Show Job Controls
Bid Cobra

CORYELL SH 9 (3623-01-004)

Items: 123

County: CORYELL
Length: 0.0000 MILES
Highway: SH 9
District: WACO
Control Number: 3623-01-004
DBE Goal: 0.0%
Project: C 3623-1-4
Guaranty: $100,000.00
Time: 180 WORKING DAYS
Engineer's Estimate: $12,372,591.53
Date: 09/04/2025 (9 months ago)
Contract Number: 9253006
Type: CONSTRUCT RAMPS
Project ID: A00131524
Project Description: CONSTRUCT EXIT RAMP TO TANK DESTROYER BLVD AND ENTRANCE RAMP FROM OLD GEORGETOWN ROAD.
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
MICHAEL YATES
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$12,372,591.53
$7,187,652.68
Over/Under Est: -41.91% -$5,184,938.85
Over/Under Est: -33.32% -$4,123,024.51
Amt Left: 14.77% $1,061,914.34
Over/Under Est: -31.98% -$3,957,176.53
Amt Left: 17.08% $1,227,762.32
Delta: -2.01% -$165,847.98
Subcontractor Percentage Amount
WOOLERY CUSTOM FENCE CO. 4.00% $286,131.65
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., LLC 3.88% $277,547.70
CAP RIVER LLC 1.71% $122,321.28
ENVIRONMENTAL SAFETY SERVICES, INC. 0.99% $70,817.58
D. I. J. CONSTRUCTION, INC. 0.82% $58,656.99
STRIPE-A-ZONE, LLC 0.41% $29,328.49
4E TREE WORX LLC 0.38% $27,182.51
Total: 12.19% $871,986.20

Bid Items & Bid Tabulations

123 Total 0 of 123
CORYELL  |  SH 9  |  WACO  |  3623-01-004  |  09/04/2025  |  $12,372,591.53  |  C 3623-1-4  |  CONSTRUCT RAMPS  |  180 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BIG CREEK CONSTRUCTION, LTD.
TEXAS MATERIALS GROUP, INC.
JORDAN FOSTER CONSTRUCTION, LLC
PREPARING ROW
STA 28.400 $7,000.000 $5,000.000 $1,345.000 $19,000.000
REMOV CONC (PAV)
SY 236.000 $40.000 $40.000 $65.000 $40.000
RMV (9"-13") TRT/UNTRT BASE & ASPH PAV
SY 1,305.000 $15.000 $12.000 $11.750 $11.000
RMV (14"-18") TRT/UNTRT BASE & ASPH PAV
SY 3,182.000 $20.000 $20.000 $15.000 $13.000
RMV (0"-8") TRT/UNTRT BASE & ASPH PAV
SY 205.000 $10.000 $35.000 $26.000 $10.000
EXCAV (ROADWAY)
CY 79,850.000 $48.000 $16.000 $30.000 $10.500
EMBANK (FNL)(OC)(TY B)
CY 178.000 $43.000 $40.000 $38.000 $17.250
EMBANK (FNL)(DC)(TY B)
CY 28,269.000 $42.000 $14.000 $6.100 $17.250
FURN & PLACE TOPSOIL (4")
SY 138,384.000 $4.000 $1.500 $3.750 $3.100
BROADCAST SEED (TEMP_WARM_COOL)
SY 138,384.000 $0.500 $0.270 $0.120 $0.200
HYDRO MULCH SEED (PERM_RURAL_CLAY)
SY 138,384.000 $1.500 $0.450 $0.420 $0.700
VEGETATIVE WATERING
TGL 2,247.000 $60.000 $35.000 $64.880 $55.000
SOIL RET BLKT(SL_MOD_CLAY_LONG)
SY 33,678.000 $2.500 $1.500 $0.660 $2.000
SOIL RET BLKT(CHAN_PERM_6 PSF)
SY 5,633.000 $4.500 $3.000 $7.730 $5.350
PROOF ROLLING
HR 6.000 $115.000 $125.000 $130.000 $120.000
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 7,321.000 $80.000 $72.000 $62.000 $75.000
LIME (COM OR QK)(SLURRY)
TON 30.000 $350.000 $350.000 $285.000 $335.000
LIME TRT (EXIST MATL)(12")
SY 916.000 $6.000 $15.000 $27.000 $25.000
EMULS ASPH (BS OR SUBGR TRT)(CSS-1H)
GAL 52,726.000 $5.000 $3.400 $3.400 $7.500
FOG SEAL (CSS-1H)
GAL 2,637.000 $5.000 $6.000 $4.500 $4.000
ASPH (CRS-2)
GAL 11,863.000 $4.750 $3.800 $3.500 $4.150
AGGR (TY-D OR L, GR-4)
CY 194.000 $250.000 $200.000 $248.000 $260.000
D-GR HMA TY-B PG64-22
TON 7,089.000 $135.000 $95.000 $120.000 $120.000
SP MIXES SP-C SAC-B PG70-22
TON 4,056.000 $140.000 $102.000 $140.000 $138.000
TACK COAT
GAL 2,352.000 $5.300 $3.600 $3.050 $4.150
TOM-C PG76-22 SAC-B
TON 1,148.000 $140.000 $150.000 $173.000 $178.000
TACK COAT
GAL 2,664.000 $5.000 $3.700 $3.050 $4.150
PLAN ASPH CONC PAV (0.75")
SY 26,638.000 $2.250 $1.800 $1.350 $1.000
CONC PVMT (CRCP) (9")
SY 844.000 $180.000 $150.000 $140.000 $155.000
CUT & RESTORING PAV
SY 132.000 $240.000 $160.000 $160.000 $265.000
CEM STABIL BKFL
CY 165.000 $280.000 $195.000 $260.000 $200.000
TRENCH EXCAVATION PROTECTION
LF 366.000 $22.000 $35.000 $1.000 $15.000
TEMPORARY SPL SHORING
SF 1,184.000 $45.000 $30.000 $30.000 $23.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 35.000 $280.000 $250.000 $170.000 $200.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 88.000 $360.000 $300.000 $210.000 $245.000
RIPRAP (CONC)(5 IN)
CY 183.000 $750.000 $700.000 $675.000 $975.000
RIPRAP (MOW STRIP)(5 IN)
CY 2.000 $500.000 $1,000.000 $1,000.000 $1,200.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 67.000 $225.000 $160.000 $275.000 $280.000
CONC BOX CULV (3 FT X 2 FT)
LF 65.000 $420.000 $275.000 $280.000 $500.000
CONC BOX CULV (7 FT X 7 FT)
LF 63.000 $1,200.000 $870.000 $975.000 $1,400.000
RC PIPE (CL III)(18 IN)
LF 122.000 $110.000 $85.000 $80.000 $185.000
RC PIPE (CL III)(24 IN)
LF 250.000 $135.000 $155.000 $95.000 $205.000
RC PIPE (CL III)(36 IN)
LF 373.000 $245.000 $185.000 $210.000 $280.000
RC PIPE (CL IV)(30 IN)
LF 96.000 $195.000 $150.000 $150.000 $290.000
MANH (COMPL)(PRM)(72IN)
EA 1.000 $12,000.000 $23,000.000 $8,800.000 $40,000.000
INLET(COMPL)(PAZD)(FG)(5FTX5FT-4FTX4FT)
EA 1.000 $11,500.000 $8,800.000 $10,300.000 $10,000.000
WINGWALL (PW - 2) (HW=8 FT)
EA 2.000 $35,000.000 $26,900.000 $27,900.000 $45,000.000
SET (TY I)(S= 3 FT)(HW= 3 FT)(3:1)(C)
EA 2.000 $8,000.000 $10,800.000 $7,000.000 $9,500.000
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 2.000 $1,950.000 $875.000 $900.000 $2,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 1.000 $2,000.000 $1,060.000 $1,220.000 $2,400.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 1.000 $2,000.000 $1,350.000 $1,100.000 $2,000.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 1.000 $2,050.000 $1,410.000 $1,350.000 $2,400.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 1.000 $2,200.000 $1,600.000 $1,600.000 $3,111.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 2.000 $2,720.000 $2,500.000 $2,500.000 $4,300.000
SET (TY II) (36 IN) (RCP) (3: 1) (C)
EA 5.000 $4,500.000 $3,400.000 $3,000.000 $6,600.000
REMOV STR (SET)
EA 1.000 $700.000 $350.000 $300.000 $500.000
REMOV STR (PIPE)
LF 226.000 $37.500 $25.000 $13.000 $22.000
MOBILIZATION
LS 1.000 $626,890.780 $700,000.000 $500,000.000 $800,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $12,000.000 $5,000.000 $5,000.000 $8,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $10,000.000 $9,750.000 $6,000.000 $11,000.000
TMA (STATIONARY)
DAY 193.000 $300.000 $400.000 $275.000 $30.000
TMA (MOBILE OPERATION)
HR 112.000 $90.000 $85.000 $10.000 $200.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 216.000 $49.000 $45.000 $45.160 $41.000
ROCK FILTER DAMS (REMOVE)
LF 216.000 $16.500 $5.000 $17.000 $23.000
EMBANK (EROSN & SEDMT CONT, IN PLACE)
CY 743.000 $50.000 $25.000 $20.000 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,873.000 $5.500 $5.000 $6.490 $4.150
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,873.000 $2.450 $1.000 $0.880 $1.350
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 1,830.000 $25.000 $12.000 $16.860 $18.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 810.000 $10.000 $8.000 $17.000 $4.750
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 1,830.000 $16.500 $11.000 $16.500 $17.000
CONC CURB & GUTTER (TY I)
LF 889.000 $60.000 $36.000 $48.000 $36.000
DRIVEWAYS (ACP)
SY 155.000 $100.000 $60.000 $75.000 $130.000
CONC MEDIAN
SY 571.000 $195.000 $95.000 $110.000 $145.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,400.000 $1,500.000 $1,550.000 $875.000
CRASH CUSH ATTEN (STKPL)
EA 2.000 $1,225.000 $1,000.000 $810.000 $1,020.000
CRASH CUSH ATTEN (INSTL)(S)(W)(TL3)
EA 2.000 $11,000.000 $12,000.000 $7,925.000 $12,300.000
CHAIN LINK FENCE (REMOVE)
LF 5,706.000 $19.000 $8.000 $10.520 $6.000
CHAIN LINK FENCE(INSTALL)(6 )(BARB TOP)
LF 7,192.000 $64.000 $40.000 $42.360 $35.000
GATE (REMOVE)
EA 2.000 $400.000 $2,500.000 $539.650 $2,000.000
GATE (INSTALL)(6'X24')
EA 2.000 $2,500.000 $10,000.000 $2,914.080 $10,000.000
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 11.000 $5,350.000 $6,500.000 $4,000.000 $4,700.000
CONDT (PVC) (SCH 40) (2")
LF 7,734.000 $21.000 $10.000 $8.000 $9.400
CONDT (PVC) (SCH 80) (2") (BORE)
LF 220.000 $28.000 $80.000 $65.000 $75.000
ELEC CONDR (NO.10) BARE
LF 10,399.000 $2.000 $1.500 $1.000 $1.200
GROUND BOX TY A (122311)W/APRON
EA 11.000 $1,500.000 $2,000.000 $1,200.000 $1,400.000
REMOVE GROUND BOX
EA 5.000 $500.000 $150.000 $92.000 $110.000
REMOVE ELECTRICAL SERVICES
EA 1.000 $1,200.000 $800.000 $552.000 $650.000
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
EA 1.000 $9,500.000 $8,500.000 $7,000.000 $8,300.000
ALUMINUM SIGNS (TY G)
SF 287.000 $45.000 $40.000 $35.000 $84.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $1,000.000 $1,200.000 $955.000 $1,315.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $1,000.000 $1,600.000 $1,280.000 $1,650.000
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 3.000 $1,250.000 $1,500.000 $1,265.000 $1,615.000
IN SM RD SN SUP&AM TYS80(1)SA(U-EXAL)
EA 1.000 $1,500.000 $2,000.000 $1,585.000 $2,140.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 42.000 $730.000 $750.000 $485.000 $690.000
REMOVE SM RD SN SUP&AM
EA 2.000 $165.000 $150.000 $110.000 $200.000
RELOCATE SM RD SN SUP & AM TY TEMP
EA 8.000 $600.000 $400.000 $450.000 $380.000
INSTALL LRSS (STRUCT STEEL)
LB 1,720.000 $9.500 $7.000 $6.000 $8.000
INSTL DEL ASSM (D-SW)SZ 2(WC)GND
EA 26.000 $30.000 $50.000 $70.000 $57.000
INSTL DEL ASSM (D-DW)SZ 2(WC)GND
EA 24.000 $30.000 $60.000 $71.000 $60.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 21.000 $100.000 $200.000 $63.000 $195.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 13,160.000 $0.600 $0.600 $0.520 $0.300
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 13,160.000 $0.600 $0.600 $0.520 $0.300
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 8.000 $2.000 $7.000 $5.000 $6.000
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 666.000 $2.000 $7.500 $5.500 $6.000
WK ZN PAV MRK REMOV (TRAF BTN) TY W
EA 20.000 $4.250 $7.000 $4.000 $6.000
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
EA 20.000 $4.250 $7.000 $4.000 $6.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 165.000 $1.600 $2.000 $1.120 $2.350
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 3,855.000 $1.200 $1.500 $1.100 $1.250
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 15.000 $3.450 $7.000 $6.500 $5.900
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 25.000 $12.000 $15.000 $13.000 $11.800
TY I HIGH PERF PM (W)6"(BRK)(100MIL)
LF 990.000 $1.000 $1.100 $0.900 $0.850
TY I HIGH PERF PM (W)6"(SLD)(100MIL)
LF 14,370.000 $1.000 $1.000 $0.870 $0.700
TY I HIGH PERF PM (Y)6"(SLD)(100MIL)
LF 11,143.000 $1.000 $1.000 $0.870 $0.700
PREFAB PM TY C (W)(ARROW)
EA 1.000 $300.000 $500.000 $205.000 $265.000
REFL PAV MRKR TY I-C
EA 266.000 $7.200 $8.000 $7.000 $6.900
REFL PAV MRKR TY II-A-A
EA 125.000 $7.200 $8.500 $7.500 $6.900
REFL PAV MRKR TY II-C-R
EA 2.000 $7.200 $7.000 $6.000 $6.900
ELIM EXT PM & MRKS (4")
LF 26,320.000 $0.650 $0.400 $0.300 $0.650
REMOVAL OF CONDUIT
LF 693.000 $10.000 $3.000 $2.000 $2.350
REMOVAL OF CABLES
LF 9,567.000 $2.000 $1.500 $0.500 $0.600
CLEANING / SWEEPING (AGGREGATE REMOVAL)
MI 1.644 $100.000 $1,000.000 $2,500.000 $2,400.000
PREFORMED IN-LANE (TRANS) RUMBLE STRIP
LF 160.000 $30.000 $20.000 $15.000 $11.750
ALUMINUM ELECTRICAL COND (#8 XHHW)
LF 27,936.000 $1.800 $2.500 $2.000 $2.300
Totals: $12,372,591.530 $7,187,652.680 $8,249,567.020 $8,415,415.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $10,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $10,000.00
Total: $20,000.00