59,489.14
Amt Left: 8.86% $47,758.00
Over/Under Est: 26.98% $142,201.34
Amt Left: 24.21% $130,470.20
Delta: -14.10% -$82,712.20
Over/Under Est: 35.32% $186,176.68
Amt Left: 32.37% $174,445.54
Delta: -6.57% -$43,975.34

Bid Items & Bid Tabulations

48 Total 0 of 48
TARRANT  |  JOHN MCCAIN RD  |  FORT WORTH  |  0902-90-213  |  10/09/2025  |  $527,106.86  |  STP 2022(380)HES  |  HWY IMPRV  |  56 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
GREY SKY CONSTRUCTION LLC
JAGOE-PUBLIC COMPANY
ED BELL CONSTRUCTION COMPANY
TEXAS MATERIALS GROUP, INC.
PREPARING ROW
STA 4.000 $3,000.000 $12,500.000 $5,000.000 $15,000.000 $4,500.000
REMOV CONC (DRIVEWAYS)
SY 75.000 $20.000 $20.000 $47.000 $50.000 $45.000
REMOV CONC (CURB & GUTTER)
LF 254.000 $40.000 $20.000 $10.000 $25.000 $21.000
RMV (4"-8") TRT/UNTRT BASE & ASPH PAV
SY 1,059.000 $15.000 $20.000 $25.000 $25.000 $16.000
EXCAV (ROADWAY)
CY 51.000 $50.000 $20.000 $100.000 $100.000 $100.000
EMBANK (FNL)(DC)(TY C)
CY 40.000 $50.000 $50.000 $100.000 $100.000 $100.000
FURN & PLACE TOPSOIL (4")
SY 300.000 $20.000 $20.000 $15.000 $15.000 $7.000
BLOCK SODDING
SY 300.000 $15.000 $10.000 $8.000 $15.000 $15.000
FERTILIZER
AC 0.200 $10,000.000 $20,000.000 $1,000.000 $5,000.000 $1,050.000
VEGETATIVE WATERING
TGL 12.000 $100.000 $50.000 $350.000 $400.000 $1,034.000
SOIL RET BLKT(SL_STEEP_SAND_LONG_ROLL)
SY 30.000 $37.700 $10.000 $10.000 $50.000 $16.830
LIME (QUICKLIME (SLURRY))
TON 24.000 $500.000 $400.000 $400.000 $300.000 $300.000
LIME TRT (SUBGRADE) (8")
SY 1,100.000 $30.000 $15.000 $20.000 $20.000 $33.950
PRIME COAT (MC-30)
GAL 221.000 $15.000 $6.000 $4.500 $25.000 $28.950
D-GR HMA TY-B PG64-22
TON 254.000 $200.000 $195.000 $120.000 $200.000 $300.000
TACK COAT
GAL 222.000 $10.000 $6.000 $0.500 $9.000 $4.622
SP MIXES SP-C SAC-B PG70-28
TON 128.000 $275.000 $200.000 $170.000 $275.000 $410.000
TRENCH EXCAVATION PROTECTION
LF 66.000 $35.000 $10.000 $1.000 $25.000 $10.000
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 13.000 $350.000 $150.000 $360.000 $500.000 $475.000
RAIL (TY PR11)
LF 110.000 $200.000 $185.000 $190.000 $200.000 $275.000
CONC BOX CULV (5 FT X 2 FT)
LF 66.000 $750.000 $650.000 $500.000 $1,200.000 $400.000
WINGWALL (PW - 1) (HW=5 FT)
EA 2.000 $28,000.000 $20,000.000 $60,000.000 $45,000.000 $36,500.000
ADJUSTING MANHOLES (WATER METER)
EA 3.000 $1,000.000 $2,500.000 $480.000 $2,500.000 $2,000.000
REMOV STR (HEADWALL)
EA 2.000 $2,500.000 $2,500.000 $6,000.000 $5,000.000 $1,500.000
REMOV STR (BOX CULVERT)
LF 66.000 $300.000 $150.000 $260.000 $110.000 $75.000
MOBILIZATION
LS 1.000 $47,900.000 $50,000.000 $65,100.000 $63,000.000 $70,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $7,593.190 $12,500.000 $12,000.000 $11,550.000 $40,000.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 228.000 $56.550 $50.000 $15.000 $20.000 $49.630
CONSTRUCTION EXITS (REMOVE)
SY 228.000 $23.700 $20.000 $5.000 $10.000 $17.890
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 95.000 $17.890 $12.000 $8.000 $12.000 $21.290
BIODEG EROSN CONT LOGS (REMOVE)
LF 95.000 $5.690 $5.000 $1.500 $6.000 $1.400
CONC CURB & GUTTER (TY II)
LF 247.000 $65.000 $65.000 $70.000 $75.000 $67.000
DRIVEWAYS (CONC)
SY 58.000 $125.000 $100.000 $190.000 $300.000 $145.000
REMOVE METAL BEAM GUARD FENCE
LF 15.000 $35.000 $3.000 $41.000 $55.000 $2.700
RELOCATE EXISTING MAILBOX
EA 2.000 $1,000.000 $1,100.000 $500.000 $330.000 $300.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 3.000 $2,000.000 $1,150.000 $700.000 $808.500 $900.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 2.000 $1,500.000 $1,150.000 $700.000 $550.000 $525.000
REMOVE SM RD SN SUP&AM
EA 2.000 $500.000 $500.000 $130.000 $165.000 $100.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 4.000 $150.000 $100.000 $110.000 $60.500 $75.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 1.000 $25.000 $85.000 $32.000 $82.500 $25.000
REFL PAV MRK TY I (W)6"(LNDP)(100MIL)
LF 820.000 $5.000 $6.000 $3.500 $3.850 $2.750
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 1,004.000 $1.500 $6.000 $3.250 $3.300 $2.500
REFL PAV MRKR TY II-A-A
EA 26.000 $10.000 $6.000 $12.000 $60.500 $9.000
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 2.000 $8,500.000 $15,000.000 $11,000.000 $4,345.000 $8,000.000
TREE REMOVAL (4" - 12" DIA)
EA 3.000 $435.000 $1,500.000 $3,800.000 $605.000 $100.000
TREE REMOVAL (12" - 18" DIA)
EA 2.000 $925.000 $2,500.000 $2,800.000 $836.000 $200.000
TREE REMOVAL (24" - 30" DIA)
EA 2.000 $1,600.000 $3,500.000 $8,000.000 $2,970.000 $300.000
RELOCATE FIRE HYDRANT
EA 1.000 $5,000.000 $5,500.000 $5,000.000 $15,000.000 $10,000.000
Totals: $527,106.860 $538,838.000 $586,596.000 $669,308.200 $713,283.544
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $25,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $25,000.00
Total: $50,000.00