Show Job Controls
Bid Cobra

ELLIS FM 2377 (2264-01-012)

Items: 104

County: ELLIS
Length: 4.2070 MILES
Highway: FM 2377
District: DALLAS
Control Number: 2264-01-012
DBE Goal: 6.0%
Project: STP 2025(972)HES
Guaranty: $100,000.00
Time: 180 WORKING DAYS
Engineer's Estimate: $7,053,216.56
Date: 08/08/2025 (10 months ago) Changed
Contract Number: 8253005
Type: REHABILITATE EXISTING ROADWAY
Project ID: A00193944
Contract Type: Federal
Project Description: SAFETY TREAT FIXED OBJECTS, CONSTRUCT PAVED SHOULDERS (1-4 FT.), MILLED EDGELINE RUMBLE STRIPS, MILLED CENTERLINE RUMBLE STRIPS
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
JUAN PAREDES
ELECIA MOORE
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (7)
E
Engineer's Estimate
$7,053,216.56
$6,535,504.83
Over/Under Est: -7.34% -$517,711.73
$6,582,349.41
Over/Under Est: -6.68% -$470,867.15
Amt Left: 0.72% $46,844.58
Over/Under Est: 1.58% $111,707.97
Amt Left: 9.63% $629,419.70
Delta: -8.85% -$582,575.12
Over/Under Est: 3.89% $274,146.85
Amt Left: 12.12% $791,858.58
Delta: -2.27% -$162,438.88
Over/Under Est: 9.88% $697,070.79
Amt Left: 18.59% $1,214,782.52
Delta: -5.77% -$422,923.94
Over/Under Est: 11.63% $820,547.54
Amt Left: 20.48% $1,338,259.27
Delta: -1.59% -$123,476.75
Over/Under Est: 18.45% $1,301,109.58
Amt Left: 27.83% $1,818,821.31
Delta: -6.10% -$480,562.04
Subcontractor Percentage Amount
BEAR CREEK CONSTRUCTION, LLC 13.01% $850,269.18
JB PINNACLE GROUP, LLC 3.78% $247,042.08
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. 1.54% $100,646.77
FORTSON CONTRACTING, INC. 1.10% $71,890.55
TRAFFIC HIGHWAY MAINTENANCE, LLC 0.92% $60,126.64
STRIPE-A-ZONE, LLC 0.92% $60,126.64
COLD CREEK CONSTRUCTION, LTD 0.75% $49,016.29
MURRAY CONSTRUCTION 0.65% $42,480.78
HIGHWAY TRAFFIC CONTROL & SERVICES, LLC 0.47% $30,716.87
KDT ELECTRIC, LLC 0.26% $16,992.31
PROFESSIONAL TRAFFIC CONTROL LLC 0.17% $11,110.36
SITE BARRICADES 0.14% $9,149.71
HOLLINGSWORTH CONCRETE CORING 0.03% $1,960.65
Total: 23.74% $1,551,528.83

Bid Items & Bid Tabulations

104 Total 0 of 104
ELLIS  |  FM 2377  |  DALLAS  |  2264-01-012  |  08/08/2025  |  $7,053,216.56  |  STP 2025(972)HES  |  REHAB EXIST ROADWAY  |  180 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
KNIFE RIVER CORPORATION - SOUTH
A. L. HELMCAMP, INC.
ED BELL CONSTRUCTION COMPANY
TEXAS MATERIALS GROUP, INC.
BIG CREEK CONSTRUCTION, LTD.
GREY SKY CONSTRUCTION LLC
ROAD MAKER CONTRACTORS, LLC
PREPARING ROW
STA 171.840 $1,200.000 $785.000 $800.000 $2,633.000 $410.000 $1,500.000 $4,000.000 $5,420.000
REMOV CONC (RIPRAP)
SY 18.000 $50.000 $33.000 $16.000 $75.000 $50.000 $150.000 $20.000 $19.200
REMOV CONC (DRIVEWAYS)
SY 2,411.000 $23.000 $26.000 $16.000 $17.500 $52.570 $22.000 $20.000 $19.000
RMV (2"-6") TRT/UNTRT BASE & ASPH PAV
SY 2,456.000 $9.000 $8.000 $12.000 $13.000 $26.760 $24.000 $20.000 $11.200
EXCAV (ROADWAY)
CY 9,989.000 $25.000 $15.000 $11.000 $5.000 $10.000 $26.000 $20.000 $17.000
SUBGR WIDEN (OC)
STA 171.840 $400.000 $375.000 $110.000 $750.000 $400.000 $1,300.000 $250.000 $394.000
EMBANK (FNL)(OC)(TY C)
CY 16,708.000 $26.000 $21.000 $20.000 $10.500 $35.000 $24.000 $30.000 $34.000
BACKFILL (TY A OR B)
STA 171.840 $225.000 $235.000 $120.000 $375.000 $312.000 $150.000 $250.000 $310.000
BLADING
STA 171.840 $250.000 $100.000 $250.000 $200.000 $163.000 $130.000 $250.000 $255.000
BLOCK SODDING
SY 238.000 $9.000 $14.000 $10.000 $15.000 $12.990 $10.000 $6.000 $4.500
DRILL SEED (PERM_RURAL_CLAY)
SY 98,791.000 $0.270 $0.150 $0.250 $0.160 $0.140 $0.400 $0.500 $0.330
DRILL SEED (TEMP_WARM_COOL)
SY 98,791.000 $0.270 $0.130 $0.210 $0.130 $0.120 $0.300 $0.500 $0.330
VEGETATIVE WATERING
TGL 29,429.000 $7.000 $0.010 $1.000 $1.000 $0.010 $1.000 $1.000 $25.600
FL BS (CMP IN PLC)(TY D GR 1-2) (12")
SY 56,094.000 $26.000 $29.250 $31.750 $30.000 $40.000 $38.000 $25.000 $25.540
REWORK BS MTL (TY B)(10")(ORD COMP)
SY 1,317.000 $2.500 $12.000 $3.250 $10.000 $37.000 $30.000 $6.000 $3.700
REWORK BS MTL (TY C)(10")(ORD COMP)
SY 40,956.000 $2.500 $2.000 $2.500 $3.250 $3.100 $3.500 $6.000 $2.800
CEMENT
TON 337.000 $250.000 $235.000 $225.000 $215.000 $210.000 $325.000 $300.000 $275.000
CEMENT TRT (EXIST MATL)(6")
SY 58,959.000 $3.000 $2.000 $2.000 $1.250 $2.150 $5.000 $6.000 $3.500
PRIME COAT(MC-30 OR AE-P)
GAL 16,254.000 $4.750 $4.000 $5.000 $6.000 $4.800 $5.000 $5.000 $5.780
ASPH (CRS-2P)
GAL 13,558.000 $4.300 $4.000 $4.750 $5.000 $3.750 $4.000 $5.000 $8.400
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
GAL 11,378.000 $5.000 $4.000 $4.750 $6.000 $3.800 $5.000 $5.000 $8.660
AGGR (TY-B, GR-3)(SAC-B)
CY 518.000 $200.000 $190.000 $225.000 $275.000 $250.000 $170.000 $250.000 $446.250
SP MIXES SP-C SAC-B PG64-22
TON 5,896.000 $135.000 $130.000 $140.000 $163.000 $150.000 $120.000 $150.000 $172.000
PLANE ASPH CONC PAV(4")
SY 42,178.000 $4.000 $3.000 $3.500 $4.500 $4.500 $2.750 $6.000 $5.800
CUT & RESTORE ASPH PAVING
SY 90.000 $400.000 $675.000 $131.000 $400.000 $130.000 $275.000 $200.000 $515.000
FLOWABLE BACKFILL
CY 8.000 $300.000 $1,450.000 $420.000 $1,155.000 $1,000.000 $1,200.000 $350.000 $300.000
TRENCH EXCAVATION PROTECTION
LF 33.000 $25.000 $15.000 $16.000 $75.000 $1.000 $50.000 $10.000 $4.800
RIPRAP (MOW STRIP)(4 IN)
CY 32.000 $800.000 $700.000 $761.000 $1,000.000 $725.000 $1,200.000 $550.000 $795.000
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 10.000 $330.000 $460.000 $444.000 $402.350 $400.000 $325.000 $185.000 $167.000
RIPRAP (STONE COMMON)(DRY)(24 IN)
CY 92.000 $350.000 $320.000 $420.000 $235.040 $250.000 $300.000 $250.000 $250.000
RETROFIT RAIL (TY T131RC)
LF 196.000 $350.000 $310.000 $210.000 $235.000 $199.120 $400.000 $250.000 $270.000
CONC BOX CULV (5 FT X 4 FT)
LF 192.000 $550.000 $500.000 $735.000 $400.000 $480.000 $525.000 $650.000 $420.000
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
LF 11.000 $1,100.000 $1,200.000 $1,155.000 $900.000 $1,045.000 $2,000.000 $1,000.000 $1,220.000
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
LF 8.000 $1,150.000 $1,500.000 $1,260.000 $1,000.000 $1,150.000 $2,550.000 $1,000.000 $612.000
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
LF 16.000 $1,200.000 $1,200.000 $1,470.000 $1,100.000 $1,200.000 $1,500.000 $1,000.000 $1,200.000
RC PIPE (CL III)(18 IN)
LF 1,250.000 $101.000 $77.000 $63.000 $68.000 $59.000 $105.000 $85.000 $84.000
RC PIPE (CL III)(24 IN)
LF 404.000 $155.000 $108.000 $95.000 $91.000 $73.000 $125.000 $105.000 $133.000
RC PIPE (CL III)(30 IN)
LF 102.000 $155.000 $137.000 $131.000 $109.000 $100.000 $135.000 $150.000 $150.000
WINGWALL (PW - 1) (HW=5 FT)
EA 1.000 $19,000.000 $14,000.000 $23,100.000 $16,000.000 $19,000.000 $26,000.000 $25,000.000 $16,250.000
WINGWALL (PW - 1) (HW=6 FT)
EA 2.000 $21,000.000 $16,000.000 $26,250.000 $34,000.000 $33,250.000 $28,000.000 $30,000.000 $27,300.000
SET (TY I)(S= 4 FT)(HW= 5 FT)(3:1)(C)
EA 2.000 $18,000.000 $14,000.000 $10,500.000 $12,000.000 $8,400.000 $14,000.000 $25,000.000 $11,500.000
SET (TY I)(S= 5 FT)(HW= 5 FT)(3:1)(C)
EA 2.000 $19,000.000 $14,000.000 $12,600.000 $12,000.000 $9,600.000 $15,000.000 $30,000.000 $13,000.000
SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1)(C)
EA 1.000 $20,000.000 $16,000.000 $15,750.000 $15,000.000 $12,000.000 $24,000.000 $40,000.000 $15,000.000
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 2.000 $1,400.000 $1,425.000 $840.000 $700.000 $1,050.000 $1,425.000 $1,850.000 $3,200.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 78.000 $1,500.000 $1,575.000 $1,050.000 $900.000 $1,140.000 $1,525.000 $1,250.000 $1,200.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 1.000 $1,750.000 $1,650.000 $1,260.000 $1,100.000 $1,290.000 $1,625.000 $2,000.000 $1,900.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 30.000 $2,250.000 $1,890.000 $1,732.500 $1,500.000 $1,400.000 $1,875.000 $2,200.000 $1,560.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 8.000 $3,550.000 $4,300.000 $5,775.000 $3,500.000 $3,200.000 $3,200.000 $3,000.000 $3,220.000
REMOV STR (SET)
EA 28.000 $500.000 $1,050.000 $210.000 $250.000 $225.000 $550.000 $500.000 $755.000
REMOV STR (WINGWALL)
EA 8.000 $1,300.000 $1,800.000 $1,050.000 $4,000.000 $1,500.000 $1,400.000 $2,500.000 $1,740.000
REMOV STR (PIPE)
LF 1,335.000 $20.000 $13.000 $10.500 $30.000 $12.000 $8.000 $50.000 $27.000
REMOV STR (BOX CULVERT)
LF 152.000 $125.000 $105.000 $105.000 $90.000 $80.000 $50.000 $100.000 $58.000
MOBILIZATION
LS 1.000 $667,621.000 $650,000.000 $600,000.000 $731,000.000 $700,000.000 $725,000.000 $700,000.000 $265,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $10,000.000 $17,500.000 $8,100.000 $33,000.000 $4,500.000 $1,500.000 $8,500.000 $7,150.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $15,000.000 $18,000.000 $15,000.000 $15,000.000 $6,000.000 $10,000.000 $20,000.000 $18,450.000
TMA (STATIONARY)
DAY 200.000 $275.000 $50.000 $275.000 $100.000 $200.000 $200.000 $250.000 $225.000
TMA (MOBILE OPERATION)
HR 192.000 $75.000 $40.000 $70.000 $50.000 $10.000 $200.000 $55.000 $95.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 33.000 $85.000 $150.000 $105.000 $137.500 $140.120 $125.000 $50.000 $85.000
ROCK FILTER DAMS (REMOVE)
LF 33.000 $20.000 $24.000 $26.000 $33.000 $23.800 $20.000 $20.000 $17.500
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 247.000 $35.000 $43.000 $41.000 $38.500 $42.890 $48.000 $50.000 $33.500
CONSTRUCTION EXITS (REMOVE)
SY 247.000 $12.000 $14.000 $12.500 $11.000 $13.860 $14.500 $2.000 $12.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 10,280.000 $4.750 $5.750 $4.200 $4.000 $4.200 $4.500 $4.000 $4.100
TEMP SEDMT CONT FENCE (REMOVE)
LF 10,280.000 $1.250 $0.950 $1.050 $1.000 $0.930 $1.250 $2.000 $1.150
DRIVEWAYS (CONC)
SY 2,112.000 $150.000 $160.000 $115.000 $110.000 $135.000 $120.000 $85.000 $115.000
DRIVEWAYS (ACP)
SY 2,346.000 $65.000 $63.000 $125.000 $63.000 $65.000 $70.000 $55.000 $47.030
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 34,368.000 $0.180 $0.270 $0.370 $0.150 $0.270 $0.200 $0.300 $0.600
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
LF 17,184.000 $0.220 $0.270 $0.480 $0.250 $0.460 $0.200 $0.300 $0.600
MTL W-BEAM GD FEN (TIM POST)
LF 450.000 $30.000 $31.000 $23.000 $23.960 $21.500 $32.000 $30.000 $25.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,500.000 $2,700.000 $1,735.000 $3,023.670 $2,150.000 $2,100.000 $1,820.000 $2,365.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,300.000 $3,250.000 $3,072.000 $3,141.750 $2,925.000 $3,400.000 $3,850.000 $3,367.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 30.000 $295.000 $245.000 $236.000 $298.200 $225.000 $300.000 $1,100.000 $282.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 2.000 $400.000 $275.000 $263.000 $303.530 $250.000 $300.000 $1,100.000 $285.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 2.000 $700.000 $650.000 $630.000 $846.680 $600.000 $1,100.000 $1,100.000 $710.000
CONDT (PVC) (SCH 40) (2")
LF 8.000 $30.000 $110.000 $105.000 $50.000 $50.000 $100.000 $30.000 $73.000
ELEC CONDR (NO.12) INSULATED
LF 656.000 $2.000 $4.350 $11.000 $5.000 $20.000 $20.000 $3.000 $2.500
ALUMINUM SIGNS (TY A)
SF 11.000 $50.000 $38.000 $37.000 $50.000 $35.000 $40.000 $50.000 $40.500
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 34.000 $700.000 $765.000 $735.000 $772.130 $700.000 $850.000 $1,100.000 $711.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 7.000 $800.000 $820.000 $788.000 $756.150 $750.000 $1,000.000 $1,100.000 $783.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 5.000 $950.000 $930.000 $893.000 $921.230 $850.000 $1,150.000 $1,100.000 $894.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $1,200.000 $1,040.000 $998.000 $1,091.630 $950.000 $1,200.000 $1,100.000 $1,290.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 10.000 $45.000 $49.000 $44.000 $26.630 $38.000 $45.000 $100.000 $40.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 8.000 $75.000 $71.000 $68.000 $47.930 $65.000 $75.000 $100.000 $60.000
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 1,910.000 $0.450 $0.550 $0.530 $0.530 $0.330 $0.750 $1.000 $0.500
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 21,921.000 $0.500 $0.250 $0.240 $0.240 $0.200 $0.300 $1.000 $0.600
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 1,671.000 $1.250 $1.650 $1.140 $3.150 $1.000 $3.000 $6.000 $1.200
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 90.000 $2.000 $2.190 $2.100 $2.130 $1.000 $2.500 $1.000 $2.500
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 385.000 $1.500 $1.090 $1.050 $1.070 $1.250 $1.250 $4.000 $1.500
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 308.000 $4.500 $2.190 $2.100 $2.130 $3.150 $2.500 $6.000 $4.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 295.000 $8.000 $7.100 $6.900 $6.920 $6.500 $8.000 $20.000 $8.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 2.000 $180.000 $180.000 $175.000 $175.730 $250.000 $200.000 $250.000 $170.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 2.000 $250.000 $215.000 $205.000 $207.680 $300.000 $240.000 $250.000 $217.000
PAVEMENT SLER 12"
LF 240.000 $1.500 $1.090 $1.050 $1.070 $1.200 $1.250 $4.000 $1.500
PAVEMENT SLER 24"
LF 162.000 $2.500 $2.190 $2.100 $2.130 $2.000 $2.500 $12.000 $2.500
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 42,881.000 $0.750 $0.550 $0.530 $0.530 $0.550 $0.800 $0.650 $0.980
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
LF 1,910.000 $0.900 $0.710 $0.680 $0.690 $0.550 $0.800 $0.650 $1.000
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 32,199.000 $0.700 $0.550 $0.530 $0.530 $0.550 $0.800 $0.650 $1.800
REFL PAV MRKR TY II-A-A
EA 371.000 $6.000 $5.150 $4.990 $5.060 $3.980 $6.000 $6.000 $5.500
ELIM EXT PM & MRKS (12")
LF 240.000 $2.100 $3.280 $3.150 $3.200 $2.000 $4.000 $6.000 $5.000
ELIM EXT PM & MRKS (24")
LF 162.000 $4.000 $6.560 $6.300 $6.390 $3.500 $7.500 $20.000 $5.000
PAV SURF PREP FOR MRK (6")
LF 360.000 $0.200 $1.090 $1.050 $1.070 $0.350 $1.200 $1.000 $0.500
VEH SIG SEC (12")LED(YEL)
EA 2.000 $350.000 $550.000 $525.000 $500.000 $500.000 $1,000.000 $350.000 $458.000
INSTALL RDSD FLASH BEACON ASSEMBLY
EA 1.000 $6,000.000 $11,000.000 $8,925.000 $20,000.000 $5,000.000 $10,000.000 $12,500.000 $8,450.000
REMOVE RDSD FLASH BEACON ASSEMBLY
EA 1.000 $1,000.000 $1,650.000 $1,050.000 $5,000.000 $2,500.000 $2,500.000 $6,500.000 $8,900.000
FULL - WIDTH MOWING
CYC 3.000 $2,500.000 $2,600.000 $6,000.000 $5,500.000 $8,200.000 $2,300.000 $2,500.000 $4,135.000
Totals: $7,053,216.560 $6,535,504.830 $6,582,349.410 $7,164,924.530 $7,327,363.410 $7,750,287.350 $7,873,764.100 $8,354,326.140
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $25,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $50,000.00
Total: $75,000.00