Show Job Controls
Bid Cobra

DALLAS SL 12 (0581-02-162)

Items: 94

County: DALLAS
Length: 4.8640 MILES
Highway: SL 12
District: DALLAS
Control Number: 0581-02-162
DBE Goal: 0.0%
Project: F 2026(709)
Guaranty: $100,000.00
Time: 242 WORKING DAYS
Engineer's Estimate: $17,965,404.75
Date: 06/02/2026 (8 days ago)
Contract Number: 6263005
Type: REHABILITATE EXISTING ROADWAY
Project ID: A00196130
Contract Type: Federal
Project Description: FULL DEPTH CONCRETE REPAIR, MILL AND INLAY, BRIDGE REPAIR
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
NATHAN PETTER
DUNG NGUYEN
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$17,965,404.75
Over/Under Est: 9.04% $1,623,263.44
Over/Under Est: 12.86% $2,310,642.31
Amt Left: 3.51% $687,378.87
Over/Under Est: 14.61% $2,624,781.62
Amt Left: 5.11% $1,001,518.18
Delta: -1.55% -$314,139.31
Over/Under Est: 15.4% $2,766,296.00
Amt Left: 5.84% $1,143,032.56
Delta: -0.69% -$141,514.38

Bid Items & Bid Tabulations

94 Total 0 of 94
DALLAS  |  SL 12  |  DALLAS  |  0581-02-162  |  06/02/2026  |  $17,965,404.75  |  F 2026(709)  |  REHAB EXIST ROADWAY  |  242 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
AUSTIN BRIDGE & ROAD SERVICES, LP
GIBSON & ASSOCIATES, INC.
TEXAS MATERIALS GROUP, INC.
RAGLE CONSTRUCTION, INC.
REMOV CONC (RIPRAP)
SY 172.000 $25.000 $21.000 $23.100 $21.940 $30.000
REMOV CONC (WINGWALL)
CY 3.000 $1,000.000 $1,800.000 $1,980.000 $1,880.570 $450.000
REMOV CONC (TRAFFIC BARRIER)
LF 375.000 $25.000 $40.000 $34.000 $41.790 $30.000
EMBANK (FNL)(DC)(TY C2)
CY 67.000 $150.000 $65.000 $215.000 $67.910 $65.000
STONE-MTRX-ASPH SMA-C SAC-A PG76-22
TON 40,297.000 $150.000 $165.660 $181.980 $188.500 $178.450
TACK COAT
GAL 68,229.000 $1.000 $4.600 $4.970 $3.800 $5.200
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 11,215.000 $85.000 $76.000 $82.080 $81.520 $80.000
PLANE ASPH CONC PAV(0" TO 3")
SY 127,786.000 $2.000 $2.900 $2.750 $3.540 $2.750
FULL-DEPTH REP(BR APPR SLAB)(9"-13")
CY 45.500 $1,000.000 $3,900.000 $2,000.000 $1,619.380 $1,650.000
FULL - DEPTH REPAIR CRCP (8")
SY 5,500.000 $250.000 $198.000 $217.800 $206.860 $230.000
CEM STABIL BKFL
CY 5.500 $250.000 $400.000 $450.000 $417.750 $350.000
FLOWABLE BACKFILL
CY 84.500 $375.000 $250.000 $300.000 $261.190 $400.000
TEMPORARY SPL SHORING
SF 60.000 $30.000 $75.000 $82.500 $78.360 $100.000
CL C CONC (WINGWALLS)
CY 1.500 $3,000.000 $5,000.000 $5,500.000 $5,223.810 $3,000.000
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
SF 69.000 $150.000 $119.000 $165.000 $172.390 $175.000
CONC STR REPAIR(RAPID DECK REP(PRT DPT)
SF 146.000 $100.000 $86.000 $170.000 $177.610 $65.000
CONC STR REPR(RAPID DECK REP(FULL DPT))
SF 29.000 $200.000 $248.000 $425.000 $444.020 $215.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 1,749.000 $90.000 $160.000 $176.000 $183.880 $150.000
RIPRAP (CONC)(4 IN)
CY 36.000 $600.000 $670.000 $737.000 $699.990 $675.000
RIPRAP (CONC)(5 IN)
CY 6.500 $650.000 $690.000 $759.000 $720.890 $760.000
RIPRAP (MOW STRIP)(4 IN)
CY 15.000 $700.000 $700.000 $770.000 $731.330 $600.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 22.000 $250.000 $250.000 $275.000 $261.190 $220.000
RIPRAP (CONC)(8 IN)
CY 33.000 $650.000 $700.000 $770.000 $731.330 $600.000
CLEANING AND SEALING EXISTING JOINTS
LF 264.000 $20.000 $45.000 $49.500 $28.730 $55.000
CLEANING AND SEALING EXIST JOINTS (CL3)
LF 189.000 $30.000 $20.000 $22.000 $22.980 $18.000
CLEANING AND SEALING EXIST JOINTS (CL7)
LF 6,363.000 $25.000 $25.000 $27.500 $28.730 $23.000
CLEANING EXISTING JOINTS
LF 1,002.000 $15.000 $25.000 $27.500 $28.730 $61.340
CLEANING AND SEALING JOINTS (FOAM)
LF 957.000 $45.000 $72.000 $79.200 $83.580 $59.380
SPOT CLEAN & PNT EXT STR(SPL PROT SYS)
LS 1.000 $50,000.000 $22,500.000 $24,000.000 $25,074.290 $100,000.000
RETROFIT RAIL (TY SSTR)
LF 12,428.000 $138.000 $118.000 $129.800 $123.280 $110.000
JOINT SEALANT
LF 1.000 $30.000 $17.000 $150.000 $261.190 $100.000
CLEAN EXIST CULVERTS
EA 2.000 $3,000.000 $2,000.000 $10,000.000 $5,000.000 $42,000.000
MOBILIZATION
LS 1.000 $1,175,000.000 $2,154,753.500 $1,000,000.000 $1,158,390.000 $2,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 15.000 $25,000.000 $32,997.070 $56,000.000 $68,014.010 $70,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $20,000.000 $9,652.560 $25,000.000 $9,794.650 $25,000.000
TMA (STATIONARY)
DAY 484.000 $250.000 $1.000 $350.000 $300.000 $350.000
TMA (MOBILE OPERATION)
DAY 100.000 $300.000 $1.000 $350.000 $100.000 $350.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,050.000 $4.000 $5.000 $4.260 $5.220 $3.600
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,050.000 $1.250 $1.000 $1.100 $1.040 $1.200
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 2,100.000 $7.000 $5.000 $6.600 $5.220 $6.250
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,100.000 $1.250 $1.000 $1.100 $1.040 $1.250
PTB (FUR & INST)(STEEL)
LF 3,820.000 $100.000 $39.170 $28.500 $31.340 $122.000
PTB (MOVE)(STEEL)
LF 11,460.000 $25.000 $14.140 $6.500 $10.450 $25.000
PTB (REMOVE)(STEEL)
LF 3,820.000 $25.000 $1.170 $10.000 $10.450 $5.000
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 1,204.000 $120.000 $88.000 $96.800 $79.400 $90.000
PERM CTB (SGL SLOPE) (TY 3) (42 )
LF 356.000 $250.000 $250.000 $275.000 $84.630 $285.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 78,258.000 $0.250 $0.210 $0.280 $0.220 $0.320
MTL W-BEAM GD FEN (TIM POST)
LF 50.000 $75.000 $65.000 $28.050 $25.860 $25.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $2,000.000 $2,069.000 $1,870.000 $1,880.570 $1,700.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 3.000 $1,000.000 $1,645.000 $1,485.000 $1,253.710 $1,350.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 1.000 $1,450.000 $1,420.000 $1,347.500 $1,201.480 $1,225.000
REMOVE METAL BEAM GUARD FENCE
LF 1,665.000 $2.750 $2.750 $2.750 $3.130 $2.500
REMOVE TERMINAL ANCHOR SECTION
EA 3.000 $200.000 $275.000 $220.000 $156.710 $200.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $250.000 $275.000 $165.000 $261.190 $150.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $3,000.000 $3,355.000 $3,657.500 $3,082.050 $3,325.000
GUARDRAIL END TREATMENT (REMOVE)
EA 1.000 $250.000 $275.000 $220.000 $261.190 $200.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 6.000 $2,000.000 $1,155.000 $2,750.000 $1,290.280 $1,500.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,250.000 $775.000 $1,100.000 $861.930 $1,200.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $8,500.000 $7,500.000 $9,900.000 $7,261.100 $9,500.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GF2
EA 9.000 $20.000 $25.000 $35.000 $26.120 $25.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB (BI)
EA 11.000 $50.000 $15.000 $35.000 $20.900 $25.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 4,437.000 $1.000 $0.500 $5.000 $2.060 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 2,010.000 $2.000 $0.500 $5.000 $2.090 $1.000
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
EA 11.000 $800.000 $1,100.000 $1,485.000 $1,149.240 $1,350.000
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
EA 12.000 $1,000.000 $1,100.000 $1,842.500 $1,149.240 $1,675.000
RE PM TY III (W)(6")(SLD)
LF 51,364.000 $0.500 $0.620 $0.660 $0.650 $0.600
RE PM TY III (W)(6")(BRK)
LF 38,523.000 $0.500 $0.720 $0.720 $0.750 $0.650
RE PM TY III (W)(6")(DOT)
LF 2,980.000 $0.550 $1.600 $0.720 $1.670 $0.650
RE PM TY III (W)(12")(SLD)
LF 2,005.000 $0.700 $4.250 $1.650 $4.440 $1.500
RE PM TY III (W)(12")(DOT)
LF 900.000 $0.750 $2.000 $1.320 $2.090 $1.200
RE PM TY III (Y)(6")(SLD)
LF 51,364.000 $0.500 $0.620 $0.660 $0.650 $0.600
PAVEMENT SLER 6"
LF 19,280.000 $0.200 $0.170 $0.140 $0.180 $0.130
REFL PAV MRKR TY II-C-R
EA 2,157.000 $4.000 $4.600 $4.680 $4.810 $4.250
ELIM EXT PM & MRKS (6")
LF 19,280.000 $1.000 $0.520 $0.690 $0.540 $0.630
ELIM EXT PM & MRKS (ENTR GORE)
EA 1.000 $300.000 $644.000 $385.000 $672.830 $350.000
FIBER REINFORCED POLYMER PATCHING MATLS
LB 6,000.000 $10.000 $6.650 $7.320 $6.950 $7.500
DRIFTWOOD REMOVAL
CY 18.500 $100.000 $100.000 $150.000 $105.030 $70.000
TREE TRIMMING / BRUSH REMOVAL
MI 0.800 $2,000.000 $64,000.000 $11,500.000 $10,447.630 $72,000.000
REPAIR (STEEL POST W/BASE PLATE)
EA 16.000 $2,500.000 $600.000 $585.000 $626.860 $690.000
CONCRETE RAIL REPAIR (IN-KIND)
LF 40.000 $500.000 $820.000 $250.000 $856.700 $450.000
CNC CRACK REPAIR (DISCRETE)(GRAVITY)
LF 326.000 $30.000 $26.000 $41.000 $42.840 $22.000
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 281.000 $100.000 $84.000 $66.000 $68.950 $22.000
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
LF 161.000 $50.000 $28.000 $50.000 $52.240 $22.000
CNC CRACK REPAIR (DISCRETE)(SURF SEAL)
LF 70.000 $50.000 $50.000 $50.000 $52.240 $25.000
CNC CRACK REPAIR (FLOOD)(GRAVITY)
SF 603.000 $20.000 $18.000 $26.000 $31.340 $8.000
REP STL BRIDGE MEMBER (BEAM)
EA 7.000 $20,000.000 $1,600.000 $1,450.000 $1,671.620 $650.000
BRIDGE JOINT REPAIR (ARMOR)
LF 247.000 $250.000 $200.000 $190.000 $208.950 $70.000
BRIDGE JOINT REPAIR (SEJ)
LF 316.000 $300.000 $230.000 $230.000 $240.300 $70.000
BRIDGE JOINT REPLACEMENT (ARMOR)
LF 40.000 $550.000 $860.000 $860.000 $898.500 $295.000
BRIDGE JOINT REPLACEMENT (SEJ)
LF 765.000 $400.000 $775.000 $800.000 $809.690 $410.000
REPLACING ELASTOMERIC BEARING PADS
EA 34.000 $3,500.000 $6,300.000 $6,300.000 $6,582.000 $3,000.000
CAM PG76-22 SAC-B
TON 17,041.000 $165.000 $188.080 $202.880 $202.500 $175.000
CONTINUOUS GRINDING-CONCRETE PAVEMENT
SY 15,615.000 $5.500 $5.740 $6.690 $6.350 $8.740
BENT CAP/ABUTMENT CAP CLEANING
EA 7.000 $10,000.000 $1,600.000 $1,600.000 $1,671.620 $850.000
Totals: $17,965,404.750 $19,588,668.190 $20,276,047.060 $20,590,186.349 $20,731,700.750
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
RAILROAD FLAGGING: RAILROAD FORCE ACCOUNT WORK (PART) $50,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $15,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $225,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $175,000.00
Total: $465,000.00