MADISON SH 21 (0117-05-063)

Items: 92

County: MADISON
Length: 0.0000 MILES
Highway: SH 21
District: BRYAN
Control Number: 0117-05-063
DBE Goal: 0.0%
Project: STP 2026(122)HES
Guaranty: $47,000.00
Time: 89 WORKING DAYS
Engineer's Estimate: $2,371,533.25
Date: 11/06/2025 (7 months ago)
Contract Number: 11253221
Type: EXTENDING/ADDING A TWLTL
Project ID: A00192965
Contract Type: Federal
Project Description: EXTEND/ADD TWLTL
Mail/Deliver Bids To: N/A
DELMY REYES
MATT HENSARLING
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (8)
E
Engineer's Estimate
$2,371,533.25
$2,014,433.07
Over/Under Est: -15.06% -$357,100.18
Over/Under Est: 0.3% $7,048.59
Amt Left: 18.08% $364,148.77
Over/Under Est: 1.18% $28,050.69
Amt Left: 19.12% $385,150.87
Delta: -0.88% -$21,002.10
Over/Under Est: 2.66% $63,130.92
Amt Left: 20.86% $420,231.10
Delta: -1.46% -$35,080.23
Over/Under Est: 11.24% $266,627.90
Amt Left: 30.96% $623,728.08
Delta: -8.36% -$203,496.98
Over/Under Est: 17.87% $423,881.93
Amt Left: 38.77% $780,982.11
Delta: -5.96% -$157,254.03
$3,269,229.77
Over/Under Est: 37.85% $897,696.52
Amt Left: 62.29% $1,254,796.70
Delta: -16.95% -$473,814.59
$3,989,171.38
Over/Under Est: 68.21% $1,617,638.13
Amt Left: 98.03% $1,974,738.31
Delta: -22.02% -$719,941.61
Subcontractor Percentage Amount
STRIPE LINES, INC. 3.67% $73,929.69
WILLOW CITY SIGN & RAIL, INC. 1.58% $31,828.04
SURFACE PREPARATION TECHNOLOGIES, LLC 0.53% $10,676.50
J. H. ODEN CONTRACTING COMPANY 0.25% $5,036.08
Total: 6.03% $121,470.31

Bid Items & Bid Tabulations

92 Total 0 of 92
MADISON  |  SH 21  |  BRYAN  |  0117-05-063  |  11/06/2025  |  $2,371,533.25  |  STP 2026(122)HES  |  EXTENDING/ADDING A TWLTL  |  89 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BIG CREEK CONSTRUCTION, LTD.
LARRY YOUNG PAVING, INC.
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
KNIFE RIVER CORPORATION - SOUTH
TEXAS MATERIALS GROUP, INC.
DURWOOD GREENE CONSTRUCTION CO.
A. L. HELMCAMP, INC.
STX CIVIL
REMOV CONC (DRIVEWAYS)
SY 457.000 $15.000 $20.000 $14.000 $25.000 $14.500 $28.000 $30.000 $30.000 $25.000
REMOV CONC (CURB)
LF 50.000 $15.000 $30.000 $7.500 $12.000 $18.000 $15.000 $15.000 $2.250 $10.000
REMOV CONC (CURB & GUTTER)
LF 72.000 $15.000 $19.000 $14.000 $25.000 $23.000 $16.000 $30.000 $28.000 $10.000
RMV (2"-6") TRT/UNTRT BASE & ASPH PAV
SY 409.000 $10.000 $7.000 $15.000 $15.900 $10.700 $15.000 $12.000 $32.000 $10.000
RMV (14"-18") TRT/UNTRT BASE & ASPH PAV
SY 6,008.000 $20.000 $12.000 $12.000 $18.620 $5.800 $17.600 $17.000 $35.000 $10.000
EXCAV (ROADWAY)
CY 2,776.000 $12.000 $15.500 $18.000 $35.650 $29.320 $40.000 $25.000 $22.000 $25.000
EXCAV (CHANNEL)
CY 20.000 $30.000 $150.000 $61.000 $150.000 $32.850 $20.000 $75.000 $50.000 $25.000
EMBANK (FNL)(DC)(TY C)
CY 975.000 $15.000 $15.500 $19.000 $13.850 $6.000 $42.000 $25.000 $25.000 $30.000
BACKFILL (TY A OR B)
STA 58.000 $250.000 $195.000 $260.000 $380.000 $249.000 $440.000 $325.000 $320.000 $260.000
FURN & PLACE TOPSOIL (4")
SY 8,286.000 $1.500 $0.750 $2.250 $1.500 $0.410 $1.800 $1.200 $3.000 $4.000
BROADCAST SEED (PERM_RURAL_SAND)
SY 8,286.000 $0.500 $0.320 $0.380 $0.300 $0.330 $0.330 $0.380 $0.330 $0.400
BROADCAST SEED (TEMP_WARM)
SY 4,143.000 $0.350 $0.320 $0.380 $0.300 $0.330 $0.330 $0.380 $0.330 $0.400
BROADCAST SEED (TEMP_COOL)
SY 4,143.000 $0.350 $0.320 $0.380 $0.300 $0.330 $0.330 $0.380 $0.330 $0.400
VEGETATIVE WATERING
TGL 83.000 $40.000 $35.000 $31.000 $30.000 $41.000 $52.000 $100.000 $35.000 $1.000
FL BS (CMP IN PLC)(TY A GR 1-2) (8")
SY 10,755.000 $22.500 $17.500 $23.000 $30.300 $20.840 $24.000 $32.000 $28.000 $90.000
CEMENT
TON 143.000 $250.000 $235.000 $230.000 $240.000 $242.000 $243.000 $260.000 $270.000 $200.000
CEMENT TRT (SUBGRADE)(10")
SY 11,521.000 $4.000 $2.000 $3.500 $3.250 $1.180 $2.550 $6.000 $6.000 $8.000
CEM TRT(PLNT MX)(CL N)(TYD)(GR1-2)(12")
SY 1,666.000 $35.000 $58.000 $45.000 $55.000 $60.620 $74.000 $65.000 $100.000 $100.000
PRIME COAT(MC-30 OR AE-P)
GAL 2,484.000 $6.500 $4.250 $6.500 $4.500 $4.800 $6.000 $6.000 $8.000 $8.000
SP MIXES SP-B PG64-22
TON 3,176.000 $125.000 $96.000 $130.000 $118.500 $134.600 $130.000 $140.000 $151.000 $200.000
SP MIXES SP-C SAC-A PG70-22
TON 4,369.000 $130.000 $112.000 $140.000 $130.000 $148.800 $146.000 $150.000 $163.000 $180.000
TACK COAT
GAL 4,996.000 $3.500 $3.500 $5.000 $3.000 $4.200 $4.000 $4.500 $6.000 $7.000
SP MIXES SP-C PG70-22 (LEVEL-UP)
TON 210.000 $130.000 $117.000 $150.000 $150.000 $192.000 $209.000 $160.000 $230.000 $190.000
PLANE ASPH CONC PAV(0" TO 2")
SY 22,915.000 $2.500 $2.000 $2.250 $1.750 $3.620 $2.400 $3.500 $3.300 $4.000
CEM STABIL BKFL
CY 7.000 $250.000 $250.000 $110.000 $225.000 $220.000 $125.000 $275.000 $250.000 $500.000
RIPRAP (MOW STRIP)(4 IN)
CY 20.000 $775.000 $675.000 $770.000 $805.000 $1,000.000 $850.000 $1,100.000 $890.000 $1,000.000
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
LF 14.000 $1,000.000 $1,060.000 $840.000 $850.000 $1,170.000 $1,087.000 $1,070.000 $940.000 $500.000
RC PIPE (CL III)(18 IN)
LF 282.000 $100.000 $81.000 $81.000 $65.000 $92.000 $100.000 $80.000 $72.000 $110.000
RC PIPE (CL III)(24 IN)
LF 28.000 $175.000 $110.000 $120.000 $150.000 $122.500 $260.000 $185.000 $170.000 $130.000
WINGWALL (PW - 2) (HW=5 FT)
EA 1.000 $20,000.000 $14,100.000 $11,000.000 $7,500.000 $17,250.000 $14,000.000 $9,300.000 $8,500.000 $13,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 16.000 $1,400.000 $1,450.000 $1,100.000 $900.000 $1,250.000 $2,300.000 $1,200.000 $1,000.000 $1,800.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 2.000 $2,500.000 $2,000.000 $2,000.000 $2,500.000 $1,415.000 $2,600.000 $2,900.000 $2,800.000 $2,000.000
CLEAN EXIST CULVERTS
EA 1.000 $4,500.000 $2,700.000 $3,100.000 $2,000.000 $12,900.000 $7,800.000 $2,500.000 $2,300.000 $10,000.000
REMOV STR (SET)
EA 19.000 $600.000 $350.000 $250.000 $750.000 $476.000 $250.000 $900.000 $850.000 $500.000
REMOV STR (WINGWALL)
EA 1.000 $2,500.000 $2,200.000 $1,700.000 $1,500.000 $2,695.000 $1,160.000 $2,000.000 $1,700.000 $4,500.000
REMOV STR (PIPE)
EA 9.000 $1,000.000 $550.000 $530.000 $1,500.000 $1,000.000 $590.000 $1,800.000 $1,700.000 $1,000.000
MOBILIZATION
LS 1.000 $175,000.000 $179,000.000 $205,000.000 $150,000.000 $162,350.000 $208,397.960 $200,000.000 $300,000.000 $330,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $6,000.000 $3,200.000 $4,400.000 $6,000.000 $8,230.000 $4,700.000 $6,500.000 $16,000.000 $8,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $10,000.000 $10,300.000 $2,800.000 $10,000.000 $6,000.000 $5,000.000 $7,000.000 $7,500.000 $10,000.000
TMA (STATIONARY)
DAY 63.000 $175.000 $210.000 $260.000 $125.000 $500.000 $300.000 $300.000 $350.000 $145.000
TMA (MOBILE OPERATION)
DAY 26.000 $350.000 $850.000 $600.000 $125.000 $900.000 $300.000 $300.000 $350.000 $180.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 135.000 $55.000 $35.000 $45.000 $36.000 $40.000 $40.000 $60.000 $40.000 $200.000
ROCK FILTER DAMS (REMOVE)
LF 135.000 $17.500 $5.000 $13.000 $10.000 $11.000 $11.000 $15.000 $11.000 $40.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,530.000 $4.000 $3.500 $4.750 $3.750 $4.170 $4.150 $4.000 $4.000 $8.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,530.000 $1.750 $1.000 $1.250 $1.000 $1.000 $1.000 $1.300 $1.000 $1.000
CONC CURB (TY II)
LF 46.000 $50.000 $130.000 $10.000 $80.000 $85.000 $100.000 $100.000 $90.000 $25.000
CONC CURB & GUTTER (TY II)
LF 104.000 $50.000 $70.000 $59.000 $100.000 $68.000 $100.000 $125.000 $110.000 $45.000
DRIVEWAYS (CONC)
SY 329.000 $115.000 $125.000 $120.000 $200.000 $138.000 $110.000 $250.000 $220.000 $160.000
DRIVEWAYS (ACP)
SY 234.000 $75.000 $72.000 $50.000 $85.800 $131.000 $135.000 $80.000 $125.000 $80.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 10,060.000 $0.500 $0.350 $0.660 $0.150 $0.680 $0.300 $0.500 $1.000 $1.000
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
LF 10,033.000 $0.500 $0.350 $0.660 $0.150 $0.410 $0.300 $0.500 $1.000 $1.000
FILL MILLED ASPH RMBL STRIP(CENTERLINE)
LF 5,753.000 $7.500 $4.500 $5.000 $3.000 $2.360 $8.000 $5.000 $15.000 $4.000
MTL W-BEAM GD FEN (TIM POST)
LF 200.000 $32.500 $30.000 $34.000 $30.800 $30.000 $30.000 $38.000 $35.000 $40.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,400.000 $3,600.000 $4,100.000 $3,505.000 $3,555.000 $3,650.000 $4,000.000 $3,900.000 $4,000.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 2.000 $300.000 $400.000 $480.000 $315.000 $350.000 $426.000 $400.000 $350.000 $800.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 21.000 $750.000 $625.000 $730.000 $720.000 $800.000 $647.000 $900.000 $800.000 $1,200.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $1,000.000 $800.000 $940.000 $920.000 $1,022.000 $835.000 $1,150.000 $1,000.000 $1,300.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $1,000.000 $1,100.000 $1,200.000 $1,155.000 $1,283.000 $1,035.000 $1,443.750 $1,300.000 $1,400.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 3.000 $950.000 $500.000 $590.000 $660.000 $735.000 $525.000 $825.000 $730.000 $100.000
REMOVE SM RD SN SUP&AM
EA 19.000 $150.000 $130.000 $160.000 $110.000 $125.000 $109.000 $130.000 $120.000 $100.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF1
EA 4.000 $25.000 $27.000 $31.000 $24.000 $30.000 $27.000 $30.000 $26.000 $50.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 4.000 $75.000 $90.000 $110.000 $53.000 $60.000 $95.000 $65.000 $59.000 $50.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 4.000 $20.000 $27.000 $31.000 $20.000 $25.000 $28.000 $30.000 $23.000 $25.000
INSTL OM SM RD SIGN (1-OM-PW)Y
EA 23.000 $15.000 $38.500 $44.000 $35.000 $40.000 $39.000 $45.000 $39.000 $50.000
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 700.000 $1.750 $0.450 $1.250 $0.420 $0.470 $0.460 $0.450 $1.100 $1.170
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 15,425.000 $1.100 $0.450 $0.800 $0.420 $0.470 $0.460 $0.450 $0.700 $1.170
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 28,425.000 $1.000 $0.450 $0.800 $0.420 $0.470 $0.460 $0.450 $0.700 $1.170
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 978.000 $1.750 $1.500 $0.710 $1.000 $0.670 $1.100 $2.000 $1.000 $1.500
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 1,549.000 $1.500 $1.500 $0.710 $1.000 $0.670 $1.100 $2.000 $1.000 $1.500
REFL PAV MRK TY I (W)6"(DOT)(090MIL)
LF 240.000 $1.250 $2.200 $1.250 $2.000 $2.300 $2.200 $2.500 $1.060 $2.000
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
LF 64.000 $2.250 $2.200 $1.250 $2.000 $2.300 $2.200 $2.500 $1.200 $3.000
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 300.000 $2.000 $2.200 $1.250 $2.000 $2.300 $2.200 $2.500 $1.200 $1.850
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 34.000 $17.500 $15.000 $29.000 $14.000 $16.000 $15.000 $16.000 $26.000 $8.000
PAVEMENT SLER 6"
LF 1,018.000 $1.000 $0.220 $0.360 $0.200 $0.250 $0.220 $0.250 $0.320 $0.240
PAVEMENT SLER 8"
LF 344.000 $1.250 $0.280 $0.500 $0.250 $0.300 $0.280 $0.300 $0.440 $0.320
PAVEMENT SLER 24"
LF 34.000 $7.500 $1.100 $10.000 $1.000 $2.000 $1.100 $2.000 $9.000 $0.960
REFL PAV MRK TY I (W)6"(BRK)(090MIL)
LF 1,090.000 $1.000 $0.850 $1.250 $0.800 $1.000 $0.890 $0.920 $1.100 $0.880
REFL PAV MRK TY I (W)6"(SLD)(090MIL)
LF 13,021.000 $0.850 $0.850 $1.250 $0.800 $0.890 $0.890 $0.900 $1.100 $0.880
REFL PAV MRK TY I (Y)6"(BRK)(090MIL)
LF 2,600.000 $1.000 $0.850 $1.250 $0.800 $0.900 $0.890 $0.920 $1.100 $0.880
REFL PAV MRK TY I (Y)6"(SLD)(090MIL)
LF 15,370.000 $0.850 $0.850 $1.250 $0.800 $0.890 $0.890 $0.900 $1.100 $0.880
PREFAB PM TY C (W)(ARROW)
EA 8.000 $250.000 $225.000 $530.000 $215.000 $239.000 $238.000 $250.000 $450.000 $267.420
PREFAB PM TY C (W)(LN REDUCT ARROW)
EA 2.000 $550.000 $320.000 $880.000 $300.000 $335.000 $332.000 $350.000 $780.000 $453.000
PREFAB PM TY C (W)(WORD)
EA 2.000 $325.000 $270.000 $630.000 $250.000 $300.000 $277.000 $300.000 $560.000 $378.960
REFL PAV MRKR TY I-C
EA 55.000 $6.250 $6.500 $7.500 $6.000 $7.000 $6.650 $7.000 $6.600 $6.000
REFL PAV MRKR TY II-A-A
EA 328.000 $6.250 $6.500 $7.500 $6.000 $7.000 $6.650 $7.000 $6.600 $6.000
ELIM EXT PM & MRKS (4")
LF 2,760.000 $1.250 $0.400 $0.630 $0.350 $0.390 $0.390 $0.400 $0.550 $0.520
ELIM EXT PM & MRKS (6")
LF 15,571.000 $0.750 $0.450 $0.630 $0.400 $0.440 $0.440 $0.450 $0.550 $0.620
PAV SURF PREP FOR MRK (6")
LF 1,018.000 $0.850 $0.050 $0.940 $0.010 $0.100 $0.010 $0.010 $0.830 $0.060
PAV SURF PREP FOR MRK (8")
LF 344.000 $0.500 $0.050 $1.250 $0.010 $0.100 $0.010 $0.010 $1.100 $0.080
PAV SURF PREP FOR MRK (24")
LF 34.000 $2.000 $0.150 $1.250 $0.090 $0.100 $0.100 $0.100 $1.100 $0.240
PAV SURF PREP FOR MRK (ARROW)
EA 2.000 $20.000 $11.000 $6.250 $10.000 $11.000 $11.000 $20.000 $5.500 $5.000
PAV SURF PREP FOR MRK (WORD)
EA 2.000 $50.000 $11.000 $6.250 $10.000 $11.000 $11.000 $20.000 $5.500 $5.000
Totals: $2,371,533.250 $2,014,433.070 $2,378,581.840 $2,399,583.940 $2,434,664.170 $2,638,161.150 $2,795,415.180 $3,269,229.770 $3,989,171.380