COLORADO US 90 (0026-06-033)

Items: 64

County: COLORADO
Length: 0.2320 MILES
Highway: US 90
District: YOAKUM
Control Number: 0026-06-033
DBE Goal: 0.0%
Project: BR 2026(338)
Guaranty: $100,000.00
Time: WORKING DAYS
Engineer's Estimate: $5,159,024.00
Date: 02/05/2026 (4 months ago)
Contract Number: 2263208
Type: BRIDGE REPLACEMENT
Project ID: A00130025
Contract Type: Federal
Project Description: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
RYAN SIMPER
PAUL RODRIGUEZ
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (14)
E
Engineer's Estimate
$5,159,024.00
$3,715,521.15
Over/Under Est: -27.98% -$1,443,502.85
Over/Under Est: -25.45% -$1,312,839.35
Amt Left: 3.52% $130,663.50
Over/Under Est: -27.65% -$1,426,455.08
Amt Left: 0.46% $17,047.77
Delta: 2.95% $113,615.73
Over/Under Est: -7.42% -$382,923.02
Amt Left: 28.54% $1,060,579.83
Delta: -27.96% -$1,043,532.06
$4,068,075.76
Over/Under Est: -21.15% -$1,090,948.24
Amt Left: 9.49% $352,554.61
Delta: 14.82% $708,025.22
Over/Under Est: -18.45% -$951,885.40
Amt Left: 13.23% $491,617.45
Delta: -3.42% -$139,062.84
$4,687,091.00
Over/Under Est: -9.15% -$471,933.00
Amt Left: 26.15% $971,569.85
Delta: -11.41% -$479,952.40
Over/Under Est: -10.46% -$539,722.50
Amt Left: 24.32% $903,780.35
Delta: 1.45% $67,789.50
Over/Under Est: -11.32% -$583,961.39
Amt Left: 23.13% $859,541.46
Delta: 0.96% $44,238.89
$4,520,855.40
Over/Under Est: -12.37% -$638,168.60
Amt Left: 21.67% $805,334.25
Delta: 1.18% $54,207.21
Over/Under Est: 1.35% $69,622.95
Amt Left: 40.72% $1,513,125.80
Delta: -15.66% -$707,791.55
$5,053,121.35
Over/Under Est: -2.05% -$105,902.65
Amt Left: 36% $1,337,600.20
Delta: 3.36% $175,525.60
Over/Under Est: 13.69% $706,211.19
Amt Left: 57.86% $2,149,714.04
Delta: -16.07% -$812,113.84
Over/Under Est: 4.88% $251,515.79
Amt Left: 45.62% $1,695,018.64
Delta: 7.75% $454,695.40

Bid Items & Bid Tabulations

64 Total 0 of 64
COLORADO  |  US 90  |  YOAKUM  |  0026-06-033  |  02/05/2026  |  $5,159,024.00  |  BR 2026(338)  |  BRIDGE REPL  |  WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
R CONSTRUCTION CIVIL, LLC
TEXAS STEEL INDUSTRIAL PLACING, LLC
HUNTER INDUSTRIES, LTD.
RAGLE CONSTRUCTION, INC.
TUCAN CONTRACTING, LLC
E-Z BEL CONSTRUCTION, LLC
ALTUS CONSTRUCTION LLC
HODGES AND SON CONSTRUCTION COMPANY, INC.
DEAN WORD COMPANY, LTD.
CASTILLO ARANDA LLC
TEXAS MATERIALS GROUP, INC.
C. E. BARKER, LTD.
HARPER BROTHERS CONSTRUCTION LLC
FORDE CONSTRUCTION COMPANY, INC.
PREPARING ROW
STA 14.000 $10,000.000 $2,400.000 $1,000.000 $732.600 $25,000.000 $330.000 $6,200.000 $33,144.677 $3,500.000 $8,500.000 $5,250.000 $24,500.000 $35,714.000 $2,250.000 $6,200.000
EXCAV (ROADWAY)
CY 144.000 $20.000 $65.000 $25.000 $29.700 $193.000 $55.000 $12.500 $17.536 $30.000 $66.250 $20.000 $169.000 $29.070 $25.000 $37.000
EXCAV (CHANNEL)
CY 479.000 $20.000 $40.000 $25.000 $29.700 $28.000 $22.000 $11.000 $22.107 $30.000 $19.750 $20.000 $25.000 $29.070 $12.500 $35.000
EMBANK (FNL)(OC)(TY C)
CY 1,356.000 $30.000 $25.000 $30.000 $22.000 $12.900 $22.000 $24.000 $42.111 $25.000 $18.000 $15.000 $50.000 $47.430 $35.000 $31.000
BLADING
HR 20.000 $100.000 $110.000 $100.000 $99.000 $157.000 $165.000 $120.000 $100.221 $20.000 $56.250 $70.000 $75.000 $145.350 $140.000 $110.000
FURN & PLACE TOPSOIL (4")
SY 8,947.000 $20.000 $8.000 $4.000 $1.100 $1.800 $3.300 $6.000 $2.358 $4.000 $3.750 $2.000 $2.750 $6.390 $3.570 $5.000
HYDRO MULCH SEED (PERM_RURAL_CLAY)
SY 8,947.000 $1.000 $0.950 $0.660 $1.290 $0.660 $0.500 $0.650 $0.431 $1.500 $0.500 $1.000 $0.400 $0.610 $0.750 $0.750
HYDRO MULCH SEED (TEMP_WARM)
SY 2,238.000 $1.000 $1.000 $0.660 $1.210 $0.660 $0.400 $0.650 $0.368 $1.000 $0.500 $1.000 $0.400 $0.610 $0.750 $0.750
HYDRO MULCH SEED (TEMP_COOL)
SY 2,238.000 $1.000 $1.000 $0.660 $1.210 $0.660 $0.420 $0.650 $0.634 $1.000 $0.500 $1.000 $0.400 $0.610 $0.750 $0.750
VEGETATIVE WATERING
TGL 75.000 $70.000 $250.000 $1.000 $25.300 $74.000 $30.800 $55.000 $25.423 $1.000 $83.750 $40.000 $49.000 $77.520 $35.000 $150.000
SOIL RET BLKT(SL_MOD_SAND_SHORT)
SY 600.000 $4.000 $3.000 $2.000 $3.080 $2.000 $3.030 $1.350 $2.453 $4.000 $3.250 $6.000 $3.000 $9.690 $5.000 $1.500
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
CY 41.000 $150.000 $200.000 $130.000 $115.900 $131.000 $110.000 $93.000 $94.797 $150.000 $258.750 $80.000 $260.000 $176.260 $100.000 $200.000
AGGR (TY-PE, GR-4)(SAC-B)
CY 115.000 $400.000 $275.000 $332.550 $144.910 $180.000 $220.000 $250.000 $170.971 $500.000 $177.500 $90.000 $245.000 $306.000 $250.000 $265.000
ASPH (AC 20-5TR OR AC-20XP OR CRS-2P)
GAL 4,981.000 $8.000 $5.000 $3.740 $3.850 $4.800 $8.800 $4.500 $7.137 $9.000 $4.000 $10.000 $3.500 $5.510 $4.500 $4.000
D-GR HMA TY-B PG64-22
TON 1,622.000 $132.000 $145.000 $103.980 $96.800 $139.000 $110.000 $132.000 $185.704 $150.000 $156.750 $200.000 $100.000 $161.570 $132.000 $167.000
D-GR HMA TY-D SAC-B PG70-22
TON 1,589.000 $132.000 $155.000 $110.630 $107.800 $139.000 $176.000 $145.000 $196.512 $150.000 $166.000 $230.000 $162.000 $177.480 $145.000 $193.000
TACK COAT
GAL 773.000 $10.000 $5.000 $3.060 $2.970 $7.300 $5.500 $4.500 $3.706 $8.000 $10.000 $10.000 $5.000 $5.510 $4.500 $5.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 4,156.000 $65.000 $100.000 $65.740 $64.530 $95.000 $110.000 $87.000 $106.077 $100.000 $99.000 $55.000 $93.000 $106.490 $35.000 $98.000
CEM STABIL BKFL
CY 114.000 $225.000 $105.000 $225.000 $150.000 $132.000 $176.000 $224.600 $165.807 $300.000 $240.750 $90.000 $178.000 $223.180 $225.000 $260.000
DRILL SHAFT (36 IN)
LF 1,320.000 $300.000 $265.000 $300.000 $309.650 $236.000 $226.370 $300.000 $242.816 $300.000 $314.250 $380.000 $304.000 $443.430 $600.000 $520.000
CL C CONC (ABUT)
CY 56.600 $1,600.000 $635.000 $1,200.000 $1,625.000 $863.000 $1,100.000 $1,105.000 $1,332.279 $1,200.000 $1,739.500 $1,400.000 $1,595.000 $1,291.170 $3,250.000 $2,500.000
CL C CONC (CAP)
CY 140.900 $1,800.000 $775.000 $1,700.000 $1,275.000 $1,126.000 $1,210.000 $1,050.000 $962.196 $1,350.000 $2,261.250 $1,500.000 $1,585.000 $1,625.270 $3,250.000 $2,400.000
CL C CONC (COLUMN)
CY 52.700 $2,000.000 $820.000 $1,700.000 $1,175.000 $1,875.000 $1,320.000 $1,225.000 $2,495.583 $1,200.000 $2,815.750 $1,100.000 $1,795.000 $1,758.540 $2,750.000 $2,100.000
REINF CONC SLAB
SF 24,840.000 $32.000 $24.000 $20.000 $26.000 $21.250 $24.200 $25.000 $17.657 $25.000 $26.000 $24.000 $28.500 $18.740 $29.000 $28.000
PRESTR CONC GIRDER (TX28)
LF 3,216.000 $205.000 $175.000 $170.000 $175.000 $173.000 $159.590 $232.000 $154.267 $210.000 $204.500 $260.000 $190.000 $188.900 $275.000 $243.000
RIPRAP (CONC)(5 IN)
CY 20.000 $700.000 $515.000 $750.000 $900.000 $629.000 $770.000 $500.000 $517.732 $800.000 $505.000 $450.000 $730.000 $824.360 $750.000 $975.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 887.000 $195.000 $215.000 $185.000 $169.980 $192.000 $165.000 $175.000 $199.568 $190.000 $92.750 $275.000 $200.000 $273.260 $200.000 $270.000
RAIL (TY T223)
LF 1,128.000 $150.000 $205.000 $160.000 $140.000 $116.000 $165.000 $174.000 $143.410 $140.000 $181.750 $190.000 $195.000 $104.840 $150.000 $240.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 182.000 $250.000 $175.000 $250.000 $280.000 $213.000 $187.000 $275.000 $344.879 $200.000 $312.750 $160.000 $265.000 $210.530 $225.000 $270.000
CMP (GAL STL 15 IN)
LF 166.000 $150.000 $105.000 $110.000 $80.000 $68.000 $49.500 $52.000 $58.953 $75.000 $57.500 $40.000 $445.000 $17.510 $150.000 $87.000
SET (TY II) (15 IN) (CMP) (6: 1) (P)
EA 2.000 $1,200.000 $4,900.000 $2,500.000 $1,600.000 $730.000 $770.000 $1,350.000 $884.306 $500.000 $1,390.750 $2,200.000 $1,500.000 $1,453.500 $3,000.000 $3,100.000
REMOV STR (BRIDGE 500 - 999 FT LENGTH)
EA 1.000 $450,000.000 $75,000.000 $100,000.000 $73,501.500 $400,000.000 $55,000.000 $72,500.000 $123,065.998 $200,000.000 $110,000.000 $85,000.000 $95,000.000 $73,440.000 $450,000.000 $155,000.000
REMOV STR (SMALL)
EA 1.000 $2,400.000 $1,000.000 $2,425.000 $5,000.000 $1,200.000 $1,320.000 $1,090.000 $2,800.304 $5,000.000 $565.000 $2,500.000 $1,500.000 $5,814.000 $950.000 $2,600.000
MOBILIZATION
LS 1.000 $469,539.000 $35,000.000 $381,153.430 $357,001.140 $475,000.000 $600,000.000 $390,000.000 $466,369.054 $550,000.000 $275,000.000 $200,000.000 $850,000.000 $459,000.000 $445,000.000 $350,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $5,000.000 $4,300.000 $3,500.000 $7,439.750 $35,700.000 $2,200.000 $2,850.000 $26,039.589 $3,000.000 $3,988.500 $11,500.000 $3,300.000 $3,085.500 $24,000.000 $4,400.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $13,000.000 $24,000.000 $30,000.000 $3,857.300 $9,800.000 $5,500.000 $5,700.000 $7,000.760 $20,000.000 $29,562.250 $15,000.000 $12,800.000 $20,196.000 $30,000.000 $10,000.000
TMA (STATIONARY)
DAY 20.000 $250.000 $325.000 $250.000 $165.310 $287.000 $308.000 $255.000 $147.384 $300.000 $177.500 $500.000 $260.000 $122.400 $500.000 $200.000
TMA (MOBILE OPERATION)
DAY 20.000 $150.000 $340.000 $1.000 $330.630 $616.000 $352.000 $475.000 $110.538 $300.000 $442.000 $750.000 $260.000 $122.400 $750.000 $200.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 855.000 $5.000 $5.000 $6.000 $4.760 $6.000 $3.580 $4.250 $3.367 $1.000 $4.000 $4.000 $2.000 $2.200 $3.800 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 855.000 $2.000 $1.000 $1.000 $2.470 $1.000 $1.380 $1.000 $0.921 $1.000 $1.500 $1.000 $2.000 $2.200 $1.500 $1.500
CONSTRUCTING DETOURS
SY 781.000 $140.000 $50.000 $120.000 $46.200 $51.000 $44.000 $99.000 $48.418 $70.000 $97.250 $50.000 $95.000 $126.390 $165.000 $95.000
MTL W-BEAM GD FEN (TIM POST)
LF 400.000 $30.000 $24.000 $27.000 $26.480 $22.750 $25.030 $22.800 $21.075 $26.000 $29.750 $30.000 $27.000 $29.990 $24.720 $28.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,500.000 $1,900.000 $2,000.000 $1,859.290 $2,600.000 $1,991.000 $1,810.000 $1,746.505 $1,500.000 $3,026.500 $1,950.000 $3,000.000 $2,527.560 $1,736.000 $1,950.000
REMOVE METAL BEAM GUARD FENCE
LF 487.000 $6.000 $5.000 $5.000 $3.430 $5.000 $5.500 $5.000 $2.210 $2.000 $9.750 $10.000 $3.000 $7.710 $3.200 $3.600
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,500.000 $3,000.000 $3,000.000 $3,525.800 $2,845.000 $3,129.500 $2,845.000 $2,447.148 $3,500.000 $4,252.500 $600.000 $3,300.000 $3,672.000 $3,292.000 $3,700.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $600.000 $265.000 $275.000 $374.860 $250.000 $275.000 $250.000 $221.076 $500.000 $626.750 $300.000 $275.000 $379.440 $350.000 $470.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 1.000 $500.000 $525.000 $350.000 $535.510 $500.000 $550.000 $380.900 $184.230 $1,500.000 $364.500 $500.000 $425.000 $220.320 $500.000 $673.340
MAILBOX INSTALL-D (WC-POST) TY 3
EA 1.000 $500.000 $575.000 $350.000 $578.350 $700.000 $550.000 $394.400 $212.602 $1,500.000 $425.500 $300.000 $500.000 $281.520 $540.000 $727.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 1.000 $1,000.000 $525.000 $650.000 $535.510 $1,000.000 $550.000 $487.700 $377.517 $1,500.000 $790.250 $700.000 $750.000 $856.800 $500.000 $675.000
REMOVE SM RD SN SUP&AM
EA 1.000 $200.000 $210.000 $100.000 $107.100 $250.000 $110.000 $100.000 $84.746 $50.000 $152.000 $100.000 $165.000 $122.400 $100.000 $134.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BR)
EA 12.000 $30.000 $20.000 $35.000 $19.280 $35.000 $16.500 $200.000 $33.161 $30.000 $21.500 $35.000 $35.000 $36.720 $18.000 $24.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 2.000 $40.000 $30.000 $35.000 $29.990 $50.000 $49.500 $200.000 $25.792 $30.000 $33.750 $20.000 $35.000 $42.840 $28.000 $37.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 4.000 $40.000 $120.000 $120.000 $123.170 $125.000 $27.500 $200.000 $66.322 $300.000 $88.750 $80.000 $70.000 $79.560 $115.000 $155.000
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 1,997.000 $1.500 $1.000 $1.000 $0.860 $1.000 $0.550 $1.350 $0.982 $2.000 $1.250 $1.100 $1.500 $1.220 $0.800 $1.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 7,451.000 $1.500 $1.000 $1.000 $0.910 $1.000 $0.550 $1.350 $0.982 $2.000 $1.250 $1.100 $1.500 $1.220 $0.850 $1.100
RE PM TY II (W) 6" (SLD)
LF 1,080.000 $1.000 $2.000 $0.500 $1.870 $0.500 $16.500 $0.650 $0.736 $2.000 $1.000 $1.000 $1.000 $0.920 $1.750 $16.000
RE PM TY II (Y) 6" (SLD)
LF 1,080.000 $1.000 $2.000 $0.500 $1.870 $0.500 $16.500 $0.650 $0.736 $2.000 $1.000 $1.000 $1.000 $0.920 $1.750 $2.300
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 4,000.000 $1.500 $1.000 $0.700 $0.960 $0.700 $1.380 $0.850 $1.129 $2.000 $1.500 $1.300 $1.000 $1.410 $0.900 $1.200
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 4,592.000 $1.500 $1.000 $0.700 $0.960 $0.700 $1.380 $0.850 $1.129 $2.000 $1.500 $1.300 $1.000 $1.410 $0.900 $1.200
REFL PAV MRKR TY II-A-A
EA 167.000 $10.000 $6.000 $7.000 $6.430 $7.000 $8.800 $10.000 $7.369 $20.000 $9.250 $8.000 $10.000 $9.180 $6.000 $8.000
ELIM EXT PM & MRKS (4")
LF 1,180.000 $2.000 $1.000 $0.450 $1.070 $0.450 $4.400 $0.400 $1.965 $1.000 $2.500 $2.000 $4.000 $2.450 $1.000 $1.350
PAV SURF PREP FOR MRK (6")
LF 2,160.000 $1.000 $0.500 $0.200 $0.540 $0.200 $0.660 $0.100 $0.098 $1.000 $0.250 $0.500 $0.100 $2.450 $0.500 $0.700
NO. OF WORKING DAYS
$/D 10,091.000 $10,091.000 $120.000 $130.000 $160.000 $69.000 $154.000 $150.000 $170.000 $180.000 $185.000 $200.000 $140.000 $185.000 $145.000 $200.000
TMSP RADAR SPEED CONTROL MONITOR
EA 2.000 $10,000.000 $15,000.000 $10,000.000 $7,714.590 $8,000.000 $7,700.000 $1,400.000 $11,790.754 $16,000.000 $20,416.250 $18,500.000 $15,000.000 $18,360.000 $23,250.000 $10,000.000
Totals: $106,987,305.000 $4,926,441.150 $5,158,014.650 $5,347,128.920 $5,472,379.980 $5,622,089.760 $5,720,788.600 $6,402,560.981 $6,435,681.500 $6,441,897.600 $6,539,055.400 $6,641,386.950 $6,919,956.353 $7,328,430.190 $7,428,739.790
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
ENVIRONMENTAL: CONTRACTOR FORCE ACCOUNT WORK (PART) $500.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $6,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,000.00
Total: $7,500.00