CHAMBERS IH 10 (0508-03-111)

Items: 51

County: CHAMBERS
Length: 0.0000 MILES
Highway: IH 10
District: BEAUMONT
Control Number: 0508-03-111
DBE Goal: 0.0%
Project: STP 2B25(164)MM
Guaranty: $18,000.00
Time: 45 WORKING DAYS
Engineer's Estimate: $964,483.72
Date: 10/09/2025 (8 months ago)
Contract Number: 10253227
Type: SURFACING/ROADWAY RESTORATION
Project ID: A00177962
Contract Type: Federal
Project Description: IH 10 WBFR (FM 1406, EAST TO 0.361 MILES EAST OF FM 1406) BASE REPAIR / OVERLAY
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
ROBERTO RODRIGUEZ
ROBERTO M RODRIGUEZ
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$964,483.72
Over/Under Est: -14.69% -$141,641.62
Over/Under Est: -0.79% -$7,609.69
Amt Left: 16.29% $134,031.93
Over/Under Est: 0.47% $4,511.93
Amt Left: 17.76% $146,153.55
Delta: -1.27% -$12,121.62
Subcontractor Percentage Amount
J & M CONTRACTING, COMPANY 14.63% $120,381.80
MAR-ZAP CONSTRUCTION, LLC 8.81% $72,492.39
BATTERSON, LLP 7.93% $65,251.38
4E TREE WORX LLC 2.53% $20,817.91
J. H. ODEN CONTRACTING COMPANY 0.89% $7,323.29
LONESTAR TRAFFIC SAFETY, LLC 0.70% $5,759.89
Total: 35.49% $292,026.66

Bid Items & Bid Tabulations

51 Total 0 of 51
CHAMBERS  |  IH 10  |  BEAUMONT  |  0508-03-111  |  10/09/2025  |  $964,483.72  |  STP 2B25(164)MM  |  SURF/ROADWAY RESTOR  |  45 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
ELITE KINGS CONSTRUCTION, LLC
TEXAS MATERIALS GROUP, INC.
PREPARING ROW
STA 24.000 $1,800.000 $900.000 $20.750 $960.000
REMOV CONC (MOWSTRIP)
LF 786.000 $15.000 $25.000 $8.210 $9.000
EXCAV (SPECIAL)
CY 3.000 $35.000 $500.000 $20.870 $754.000
EMBANK (FNL)(OC)(TY C)
CY 4.000 $100.000 $800.000 $18.000 $522.000
BACKFILL (TY A OR B)
STA 89.000 $268.000 $390.000 $11.200 $329.000
SPEC EXCAV WORK (HYD EXCAVATOR)
HR 16.000 $300.000 $250.000 $225.500 $930.000
HYDRO MULCH SEED (PERM_RURAL_SANDY)
SY 9,720.000 $0.600 $0.750 $1.200 $0.450
VEGETATIVE WATERING
TGL 100.000 $40.000 $10.000 $2.990 $226.000
SP MIXES SP-C SAC-A PG76-22
TON 2,204.000 $185.000 $153.000 $200.000 $175.000
TACK COAT
GAL 2,003.000 $4.000 $3.500 $7.000 $3.600
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 700.000 $90.000 $95.000 $58.050 $103.000
PLANE ASPH CONC PAV(0" TO 2")
SY 1,545.000 $8.000 $10.000 $4.190 $8.000
RIPRAP (MOW STRIP)(4 IN)
CY 53.000 $705.000 $1,000.000 $646.210 $665.000
RC PIPE (CL III)(24 IN)
LF 4.000 $160.000 $225.000 $128.000 $2,370.000
RC PIPE (CL III)(30 IN)
LF 4.000 $175.000 $350.000 $131.360 $1,230.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 3.000 $2,500.000 $2,500.000 $3,000.000 $2,113.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 2.000 $2,840.000 $4,000.000 $3,000.000 $2,840.000
MOBILIZATION
LS 1.000 $50,000.000 $62,000.000 $150,000.000 $90,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $9,000.000 $3,000.000 $9,000.000 $1,107.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $4,500.000 $2,000.000 $300.000 $3,658.000
TMA (STATIONARY)
DAY 80.000 $900.000 $75.000 $300.000 $266.000
TMA (MOBILE OPERATION)
DAY 10.000 $700.000 $75.000 $330.000 $723.000
DRIVEWAYS (CONC)
SY 69.000 $228.000 $260.000 $105.880 $64.000
DRIVEWAYS (ACP)
SY 200.000 $60.000 $45.000 $46.590 $96.000
DRIVEWAYS (BASE)
SY 227.000 $50.000 $45.000 $19.080 $36.000
MTL W-BEAM GD FEN (TIM POST)
LF 900.000 $35.000 $21.000 $20.000 $28.000
REMOVE METAL BEAM GUARD FENCE
LF 550.000 $5.000 $5.000 $4.000 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 6.000 $145.000 $175.000 $800.000 $277.000
GUARDRAIL END TREATMENT (INSTALL)
EA 7.000 $3,330.000 $2,885.000 $3,000.000 $3,100.000
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
EA 1.000 $6,500.000 $5,000.000 $35,500.000 $31,000.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 2.000 $300.000 $320.000 $319.800 $332.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 1.000 $285.000 $320.000 $362.000 $332.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 21.000 $500.000 $690.000 $357.000 $637.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 16.000 $600.000 $830.000 $300.000 $847.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000 $800.000 $975.000 $350.000 $980.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 1.000 $900.000 $1,175.000 $300.000 $1,219.000
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 1.000 $1,300.000 $1,345.000 $510.000 $1,440.000
REMOVE SM RD SN SUP&AM
EA 38.000 $150.000 $150.000 $650.000 $99.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 12.000 $27.000 $35.000 $22.000 $34.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 96.000 $2.120 $1.000 $0.980 $0.500
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 770.000 $1.800 $1.000 $0.500 $0.500
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 1,158.000 $1.600 $0.900 $0.920 $2.150
REFL PAV MRK TY I (W)6"(SLD)(090MIL)
LF 15,595.000 $0.600 $0.600 $0.690 $1.100
REFL PAV MRK TY I (Y)6"(BRK)(090MIL)
LF 1,630.000 $0.600 $0.600 $1.150 $1.100
REFL PAV MRK TY I (Y)6"(SLD)(090MIL)
LF 12,604.000 $0.600 $0.600 $0.680 $1.100
PREFAB PM TY C (W)(24")(SLD)
LF 30.000 $13.000 $18.000 $150.000 $27.750
PREFAB PM TY C (W)(WORD)
EA 12.000 $250.000 $300.000 $156.000 $415.500
PREFAB PM TY C (W)(36")(YLD TRI)
EA 28.000 $54.000 $40.000 $144.000 $61.000
REFL PAV MRKR TY I-C
EA 48.000 $5.000 $6.000 $2.000 $7.750
REFL PAV MRKR TY II-A-A
EA 193.000 $5.000 $6.000 $2.750 $7.750
REFL PAV MRKR TY II-C-R
EA 48.000 $5.000 $6.000 $2.000 $7.750
Totals: $964,483.720 $822,842.100 $956,874.030 $968,995.650
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
Total: $15,000.00