HARRIS SH 99 (3510-05-050)

Items: 138

County: HARRIS
Length: 0.0000 MILES
Highway: SH 99
District: HOUSTON
Control Number: 3510-05-050
DBE Goal: 0.0%
Project: CC 3510-5-50
Guaranty: $100,000.00
Time: 242 WORKING DAYS
Engineer's Estimate: $8,730,471.70
Date: 10/08/2025 (8 months ago)
Contract Number: 10253011
Type: CONSTRUCT FRONTAGE ROADS
Project ID: A00186223
Project Description: CONSTRUCT PAVEMENT, STORM SEWER, SIGNS, AND PAVEMENT MARKINGS FOR SOUTHBOUND FRONTAGE ROAD (NON-TOLL)
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
HAMOON BAHRAMI
WILLIAM BURCH
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (10)
E
Engineer's Estimate
$8,730,471.70
$6,547,219.34
Over/Under Est: -25.01% -$2,183,252.36
$7,835,083.42
Over/Under Est: -10.26% -$895,388.28
Amt Left: 19.67% $1,287,864.08
$8,156,594.40
Over/Under Est: -6.57% -$573,877.30
Amt Left: 24.58% $1,609,375.06
Delta: -4.10% -$321,510.98
$8,353,698.25
Over/Under Est: -4.32% -$376,773.45
Amt Left: 27.59% $1,806,478.91
Delta: -2.42% -$197,103.85
Over/Under Est: -3.02% -$263,325.64
Amt Left: 29.32% $1,919,926.72
Delta: -1.36% -$113,447.81
Over/Under Est: -2.29% -$200,061.40
Amt Left: 30.29% $1,983,190.96
Delta: -0.75% -$63,264.24
Over/Under Est: -1.8% -$156,961.70
Amt Left: 30.95% $2,026,290.66
Delta: -0.51% -$43,099.70
$8,955,745.33
Over/Under Est: 2.58% $225,273.63
Amt Left: 36.79% $2,408,525.99
Delta: -4.46% -$382,235.33
$10,021,013.25
Over/Under Est: 14.78% $1,290,541.55
Amt Left: 53.06% $3,473,793.91
Delta: -11.89% -$1,065,267.92
$10,488,103.65
Over/Under Est: 20.13% $1,757,631.95
Amt Left: 60.19% $3,940,884.31
Delta: -4.66% -$467,090.40
Subcontractor Percentage Amount
SEMARCK LANDSCAPE SERVICES, INC. 4.11% $269,090.71
DECO CONTRACTORS, INC. 2.37% $155,169.10
STRIPE LINES, INC. 0.92% $60,234.42
PRV SERVICES, INC. 0.38% $24,879.43
C & C TRAFFIC CONTROL 0.18% $11,784.99
Total: 7.96% $521,158.65

Bid Items & Bid Tabulations

138 Total 0 of 138
HARRIS  |  SH 99  |  HOUSTON  |  3510-05-050  |  10/08/2025  |  $8,730,471.70  |  CC 3510-5-50  |  CONSTRUCT FRONTAGE ROADS  |  242 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SER CONSTRUCTION PARTNERS, LLC
MC2 CIVIL, LLC
ICON GC, LLC
ISI CONTRACTING, INC.
GRANITE CONSTRUCTION COMPANY
TEXAS MATERIALS GROUP, INC.
ENVIRONMENTAL ALLIES, INC.
C. E. BARKER, LTD.
MBN ENTERPRISES LLC
R CONSTRUCTION CIVIL, LLC
PREPARING ROW
STA 52.930 $4,000.000 $1,600.000 $7,350.000 $3,991.000 $2,969.000 $16,000.000 $1,000.000 $3,500.000 $16,000.000 $4,000.000 $5,800.000
REMOV CONC (PAV)
SY 223.000 $25.000 $100.600 $130.000 $109.000 $113.000 $50.000 $113.000 $11.000 $22.880 $25.000 $42.000
REMOV CONC (RIPRAP)
SY 2,191.000 $12.000 $13.500 $10.000 $9.000 $12.000 $10.000 $14.000 $11.000 $22.880 $15.000 $33.000
REMOV CONC (CURB RAMP)
SY 8.000 $135.000 $11.500 $80.000 $63.000 $275.000 $50.000 $205.000 $100.000 $22.880 $20.000 $1,150.000
RMV (4") TRT/UNTRT BASE & ASPH PAV
SY 12.000 $20.000 $11.500 $150.000 $59.000 $115.000 $50.000 $130.000 $14.750 $7.120 $25.000 $385.000
RMV (7"-13") TRT/UNTRT BASE & ASPH PAV
SY 557.000 $25.000 $33.900 $20.000 $5.000 $72.000 $15.000 $37.000 $8.000 $10.680 $25.000 $25.000
EXCAV (ROADWAY)
CY 36,812.000 $22.500 $6.500 $5.000 $6.000 $15.000 $10.000 $9.000 $14.000 $14.230 $11.000 $15.000
EMBANK (FNL)(DC)(TY C)
CY 34,216.000 $15.000 $3.100 $5.000 $16.000 $10.500 $6.000 $20.000 $14.000 $15.330 $13.000 $30.000
COMPOST MANUF TOPSOIL (4")
SY 4,560.000 $3.000 $1.300 $1.000 $3.000 $0.930 $0.840 $1.000 $6.750 $3.560 $2.000 $1.000
BLOCK SODDING
SY 51,443.000 $5.250 $4.600 $3.500 $4.000 $3.760 $3.410 $4.000 $6.250 $5.340 $8.000 $4.000
STRAW OR HAY MULCH
SY 16,320.000 $0.350 $0.300 $0.250 $0.260 $0.220 $0.200 $0.250 $0.500 $0.240 $0.500 $0.250
BROADCAST SEED (TEMP_WARM_COOL)
SY 514.000 $0.250 $0.200 $0.150 $0.170 $0.150 $0.130 $0.150 $0.400 $1.190 $6.000 $0.150
BROADCAST SEED (OPT1)
SY 46.000 $0.250 $0.200 $0.180 $0.200 $0.170 $0.150 $0.200 $0.400 $13.260 $25.000 $0.150
DRILL SEED (TEMP_WARM_COOL)
SY 11,201.000 $0.300 $0.200 $0.150 $0.170 $0.150 $0.130 $0.150 $0.500 $0.180 $0.450 $0.150
DRILL SEED (OPT1)
SY 4,560.000 $0.400 $0.200 $0.180 $0.200 $0.170 $0.150 $0.200 $0.500 $0.220 $0.500 $0.150
FERTILIZER
AC 14.010 $1,150.000 $14.400 $650.000 $755.000 $655.000 $594.040 $690.000 $775.000 $1,220.040 $2,600.000 $650.000
VEGETATIVE WATERING
TGL 1,680.000 $40.000 $31.900 $35.000 $43.000 $38.000 $25.000 $40.000 $25.000 $106.750 $58.000 $140.000
LIME (COM OR QK)(SLURRY) OR QK(DRY)
TON 351.000 $360.000 $344.500 $400.000 $419.000 $357.000 $324.000 $380.000 $360.000 $329.410 $330.000 $350.000
LIME TRT (EXIST MATL)(8")
SY 19,476.000 $5.000 $3.700 $6.000 $7.000 $12.100 $5.180 $10.750 $7.000 $2.670 $4.500 $12.000
CEM TRT(PLNT MX)(CL N)(TY E)(GR 4)(6")
SY 19,476.000 $16.000 $20.700 $25.000 $34.590 $20.000 $17.260 $29.000 $21.000 $23.130 $15.000 $29.000
ASPHALT TRT BASE (GR 4)(PG 64)
TON 1,071.000 $150.000 $159.800 $110.000 $196.000 $181.000 $200.000 $175.000 $165.000 $157.820 $165.000 $240.000
CONC PVMT (CRCP) (10")
SY 16,388.000 $90.000 $73.900 $80.000 $125.000 $89.000 $100.000 $91.150 $99.500 $99.150 $112.000 $100.000
CONC PVMT (CRCP) (12")
SY 2,140.000 $105.000 $89.400 $120.000 $191.280 $151.000 $205.000 $135.000 $117.500 $121.350 $12.000 $116.000
CEM STABIL BKFL
CY 2,299.000 $70.000 $57.300 $60.000 $6.000 $59.000 $75.000 $63.000 $72.500 $81.340 $80.000 $60.000
CEMENT STAB BACKFILL (INLET OR MH)
CY 283.000 $60.000 $57.300 $60.000 $6.000 $59.000 $75.000 $63.000 $70.000 $81.340 $100.000 $60.000
TRENCH EXCAVATION PROTECTION
LF 2,890.000 $5.000 $0.100 $2.000 $0.010 $4.130 $1.000 $6.000 $1.500 $31.010 $10.000 $2.000
CL C CONC (RAIL FOUNDATION)
CY 12.000 $1,100.000 $846.400 $1,200.000 $1,026.000 $2,529.000 $633.070 $744.000 $800.000 $510.890 $1,000.000 $1,000.000
RIPRAP (CONC)(CL B)(5 IN)
CY 1,503.000 $500.000 $531.600 $725.000 $370.000 $415.000 $310.540 $764.000 $600.000 $510.890 $550.000 $850.000
RIPRAP (CONC) (CL B) (6 IN)
CY 7.000 $1,500.000 $545.700 $2,000.000 $444.000 $1,194.000 $604.990 $811.000 $900.000 $540.550 $810.000 $1,400.000
RAIL (TY SSTR)
LF 458.000 $115.000 $61.900 $115.000 $186.000 $84.000 $87.910 $85.000 $220.000 $122.150 $120.000 $90.000
CONC BOX CULV (5 FT X 3 FT)
LF 116.000 $450.000 $416.700 $450.000 $447.000 $431.000 $450.000 $458.000 $590.000 $567.110 $1,000.000 $695.000
CONC BOX CULV (6 FT X 3 FT)
LF 116.000 $500.000 $506.500 $525.000 $543.000 $518.000 $500.000 $540.000 $735.000 $655.400 $1,050.000 $865.000
CONC BOX CULV (6 FT X 4 FT)
LF 652.000 $550.000 $556.900 $600.000 $593.000 $470.000 $550.000 $590.000 $787.000 $698.220 $1,020.000 $885.000
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
LF 140.000 $1,200.000 $586.900 $600.000 $593.000 $839.000 $750.000 $599.000 $787.000 $698.220 $1,000.000 $970.000
CONC BOX CULV (8 FT X 4 FT)(EXTEND)
LF 106.000 $1,500.000 $784.100 $860.000 $886.000 $1,258.000 $950.000 $900.000 $1,150.000 $860.000 $2,000.000 $1,150.000
RC PIPE (CL III)(24 IN)
LF 2,778.000 $125.000 $85.800 $80.000 $92.000 $127.000 $100.000 $105.000 $135.000 $101.490 $100.000 $225.000
RC PIPE (CL III)(30 IN)
LF 49.000 $135.000 $141.100 $225.000 $151.000 $488.000 $150.000 $210.000 $235.000 $117.880 $150.000 $270.000
RC PIPE (CL III)(42 IN)
LF 152.000 $215.000 $182.900 $240.000 $282.000 $300.000 $200.000 $221.000 $285.000 $206.510 $300.000 $365.000
RC PIPE (CL III)(54 IN)
LF 4.000 $450.000 $645.300 $1,000.000 $814.000 $5,365.000 $1,000.000 $1,017.000 $755.000 $358.410 $750.000 $1,550.000
INLET (COMPL)(CURB)(TY C)(NONE)(HOU)
EA 25.000 $6,000.000 $4,952.600 $7,500.000 $7,166.000 $6,271.000 $10,000.000 $7,830.000 $5,250.000 $2,058.820 $7,500.000 $3,400.000
INLET (COMPL)(CURB)(TY C)(RIGHT)(HOU)
EA 1.000 $7,500.000 $5,560.800 $10,000.000 $9,219.000 $7,989.000 $11,000.000 $9,425.000 $5,400.000 $2,058.820 $6,000.000 $3,400.000
INLET (COMPL)(TY AAD)(HOU)
EA 6.000 $9,000.000 $5,736.200 $9,500.000 $9,379.000 $8,125.000 $10,000.000 $9,750.000 $8,250.000 $3,075.520 $7,500.000 $3,400.000
INLET (COMPL)(TY AZ)(HOU)
EA 1.000 $8,500.000 $5,057.700 $3,000.000 $7,846.000 $6,869.000 $9,500.000 $8,375.000 $12,000.000 $3,075.520 $5,000.000 $3,400.000
MANH (COMPL)(TY A)(HOU)
EA 4.000 $8,000.000 $5,941.900 $7,700.000 $6,939.000 $5,131.000 $10,000.000 $6,885.000 $7,000.000 $3,609.290 $9,500.000 $11,800.000
JCT BOX (COMPL)(SPL)
EA 1.000 $50,000.000 $33,001.100 $50,000.000 $25,746.000 $30,837.000 $50,000.000 $31,450.000 $19,500.000 $7,371.080 $40,000.000 $28,000.000
WINGWALL (SW - 0) (HW=5 FT)
EA 2.000 $7,000.000 $17,722.800 $18,000.000 $34,407.000 $25,727.000 $20,000.000 $10,000.000 $16,000.000 $17,140.640 $9,000.000 $9,700.000
SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1)(C)
EA 4.000 $14,000.000 $15,498.400 $13,000.000 $12,950.000 $12,581.000 $15,000.000 $12,850.000 $15,000.000 $2,592.590 $10,000.000 $6,100.000
SET (TY I)(S= 6 FT)(HW= 5 FT)(6:1)(P)
EA 10.000 $15,000.000 $17,823.100 $18,000.000 $17,230.000 $16,180.000 $20,000.000 $16,800.000 $14,500.000 $2,592.590 $10,000.000 $9,100.000
SET (TY I)(S= 8 FT)(HW= 5 FT)(4:1)(C)
EA 3.000 $30,000.000 $19,613.300 $18,000.000 $15,658.000 $14,032.000 $25,000.000 $14,450.000 $15,000.000 $2,592.590 $1,400.000 $14,000.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 13.000 $1,500.000 $2,028.900 $1,800.000 $1,754.000 $3,217.000 $3,000.000 $1,600.000 $1,800.000 $2,592.590 $1,850.000 $5,600.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 1.000 $2,300.000 $3,035.800 $2,800.000 $2,473.000 $3,776.000 $3,500.000 $2,150.000 $2,300.000 $2,592.590 $5,000.000 $6,600.000
SET (TY II) (42 IN) (RCP) (6: 1) (P)
EA 2.000 $7,000.000 $12,018.700 $11,000.000 $12,539.000 $12,206.000 $15,000.000 $11,400.000 $8,900.000 $2,592.590 $8,000.000 $12,000.000
REMOV STR (INLET)
EA 2.000 $850.000 $520.200 $350.000 $652.000 $1,159.000 $500.000 $1,155.000 $1,000.000 $2,058.820 $1,000.000 $1,150.000
REMOV STR (SET)
EA 12.000 $600.000 $520.200 $700.000 $652.000 $2,590.000 $500.000 $900.000 $750.000 $266.880 $200.000 $1,150.000
REMOV STR (HEADWALL)
EA 2.000 $2,500.000 $1,184.500 $1,600.000 $1,899.000 $10,360.000 $1,000.000 $2,065.000 $500.000 $1,779.230 $1,500.000 $3,400.000
REMOV STR (PIPE)
LF 152.000 $35.000 $24.700 $30.000 $33.000 $159.000 $50.000 $50.000 $24.000 $26.690 $30.000 $30.000
REMOV STR (BOX CULVERT)
LF 132.000 $85.000 $49.400 $75.000 $98.000 $130.000 $100.000 $47.000 $55.000 $35.580 $40.000 $70.000
REMOVE STR (RAIL)
LF 22.000 $25.000 $24.700 $30.000 $44.000 $236.850 $200.000 $57.000 $87.500 $17.790 $50.000 $210.000
MOBILIZATION
LS 1.000 $794,000.000 $640,000.000 $780,000.000 $218,022.000 $800,000.000 $830,000.000 $514,000.000 $500,000.000 $800,000.000 $750,000.000 $490,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $8,500.000 $1,759.600 $7,000.000 $3,484.000 $10,076.000 $5,500.000 $3,750.000 $1,650.000 $2,697.840 $4,200.000 $3,150.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 12.000 $130.000 $154.500 $200.000 $321.000 $238.000 $120.000 $190.000 $120.000 $1,016.700 $150.000 $550.000
TMA (STATIONARY)
DAY 24.000 $275.000 $360.500 $250.000 $391.720 $315.000 $250.000 $380.000 $225.000 $1,016.700 $200.000 $450.000
TMA (MOBILE OPERATION)
HR 120.000 $50.000 $103.000 $80.000 $116.000 $78.000 $105.000 $75.000 $70.000 $254.180 $35.000 $120.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 249.000 $50.000 $82.400 $35.000 $45.000 $38.880 $35.260 $41.000 $40.000 $50.840 $65.000 $77.000
ROCK FILTER DAMS (REMOVE)
LF 249.000 $15.000 $20.600 $9.000 $11.000 $9.860 $8.940 $10.000 $15.000 $20.330 $20.000 $11.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 156.000 $40.000 $28.800 $35.000 $43.000 $37.640 $34.140 $40.000 $23.000 $30.500 $35.000 $65.000
CONSTRUCTION EXITS (REMOVE)
SY 156.000 $15.000 $10.300 $10.000 $12.000 $10.230 $9.270 $10.000 $8.000 $20.330 $10.000 $11.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 6,257.000 $4.000 $1.900 $3.500 $4.000 $3.610 $5.000 $3.850 $2.750 $5.080 $5.000 $7.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 6,257.000 $1.000 $0.600 $0.800 $1.000 $0.850 $0.770 $0.900 $1.250 $2.030 $2.000 $2.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 285.000 $5.000 $5.200 $5.000 $6.000 $5.180 $4.700 $5.500 $5.500 $10.170 $13.000 $11.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 15.000 $7.000 $6.200 $6.000 $7.000 $6.070 $5.460 $6.500 $7.500 $15.250 $40.000 $12.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 300.000 $2.000 $2.100 $0.800 $1.000 $0.890 $0.810 $0.950 $4.000 $5.080 $4.000 $2.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 1,020.000 $70.000 $11.400 $38.000 $90.000 $40.000 $75.000 $93.000 $75.000 $76.760 $65.000 $75.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 60.000 $110.000 $11.400 $85.000 $91.000 $71.000 $120.000 $76.000 $85.000 $76.760 $65.000 $150.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 540.000 $10.000 $12.000 $15.000 $13.000 $35.000 $5.000 $19.000 $9.000 $10.680 $20.000 $150.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 40.000 $12.000 $12.000 $14.000 $15.000 $55.000 $5.000 $19.000 $15.000 $10.680 $20.000 $150.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 1,020.000 $30.500 $12.300 $12.000 $22.000 $31.000 $12.000 $17.000 $9.000 $15.760 $25.000 $5.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 60.000 $29.000 $12.300 $10.000 $22.000 $48.000 $15.000 $17.000 $11.000 $15.760 $25.000 $5.000
CONC CURB (MONO) (TY II)
LF 10,466.000 $15.000 $3.800 $6.000 $6.110 $9.270 $3.440 $8.300 $11.500 $6.230 $10.000 $4.000
DRIVEWAYS (CONC)
SY 327.000 $100.000 $78.300 $105.000 $115.000 $200.000 $78.940 $140.000 $90.000 $57.310 $110.000 $110.000
CURB RAMPS (TY 1)
EA 1.000 $4,000.000 $1,645.400 $2,800.000 $2,145.000 $20,453.000 $1,890.700 $3,500.000 $2,500.000 $991.280 $4,000.000 $3,500.000
FIXED BOLLARD
EA 8.000 $1,200.000 $292.300 $400.000 $513.000 $372.000 $798.180 $1,200.000 $1,300.000 $1,525.050 $800.000 $4,500.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 1.000 $2,400.000 $2,595.600 $2,500.000 $3,776.000 $1,874.000 $2,520.000 $2,950.000 $3,250.000 $3,558.450 $1,000.000 $5,700.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $3,200.000 $3,553.500 $3,500.000 $5,169.000 $3,816.000 $3,450.000 $4,000.000 $4,250.000 $3,863.460 $1,500.000 $7,900.000
CONDT (PVC) (SCH 80) (3")
LF 500.000 $22.000 $25.000 $25.000 $21.000 $17.390 $16.020 $17.000 $19.000 $16.290 $50.000 $20.000
CONDT (PVC) (SCH 80) (3") (BORE)
LF 149.000 $32.000 $36.500 $35.000 $28.000 $23.300 $21.470 $25.850 $24.000 $21.830 $65.000 $30.000
CONDUIT (PREPARE)
LF 2,885.000 $1.500 $3.400 $3.500 $4.000 $3.080 $2.840 $3.500 $3.000 $2.890 $70.000 $5.000
ELEC CONDR (NO.6) BARE
LF 1,320.000 $2.000 $2.100 $2.250 $3.000 $2.690 $2.480 $2.350 $2.250 $2.520 $65.000 $2.200
ELEC CONDR (NO.4) BARE
LF 985.000 $2.500 $3.600 $4.000 $4.000 $3.780 $3.450 $3.500 $3.000 $3.510 $125.000 $3.500
ELEC CONDR (NO.4) INSULATED
LF 1,970.000 $4.000 $4.000 $4.000 $5.000 $4.050 $3.730 $3.500 $3.000 $3.790 $150.000 $4.000
TRAY CABLE (4 CONDR) (12 AWG)
LF 1,560.000 $3.500 $3.400 $4.000 $5.000 $4.240 $3.910 $2.350 $3.250 $3.980 $150.000 $3.500
ITS GND BOX TY 1 (362422)W/APRON
EA 3.000 $4,000.000 $6,810.100 $7,500.000 $7,748.000 $6,552.000 $6,037.170 $2,150.000 $7,000.000 $6,137.990 $100.000 $6,700.000
GROUND BOX TY D (162922)W/APRON
EA 1.000 $1,500.000 $1,876.600 $2,000.000 $1,509.000 $1,276.000 $1,175.530 $2,550.000 $1,400.000 $1,195.160 $5.000 $2,100.000
REMOVE GROUND BOX
EA 2.000 $200.000 $2,164.500 $2,250.000 $335.000 $284.000 $261.320 $965.000 $450.000 $265.680 $80.000 $400.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 6.000 $550.000 $667.700 $825.000 $1,502.000 $742.000 $680.000 $800.000 $875.000 $694.500 $10.000 $725.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 8.000 $750.000 $921.600 $1,100.000 $1,403.000 $997.000 $920.000 $1,080.000 $1,000.000 $933.990 $10.000 $975.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $1,000.000 $874.500 $1,400.000 $1,645.000 $1,169.000 $1,195.000 $1,400.000 $1,200.000 $1,094.760 $5.000 $1,300.000
REMOVE SM RD SN SUP&AM
EA 5.000 $95.000 $108.200 $130.000 $199.000 $141.000 $110.000 $130.000 $130.000 $132.170 $5.000 $120.000
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 147.000 $2.750 $2.100 $1.500 $2.000 $1.470 $2.000 $1.500 $3.500 $1.370 $6.000 $2.000
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 1,267.000 $1.500 $1.000 $1.500 $2.000 $1.470 $2.000 $1.500 $3.500 $1.370 $4.000 $2.000
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 688.000 $2.000 $2.100 $3.000 $4.000 $2.930 $3.500 $3.200 $5.500 $2.750 $10.000 $3.500
WK ZN PAV MRK REMOV (W)(ARROW)
EA 3.000 $200.000 $206.000 $220.000 $298.000 $212.000 $245.000 $230.000 $225.000 $198.260 $175.000 $250.000
WK ZN PAV MRK REMOV (W)(DBL ARROW)
EA 1.000 $300.000 $360.500 $250.000 $344.000 $244.000 $315.000 $260.000 $300.000 $228.760 $380.000 $320.000
WK ZN PAV MRK REMOV (W)(TPL ARROW)
EA 1.000 $250.000 $463.500 $310.000 $420.000 $299.000 $385.000 $320.000 $350.000 $279.590 $500.000 $400.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 1,606.000 $1.500 $1.000 $2.500 $2.000 $1.470 $2.000 $1.600 $3.250 $1.370 $1.500 $2.000
RE PM TY III (W)(6")(SLD)
LF 320.000 $1.250 $2.100 $2.000 $3.000 $1.900 $1.500 $2.000 $3.250 $1.780 $3.000 $1.500
RE PM TY III (W)(6")(BRK)
LF 1,340.000 $1.250 $2.100 $2.000 $3.000 $1.900 $1.500 $2.000 $3.250 $1.780 $1.500 $1.500
RE PM TY III (W)(8")(SLD)
LF 2,684.000 $1.750 $2.100 $2.500 $3.000 $2.440 $2.000 $2.750 $4.250 $2.290 $2.000 $2.000
RE PM TY III (W)(12")(SLD)
LF 244.000 $7.000 $5.200 $4.000 $5.000 $3.800 $5.000 $4.100 $8.000 $3.560 $5.000 $5.000
RE PM TY III (W)(24")(SLD)
LF 58.000 $11.000 $15.500 $14.000 $19.000 $13.570 $10.000 $14.500 $16.000 $12.710 $10.000 $10.000
RE PM TY III (Y)(6")(SLD)
LF 821.000 $1.250 $2.100 $2.000 $3.000 $1.900 $1.500 $2.000 $3.250 $1.770 $10.000 $1.500
RE PM TY III (W)(ARROW)
EA 8.000 $425.000 $257.500 $350.000 $497.000 $353.000 $300.000 $380.000 $275.000 $330.430 $230.000 $325.000
RE PM TY III (W)(WORD)
EA 6.000 $425.000 $257.500 $400.000 $542.000 $385.000 $350.000 $420.000 $300.000 $360.930 $300.000 $350.000
RE PM TY III (BLK)(6")(SHADOW)
LF 1,340.000 $1.000 $2.100 $2.000 $3.000 $1.900 $2.000 $2.000 $3.250 $1.780 $1.500 $2.000
REFL PAV MRKR TY II-C-R
EA 194.000 $7.000 $7.200 $7.000 $9.000 $6.510 $6.000 $7.000 $6.500 $6.100 $10.000 $6.000
ELIM EXT PM & MRKS (6")
LF 3,019.000 $0.600 $0.600 $0.700 $1.000 $0.670 $0.500 $0.750 $2.250 $0.630 $1.000 $0.500
ELIM EXT PM & MRKS (8")
LF 688.000 $1.000 $0.700 $1.000 $1.000 $0.960 $0.750 $1.000 $2.250 $0.890 $1.300 $1.000
PAV SURF PREP FOR MRK (6")
LF 3,821.000 $0.100 $0.100 $0.070 $0.090 $0.070 $0.050 $0.050 $2.250 $0.060 $0.800 $0.100
PAV SURF PREP FOR MRK (8")
LF 2,684.000 $0.100 $0.100 $0.090 $0.120 $0.090 $0.100 $0.100 $2.250 $0.080 $0.900 $0.100
PAV SURF PREP FOR MRK (12")
LF 244.000 $0.250 $0.200 $0.140 $0.190 $0.130 $0.500 $0.150 $2.500 $0.120 $3.000 $0.500
PAV SURF PREP FOR MRK (24")
LF 58.000 $1.000 $0.400 $0.250 $0.370 $0.260 $1.000 $0.300 $5.000 $0.240 $25.000 $1.000
PAV SURF PREP FOR MRK (ARROW)
EA 8.000 $15.000 $5.200 $5.500 $8.000 $5.430 $10.000 $6.000 $30.000 $5.080 $30.000 $11.000
PAV SURF PREP FOR MRK (WORD)
EA 6.000 $15.000 $5.200 $5.500 $8.000 $5.430 $10.000 $6.000 $45.000 $5.080 $40.000 $10.000
PED SIG SEC (LED)(COUNTDOWN)
EA 2.000 $800.000 $1,125.800 $1,200.000 $844.000 $713.000 $657.410 $975.000 $1,200.000 $668.390 $30.000 $1,000.000
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
LF 2,800.000 $2.000 $2.000 $2.250 $2.000 $1.800 $1.660 $3.500 $2.000 $1.690 $15.000 $2.500
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
LF 3,235.000 $2.500 $3.100 $3.500 $3.000 $2.690 $2.480 $3.500 $2.500 $2.520 $15.000 $3.000
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
LF 2,075.000 $3.250 $4.500 $5.000 $5.000 $3.990 $3.680 $6.000 $3.500 $3.740 $10.000 $4.500
REMOVE TRF SIG CBL
LF 13,945.000 $2.500 $0.400 $0.500 $1.000 $1.250 $1.150 $1.200 $1.150 $1.170 $10.000 $1.700
PED POLE ASSEMBLY
EA 1.000 $3,000.000 $4,716.200 $5,000.000 $3,754.000 $3,175.000 $2,925.360 $5,350.000 $4,350.000 $2,974.210 $10.000 $4,000.000
REMOVE PED POLE ASSEMBLY
EA 1.000 $325.000 $835.600 $900.000 $148.000 $125.000 $115.050 $1,150.000 $850.000 $1,133.670 $5.000 $2,600.000
PED DETECT PUSH BUTTON (APS)
EA 2.000 $1,000.000 $1,340.900 $1,400.000 $1,109.000 $938.000 $864.460 $1,300.000 $1,450.000 $878.900 $500.000 $1,200.000
VIVDS CABLING (INSTALL ONLY)
LF 1,550.000 $2.750 $0.900 $1.000 $1.000 $1.250 $1.150 $4.700 $2.250 $1.170 $25.000 $1.750
VIVDS CABLING (REMOVE)
LF 1,550.000 $0.500 $0.900 $1.000 $1.000 $1.250 $1.150 $2.350 $1.500 $1.170 $25.000 $1.750
RVDS (ADVANCE DET)(INSTALL ONLY)
EA 2.000 $1,000.000 $3,000.300 $3,200.000 $295.000 $250.000 $230.120 $2,100.000 $1,200.000 $233.960 $10.000 $750.000
REMOVE RVDS
EA 2.000 $300.000 $763.300 $800.000 $295.000 $250.000 $230.120 $230.000 $700.000 $233.960 $5.000 $500.000
GROUND BOX (PREPARE)
EA 3.000 $750.000 $1,024.300 $1,100.000 $419.000 $355.000 $326.670 $830.000 $600.000 $332.130 $10.000 $375.000
FIBER OPTIC CBL (SINGLE-MODE)(12 FIBER)
LF 815.000 $3.000 $4.900 $5.000 $6.000 $5.300 $4.890 $11.750 $10.500 $4.970 $15.000 $80.000
LIGHTNING PROTECTION SYSTEM
EA 1.000 $12,000.000 $20,424.800 $20,000.000 $14,871.000 $12,576.000 $11,587.810 $14,000.000 $8,250.000 $12,055.840 $12.000 $25,000.000
Totals: $8,730,471.700 $6,547,219.344 $7,835,083.420 $8,156,594.400 $8,353,698.250 $8,467,146.060 $8,530,410.300 $8,573,510.000 $8,955,745.330 $10,021,013.250 $10,488,103.650
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $20,000.00
ITS: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $100,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $10,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $10,000.00
Total: $140,000.00