1776-02-019
|
HAYS
|
AUSTIN
|
$6,720,271
|
FM 2001
|
C 1776-2-19
|
03/05/2021
|
11/15/2023
|
CONSTRUCT NEW ROADWAY LANES
|
HUNTER INDUSTRIES, LTD.
($5,959,526)
|
|
|
0111-01-095
|
HARRIS
|
HOUSTON
|
$1,397,202
|
FM 521
|
C 111-1-95
|
02/04/2021
|
11/15/2023
|
RESTOR OF ROADWAY
|
DURWOOD GREENE CONSTRUCTION CO.
($969,114)
|
|
|
0179-02-085
|
BRAZORIA
|
HOUSTON
|
$946,362
|
BS 35-E
|
C 179-2-85
|
02/04/2021
|
11/15/2023
|
PLANING, PAVMT REPAIR, SEAL COAT AND...
|
DURWOOD GREENE CONSTRUCTION CO.
($858,674)
|
|
|
1685-01-110
|
HARRIS
|
HOUSTON
|
$5,117,781
|
FM 1960
|
C 1685-1-110
|
02/04/2021
|
11/15/2023
|
2.5 " PLANING, SEAL COAT, TOM OVERLA...
|
ANGEL BROTHERS HOLDINGS CORP.
($3,598,843)
|
|
|
6361-79-001
|
HOWARD
|
ABILENE
|
$630,570
|
IH0020
|
BPM - 636179001
|
02/04/2021
|
11/15/2023
|
MISCELLANEOUS BRIDGE REPAIR
|
MPB, INC.
($425,867)
|
|
|
0005-14-084
|
MIDLAND
|
ODESSA
|
$61,937,172
|
IH 20
|
C 5-14-84
|
01/08/2021
|
11/15/2023
|
CONSTRUCT NEW INTERCHANGE
|
PULICE CONSTRUCTION, INC.
($59,101,874)
|
|
|
2524-02-022
|
BRAZORIA
|
HOUSTON
|
$11,460,496
|
FM 2611
|
BR 2018(103)
|
01/08/2021
|
11/15/2023
|
REPLACE BRIDGE AND APPROACHES
|
COPASA INC
($12,141,992)
|
|
|
0906-00-203
|
ECTOR
|
ODESSA
|
$1,830,439
|
VA
|
C 906-00-203
|
01/07/2021
|
11/15/2023
|
BRIDGE JOINT REPAIR PROGRAM (2021)
|
SCR CIVIL CONSTRUCTION, LLC
($1,267,114)
|
|
|
6365-64-001
|
CHAMBERS
|
BEAUMONT
|
$84,879
|
IH0010
|
BPM - 636564001
|
01/06/2021
|
11/15/2023
|
CLEAN & SEAL JOINTS/EROSION CNTRL/CO...
|
TALBRAN ENTERPRISES LLC
($72,198)
|
|
|
6369-07-001
|
FREESTONE
|
BRYAN
|
$88,430
|
FM0080
|
BPM - 636907001
|
12/17/2020
|
11/15/2023
|
SCOUR REPAIR & PILE REPAIR
|
GV LANDSCAPE AND CONSTRUCTION LLC
($70,040)
|
|
|
6372-63-001
|
MAVERICK
|
LAREDO
|
$215,520
|
US0057
|
RMC - 637263001
|
12/16/2020
|
11/15/2023
|
REHAB OF A BRIDGE FACILITY
|
GIBSON & ASSOCIATES, INC.
($161,400)
|
|
|
6354-93-001
|
GREGG
|
TYLER
|
$207,353
|
US0259
|
BPM - 635493001
|
12/08/2020
|
11/15/2023
|
BRIDGE JOINT CLEANING AND SEALING
|
TALBRAN ENTERPRISES LLC
($161,490)
|
|
|
0494-08-015
|
GLASSCOCK
|
SAN ANGELO
|
$30,651,534
|
SH 137
|
STP 2020(950)
|
12/02/2020
|
11/15/2023
|
RESTOR OF EXIST ROAD
|
RK HALL, LLC
($25,932,283)
|
|
|
2523-02-068
|
BRAZORIA
|
HOUSTON
|
$32,419,999
|
FM 2004
|
STP 2021(189)
|
12/02/2020
|
11/15/2023
|
CONSTRUCTION OF SUPER 2 HWY
|
ANGEL BROTHERS HOLDINGS CORP.
($28,859,306)
|
|
|
6368-29-001
|
PALO PINTO
|
FORT WORTH
|
$59,538
|
IH0020
|
BPM - 636829001
|
11/19/2020
|
11/15/2023
|
REPAIR OF EXIST BRIDGE BEAM
|
TEXCON GENERAL CONTRACTORS
($41,824)
|
|
|
0143-07-039
|
GONZALES
|
YOAKUM
|
$10,496,080
|
US 87
|
BR 2021(117)
|
11/05/2020
|
11/15/2023
|
REPLACE BRIDGE AND APPROACHES
|
ANGEL BROTHERS HOLDINGS CORP.
($8,424,542)
|
|
|
6365-28-001
|
MOORE
|
AMARILLO
|
$747,038
|
US0087
|
BPM - 636528001
|
11/05/2020
|
11/15/2023
|
FY 2021 BPM PROJECT
|
PBX BRIDGE COMPANY
($666,090)
|
|
|
6370-22-001
|
ECTOR
|
ODESSA
|
$297,425
|
IH0020
|
BPM - 637022001
|
11/05/2020
|
11/15/2023
|
BRIDGE JOINT REPAIR
|
SCOTT TUCKER CONSTRUCTION COMPANY, LLC
($173,811)
|
|
|
0535-07-050
|
FAYETTE
|
YOAKUM
|
$13,026,398
|
IH 10
|
NH 2021(119)
|
11/04/2020
|
11/15/2023
|
ACP OVERLAY
|
HUNTER INDUSTRIES, LTD.
($10,399,532)
|
|
|
0294-02-023
|
GAINES
|
LUBBOCK
|
$56,190,977
|
US 180
|
C 294-2-23
|
10/02/2020
|
11/15/2023
|
SUPER 2 PASSING LANES
|
JAMES HAMILTON CONSTRUCTION CO.
($48,813,790)
|
|
|
0508-01-345
|
HARRIS
|
HOUSTON
|
$16,601,549
|
IH 10
|
C 508-1-345
|
10/02/2020
|
11/15/2023
|
CONSTRUCT EAST BOUND ENTRANCE RAMP
|
SER CONSTRUCTION PARTNERS, LLC
($14,598,296)
|
|
|
0598-02-119
|
BRAZORIA
|
HOUSTON
|
$5,856,903
|
SH 288
|
CC 598-2-119
|
10/02/2020
|
11/15/2023
|
CONSTRUCT NEW 2-LANE NB FRONTAGE ROA...
|
SER CONSTRUCTION PARTNERS, LLC
($4,797,529)
|
|
|
0909-40-076
|
LIMESTONE
|
WACO
|
$655,173
|
CR
|
BR 2018(477)
|
10/02/2020
|
11/15/2023
|
REPLACE BRIDGE AND APPROACHES
|
FUQUA CONSTRUCTION CO., INC.
($733,162)
|
|
|
2087-01-021
|
MILAM
|
BRYAN
|
$1,280,587
|
FM 908
|
BR 2021(027)
|
10/01/2020
|
11/15/2023
|
BR - BRIDGE REPL
|
SB CONTRACTORS LLC
($1,185,696)
|
|
|
2553-01-115
|
ANGELINA
|
LUFKIN
|
$15,921,009
|
US 59
|
NH 2B20(055)
|
10/01/2020
|
11/15/2023
|
CONVERT TO 4 LANE FRWY W/2 LANE NB&S...
|
LONGVIEW BRIDGE AND ROAD, LTD.
($19,326,241)
|
|
|
0088-01-069
|
BEE
|
CORPUS CHRISTI
|
$19,724,247
|
US 59
|
C 88-1-69
|
09/04/2020
|
11/15/2023
|
PAVMT REPAIR AND STRUCTURAL OVERLAY
|
SMITH & COMPANY
($15,920,071)
|
|
|
0114-11-082
|
WALLER
|
HOUSTON
|
$4,725,918
|
US 290
|
NH 2B20(183)
|
09/04/2020
|
11/15/2023
|
CONSTRUCT U-TURN
|
ISI CONTRACTING, INC.
($4,591,144)
|
|
|
1685-03-098
|
HARRIS
|
HOUSTON
|
$71,190,175
|
FM 1960
|
C 1685-3-98
|
09/04/2020
|
11/15/2023
|
WIDEN FROM 4 TO 6 LANES & CONSTRUCT...
|
WEBBER, LLC
($70,042,726)
|
|
|
2399-01-074
|
BRAZOS
|
BRYAN
|
$61,235,947
|
FM 2818
|
NH 2020(879)
|
09/04/2020
|
11/15/2023
|
WIDEN NON-FREEWAY FACILITY
|
KNIFE RIVER CORPORATION - SOUTH
($50,398,943)
|
|
|
0265-02-036
|
TRAVIS
|
AUSTIN
|
$50,709,809
|
SH 71
|
C 265-2-36
|
09/03/2020
|
11/15/2023
|
CONSTRUCT 4-LANE OVERPASSES AT ROSS...
|
ZACHRY CONSTRUCTION CORPORATION
($61,227,248)
|
|
|
0265-14-008
|
FAYETTE
|
YOAKUM
|
$14,271,311
|
BS 71-E
|
BR 2021(121)
|
09/03/2020
|
11/15/2023
|
CONSTRUCT BRIDGE AND APPROACHES
|
ANGEL BROTHERS HOLDINGS CORP.
($13,635,356)
|
|
|
1413-01-018
|
BRAZORIA
|
HOUSTON
|
$1,632,447
|
FM 1459
|
C 1413-1-18
|
09/03/2020
|
11/15/2023
|
SURF/ROADWAY RESTOR
|
ANGEL BROTHERS HOLDINGS CORP.
($1,468,982)
|
|
|
1415-03-012
|
FORT BEND
|
HOUSTON
|
$1,599,659
|
FM 2759
|
STP 2B20(052)
|
09/03/2020
|
11/15/2023
|
CONSTRUCT NOISE BARRIER
|
TEXAS WALL & LANDSCAPE
($1,285,464)
|
|
|
1986-01-065
|
MONTGOMERY
|
HOUSTON
|
$3,429,851
|
FM 1314
|
CC 1986-1-65
|
09/03/2020
|
11/15/2023
|
CONSTRUCT DRAINAGE CULVERTS&REPLACE...
|
RAC INDUSTRIES, LLC
($3,360,867)
|
|
|
0006-07-085
|
CALLAHAN
|
ABILENE
|
$4,421,987
|
IH 20
|
C 6-7-85
|
08/06/2020
|
11/15/2023
|
CONC MEDIAN BARRIER
|
HJC FARMS, INC.
($4,097,727)
|
|
|
0200-14-097
|
JEFFERSON
|
BEAUMONT
|
$2,111,801
|
US 69
|
NH 2021(032)
|
08/06/2020
|
11/15/2023
|
SFT - SAFETY IMPRV PROJECT
|
FLOVERA CONSTRUCTION SERVICES, LLC
($2,456,628)
|
|
|
0114-09-077
|
WASHINGTON
|
BRYAN
|
$2,691,639
|
BU 290F
|
STP 2B20(105)
|
08/05/2020
|
11/15/2023
|
MILL AND INLAY
|
KNIFE RIVER CORPORATION - SOUTH
($2,697,458)
|
|
|
0179-02-087
|
BRAZORIA
|
HOUSTON
|
$12,602,399
|
SH 35
|
STP 2B20(045)
|
08/05/2020
|
11/15/2023
|
SURF/ROADWAY RESTOR
|
DURWOOD GREENE CONSTRUCTION CO.
($10,077,740)
|
|
|
0088-05-104
|
VICTORIA
|
YOAKUM
|
$6,402,470
|
US 59
|
NH 2020(988)
|
07/09/2020
|
11/15/2023
|
INSTL MEDIAN BARRIER AND WIDEN ROADW...
|
HUNTER INDUSTRIES, LTD.
($6,878,588)
|
|
|
0179-03-034
|
BRAZORIA
|
HOUSTON
|
$5,870,139
|
SH 35
|
NH 2020(968)
|
07/09/2020
|
11/15/2023
|
PFC OVERLAY
|
ANGEL BROTHERS HOLDINGS CORP.
($5,289,598)
|
|
|
0216-01-057
|
COMAL
|
SAN ANTONIO
|
$14,258,767
|
SL 337
|
STP 2B20(029)MM
|
07/09/2020
|
11/15/2023
|
CONSTRUCT GRADE SEPARATION
|
HUNTER INDUSTRIES, LTD.
($14,284,639)
|
|
|
0231-03-147
|
BELL
|
WACO
|
$3,095,819
|
IH 14
|
STP 2020(941)MM
|
07/09/2020
|
11/15/2023
|
CONSTRUCT WEST TO EAST TURNAROUND @...
|
J.D. ABRAMS, L.P.
($3,098,000)
|
|
|
0015-08-147
|
WILLIAMSON
|
AUSTIN
|
$60,342,307
|
IH 35
|
NH 2020(185)
|
07/08/2020
|
11/15/2023
|
INTERCHANGE (NEW OR RECONED)
|
J.D. ABRAMS, L.P.
($61,721,948)
|
|
|
0100-08-095
|
BEE
|
CORPUS CHRISTI
|
$17,136,769
|
US 181
|
C 100-8-95
|
07/08/2020
|
11/15/2023
|
SURF/ROADWAY RESTOR
|
HUNTER INDUSTRIES, LTD.
($14,739,738)
|
|
|
0523-08-007
|
MONTGOMERY
|
HOUSTON
|
$31,340,369
|
FM 1488
|
C 523-8-7
|
07/08/2020
|
11/15/2023
|
WIDENING OF A NON-FREEWAY
|
LINDSEY CONSTRUCTION, INC.
($29,787,408)
|
|
|
1685-03-058
|
HARRIS
|
HOUSTON
|
$63,558,062
|
FM 1960
|
C 1685-3-58
|
07/08/2020
|
11/15/2023
|
WIDEN FROM 4 TO 6 LANES
|
ANGEL BROTHERS HOLDINGS CORP.
($58,199,301)
|
|
|
0028-14-091
|
ORANGE
|
BEAUMONT
|
$47,457,145
|
IH 10
|
NH 2020(966)
|
06/05/2020
|
11/15/2023
|
WIDEN EXIST MAINLANES FROM 4 TO 6 LA...
|
WILLIAMS BROTHERS CONSTRUCTION CO., INC.
($52,363,934)
|
|
|
0923-06-058
|
BROWN
|
BROWNWOOD
|
$556,091
|
CR
|
BR 2020(869)
|
06/05/2020
|
11/15/2023
|
REPLACE BRIDGE AND APPROACHES
|
PIERCE R & B LLC
($570,000)
|
|
|
0907-13-012
|
RUNNELS
|
SAN ANGELO
|
$2,412,984
|
CR
|
BR 1402(117)
|
06/04/2020
|
11/15/2023
|
BRIDGE REPL
|
RELMCO, INC.
($2,384,074)
|
|
|
0923-09-063
|
EASTLAND
|
BROWNWOOD
|
$907,023
|
CR
|
BR 2020(702)
|
06/04/2020
|
11/15/2023
|
REPLACE BRIDGE AND APPROACHES
|
HODGES AND SON CONSTRUCTION COMPANY, INC.
($858,823)
|
|
|
0923-17-079
|
COMANCHE
|
BROWNWOOD
|
$932,085
|
CR
|
BR 2020(699)
|
06/04/2020
|
11/15/2023
|
REPLACE BRIDGE AND APPROACHES
|
KNIFE RIVER CORPORATION - SOUTH
($939,512)
|
|
|
0610-07-113
|
BOWIE
|
ATLANTA
|
$74,732,487
|
IH 30
|
NH 2020(455)
|
05/08/2020
|
11/15/2023
|
GR,STR,BASE,SURF & PAV MRK
|
LONGVIEW BRIDGE AND ROAD, LTD.
($88,870,749)
|
|
|
1835-02-059
|
BELL
|
WACO
|
$2,664,586
|
FM 1741
|
NH 2020(839)
|
05/08/2020
|
11/15/2023
|
CONSTRUCT SIDEWALK AND PEDESTRIAN BR...
|
TTG UTILITIES, LP
($2,447,065)
|
|
|
0923-17-087
|
COMANCHE
|
BROWNWOOD
|
$592,163
|
CR
|
BR 2020(459)
|
05/07/2020
|
11/15/2023
|
REPLACE BRIDGE AND APPROACHES
|
ENCINO LANDSCAPE, INC.
($591,668)
|
|
|
6356-41-001
|
COLORADO
|
YOAKUM
|
$292,600
|
IH0010
|
MMC - 635641001
|
05/06/2020
|
09/26/2024
|
HOT-MIX (MATERIAL ONLY)
|
QUALITY HOT MIX, INC.
($228,000)
|
|
|
6356-49-001
|
WHARTON
|
YOAKUM
|
$195,000
|
US0059
|
MMC - 635649001
|
05/06/2020
|
09/26/2024
|
HOT-MIX (MATERIAL ONLY)
|
QUALITY HOT MIX, INC.
($192,000)
|
|
|
6356-50-001
|
MATAGORDA
|
YOAKUM
|
$296,100
|
SH0035
|
MMC - 635650001
|
05/06/2020
|
09/26/2024
|
HOT-MIX (MATERIAL ONLY)
|
QUALITY HOT MIX, INC.
($291,400)
|
|
|
6356-51-001
|
AUSTIN
|
YOAKUM
|
$294,800
|
IH0010
|
MMC - 635651001
|
05/06/2020
|
09/26/2024
|
HOT-MIX (MATERIAL ONLY)
|
QUALITY HOT MIX, INC.
($286,000)
|
|
|
0111-04-035
|
BRAZORIA
|
HOUSTON
|
$2,115,337
|
FM 521
|
STP 2020(694)
|
04/09/2020
|
11/15/2023
|
PAVMT REPAIR, SEAL COAT AND 1.5 IN P...
|
DURWOOD GREENE CONSTRUCTION CO.
($1,947,783)
|
|
|
3545-02-010
|
HAYS
|
AUSTIN
|
$7,098,810
|
FM 110
|
STP 2020(761)
|
04/09/2020
|
11/15/2023
|
CONSTRUCT OVERPASS
|
HUNTER INDUSTRIES, LTD.
($5,882,254)
|
|
|
6354-37-001
|
BRAZORIA
|
HOUSTON
|
$757,641
|
SH0288
|
RMC - 635437001
|
04/09/2020
|
11/15/2023
|
ACP OVERLAY
|
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
($781,875)
|
|
|
6359-80-001
|
ECTOR
|
ODESSA
|
$616,000
|
IH0020
|
RMC - 635980001
|
04/09/2020
|
11/15/2023
|
CALLOUT BRIDGE REPAIR
|
SCR CIVIL CONSTRUCTION, LLC
($490,575)
|
|
|
6360-25-001
|
PECOS
|
ODESSA
|
$616,000
|
IH0010
|
RMC - 636025001
|
04/09/2020
|
11/15/2023
|
BRIDGE REPAIR (CALLOUT)
|
RELMCO, INC.
($429,900)
|
|
|
6353-27-001
|
HOPKINS
|
PARIS
|
$261,622
|
IH0030
|
BPM - 635327001
|
03/19/2020
|
11/15/2023
|
BPM-CONC BEAM AND STRUCT REPAIR
|
GIBSON & ASSOCIATES, INC.
($182,140)
|
|
|
0014-07-102
|
HILL
|
WACO
|
$3,850,809
|
IH 35
|
NH 2020(753)
|
03/04/2020
|
11/15/2023
|
OVERLAY
|
THE TRUESDELL CORPORATION
($3,699,699)
|
|
|
1004-02-017
|
BRAZORIA
|
HOUSTON
|
$2,633,017
|
FM 524
|
STP 2020(665)
|
03/04/2020
|
11/15/2023
|
PAVMT REPAIR, SEAL COAT AND 1.5 IN A...
|
DURWOOD GREENE CONSTRUCTION CO.
($2,696,289)
|
|
|
1258-04-062
|
HARRIS
|
HOUSTON
|
$2,155,444
|
FM 1093
|
STP 2020(666)
|
03/04/2020
|
11/15/2023
|
CONSTRUCTION OF AN OVERLAY
|
ANGEL BROTHERS HOLDINGS CORP.
($2,091,002)
|
|
|
6340-83-001
|
WALLER
|
HOUSTON
|
$319,750
|
FM1488
|
BPM - 634083001
|
03/04/2020
|
11/15/2023
|
MISCELLANEOUS BRIDGE REPAIR
|
SCR CIVIL CONSTRUCTION, LLC
($149,525)
|
|
|
0120-05-026
|
HAMILTON
|
WACO
|
$4,906,992
|
FM 218
|
STP 2020(564)
|
02/07/2020
|
11/15/2023
|
REHAB & WIDEN ROADWAY
|
BIG CREEK CONSTRUCTION, LTD.
($5,387,759)
|
|
|
0177-03-103
|
LIBERTY
|
BEAUMONT
|
$2,742,971
|
US 59
|
NH 2020(591)
|
02/07/2020
|
11/15/2023
|
OV-OVERLAY
|
SMITH & COMPANY
($2,133,678)
|
|
|
0367-01-070
|
CHAMBERS
|
BEAUMONT
|
$2,843,823
|
SH 124
|
NH 2020(641)
|
02/07/2020
|
11/15/2023
|
OV-OVERLAY
|
ANGEL BROTHERS HOLDINGS CORP.
($2,844,750)
|
|
|
0543-01-065
|
WALLER
|
HOUSTON
|
$1,753,720
|
FM 359
|
STP 2020(595)
|
02/07/2020
|
11/15/2023
|
PLANING, SEAL COAT, ACP OVERLAY AND...
|
ANGEL BROTHERS HOLDINGS CORP.
($1,597,357)
|
|
|
6352-82-001
|
WHEELER
|
CHILDRESS
|
$707,146
|
IH0040
|
BPM - 635282001
|
02/07/2020
|
11/15/2023
|
BRIDGE PREVENT MAINT
|
SCOTT TUCKER CONSTRUCTION COMPANY, LLC
($697,998)
|
|
|
6352-27-001
|
TOM GREEN
|
SAN ANGELO
|
$75,100
|
US0087
|
RMC - 635227001
|
01/23/2020
|
11/15/2023
|
BRIDGE BEAM REPAIRS
|
SJ&J CONSTRUCTION, LLC
($72,200)
|
|
|
0089-08-098
|
WHARTON
|
YOAKUM
|
$195,525,806
|
US 59
|
NH 2020(496)
|
01/10/2020
|
09/26/2024
|
UPGRADE TO RURAL FREEWAY
|
WILLIAMS BROTHERS CONSTRUCTION CO., INC.
($191,395,295)
|
|
|
6347-85-001
|
LIBERTY
|
BEAUMONT
|
$1,018,537
|
SH0105
|
RMC - 634785001
|
01/10/2020
|
11/15/2023
|
OVERLAY AND PAVMT REPAIR
|
ANGEL BROTHERS HOLDINGS CORP.
($993,503)
|
|
|
0005-04-076
|
MARTIN
|
ODESSA
|
$27,506,703
|
IH 20
|
NH 2020(476)
|
01/09/2020
|
09/26/2024
|
REPLACE BRIDGE,REHAB FRONTAGE ROADS,...
|
FNF CONSTRUCTION, INC.
($30,634,104)
|
|
|
0370-04-033
|
VICTORIA
|
YOAKUM
|
$10,285,894
|
US 77
|
STP 2020(435)
|
01/09/2020
|
09/26/2024
|
ACP OVERLAY
|
HUNTER INDUSTRIES, LTD.
($9,370,793)
|
|
|
1188-02-089
|
MIDLAND
|
ODESSA
|
$22,910,734
|
SL 250
|
NH 2020(478)
|
01/09/2020
|
09/26/2024
|
CONSTRUCT NEW INTERCHANGE
|
JONES BROS. DIRT & PAVING CONTRACTORS, INC.
($22,509,210)
|
|
|
1685-05-109
|
HARRIS
|
HOUSTON
|
$5,852,050
|
SH 6
|
NH 2020(506)
|
01/09/2020
|
09/26/2024
|
PLANING,SEAL COAT,OVERLAY & PAVMT MR...
|
DURWOOD GREENE CONSTRUCTION CO.
($5,195,709)
|
|
|
0176-03-097
|
ANGELINA
|
LUFKIN
|
$141,599,693
|
US 59
|
NH 2013(218)
|
12/04/2019
|
11/15/2023
|
HWY IMPRV
|
SACYR CONSTRUCTION USA LLC
($140,865,929)
|
|
|
1187-02-018
|
MCLENNAN
|
WACO
|
$671,088
|
FM 938
|
BR 2020(397)
|
12/04/2019
|
11/15/2023
|
REPL BR & APPRS
|
KNIFE RIVER CORPORATION - SOUTH
($663,130)
|
|
|
2940-02-011
|
FORT BEND
|
HOUSTON
|
$1,060,613
|
FM 2919
|
STP 2020(417)
|
12/04/2019
|
11/15/2023
|
SEAL COAT, ACP OVERLAY, SIGNING & PV...
|
DURWOOD GREENE CONSTRUCTION CO.
($1,038,126)
|
|
|
1258-04-063
|
HARRIS
|
HOUSTON
|
$12,023,524
|
FM 1093
|
STP 1902(183)
|
12/03/2019
|
11/15/2023
|
PLANING, UNDERSEAL, OVERLAY & PAVMT...
|
ANGEL BROTHERS HOLDINGS CORP.
($11,892,688)
|
|
|
6346-13-001
|
RUNNELS
|
SAN ANGELO
|
$164,850
|
SH0153
|
BPM - 634613001
|
11/15/2019
|
11/15/2023
|
BRIDGE REPAIRS
|
MAD ENERGY SERVICE LLC
($95,000)
|
|
|
6346-14-001
|
IRION
|
SAN ANGELO
|
$184,250
|
SH0163
|
BPM - 634614001
|
11/15/2019
|
11/15/2023
|
BRIDGE REPAIRS
|
MAD ENERGY SERVICE LLC
($99,000)
|
|
|
6352-49-001
|
CONCHO
|
SAN ANGELO
|
$272,675
|
US0083
|
BPM - 635249001
|
11/15/2019
|
11/15/2023
|
BRIDGE REPAIRS
|
SCOTT TUCKER CONSTRUCTION COMPANY, LLC
($157,962)
|
|
|
6351-36-001
|
FORT BEND
|
HOUSTON
|
$287,950
|
US0059
|
RMC - 635136001
|
11/12/2019
|
11/15/2023
|
CONC SPALL REPAIR
|
ISI CONTRACTING, INC.
($280,700)
|
|
|
0185-01-030
|
BELL
|
WACO
|
$79,955,513
|
US 190
|
NH 2019(599)
|
11/06/2019
|
11/15/2023
|
WIDEN FROM TWO TO FOUR LANE DIVIDED...
|
J.D. ABRAMS, L.P.
($77,807,569)
|
|
|
0266-01-083
|
FAYETTE
|
YOAKUM
|
$16,067,131
|
SH 71
|
NH 2020(197)
|
11/06/2019
|
11/15/2023
|
OVERLAY
|
HUNTER INDUSTRIES, LTD.
($15,790,738)
|
|
|
0508-01-353
|
HARRIS
|
HOUSTON
|
$6,491,829
|
IH 10
|
BR 2020(205)
|
11/06/2019
|
11/15/2023
|
BRIDGE REPL
|
NBG CONSTRUCTORS, INC.
($6,382,061)
|
|
|
0271-02-049
|
AUSTIN
|
YOAKUM
|
$195,127,131
|
IH 10
|
NH 2020(115)
|
11/05/2019
|
11/15/2023
|
WIDEN FREEWAY
|
WEBBER, LLC
($184,551,690)
|
|
|
0456-01-047
|
FREESTONE
|
BRYAN
|
$17,432,231
|
FM 27
|
STP 1902(155)
|
10/03/2019
|
11/15/2023
|
REHAB EXIST ROAD
|
KNIFE RIVER CORPORATION - SOUTH
($14,892,846)
|
|
|
0471-04-030
|
CALDWELL
|
AUSTIN
|
$12,289,977
|
SH 21
|
NH 1902(253)
|
10/03/2019
|
11/15/2023
|
SUPER-2 HWY
|
ANGEL BROTHERS HOLDINGS CORP.
($12,225,105)
|
|
|
0089-03-091
|
JACKSON
|
YOAKUM
|
$13,609,496
|
US 59
|
NH 2020(114)
|
10/02/2019
|
11/15/2023
|
PLANING AND ACP OVERLAY
|
HUNTER INDUSTRIES, LTD.
($12,833,114)
|
|
|
0909-38-079
|
FALLS
|
WACO
|
$390,702
|
CR
|
BR 1702(808)
|
10/02/2019
|
11/15/2023
|
REPL BR & APPRS
|
ELLIS-MCGINNIS CONSTRUCTION CO.
($362,831)
|
|
|
0188-02-029
|
FORT BEND
|
HOUSTON
|
$87,914,194
|
SH 36
|
NH 1902(002)
|
09/06/2019
|
11/15/2023
|
WIDEN NON-FREEWAY FROM TWO TO FOUR L...
|
PULICE CONSTRUCTION, INC.
($81,760,171)
|
|
|
0188-02-036
|
FORT BEND
|
HOUSTON
|
$49,337,048
|
SH 36
|
STP 2020(056)MM
|
09/06/2019
|
11/15/2023
|
WIDEN NON FREEWAY FROM TWO TO FOUR L...
|
PULICE CONSTRUCTION, INC.
($42,315,989)
|
|
|
0271-09-024
|
WALLER
|
HOUSTON
|
$3,560,621
|
US 90
|
STP 2020(024)
|
09/06/2019
|
11/15/2023
|
BASE REPAIR, PLANING, SEAL COAT & 1....
|
DURWOOD GREENE CONSTRUCTION CO.
($3,290,507)
|
|
|
0543-03-076
|
FORT BEND
|
HOUSTON
|
$759,186
|
FM 762
|
STP 2020(026)
|
09/06/2019
|
11/15/2023
|
BASE REPAIR, PLANING AND 2" ACP OVER...
|
ANGEL BROTHERS HOLDINGS CORP.
($791,784)
|
|
|
0027-03-073
|
COLORADO
|
YOAKUM
|
$4,807,776
|
FM 102
|
STP 2020(052)
|
09/05/2019
|
11/15/2023
|
MILL AND INLAY
|
ANGEL BROTHERS HOLDINGS CORP.
($3,987,941)
|
|
|
0188-03-019
|
BRAZORIA
|
HOUSTON
|
$81,323,903
|
SH 36
|
STP 2020(057)MM
|
09/05/2019
|
11/15/2023
|
WIDEN NON-FREEWAY FROM TWO TO FOUR L...
|
PULICE CONSTRUCTION, INC.
($75,955,686)
|
|
|
0063-06-099
|
SHELBY
|
LUFKIN
|
$3,622,328
|
US 96
|
BR 1902(284)
|
08/06/2019
|
11/15/2023
|
BRIDGE MAINT
|
GIBSON & ASSOCIATES, INC.
($3,364,209)
|
|
|
0683-01-056
|
WILLIAMSON
|
AUSTIN
|
$26,803,522
|
RM 620
|
NH 2019(996)
|
08/06/2019
|
11/15/2023
|
INTERS & OPERATIONAL IMPRVS
|
BRIDGES AND ROADS, LLC
($27,468,704)
|
|
|
0110-02-027
|
MONTGOMERY
|
HOUSTON
|
$4,785,350
|
SH 75
|
BR 1902(363)
|
07/10/2019
|
09/27/2024
|
BRIDGE AND APPROACH REPL
|
SMITH & COMPANY
($5,663,720)
|
|
|
0912-70-093
|
HARRIS
|
HOUSTON
|
$4,168,235
|
CS
|
BR 2014(687)
|
07/10/2019
|
09/27/2024
|
REPLACE BRIDGE
|
RAGLE CONSTRUCTION, INC.
($4,947,624)
|
|
|
0176-01-081
|
NACOGDOCHES
|
LUFKIN
|
$77,867,878
|
US 59
|
NH 1902(081)
|
07/09/2019
|
09/27/2024
|
CONSTRUCT 4 LANE DIRECT CONNECTION
|
LONGVIEW BRIDGE AND ROAD, LTD.
($86,198,369)
|
|
|
0912-72-340
|
HARRIS
|
HOUSTON
|
$13,717,932
|
CS
|
STP 1902(181)MM
|
07/09/2019
|
09/27/2024
|
WIDEN TO 4-LN DIVIDED RDWY, BRIDGE,...
|
ISI CONTRACTING, INC.
($15,109,139)
|
|
|
0346-02-016
|
JACKSON
|
YOAKUM
|
$1,212,241
|
SH 111
|
STP 1902(023)HES
|
06/05/2019
|
11/15/2023
|
INCREASE SUPERELEVATION
|
HUNTER INDUSTRIES, LTD.
($1,235,556)
|
|
|
0909-38-082
|
FALLS
|
WACO
|
$936,885
|
CR
|
BR 2018(296)
|
06/05/2019
|
11/15/2023
|
REPL BR & APPRS
|
ELLIS-MCGINNIS CONSTRUCTION CO.
($887,644)
|
|
|
0016-04-117
|
COMAL
|
SAN ANTONIO
|
$80,245,982
|
IH 35
|
NH 1902(057)
|
06/04/2019
|
11/15/2023
|
FREEWAY OPERATIONAL IMPRVS
|
WEBBER, LLC
($73,245,147)
|
|
|
0231-03-145
|
BELL
|
WACO
|
$42,581,073
|
US 190
|
NH 2019(651)
|
06/04/2019
|
11/15/2023
|
WDN, BS, STR, SURF
|
J.D. ABRAMS, L.P.
($44,733,666)
|
|
|
0265-04-062
|
BASTROP
|
AUSTIN
|
$48,524,348
|
SH 21
|
NH 2019(613)
|
05/08/2019
|
11/15/2023
|
STR, GR, BASE, HMACP & PVMT MRKS
|
CAPITAL EXCAVATION COMPANY
($50,359,853)
|
|
|
0266-05-048
|
WHARTON
|
YOAKUM
|
$10,961,080
|
SH 71
|
STP 2019(730)
|
05/08/2019
|
11/15/2023
|
ADD 2 LANES FOR 4-LANE UNDIVIDED
|
HUNTER INDUSTRIES, LTD.
($9,682,167)
|
|
|
3538-01-035
|
MONTGOMERY
|
HOUSTON
|
$40,937,493
|
SH 242
|
STP 2019(952)
|
05/08/2019
|
11/15/2023
|
WIDEN FROM 2 TO 4 LANES
|
WILLIAMS BROTHERS CONSTRUCTION CO., INC.
($36,793,630)
|
|
|
0027-01-044
|
COLORADO
|
YOAKUM
|
$8,536,799
|
US 90
|
BR 2019(850)
|
05/07/2019
|
11/15/2023
|
CONSTRUCT ONE WAY BRIDGE AND APPR
|
HARPER BROTHERS CONSTRUCTION LLC
($8,244,675)
|
|
|
0048-09-029
|
HILL
|
WACO
|
$121,792,371
|
IH 35E
|
NH 2019(834)
|
05/07/2019
|
11/15/2023
|
WDN, GR, STRS, SURF
|
SACYR CONSTRUCTION USA LLC
($133,117,086)
|
|
|
0179-04-099
|
MATAGORDA
|
YOAKUM
|
$7,750,820
|
SH 35
|
STP 2019(759)
|
05/07/2019
|
11/15/2023
|
ACP OVERLAY AND ADD SHOULDERS
|
DURWOOD GREENE CONSTRUCTION CO.
($7,279,319)
|
|
|
0838-03-024
|
FORT BEND
|
HOUSTON
|
$7,095,365
|
FM 361
|
STP 2019(918)
|
05/07/2019
|
11/15/2023
|
SHOULDERS, BASE REP, O/L, BRIDGE & P...
|
DURWOOD GREENE CONSTRUCTION CO.
($7,225,989)
|
|
|
0172-05-115
|
ELLIS
|
DALLAS
|
$36,969,721
|
US 287
|
NH 2019(978)
|
04/03/2019
|
11/15/2023
|
GR, RV, DR, BR, RET WALL, CUL, SIGN,...
|
OHL USA, INC.
($37,276,577)
|
|
|
2250-02-017
|
DENTON
|
DALLAS
|
$3,192,171
|
SL 288
|
STP 2019(798)HES
|
04/03/2019
|
11/15/2023
|
INSTL MEDIAN CONC BARRIERS
|
ED BELL CONSTRUCTION COMPANY
($3,179,441)
|
|
|
0015-09-193
|
WILLIAMSON
|
AUSTIN
|
$10,555,578
|
IH 35
|
NH 2019(747)
|
04/02/2019
|
11/15/2023
|
GR,BASE,HMACP,SIGNS & PVMT MRKS
|
JORDAN FOSTER CONSTRUCTION, LLC
($10,705,999)
|
|
|
0065-07-062
|
JEFFERSON
|
BEAUMONT
|
$21,091,621
|
US 69
|
NH 2019(818)
|
04/02/2019
|
11/15/2023
|
WIDEN FREEWAY FROM 4 TO 6 LANES
|
ANGEL BROTHERS HOLDINGS CORP.
($21,735,072)
|
|
|
0173-02-071
|
KAUFMAN
|
DALLAS
|
$37,208,363
|
SH 34
|
STP 2019(711)
|
04/02/2019
|
11/15/2023
|
REHAB EXIST ROADWAY AND ADD SHOULDER...
|
STERLING DELAWARE HOLDING COMPANY, INC.
($36,563,467)
|
|
|
0015-08-141
|
WILLIAMSON
|
AUSTIN
|
$15,646,512
|
IH 35
|
NH 2019(683)
|
03/06/2019
|
11/15/2023
|
REPLACE BRIDGE OVERPASS AND TIE-IN A...
|
DAN WILLIAMS COMPANY
($15,048,230)
|
|
|
0446-03-047
|
COLORADO
|
YOAKUM
|
$8,043,817
|
US 90A
|
BR 2019(096)
|
03/06/2019
|
11/15/2023
|
REPLACE BRIDGE AND APPROACHES
|
EARTH BUILDERS, L.P.
($10,990,759)
|
|
|
0909-38-081
|
FALLS
|
WACO
|
$1,390,650
|
CR
|
BR 2018(295)
|
03/05/2019
|
11/15/2023
|
REPL BR & APPRS
|
ELLIS-MCGINNIS CONSTRUCTION CO.
($1,340,677)
|
|
|
1062-04-022
|
HARRIS
|
HOUSTON
|
$43,921,829
|
FM 2100
|
NH 2019(626)
|
03/05/2019
|
11/15/2023
|
WIDEN TO 4-LANE DIVIDED
|
TRIPLE B SERVICES LLP
($43,751,963)
|
|
|
2136-01-015
|
BELL
|
WACO
|
$4,194,503
|
FM 2268
|
BR 2019(313)
|
02/06/2019
|
11/15/2023
|
REPL BR & APPRS
|
CAPITAL EXCAVATION COMPANY
($5,238,854)
|
|
|
3173-01-004
|
WHARTON
|
YOAKUM
|
$3,444,828
|
FM 3086
|
C 3173-1-4
|
02/06/2019
|
11/15/2023
|
RESTORE EXIST ROADWAY
|
ANGEL BROTHERS HOLDINGS CORP.
($3,597,289)
|
|
|
0508-02-120
|
CHAMBERS
|
BEAUMONT
|
$34,921,671
|
IH 10
|
STP 2018(953)MM
|
02/05/2019
|
11/15/2023
|
CONSTRUCT OVERPASS AND RECONFIGURE I...
|
COPASA INC
($35,023,919)
|
|
|
0015-08-142
|
WILLIAMSON
|
AUSTIN
|
$14,305,404
|
IH 35
|
NH 2019(605)
|
01/09/2019
|
11/15/2023
|
GRADING, BASE, HMACP, PVMRK & SIGNS
|
DAN WILLIAMS COMPANY
($13,145,763)
|
|
|
0471-05-046
|
BASTROP
|
AUSTIN
|
$548,351
|
SH 21
|
STP 2019(386)HES
|
01/09/2019
|
11/15/2023
|
INSTL TRAF SIGNAL
|
THE LEVY COMPANY, INC.
($568,729)
|
|
|
0836-02-075
|
BELL
|
WACO
|
$317,716
|
SH 195
|
STP 2019(406)HES
|
01/09/2019
|
11/15/2023
|
INSTLL SGNLS AND SGNS
|
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.
($288,045)
|
|
|
1418-01-012
|
WALLER
|
HOUSTON
|
$1,439,222
|
FM 1489
|
C 1418-1-12
|
01/09/2019
|
11/15/2023
|
BASE REPAIR,ACP OVERLAY AND PAVMT MR...
|
ANGEL BROTHERS HOLDINGS CORP.
($1,597,058)
|
|
|
0089-07-146
|
WHARTON
|
YOAKUM
|
$32,500,717
|
US 59
|
NH 2019(437)
|
01/08/2019
|
11/15/2023
|
CONSTRUCT FRONTAGE ROADS
|
SER CONSTRUCTION PARTNERS, LLC
($34,757,445)
|
|
|
0457-03-028
|
WASHINGTON
|
BRYAN
|
$7,089,457
|
FM 50
|
STP 2019(415)
|
01/08/2019
|
11/15/2023
|
REHAB EXIST ROAD
|
BIG CREEK CONSTRUCTION, LTD.
($6,487,935)
|
|
|
1302-03-010
|
WHARTON
|
YOAKUM
|
$2,612,339
|
FM 441
|
C 1302-3-10
|
12/06/2018
|
11/15/2023
|
RESTOR OF EXIST ROADWAY
|
REXCO CONSTRUCTION SERVICES, INC.
($2,932,384)
|
|
|
2819-01-009
|
WHARTON
|
YOAKUM
|
$2,936,724
|
FM 2765
|
C 2819-1-9
|
12/06/2018
|
11/15/2023
|
REHAB EXIST ROADWAY
|
BRANNAN PAVING CO., LTD.
($2,898,132)
|
|
|
0092-13-024
|
NAVARRO
|
DALLAS
|
$8,642,002
|
BI 45-F
|
BR 2019(207)
|
11/07/2018
|
11/15/2023
|
REPLACE BRIDGE AND APPROACHES
|
PIERCE R & B LLC
($7,970,000)
|
|
|
0114-05-037
|
BASTROP
|
AUSTIN
|
$32,993,154
|
US 290
|
NH 2019(106)
|
11/07/2018
|
11/15/2023
|
GR, BASE, STRS, HMACP & PVMT MRKS
|
ANGEL BROTHERS HOLDINGS CORP.
($34,428,168)
|
|
|
0604-01-043
|
MATAGORDA
|
YOAKUM
|
$593,325
|
FM 2031
|
STP 2019(175)HES
|
11/07/2018
|
11/15/2023
|
WIDEN PAVED SURF
|
REXCO CONSTRUCTION SERVICES, INC.
($594,008)
|
|
|
0836-02-025
|
BELL
|
WACO
|
$334,204
|
SH 195
|
STP 2019(143)HES
|
11/07/2018
|
11/15/2023
|
SAFETY LIGHTING
|
VACA UNDERGROUND UTILITIES INC
($281,766)
|
|
|
2817-01-010
|
FORT BEND
|
HOUSTON
|
$5,457,736
|
FM 2759
|
STP 2019(192)
|
11/07/2018
|
11/15/2023
|
ADD 4' SHOULDER AND OVERLAY
|
DURWOOD GREENE CONSTRUCTION CO.
($4,321,825)
|
|
|
0697-02-039
|
HENDERSON
|
TYLER
|
$40,593,999
|
SH 334
|
STP 2019(242)
|
11/06/2018
|
11/15/2023
|
RECON BRGS, GR, BS, SURF, PVT MRK
|
AUSTIN BRIDGE & ROAD SERVICES, LP
($43,069,729)
|
|
|
0440-06-018
|
TRAVIS
|
AUSTIN
|
$69,988,411
|
SH 130
|
CC 440-6-18
|
10/03/2018
|
11/15/2023
|
ADD ONE LANE IN EACH DIRECTION
|
OHL USA, INC.
($65,209,105)
|
|
|
0523-08-014
|
MONTGOMERY
|
HOUSTON
|
$3,876,245
|
FM 1488
|
C 523-8-14
|
08/08/2018
|
11/15/2023
|
BASE REPAIR, OCST, LEVEL UP, OV
|
ANGEL BROTHERS HOLDINGS CORP.
($3,164,973)
|
|
|
3158-01-032
|
MONTGOMERY
|
HOUSTON
|
$8,363,456
|
FM 3083
|
STP 1802(609)
|
08/08/2018
|
11/15/2023
|
WIDEN TO 4-LANE DIVIDED URBAN
|
SMITH & COMPANY
($9,047,341)
|
|
|
0080-11-001
|
HOOD
|
FORT WORTH
|
$55,348,715
|
US 377
|
NH 1802(546)
|
08/07/2018
|
11/15/2023
|
GR, DR, STR, BS AND PAVMT
|
ZACHRY CONSTRUCTION CORPORATION
($60,713,830)
|
|
|
0177-14-010
|
MONTGOMERY
|
HOUSTON
|
$14,791,057
|
SL 494
|
STP 1802(602)
|
08/07/2018
|
11/15/2023
|
RECON AND WIDEN TO A 4 LANE
|
ISI CONTRACTING, INC.
($14,347,429)
|
|
|
0015-08-140
|
WILLIAMSON
|
AUSTIN
|
$7,792,810
|
IH 35
|
NH 1802(398)
|
07/11/2018
|
11/15/2023
|
STRCT, GRADING, HMACP
|
CAPITAL EXCAVATION COMPANY
($6,748,949)
|
|
|
0027-06-051
|
FORT BEND
|
HOUSTON
|
$15,750,592
|
US 90A
|
STP 2013(736)
|
07/11/2018
|
11/15/2023
|
ADD 10-FT SHLDRS, O/L & REPLACE BRID...
|
DURWOOD GREENE CONSTRUCTION CO.
($13,229,156)
|
|
|
0184-01-063
|
CORYELL
|
WACO
|
$12,492,719
|
SH 36
|
C 184-1-63
|
07/11/2018
|
11/15/2023
|
WDN RDWY & ADD PASS LNS
|
BIG CREEK CONSTRUCTION, LTD.
($11,187,471)
|
|
|
0543-02-065
|
FORT BEND
|
HOUSTON
|
$18,935,772
|
FM 359
|
C 543-2-65
|
07/11/2018
|
11/15/2023
|
WIDEN FROM 2 TO 4 LANES DIVIDED ROAD...
|
SER CONSTRUCTION PARTNERS, LLC
($18,950,220)
|
|
|
0739-02-162
|
JEFFERSON
|
BEAUMONT
|
$131,944,009
|
IH 10
|
NH 1802(413)
|
07/11/2018
|
11/15/2023
|
WIDEN FREEWAY FROM 4 TO 6 LANES
|
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY
($128,399,060)
|
|
|
0909-39-127
|
CORYELL
|
WACO
|
$978,729
|
CR
|
BR 1502(366)
|
07/11/2018
|
11/15/2023
|
REPL BR & APPRS
|
CAPITAL EXCAVATION COMPANY
($1,020,198)
|
|
|
0089-18-003
|
FORT BEND
|
HOUSTON
|
$1,724,083
|
SL 540
|
C 89-18-3
|
07/10/2018
|
11/15/2023
|
BASE REPAIR, PLANING, ACP OL, SIGNIN...
|
DURWOOD GREENE CONSTRUCTION CO.
($1,518,767)
|
|
|
0200-11-095
|
JEFFERSON
|
BEAUMONT
|
$25,665,191
|
US 69
|
NH 1802(412)
|
07/10/2018
|
11/15/2023
|
WIDEN FREEWAY FROM 4 TO 6 LANES
|
OLDCASTLE MATERIALS TEXAS, INC.
($31,528,539)
|
|
|
0192-01-093
|
FORT BEND
|
HOUSTON
|
$7,046,420
|
SH 6
|
STP 2018(958)MM
|
06/06/2018
|
11/15/2023
|
WIDEN FROM 6 TO 8 LANES
|
RAGLE CONSTRUCTION, INC.
($6,992,340)
|
|
|
0440-06-018
|
TRAVIS
|
AUSTIN
|
$70,540,747
|
SH 130
|
CC 440-6-18
|
06/06/2018
|
11/15/2023
|
ADD ONE LANE IN EACH DIRECTION
|
WEBBER, LLC
($69,910,317)
|
|
|
0909-40-074
|
LIMESTONE
|
WACO
|
$1,125,233
|
CR
|
BR 2016(445)
|
06/06/2018
|
11/15/2023
|
REHAB BR & APPRS
|
ELLIS-MCGINNIS CONSTRUCTION CO.
($1,515,689)
|
|
|
0912-37-228
|
MONTGOMERY
|
HOUSTON
|
$1,161,898
|
CR
|
BR 2016(616)
|
06/06/2018
|
11/15/2023
|
BRIDGE REPL
|
FORDE CONSTRUCTION COMPANY, INC.
($1,087,297)
|
|
|
6327-53-001
|
COLORADO
|
YOAKUM
|
$383,314
|
IH0010
|
RMC - 632753001
|
06/06/2018
|
11/15/2023
|
REHAB ROADWAY AND ACP OVERLAY
|
ANGEL BROTHERS HOLDINGS CORP.
($299,561)
|
|
|
0231-03-146
|
BELL
|
WACO
|
$4,323,326
|
US 190
|
NH 1802(211)
|
06/05/2018
|
11/15/2023
|
RDWY RECONFIG
|
CAPITAL EXCAVATION COMPANY
($4,549,398)
|
|
|
0716-02-042
|
COLORADO
|
YOAKUM
|
$3,551,525
|
FM 109
|
STP 2018(992)
|
06/05/2018
|
11/15/2023
|
ADD SHOULDERS
|
GLENN FUQUA, INC.
($3,476,586)
|
|
|
1259-01-042
|
MONTGOMERY
|
HOUSTON
|
$14,918,126
|
FM 1097
|
STP 2018(800)
|
06/05/2018
|
11/15/2023
|
WIDEN FROM 2 TO 4 LANES WITH CLTL
|
ANGEL BROTHERS HOLDINGS CORP.
($14,962,668)
|
|
|
2938-02-022
|
BRAZORIA
|
HOUSTON
|
$3,412,378
|
FM 2917
|
C 2938-2-22
|
06/05/2018
|
11/15/2023
|
PAVMT REPAIR AND ACP OVERLAY
|
ANGEL BROTHERS HOLDINGS CORP.
($2,791,369)
|
|
|
3050-03-021
|
HARRIS
|
HOUSTON
|
$7,134,764
|
FM 2978
|
STP 1802(218)
|
06/05/2018
|
11/15/2023
|
REPLACE BRIDGE AND APPROACHES
|
J.D. ABRAMS, L.P.
($7,552,754)
|
|
|
0200-02-039
|
ANGELINA
|
LUFKIN
|
$72,772,732
|
US 69
|
NH 2018(811)
|
05/02/2018
|
11/15/2023
|
GR STRS BASE & SURF
|
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY
($71,614,967)
|
|
|
0320-03-099
|
WILLIAMSON
|
AUSTIN
|
$829,418
|
SH 95
|
BR 2018(820)
|
05/02/2018
|
11/15/2023
|
REPLACE DECK AND STRUCTURAL REPAIRS
|
DAN WILLIAMS COMPANY
($1,149,643)
|
|
|
0389-05-116
|
HARRIS
|
HOUSTON
|
$191,581,736
|
SH 146
|
NH 2018(852)
|
05/02/2018
|
11/15/2023
|
WIDEN TO 6 LANES WITH 4 LANE EXPRESS...
|
WEBBER, LLC
($201,835,273)
|
|
|
0997-03-007
|
NAVARRO
|
DALLAS
|
$18,999,390
|
FM 667
|
STP 2018(888)
|
05/02/2018
|
11/15/2023
|
REPAIR AND RESURF HWY
|
BIG CREEK CONSTRUCTION, LTD.
($12,773,112)
|
|
|
0320-03-092
|
WILLIAMSON
|
AUSTIN
|
$389,915
|
SH 95
|
BR 2018(819)
|
05/01/2018
|
11/15/2023
|
BRIDGE WIDENING & REPLACE APPROACHES
|
DAN WILLIAMS COMPANY
($330,318)
|
|
|
0508-04-162
|
JEFFERSON
|
BEAUMONT
|
$17,631,240
|
SH 73
|
STP 2013(576)HES
|
04/03/2018
|
11/15/2023
|
GRADE SEPARATION, REHAB & EXTEND FRO...
|
STERLING DELAWARE HOLDING COMPANY, INC.
($18,747,291)
|
|
|
0833-03-036
|
MCLENNAN
|
WACO
|
$13,384,546
|
FM 1637
|
STP 2018(766)
|
04/03/2018
|
11/15/2023
|
WDN GR, STRS & SURF
|
BIG CREEK CONSTRUCTION, LTD.
($11,487,770)
|
|
|
3538-01-045
|
MONTGOMERY
|
HOUSTON
|
$24,460,775
|
SH 242
|
STP 2018(858)
|
04/03/2018
|
11/15/2023
|
CONSTRUCT_GRADE SEPARATION
|
ARANDA BROTHERS CONSTRUCTION CO., INC.
($23,483,270)
|
|
|
6319-72-001
|
BRAZORIA
|
HOUSTON
|
$752,055
|
FM1462
|
RMC - 631972001
|
04/03/2018
|
11/15/2023
|
ACP OVERLAY
|
DURWOOD GREENE CONSTRUCTION CO.
($648,550)
|
|
|
0178-01-036
|
HARRIS
|
HOUSTON
|
$1,727,028
|
SH 35
|
NH 2018(659)
|
03/07/2018
|
11/15/2023
|
CONC REPAIR, MILL, SC & 1" TOM
|
ANGEL BROTHERS HOLDINGS CORP.
($1,495,895)
|
|
|
2744-01-011
|
MONTGOMERY
|
HOUSTON
|
$21,958,755
|
FM 2854
|
STP 1702(640)MM
|
03/07/2018
|
11/15/2023
|
RECON TO A 4 LANE DIVIDED CURB & GUT...
|
HARPER BROTHERS CONSTRUCTION LLC
($18,657,275)
|
|
|
0586-01-066
|
BRAZORIA
|
HOUSTON
|
$3,226,591
|
SH 332
|
NH 2018(666)
|
03/06/2018
|
11/15/2023
|
SC, LEVEL UP, W/ LP DETRS & O/L
|
DURWOOD GREENE CONSTRUCTION CO.
($2,395,790)
|
|
|
0846-03-046
|
MATAGORDA
|
YOAKUM
|
$1,783,799
|
FM 521
|
STP 2018(607)
|
03/06/2018
|
11/15/2023
|
ACP OVERLAY
|
DURWOOD GREENE CONSTRUCTION CO.
($1,521,680)
|
|
|
6326-62-001
|
MONTGOMERY
|
HOUSTON
|
$463,800
|
IH0045
|
RMC - 632662001
|
03/06/2018
|
11/15/2023
|
MILL AND OVERLAY
|
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
($551,281)
|
|
|
0408-02-046
|
AUSTIN
|
YOAKUM
|
$4,363,073
|
SH 159
|
BR 2018(508)
|
02/02/2018
|
11/15/2023
|
REPLACE BRIDGE AND APPROACHES
|
ANGEL BROTHERS HOLDINGS CORP.
($3,793,060)
|
|
|
0055-08-099
|
MCLENNAN
|
WACO
|
$27,609,767
|
US 84
|
NH 2018(346)
|
02/01/2018
|
11/15/2023
|
GR, STRS & SURF
|
BIG CREEK CONSTRUCTION, LTD.
($20,587,595)
|
|
|
0192-03-017
|
BRAZORIA
|
HOUSTON
|
$1,859,206
|
SH 6
|
NH 2018(561)
|
02/01/2018
|
11/15/2023
|
PAVMT REPAIR AND ACP OVERLAY
|
ANGEL BROTHERS HOLDINGS CORP.
($1,534,309)
|
|
|
1594-02-012
|
CORYELL
|
WACO
|
$1,116,439
|
FM 1783
|
BR 2018(547)
|
02/01/2018
|
11/15/2023
|
REPLACE BRIDGE AND APPROACHES
|
KNIFE RIVER CORPORATION - SOUTH
($1,048,921)
|
|
|
0231-03-143
|
BELL
|
WACO
|
$7,986,415
|
US 190
|
NH 2018(347)
|
12/06/2017
|
11/15/2023
|
WDN, BS, STR, SURF
|
BIG CREEK CONSTRUCTION, LTD.
($7,287,694)
|
|
|
0440-06-017
|
TRAVIS
|
AUSTIN
|
$39,118,063
|
SH 130
|
CC 440-6-17
|
12/06/2017
|
11/15/2023
|
ADD ONE LANE IN EACH DIRECTION
|
OHL USA, INC.
($36,726,431)
|
|
|
0008-13-221
|
TARRANT
|
FORT WORTH
|
$187,793,662
|
IH 820
|
NH 2018(321)
|
12/05/2017
|
11/15/2023
|
GR,DR,BS,STR,PAV,ITS,SGNL,ILLUM & SG...
|
FLATIRON CONSTRUCTORS, INC.
($173,724,095)
|
|
|
0187-02-066
|
AUSTIN
|
YOAKUM
|
$1,522,963
|
SH 36
|
NH 2018(332)
|
11/03/2017
|
11/15/2023
|
ACP OVERLAY
|
ANGEL BROTHERS HOLDINGS CORP.
($1,151,605)
|
|
|
0231-04-056
|
BELL
|
WACO
|
$1,064,589
|
US 190
|
STP 2018(251)HES
|
11/03/2017
|
11/15/2023
|
SAFETY TREAT FIXED OBJECTS
|
BEAR CREEK CONTRACTING, LLC
($1,063,872)
|
|
|
0027-10-071
|
HARRIS
|
HOUSTON
|
$3,429,858
|
US 90A
|
BR 2018(234)
|
10/04/2017
|
11/15/2023
|
REPLACE BRIDGE AND APPROACHES
|
HARPER BROTHERS CONSTRUCTION LLC
($3,815,251)
|
|
|
0111-03-031
|
FORT BEND
|
HOUSTON
|
$35,945,305
|
FM 521
|
NH 1702(416)
|
10/04/2017
|
11/15/2023
|
WIDEN TO 4-LN & CONSTR RR GR SEPARAT...
|
PULICE CONSTRUCTION, INC.
($34,567,384)
|
|
|
0320-02-036
|
BELL
|
WACO
|
$7,449,956
|
SH 95
|
STP 2017(900)
|
10/03/2017
|
11/15/2023
|
WDN, GR, SURF, ADD PASS LNS
|
BIG CREEK CONSTRUCTION, LTD.
($6,123,478)
|
|
|
0858-02-021
|
MILAM
|
BRYAN
|
$1,577,874
|
FM 908
|
STP 2018(029)
|
09/07/2017
|
11/15/2023
|
REHAB EXIST ROAD
|
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
($1,428,674)
|
|
|
0262-07-033
|
MILAM
|
BRYAN
|
$663,630
|
FM 485
|
BR 1702(780)
|
08/09/2017
|
11/15/2023
|
REPLACE EXIST BRIDGE
|
KNIFE RIVER CORPORATION - SOUTH
($668,668)
|
|
|
0675-07-101
|
WALKER
|
BRYAN
|
$118,265,746
|
IH 45
|
NH 1702(696)
|
08/09/2017
|
11/15/2023
|
WIDEN FREEWAY (SIX LANES)
|
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY
($122,051,473)
|
|
|
0739-02-161
|
JEFFERSON
|
BEAUMONT
|
$101,970,748
|
IH 10
|
NH 1702(506)
|
08/09/2017
|
11/15/2023
|
WIDEN FREEWAY FROM 4 TO 6 LANES
|
WILLIAMS BROTHERS CONSTRUCTION CO., INC.
($108,315,368)
|
|
|
0752-04-024
|
FALLS
|
WACO
|
$3,976,979
|
FM 935
|
STP 1702(621)
|
08/09/2017
|
11/15/2023
|
WDN, GR, BS, SURF, ADD SHLDRS
|
BIG CREEK CONSTRUCTION, LTD.
($3,524,689)
|
|
|
3510-06-014
|
HARRIS
|
HOUSTON
|
$4,720,914
|
SH 99
|
NH 1702(641)
|
08/09/2017
|
11/15/2023
|
CONSTRUCT SOUNDWALL
|
TEXAS WALL & LANDSCAPE
($3,375,271)
|