PREPARING ROW
|
STA
|
240.000
|
$1,100.000
|
$502.070
|
$500.000
|
$2,000.000
|
$797.000
|
|
|
REMOV CONC (DRIVEWAYS)
|
SY
|
25.000
|
$30.000
|
$73.640
|
$50.000
|
$50.000
|
$71.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
20,497.000
|
$16.250
|
$5.770
|
$15.000
|
$17.000
|
$12.750
|
|
|
EMBANK (FNL)(DC)(TY C)
|
CY
|
24,553.000
|
$18.000
|
$3.320
|
$18.000
|
$17.000
|
$10.300
|
|
|
BLADING
|
HR
|
40.000
|
$170.000
|
$468.680
|
$175.000
|
$150.000
|
$155.000
|
|
|
BROADCAST SEED (TEMP_WARM)
|
SY
|
26,295.000
|
$0.200
|
$0.170
|
$0.200
|
$0.200
|
$0.180
|
|
|
BROADCAST SEED (TEMP_COOL)
|
SY
|
26,295.000
|
$0.200
|
$0.170
|
$0.200
|
$0.200
|
$0.180
|
|
|
DRILL SEED (PERM_RURAL_SAND)
|
SY
|
52,589.000
|
$0.200
|
$0.170
|
$0.200
|
$0.200
|
$0.180
|
|
|
VEGETATIVE WATERING
|
TGL
|
578.500
|
$25.000
|
$46.500
|
$25.000
|
$15.000
|
$70.250
|
|
|
PROOF ROLLING
|
HR
|
40.000
|
$111.000
|
$147.420
|
$100.000
|
$150.000
|
$143.250
|
|
|
FL BS (CMP IN PLC)(TY A GR 1-2) (10")
|
SY
|
120,269.000
|
$22.000
|
$17.440
|
$16.000
|
$17.000
|
$21.750
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
11,151.000
|
$83.000
|
$43.470
|
$50.000
|
$50.000
|
$64.500
|
|
|
FL BS (CMP IN PLC)(TY D GR 4)(FNAL POS)
|
CY
|
2,500.000
|
$75.000
|
$55.270
|
$95.000
|
$125.000
|
$87.400
|
|
|
REWORK BS MTL (TY C)(8")(DENS CONT)
|
SY
|
121,502.000
|
$2.750
|
$0.560
|
$1.000
|
$1.000
|
$1.850
|
|
|
CEMENT
|
TON
|
882.000
|
$245.000
|
$243.110
|
$235.000
|
$250.000
|
$275.000
|
|
|
CEMENT TRT (EXIST MATL)(8")
|
SY
|
104,249.000
|
$4.000
|
$1.750
|
$2.000
|
$2.500
|
$1.750
|
|
|
PRIME COAT (MC-30)
|
GAL
|
18,597.000
|
$6.000
|
$5.150
|
$5.000
|
$5.500
|
$8.150
|
|
|
ASPH (RC-250)
|
GAL
|
23,556.000
|
$5.000
|
$5.150
|
$4.000
|
$5.000
|
$6.800
|
|
|
ASPH (AC-20-5TR OR CRS-2P)
|
GAL
|
66,453.000
|
$4.750
|
$4.680
|
$4.250
|
$4.000
|
$5.050
|
|
|
AGGR (TY-B, GR-4)(SAC-B)
|
CY
|
563.000
|
$110.000
|
$154.920
|
$140.000
|
$150.000
|
$235.000
|
|
|
AGGR (TY-PB, GR-4)(SAC-B)
|
CY
|
1,476.000
|
$130.000
|
$160.600
|
$175.000
|
$130.000
|
$215.250
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
6,524.000
|
$125.000
|
$107.700
|
$130.000
|
$102.000
|
$159.000
|
|
|
SP MIXES SP-D SAC-B PG76-22
|
TON
|
535.000
|
$140.000
|
$126.470
|
$165.000
|
$150.000
|
$245.000
|
|
|
PLANE & TEXT ASPH CONC PAV(0" TO 10")
|
SY
|
8,813.000
|
$7.500
|
$8.990
|
$5.000
|
$12.000
|
$17.700
|
|
|
PLANE ASPH CONC PAV(0" TO 3")
|
SY
|
802.000
|
$3.000
|
$5.390
|
$5.000
|
$7.000
|
$26.500
|
|
|
PLANE ASPH CONC PAV(0" TO 4")
|
SY
|
802.000
|
$3.500
|
$5.600
|
$5.000
|
$8.000
|
$26.000
|
|
|
CEM STABIL BKFL
|
CY
|
400.000
|
$220.000
|
$199.430
|
$250.000
|
$180.000
|
$275.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
113.000
|
$280.000
|
$234.700
|
$375.000
|
$220.000
|
$290.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
111.000
|
$31.000
|
$251.850
|
$35.000
|
$30.000
|
$1.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
8,335.000
|
$25.000
|
$38.300
|
$22.000
|
$15.000
|
$28.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
11.100
|
$2,500.000
|
$757.850
|
$1,100.000
|
$1,500.000
|
$1,150.000
|
|
|
PENETRATING CONCRETE SURFACE TREATMENT
|
SY
|
16.000
|
$60.000
|
$29.500
|
$250.000
|
$75.000
|
$100.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
295.000
|
$550.000
|
$645.740
|
$600.000
|
$650.000
|
$710.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
461.000
|
$600.000
|
$645.740
|
$550.000
|
$650.000
|
$718.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
446.000
|
$550.000
|
$516.660
|
$650.000
|
$650.000
|
$725.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
248.000
|
$225.000
|
$164.030
|
$180.000
|
$150.000
|
$290.000
|
|
|
CLEANING AND SEALING EXIST JOINTS (CL3)
|
LF
|
201.000
|
$70.000
|
$58.040
|
$75.000
|
$80.000
|
$62.000
|
|
|
RAIL (TY T221)(MOD)
|
LF
|
36.700
|
$200.000
|
$147.460
|
$500.000
|
$350.000
|
$235.000
|
|
|
RETROFIT RAIL (TY T631)
|
LF
|
510.000
|
$115.000
|
$91.910
|
$105.000
|
$150.000
|
$140.000
|
|
|
WATERPROOFING (TY 10)
|
SY
|
95.000
|
$189.000
|
$108.140
|
$60.000
|
$75.000
|
$200.000
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
1,969.000
|
$90.000
|
$147.330
|
$80.000
|
$75.000
|
$68.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
62.000
|
$390.000
|
$449.350
|
$400.000
|
$400.000
|
$390.000
|
|
|
CONC BOX CULV (4 FT X 4 FT)
|
LF
|
130.000
|
$475.000
|
$584.110
|
$500.000
|
$500.000
|
$868.000
|
|
|
CONC BOX CULV (8 FT X 6 FT)
|
LF
|
54.000
|
$1,200.000
|
$1,299.460
|
$1,200.000
|
$1,000.000
|
$1,300.000
|
|
|
CONC BOX CULV (8 FT X 6 FT)(EXTEND)
|
LF
|
32.000
|
$1,500.000
|
$1,718.140
|
$1,500.000
|
$1,500.000
|
$1,380.000
|
|
|
CONC BOX CULV (8 FT X 8 FT)(EXTEND)
|
LF
|
60.000
|
$1,575.000
|
$1,963.890
|
$1,600.000
|
$1,700.000
|
$1,640.000
|
|
|
CONC BOX CULV (10 FT X 10 FT)(EXTEND)
|
LF
|
28.000
|
$1,900.000
|
$2,209.630
|
$2,100.000
|
$2,000.000
|
$2,770.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
82.000
|
$140.000
|
$215.380
|
$120.000
|
$100.000
|
$82.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
387.000
|
$120.000
|
$234.880
|
$125.000
|
$122.000
|
$100.000
|
|
|
WINGWALL (PW - 1) (HW=10 FT)
|
EA
|
4.000
|
$92,000.000
|
$18,119.550
|
$60,000.000
|
$55,000.000
|
$50,000.000
|
|
|
WINGWALL (PW - 1) (HW=14 FT)
|
EA
|
2.000
|
$115,000.000
|
$43,955.290
|
$125,000.000
|
$120,000.000
|
$100,000.000
|
|
|
SET (TY I)(S= 3 FT)(HW= 3 FT)(3:1)(C)
|
EA
|
4.000
|
$9,000.000
|
$3,287.390
|
$8,000.000
|
$5,000.000
|
$9,300.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(3:1)(C)
|
EA
|
2.000
|
$13,000.000
|
$5,047.520
|
$16,000.000
|
$10,000.000
|
$10,600.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 5 FT)(3:1)(C)
|
EA
|
10.000
|
$19,700.000
|
$6,507.990
|
$6,000.000
|
$5,000.000
|
$10,000.000
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (P)
|
EA
|
70.000
|
$1,930.000
|
$3,604.520
|
$2,000.000
|
$1,500.000
|
$1,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
3.000
|
$2,425.000
|
$3,149.430
|
$2,800.000
|
$1,750.000
|
$1,600.000
|
|
|
REMOV STR (PIPE)
|
LF
|
77.000
|
$24.000
|
$45.640
|
$60.000
|
$35.000
|
$12.000
|
|
|
REMOV STR (PIPE)
|
EA
|
10.000
|
$800.000
|
$702.820
|
$2,500.000
|
$650.000
|
$200.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,150,000.000
|
$1,052,000.000
|
$1,100,000.000
|
$1,100,000.000
|
$1,175,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
24.000
|
$10,000.000
|
$10,114.610
|
$5,000.000
|
$5,000.000
|
$2,300.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
180.000
|
$170.000
|
$104.460
|
$100.000
|
$150.000
|
$118.000
|
|
|
TMA (STATIONARY)
|
DAY
|
241.000
|
$205.000
|
$227.340
|
$250.000
|
$300.000
|
$110.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
62.000
|
$250.000
|
$727.640
|
$200.000
|
$550.000
|
$110.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
580.000
|
$80.000
|
$67.720
|
$75.000
|
$80.000
|
$70.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,480.000
|
$16.000
|
$14.520
|
$16.000
|
$12.000
|
$15.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
1,170.000
|
$32.250
|
$33.860
|
$10.000
|
$25.000
|
$35.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,170.000
|
$11.000
|
$9.670
|
$5.000
|
$10.000
|
$10.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
68.000
|
$182.000
|
$156.610
|
$125.000
|
$150.000
|
$222.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
15,413.000
|
$4.250
|
$4.110
|
$4.500
|
$4.000
|
$4.250
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
15,413.000
|
$1.000
|
$0.280
|
$0.500
|
$1.000
|
$0.290
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
560.000
|
$10.000
|
$7.740
|
$10.000
|
$7.000
|
$8.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
560.000
|
$2.650
|
$1.930
|
$2.000
|
$1.000
|
$2.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2) 6:1
|
LF
|
900.000
|
$80.000
|
$62.880
|
$70.000
|
$60.000
|
$65.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
28,057.000
|
$29.000
|
$23.210
|
$25.000
|
$35.000
|
$35.500
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
9.000
|
$6,000.000
|
$4,102.960
|
$7,500.000
|
$5,000.000
|
$8,160.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
390.000
|
$70.000
|
$107.540
|
$125.000
|
$50.000
|
$112.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
1,470.000
|
$25.000
|
$18.510
|
$50.000
|
$15.000
|
$23.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
390.000
|
$30.000
|
$23.260
|
$100.000
|
$45.000
|
$59.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
97.000
|
$108.000
|
$100.860
|
$150.000
|
$150.000
|
$145.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
3,852.000
|
$30.000
|
$17.760
|
$25.000
|
$25.000
|
$90.000
|
|
|
TURNOUTS (ACP)
|
SY
|
83.000
|
$100.000
|
$55.260
|
$120.000
|
$75.000
|
$33.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
3,525.000
|
$32.500
|
$29.990
|
$32.000
|
$35.000
|
$32.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$2,500.000
|
$2,936.290
|
$2,500.000
|
$2,500.000
|
$3,250.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
2,200.000
|
$3.250
|
$2.420
|
$2.750
|
$10.000
|
$2.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
28.000
|
$3,500.000
|
$2,999.060
|
$3,250.000
|
$3,500.000
|
$3,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
22.000
|
$300.000
|
$241.860
|
$250.000
|
$500.000
|
$300.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
10.000
|
$2,500.000
|
$2,902.330
|
$1,000.000
|
$2,500.000
|
$1.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$2,000.000
|
$1,451.170
|
$1,000.000
|
$1,250.000
|
$1,200.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$12,000.000
|
$10,158.140
|
$10,000.000
|
$9,000.000
|
$12,000.000
|
|
|
WIRE FENCE (TY C)
|
LF
|
610.000
|
$25.000
|
$26.120
|
$17.000
|
$25.000
|
$35.000
|
|
|
WIRE FENCE (TY D)
|
LF
|
650.000
|
$27.000
|
$26.120
|
$18.000
|
$25.000
|
$30.000
|
|
|
GATE (TY 2)
|
EA
|
2.000
|
$2,000.000
|
$1,040.000
|
$1,200.000
|
$2,500.000
|
$2,000.000
|
|
|
WIRE FENCE (WATER GAP)
|
LF
|
60.000
|
$60.000
|
$31.440
|
$60.000
|
$100.000
|
$65.000
|
|
|
PIPE UNDERDRAINS (TY 7) (6")
|
LF
|
425.000
|
$28.000
|
$30.720
|
$50.000
|
$70.000
|
$45.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
8.000
|
$300.000
|
$237.020
|
$250.000
|
$350.000
|
$400.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
35.000
|
$750.000
|
$606.590
|
$650.000
|
$550.000
|
$700.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
4.000
|
$900.000
|
$794.270
|
$825.000
|
$700.000
|
$850.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$1,000.000
|
$960.670
|
$1,000.000
|
$850.000
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$1,300.000
|
$1,149.320
|
$1,200.000
|
$1,000.000
|
$1,100.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)
|
EA
|
49.000
|
$85.000
|
$50.310
|
$55.000
|
$50.000
|
$245.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
52.000
|
$38.000
|
$23.220
|
$25.000
|
$30.000
|
$40.000
|
|
|
INSTL OM SM RD SIGN (1-OM-CON)Y
|
EA
|
18.000
|
$40.000
|
$29.990
|
$32.000
|
$20.000
|
$200.000
|
|
|
INSTL OM SM RD SIGN (1-OM-CON)R
|
EA
|
7.000
|
$40.000
|
$29.990
|
$32.000
|
$30.000
|
$200.000
|
|
|
INSTL OM SM RD SIGN (1-OM-CON)G
|
EA
|
14.000
|
$40.000
|
$29.990
|
$32.000
|
$20.000
|
$200.000
|
|
|
INSTL OM SM RD SIGN (1-OM-CON)W
|
EA
|
3.000
|
$40.000
|
$29.990
|
$32.000
|
$50.000
|
$200.000
|
|
|
INSTL OM ASSM (OM-2Z)(YFLX)GNDHH
|
EA
|
20.000
|
$107.000
|
$243.800
|
$255.000
|
$200.000
|
$310.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
71,650.000
|
$0.400
|
$0.380
|
$0.500
|
$0.400
|
$0.400
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
48.000
|
$12.000
|
$9.820
|
$11.000
|
$11.000
|
$10.150
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
|
LF
|
2,720.000
|
$0.420
|
$0.420
|
$0.500
|
$0.450
|
$0.430
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
53,535.000
|
$0.420
|
$0.380
|
$0.500
|
$0.400
|
$0.400
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
81,537.000
|
$0.920
|
$0.380
|
$0.500
|
$0.400
|
$0.400
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
432.000
|
$15.000
|
$9.820
|
$10.000
|
$11.000
|
$10.150
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
84,788.000
|
$1.000
|
$0.380
|
$0.500
|
$0.400
|
$0.400
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
1,272.000
|
$1.350
|
$3.590
|
$1.000
|
$1.500
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
2,600.000
|
$1.600
|
$2.660
|
$1.000
|
$1.500
|
$1.000
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
1,146.000
|
$1.500
|
$0.630
|
$0.730
|
$1.000
|
$0.650
|
|
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
|
EA
|
4.000
|
$400.000
|
$686.880
|
$725.000
|
$750.000
|
$710.000
|
|
RE PM TY II (W) 6" (SLD)
|
LF
|
20,070.000
|
$0.260
|
$0.470
|
$0.500
|
$0.500
|
$0.490
|
|
RE PM TY II (Y) 6" (BRK)
|
LF
|
1,890.000
|
$0.380
|
$0.470
|
$0.500
|
$0.500
|
$0.490
|
|
RE PM TY II (Y) 6" (SLD)
|
LF
|
32,082.000
|
$0.200
|
$0.470
|
$0.500
|
$0.500
|
$0.490
|
|
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
|
LF
|
48,195.000
|
$1.000
|
$0.950
|
$1.000
|
$1.000
|
$0.980
|
|
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
|
LF
|
4,240.000
|
$1.000
|
$0.650
|
$0.700
|
$0.700
|
$0.670
|
|
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
|
LF
|
5,040.000
|
$0.550
|
$0.580
|
$0.600
|
$0.600
|
$0.600
|
|
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
|
LF
|
40.000
|
$1.150
|
$0.650
|
$0.700
|
$0.700
|
$0.670
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
53,315.000
|
$0.550
|
$0.580
|
$0.600
|
$0.600
|
$0.600
|
|
PRFB RUMBLE STRIP (BLK)(1')(CENTERLINE)
|
LF
|
5,290.000
|
$4.600
|
$3.190
|
$3.500
|
$4.000
|
$3.300
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,305.000
|
$5.000
|
$5.080
|
$5.500
|
$6.000
|
$5.250
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
213.000
|
$5.000
|
$6.530
|
$7.000
|
$7.000
|
$6.750
|
|
|
ELIM EXT PM & MRKS (6")
|
LF
|
39,516.000
|
$0.550
|
$0.620
|
$2.000
|
$1.250
|
$1.650
|
|
|
PREFORMED IN-LANE (TRANS) RUMBLE STRIP
|
LF
|
160.000
|
$10.000
|
$18.810
|
$20.000
|
$20.000
|
$19.450
|
|
|
SUBSURFACE UTIL LOCATE (OUTSIDE RDBED)
|
EA
|
6.000
|
$1,500.000
|
$1,486.900
|
$3,500.000
|
$1,500.000
|
$1,300.000
|
|
Totals: |
$13,990,090.740
|
$11,074,628.977
|
$11,885,996.630
|
$12,387,672.300
|
$13,973,451.495
|