|
|
PREPARING ROW
|
STA
|
8.000
|
$2,000.000
|
$10,000.000
|
$10,000.000
|
$10,000.000
|
$7,500.000
|
$10,000.000
|
$35,000.000
|
$2,400.000
|
$54,724.600
|
$16,000.000
|
$11,780.870
|
$20,000.000
|
$25,000.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
3,472.000
|
$7.000
|
$1.520
|
$4.000
|
$2.000
|
$5.000
|
$2.000
|
$4.000
|
$9.000
|
$8.000
|
$4.000
|
$9.290
|
$3.500
|
$5.000
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
495.000
|
$20.000
|
$2.000
|
$3.000
|
$2.080
|
$3.000
|
$2.000
|
$4.000
|
$2.250
|
$5.000
|
$4.000
|
$15.040
|
$5.000
|
$5.000
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
500.000
|
$16.000
|
$2.000
|
$3.000
|
$2.080
|
$3.000
|
$2.000
|
$4.000
|
$21.000
|
$5.000
|
$4.000
|
$14.190
|
$4.000
|
$5.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
197.000
|
$16.000
|
$6.080
|
$4.000
|
$3.120
|
$6.000
|
$3.000
|
$4.000
|
$3.350
|
$8.000
|
$4.000
|
$15.390
|
$5.000
|
$5.000
|
|
|
REMOVING CONC (RETAINING WALLS)
|
SY
|
262.000
|
$36.000
|
$75.000
|
$5.000
|
$4.160
|
$115.000
|
$4.000
|
$5.000
|
$8.000
|
$20.000
|
$30.000
|
$47.820
|
$6.000
|
$5.000
|
|
|
REMOVING CONC (CURB OR CURB & GUTTER)
|
LF
|
2,314.000
|
$4.000
|
$1.000
|
$1.000
|
$1.040
|
$1.750
|
$1.000
|
$1.000
|
$1.500
|
$3.000
|
$1.250
|
$5.920
|
$2.500
|
$5.000
|
|
|
REMOVING STAB BASE & ASPH PAV (4" - 6")
|
SY
|
5,137.000
|
$12.000
|
$2.130
|
$4.000
|
$2.500
|
$6.000
|
$2.000
|
$2.000
|
$2.400
|
$5.000
|
$2.000
|
$39.690
|
$3.350
|
$10.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
2,796.000
|
$7.000
|
$18.000
|
$10.000
|
$16.930
|
$16.000
|
$20.000
|
$7.500
|
$24.000
|
$15.000
|
$40.000
|
$11.860
|
$19.500
|
$20.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
134.000
|
$15.000
|
$18.000
|
$13.000
|
$20.760
|
$35.000
|
$50.000
|
$12.500
|
$24.000
|
$27.000
|
$50.000
|
$36.970
|
$57.000
|
$100.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY A)
|
CY
|
4,660.000
|
$15.000
|
$30.000
|
$5.000
|
$19.350
|
$27.000
|
$4.000
|
$10.000
|
$27.000
|
$20.000
|
$40.000
|
$20.220
|
$20.000
|
$45.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
1,219.000
|
$16.000
|
$48.000
|
$50.000
|
$20.440
|
$19.000
|
$8.000
|
$10.000
|
$61.000
|
$25.000
|
$40.000
|
$9.770
|
$10.000
|
$60.000
|
|
|
BLOCK SODDING
|
SY
|
3,062.000
|
$5.000
|
$3.500
|
$3.500
|
$3.780
|
$4.350
|
$4.000
|
$4.000
|
$4.000
|
$9.500
|
$4.000
|
$4.940
|
$4.200
|
$4.000
|
|
|
STRAW OR HAY MULCH
|
SY
|
1,912.000
|
$0.230
|
$0.500
|
$0.400
|
$1.000
|
$1.200
|
$0.200
|
$0.920
|
$0.410
|
$1.750
|
$0.200
|
$0.310
|
$0.500
|
$1.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
956.000
|
$0.300
|
$0.750
|
$0.800
|
$3.500
|
$3.800
|
$0.150
|
$0.950
|
$0.900
|
$1.750
|
$0.200
|
$0.140
|
$0.900
|
$4.000
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
956.000
|
$0.140
|
$0.750
|
$0.800
|
$3.500
|
$3.800
|
$0.150
|
$0.950
|
$0.900
|
$1.750
|
$0.200
|
$0.120
|
$0.900
|
$4.000
|
|
|
FERTILIZER
|
AC
|
0.390
|
$821.930
|
$2,000.000
|
$1,000.000
|
$3,888.000
|
$4,200.000
|
$700.000
|
$1,855.000
|
$2,000.000
|
$4,891.000
|
$1,000.000
|
$906.040
|
$2,160.000
|
$4,000.000
|
|
|
VEGETATIVE WATERING
|
MG
|
47.000
|
$30.200
|
$100.000
|
$25.000
|
$20.560
|
$28.000
|
$22.000
|
$55.000
|
$14.000
|
$10.000
|
$20.000
|
$48.770
|
$30.000
|
$50.000
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
5,192.000
|
$2.500
|
$4.000
|
$3.500
|
$6.380
|
$6.000
|
$7.000
|
$3.550
|
$5.000
|
$8.000
|
$4.000
|
$4.500
|
$5.100
|
$5.000
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
70.000
|
$150.000
|
$154.000
|
$165.000
|
$167.170
|
$170.000
|
$165.000
|
$175.000
|
$178.000
|
$160.000
|
$200.000
|
$238.990
|
$186.000
|
$200.000
|
|
|
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
|
SY
|
5,192.000
|
$10.000
|
$15.000
|
$15.000
|
$14.430
|
$19.000
|
$20.000
|
$10.000
|
$22.000
|
$18.000
|
$24.000
|
$9.090
|
$16.500
|
$12.000
|
|
|
ASPHALT STAB BASE (GR 2)(PG 64)
|
TON
|
313.000
|
$66.000
|
$145.000
|
$140.000
|
$223.260
|
$140.000
|
$100.000
|
$90.000
|
$90.000
|
$145.000
|
$90.000
|
$113.640
|
$115.000
|
$100.000
|
|
|
ASPH (A-R TYPE II OR III)
|
GAL
|
4,774.000
|
$3.000
|
$5.000
|
$4.000
|
$7.440
|
$4.500
|
$4.000
|
$4.100
|
$5.000
|
$5.000
|
$6.000
|
$4.900
|
$5.000
|
$8.000
|
|
|
AGGR(TY-PB GR-4 SAC-A)
|
CY
|
93.000
|
$130.000
|
$350.000
|
$150.000
|
$520.940
|
$170.000
|
$130.000
|
$130.000
|
$280.000
|
$150.000
|
$180.000
|
$259.550
|
$165.000
|
$100.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (8")
|
SY
|
5,192.000
|
$40.000
|
$58.000
|
$50.000
|
$60.000
|
$77.000
|
$55.000
|
$57.500
|
$64.000
|
$50.500
|
$64.000
|
$56.050
|
$74.000
|
$75.000
|
|
|
STRUCT EXCAV
|
CY
|
7,115.000
|
$30.000
|
$15.000
|
$10.000
|
$18.350
|
$14.500
|
$20.000
|
$7.000
|
$19.000
|
$10.250
|
$30.000
|
$17.670
|
$18.500
|
$20.000
|
|
|
CEM STABIL BKFL
|
CY
|
1,237.000
|
$65.000
|
$50.000
|
$65.000
|
$36.980
|
$78.000
|
$45.000
|
$45.000
|
$42.000
|
$63.000
|
$70.000
|
$117.270
|
$46.000
|
$60.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
100.000
|
$75.000
|
$110.000
|
$150.000
|
$153.030
|
$108.000
|
$150.000
|
$105.000
|
$280.000
|
$108.750
|
$90.000
|
$99.880
|
$110.000
|
$100.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
269.000
|
$2.000
|
$1.000
|
$2.000
|
$2.160
|
$1.100
|
$10.000
|
$2.000
|
$1.000
|
$5.500
|
$4.000
|
$9.590
|
$30.000
|
$5.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
4,039.000
|
$16.000
|
$20.000
|
$20.000
|
$26.410
|
$25.000
|
$15.000
|
$35.000
|
$9.000
|
$20.000
|
$20.000
|
$17.150
|
$48.000
|
$10.000
|
|
|
DRILL SHAFT (30 IN)
|
LF
|
120.000
|
$140.000
|
$120.000
|
$170.000
|
$104.690
|
$100.000
|
$150.000
|
$195.000
|
$130.000
|
$165.000
|
$230.000
|
$237.050
|
$211.000
|
$200.000
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
1,300.000
|
$225.000
|
$300.000
|
$420.000
|
$259.620
|
$235.000
|
$280.000
|
$295.000
|
$268.000
|
$295.000
|
$350.000
|
$601.700
|
$375.000
|
$400.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
46.000
|
$245.000
|
$215.000
|
$285.000
|
$215.000
|
$310.000
|
$300.000
|
$410.000
|
$240.000
|
$320.000
|
$781.170
|
$375.120
|
$330.000
|
$300.000
|
|
|
CL C CONC (ABUT)
|
CY
|
135.300
|
$400.000
|
$1,000.000
|
$800.000
|
$294.040
|
$900.000
|
$1,000.000
|
$900.000
|
$900.000
|
$643.250
|
$1,500.000
|
$1,155.890
|
$1,360.000
|
$800.000
|
|
|
REINF CONC SLAB
|
SF
|
560.000
|
$15.000
|
$45.000
|
$22.000
|
$60.000
|
$42.000
|
$35.000
|
$17.000
|
$59.000
|
$28.750
|
$80.000
|
$20.200
|
$31.000
|
$30.000
|
|
|
APPROACH SLAB
|
CY
|
4.000
|
$460.000
|
$1,000.000
|
$650.000
|
$756.350
|
$2,000.000
|
$1,000.000
|
$475.000
|
$615.000
|
$982.000
|
$800.000
|
$579.780
|
$2,425.000
|
$1,000.000
|
|
|
RETAINING WALL (MSE)
|
SF
|
3,064.000
|
$40.000
|
$40.000
|
$65.000
|
$49.160
|
$42.000
|
$40.000
|
$40.000
|
$55.000
|
$75.000
|
$50.000
|
$85.840
|
$54.000
|
$70.000
|
|
|
RIPRAP (CONC) (CL B) (4")
|
CY
|
16.000
|
$420.000
|
$400.000
|
$400.000
|
$438.040
|
$625.000
|
$600.000
|
$340.000
|
$680.000
|
$431.500
|
$300.000
|
$553.830
|
$840.000
|
$500.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(24 IN)
|
CY
|
362.000
|
$150.000
|
$130.000
|
$145.000
|
$231.590
|
$135.000
|
$110.000
|
$170.000
|
$167.000
|
$99.250
|
$140.000
|
$323.160
|
$167.000
|
$100.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
708.000
|
$150.000
|
$130.000
|
$145.000
|
$134.120
|
$130.000
|
$100.000
|
$190.000
|
$148.000
|
$100.500
|
$160.000
|
$228.590
|
$165.000
|
$100.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
9.000
|
$450.000
|
$500.000
|
$400.000
|
$671.060
|
$760.000
|
$600.000
|
$600.000
|
$655.000
|
$495.500
|
$550.000
|
$532.240
|
$675.000
|
$500.000
|
|
|
STR STEEL (ROLLED BEAM)
|
LB
|
11,820.000
|
$2.500
|
$3.000
|
$2.500
|
$4.800
|
$5.000
|
$6.000
|
$5.000
|
$4.000
|
$2.750
|
$3.000
|
$2.860
|
$4.650
|
$4.000
|
|
|
RAIL (TY C411)
|
LF
|
590.000
|
$300.000
|
$250.000
|
$100.000
|
$125.500
|
$265.000
|
$130.000
|
$200.000
|
$90.000
|
$80.000
|
$120.000
|
$288.580
|
$225.000
|
$125.000
|
|
|
RAIL (TY PR1)
|
LF
|
168.000
|
$110.000
|
$105.000
|
$50.000
|
$98.880
|
$100.000
|
$150.000
|
$245.000
|
$77.000
|
$136.000
|
$80.000
|
$136.870
|
$103.000
|
$125.000
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
16.000
|
$100.000
|
$125.000
|
$50.000
|
$82.700
|
$95.000
|
$200.000
|
$100.000
|
$72.000
|
$132.000
|
$50.000
|
$101.070
|
$120.000
|
$150.000
|
|
|
CMP (GAL STL 42 IN)
|
LF
|
24.000
|
$130.000
|
$100.000
|
$110.000
|
$179.790
|
$225.000
|
$150.000
|
$65.000
|
$185.000
|
$115.000
|
$150.000
|
$109.620
|
$85.000
|
$150.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
53.000
|
$60.000
|
$70.060
|
$65.000
|
$123.150
|
$105.000
|
$150.000
|
$50.000
|
$193.000
|
$82.750
|
$60.000
|
$71.980
|
$73.500
|
$100.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
117.000
|
$70.000
|
$85.000
|
$100.000
|
$121.130
|
$117.000
|
$100.000
|
$60.000
|
$127.000
|
$113.250
|
$80.000
|
$94.620
|
$79.000
|
$125.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
88.000
|
$110.000
|
$110.000
|
$120.000
|
$128.530
|
$195.000
|
$150.000
|
$106.000
|
$205.000
|
$197.750
|
$120.000
|
$152.800
|
$185.000
|
$150.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
107.000
|
$140.000
|
$160.000
|
$200.000
|
$179.460
|
$240.000
|
$160.000
|
$156.000
|
$273.000
|
$251.750
|
$190.000
|
$194.440
|
$210.000
|
$300.000
|
|
|
JCTBOX(COMPL)(PJB)(3FTX5FT)
|
EA
|
3.000
|
$4,800.000
|
$5,000.000
|
$3,500.000
|
$3,779.080
|
$7,200.000
|
$5,000.000
|
$5,100.000
|
$5,200.000
|
$3,785.000
|
$3,000.000
|
$8,759.580
|
$8,800.000
|
$5,000.000
|
|
|
INLET (COMPL)(TY AZR)
|
EA
|
2.000
|
$4,200.000
|
$3,400.000
|
$2,200.000
|
$3,079.970
|
$4,150.000
|
$4,000.000
|
$1,850.000
|
$3,400.000
|
$4,492.000
|
$4,500.000
|
$4,482.980
|
$2,600.000
|
$5,000.000
|
|
|
MANH (COMPL)(TY A)
|
EA
|
2.000
|
$3,000.000
|
$4,500.000
|
$10,000.000
|
$3,872.300
|
$4,800.000
|
$4,000.000
|
$9,750.000
|
$5,200.000
|
$3,492.000
|
$4,200.000
|
$4,368.250
|
$5,000.000
|
$5,000.000
|
|
|
INLET (COMPL)(CURB)(TY C)
|
EA
|
7.000
|
$3,000.000
|
$4,500.000
|
$3,500.000
|
$3,154.690
|
$4,550.000
|
$5,000.000
|
$3,650.000
|
$4,500.000
|
$2,995.000
|
$3,800.000
|
$4,273.320
|
$3,800.000
|
$3,000.000
|
|
|
ADJUSTING MANHOLES
|
EA
|
2.000
|
$1,500.000
|
$400.000
|
$500.000
|
$1,683.260
|
$2,000.000
|
$500.000
|
$950.000
|
$400.000
|
$1,270.000
|
$1,000.000
|
$1,194.510
|
$400.000
|
$2,500.000
|
|
|
ADJUSTING INLETS
|
EA
|
1.000
|
$1,500.000
|
$400.000
|
$500.000
|
$1,683.280
|
$1,000.000
|
$500.000
|
$450.000
|
$400.000
|
$1,270.000
|
$1,500.000
|
$3,758.400
|
$500.000
|
$1,000.000
|
|
|
ADJUSTING MANHOLES (WATER VALVE BOX)
|
EA
|
1.000
|
$450.000
|
$400.000
|
$300.000
|
$391.750
|
$1,050.000
|
$500.000
|
$550.000
|
$630.000
|
$1,270.000
|
$1,500.000
|
$981.350
|
$400.000
|
$1,000.000
|
|
|
ADJUSTING MANHOLES (WATER METER)
|
EA
|
2.000
|
$750.000
|
$400.000
|
$300.000
|
$331.350
|
$2,550.000
|
$1,000.000
|
$650.000
|
$500.000
|
$1,270.000
|
$1,500.000
|
$286.960
|
$400.000
|
$1,000.000
|
|
|
PIPE (PVC) (SCH 80) (12 IN)
|
LF
|
8.000
|
$42.000
|
$100.000
|
$100.000
|
$81.860
|
$70.000
|
$100.000
|
$25.000
|
$28.000
|
$24.000
|
$60.000
|
$213.270
|
$50.000
|
$50.000
|
|
|
REMOV STR (BOX CULVERT)
|
EA
|
1.000
|
$6,500.000
|
$60,000.000
|
$20,000.000
|
$30,000.230
|
$19,000.000
|
$20,000.000
|
$4,500.000
|
$73,000.000
|
$9,309.000
|
$50,000.000
|
$8,436.320
|
$10,300.000
|
$10,000.000
|
|
|
REMOV STR (INLET)
|
EA
|
8.000
|
$650.000
|
$250.000
|
$400.000
|
$920.020
|
$490.000
|
$500.000
|
$750.000
|
$950.000
|
$764.250
|
$500.000
|
$1,084.980
|
$400.000
|
$1,000.000
|
|
|
REMOV STR (MANHOLE)
|
EA
|
4.000
|
$1,100.000
|
$250.000
|
$500.000
|
$1,049.450
|
$675.000
|
$500.000
|
$350.000
|
$950.000
|
$778.000
|
$800.000
|
$883.570
|
$500.000
|
$1,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
432.000
|
$30.000
|
$15.000
|
$15.000
|
$30.000
|
$29.000
|
$10.000
|
$12.000
|
$24.000
|
$41.250
|
$5.000
|
$25.770
|
$15.000
|
$5.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
2.000
|
$65,000.000
|
$30,000.000
|
$20,000.000
|
$40,000.850
|
$19,000.000
|
$50,000.000
|
$100,000.000
|
$44,000.000
|
$38,740.000
|
$60,000.000
|
$56,180.700
|
$16,900.000
|
$100,000.000
|
|
|
REMOV STR (ABUTMENT)
|
EA
|
1.000
|
$2,500.000
|
$5,000.000
|
$1,000.000
|
$12,601.420
|
$6,000.000
|
$5,000.000
|
$25,000.000
|
$15,000.000
|
$1,053.000
|
$4,000.000
|
$4,932.900
|
$4,000.000
|
$10,000.000
|
|
|
REMOVE STR (GABION)
|
LF
|
108.000
|
$35.000
|
$100.000
|
$60.000
|
$102.750
|
$24.000
|
$25.000
|
$12.000
|
$160.000
|
$15.000
|
$15.000
|
$75.170
|
$33.000
|
$20.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$318,214.350
|
$150,000.000
|
$375,000.000
|
$335,000.000
|
$154,500.000
|
$395,000.000
|
$305,000.000
|
$390,000.000
|
$437,796.870
|
$440,000.000
|
$407,160.000
|
$550,000.000
|
$525,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
8.000
|
$8,000.000
|
$2,000.000
|
$5,000.000
|
$5,757.030
|
$2,000.000
|
$20,000.000
|
$2,500.000
|
$10,000.000
|
$5,601.000
|
$6,271.130
|
$10,022.400
|
$2,615.000
|
$10,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
60.000
|
$31.110
|
$40.000
|
$60.000
|
$45.850
|
$62.000
|
$50.000
|
$65.000
|
$40.000
|
$45.750
|
$46.000
|
$36.810
|
$40.000
|
$50.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
60.000
|
$10.890
|
$10.000
|
$20.000
|
$31.530
|
$15.000
|
$15.000
|
$20.000
|
$20.000
|
$31.500
|
$30.000
|
$11.670
|
$15.000
|
$15.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
112.000
|
$20.000
|
$28.000
|
$60.000
|
$44.410
|
$36.000
|
$35.000
|
$38.000
|
$30.000
|
$44.500
|
$45.000
|
$28.420
|
$15.000
|
$30.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
112.000
|
$10.000
|
$5.000
|
$10.000
|
$12.600
|
$14.000
|
$8.000
|
$10.000
|
$14.000
|
$12.500
|
$13.000
|
$8.940
|
$4.000
|
$15.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,441.000
|
$3.000
|
$3.000
|
$2.500
|
$7.230
|
$4.350
|
$3.000
|
$5.000
|
$4.500
|
$7.250
|
$4.000
|
$3.020
|
$2.400
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,441.000
|
$1.340
|
$0.500
|
$0.250
|
$2.000
|
$1.900
|
$1.000
|
$1.000
|
$2.000
|
$1.750
|
$1.000
|
$0.920
|
$0.500
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
168.000
|
$5.630
|
$8.000
|
$10.000
|
$7.120
|
$9.000
|
$10.000
|
$9.000
|
$6.000
|
$7.000
|
$10.000
|
$5.900
|
$6.000
|
$10.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
168.000
|
$1.470
|
$1.000
|
$2.000
|
$1.520
|
$4.500
|
$2.000
|
$1.000
|
$2.000
|
$1.500
|
$2.000
|
$1.420
|
$1.800
|
$5.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
334.000
|
$65.000
|
$50.000
|
$75.000
|
$134.390
|
$65.000
|
$70.000
|
$60.000
|
$84.000
|
$69.500
|
$50.000
|
$66.690
|
$75.000
|
$100.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
630.000
|
$40.000
|
$75.000
|
$22.000
|
$11.620
|
$82.000
|
$70.000
|
$55.000
|
$88.000
|
$10.500
|
$60.000
|
$81.090
|
$25.000
|
$100.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
630.000
|
$4.000
|
$5.000
|
$12.000
|
$3.970
|
$8.500
|
$9.000
|
$20.000
|
$17.000
|
$4.250
|
$2.000
|
$10.090
|
$15.000
|
$25.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
630.000
|
$5.500
|
$15.000
|
$2.000
|
$11.430
|
$17.000
|
$9.000
|
$25.000
|
$14.000
|
$10.250
|
$5.000
|
$10.930
|
$10.000
|
$10.000
|
|
|
CONC CURB (TY II)
|
LF
|
2,388.000
|
$25.000
|
$2.500
|
$5.000
|
$6.000
|
$5.750
|
$6.000
|
$6.000
|
$4.000
|
$11.750
|
$3.000
|
$18.840
|
$3.000
|
$20.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
178.000
|
$20.000
|
$15.000
|
$20.000
|
$12.190
|
$6.300
|
$25.000
|
$10.000
|
$20.000
|
$21.750
|
$30.000
|
$24.680
|
$35.000
|
$20.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
226.000
|
$75.000
|
$60.000
|
$65.000
|
$76.380
|
$180.000
|
$60.000
|
$60.000
|
$77.000
|
$64.500
|
$65.000
|
$85.680
|
$70.000
|
$60.000
|
|
|
CONC SIDEWALKS (5")
|
SY
|
337.000
|
$50.000
|
$60.000
|
$55.000
|
$67.370
|
$62.000
|
$57.000
|
$50.000
|
$64.000
|
$59.250
|
$60.000
|
$64.460
|
$58.000
|
$45.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
1.000
|
$1,500.000
|
$2,000.000
|
$1,000.000
|
$1,927.250
|
$2,000.000
|
$1,500.000
|
$1,450.000
|
$1,400.000
|
$1,883.000
|
$1,500.000
|
$1,929.690
|
$1,250.000
|
$1,500.000
|
|
|
CURB RAMPS (TY 6)
|
EA
|
1.000
|
$1,450.000
|
$2,000.000
|
$1,000.000
|
$1,939.750
|
$2,500.000
|
$1,700.000
|
$1,600.000
|
$1,400.000
|
$1,883.000
|
$1,400.000
|
$2,904.720
|
$1,700.000
|
$1,500.000
|
|
|
CONC SIDEWALKS (8")
|
SY
|
391.000
|
$65.000
|
$75.000
|
$65.000
|
$69.400
|
$91.000
|
$65.000
|
$55.000
|
$64.000
|
$72.000
|
$50.000
|
$112.750
|
$75.000
|
$60.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$2,750.000
|
$2,000.000
|
$2,000.000
|
$4,300.000
|
$2,950.000
|
$4,000.000
|
$1,250.000
|
$1,700.000
|
$2,000.000
|
$2,000.000
|
$2,087.550
|
$3,150.000
|
$2,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
3.000
|
$1,010.000
|
$800.000
|
$600.000
|
$1,500.000
|
$1,375.000
|
$1,500.000
|
$1,000.000
|
$650.000
|
$800.000
|
$800.000
|
$1,164.350
|
$1,465.000
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL2)
|
EA
|
3.000
|
$13,000.000
|
$13,250.000
|
$20,000.000
|
$15,250.000
|
$17,500.000
|
$20,000.000
|
$14,750.000
|
$18,000.000
|
$13,250.000
|
$13,250.000
|
$20,587.680
|
$18,660.000
|
$15,000.000
|
|
|
CHAIN LINK FENCE (INSTALL) (6')
|
LF
|
150.000
|
$25.000
|
$25.000
|
$35.000
|
$37.000
|
$41.500
|
$35.000
|
$30.000
|
$45.000
|
$41.480
|
$30.000
|
$29.230
|
$44.500
|
$30.000
|
|
|
CHAIN LINK FENCE (REMOVE)
|
LF
|
318.000
|
$5.000
|
$5.000
|
$1.000
|
$8.500
|
$9.500
|
$5.000
|
$10.000
|
$8.000
|
$9.530
|
$4.000
|
$3.580
|
$10.200
|
$5.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
775.000
|
$7.000
|
$10.050
|
$8.000
|
$10.050
|
$8.500
|
$10.000
|
$11.900
|
$11.000
|
$10.250
|
$10.330
|
$12.180
|
$9.150
|
$12.000
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
525.000
|
$14.000
|
$11.950
|
$11.000
|
$11.950
|
$12.000
|
$12.000
|
$12.750
|
$13.000
|
$11.750
|
$11.720
|
$18.680
|
$12.950
|
$12.000
|
|
|
CONDT (PVC) (SCH 80) (4")
|
LF
|
53.000
|
$15.000
|
$18.350
|
$16.000
|
$18.350
|
$17.500
|
$19.000
|
$17.500
|
$20.000
|
$15.750
|
$15.800
|
$19.210
|
$18.600
|
$16.000
|
|
|
CONDT (PVC) (SCH 80) (4") (BORE)
|
LF
|
245.000
|
$17.000
|
$15.750
|
$21.000
|
$15.750
|
$23.000
|
$17.000
|
$42.000
|
$17.000
|
$38.250
|
$38.150
|
$34.570
|
$24.400
|
$50.000
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
1,226.000
|
$1.500
|
$1.450
|
$1.400
|
$1.450
|
$1.500
|
$15.000
|
$1.500
|
$1.600
|
$1.250
|
$1.180
|
$1.490
|
$1.600
|
$1.500
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
105.000
|
$1.600
|
$1.850
|
$1.900
|
$1.850
|
$2.000
|
$2.000
|
$1.850
|
$2.000
|
$1.500
|
$1.540
|
$2.150
|
$2.200
|
$2.000
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
210.000
|
$1.650
|
$1.900
|
$1.900
|
$1.900
|
$2.100
|
$2.000
|
$1.900
|
$2.000
|
$1.500
|
$1.820
|
$2.650
|
$2.250
|
$2.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
17.000
|
$800.000
|
$700.000
|
$850.000
|
$700.000
|
$950.000
|
$700.000
|
$1,050.000
|
$760.000
|
$930.250
|
$930.130
|
$1,289.900
|
$1,015.000
|
$1,000.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
|
EA
|
1.000
|
$4,500.000
|
$4,005.000
|
$4,000.000
|
$4,005.000
|
$4,350.000
|
$4,000.000
|
$5,450.000
|
$4,400.000
|
$4,497.000
|
$4,496.500
|
$7,006.850
|
$3,875.000
|
$5,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
6.000
|
$425.000
|
$425.000
|
$450.000
|
$464.680
|
$545.000
|
$500.000
|
$550.000
|
$520.000
|
$425.000
|
$425.000
|
$636.670
|
$580.000
|
$500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
1.000
|
$550.000
|
$450.000
|
$450.000
|
$552.400
|
$625.000
|
$600.000
|
$670.000
|
$610.000
|
$450.000
|
$450.000
|
$725.540
|
$730.000
|
$500.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
2.000
|
$450.000
|
$350.000
|
$350.000
|
$350.000
|
$410.000
|
$400.000
|
$420.000
|
$400.000
|
$350.000
|
$350.000
|
$504.000
|
$670.000
|
$500.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
6.000
|
$100.000
|
$45.000
|
$50.000
|
$85.000
|
$100.000
|
$90.000
|
$150.000
|
$90.000
|
$45.000
|
$45.000
|
$115.210
|
$150.000
|
$50.000
|
|
|
INSTL OM ASSM (OM-3R)(FLX)GND
|
EA
|
2.000
|
$260.000
|
$300.000
|
$300.000
|
$295.750
|
$330.000
|
$300.000
|
$235.000
|
$300.000
|
$300.000
|
$300.000
|
$217.990
|
$370.000
|
$400.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
2.000
|
$25.000
|
$15.000
|
$20.000
|
$50.000
|
$55.000
|
$50.000
|
$50.000
|
$50.000
|
$15.000
|
$15.000
|
$22.340
|
$18.000
|
$25.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
665.000
|
$0.500
|
$0.230
|
$0.800
|
$0.650
|
$0.700
|
$1.000
|
$0.500
|
$0.750
|
$0.650
|
$0.230
|
$0.370
|
$0.300
|
$0.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
80.000
|
$0.500
|
$0.680
|
$1.500
|
$1.200
|
$1.310
|
$1.300
|
$1.000
|
$1.300
|
$1.200
|
$0.680
|
$0.800
|
$0.350
|
$0.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
3.000
|
$60.000
|
$110.000
|
$100.000
|
$85.000
|
$100.000
|
$100.000
|
$125.000
|
$93.000
|
$0.750
|
$110.000
|
$133.510
|
$100.000
|
$100.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
1,325.000
|
$0.500
|
$0.160
|
$0.750
|
$0.650
|
$0.750
|
$1.000
|
$0.500
|
$0.750
|
$0.650
|
$0.160
|
$0.330
|
$0.250
|
$0.500
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
80.000
|
$1.000
|
$0.750
|
$1.500
|
$1.000
|
$1.100
|
$1.000
|
$1.200
|
$1.150
|
$1.000
|
$0.750
|
$1.030
|
$0.600
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(DOT)
|
LF
|
160.000
|
$1.250
|
$1.100
|
$1.400
|
$1.250
|
$1.400
|
$1.500
|
$1.200
|
$1.400
|
$1.250
|
$1.100
|
$1.640
|
$0.600
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
3,795.000
|
$1.000
|
$0.720
|
$0.750
|
$0.650
|
$0.750
|
$1.000
|
$1.000
|
$0.750
|
$0.650
|
$0.720
|
$0.870
|
$0.600
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
1,020.000
|
$1.500
|
$0.930
|
$1.300
|
$1.200
|
$1.350
|
$1.300
|
$1.100
|
$1.300
|
$1.200
|
$0.930
|
$2.020
|
$1.200
|
$1.500
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
72.000
|
$7.000
|
$9.400
|
$7.000
|
$6.000
|
$7.000
|
$6.000
|
$11.000
|
$6.550
|
$6.000
|
$9.400
|
$7.910
|
$6.000
|
$6.000
|
|
|
WK ZN PAV MRK REMOV (W)(ARROW)
|
EA
|
1.000
|
$180.000
|
$180.000
|
$125.000
|
$115.000
|
$135.000
|
$130.000
|
$210.000
|
$125.000
|
$115.000
|
$180.000
|
$190.900
|
$135.000
|
$125.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
5,915.000
|
$1.000
|
$0.720
|
$0.750
|
$0.650
|
$0.750
|
$1.000
|
$1.050
|
$0.750
|
$0.650
|
$0.720
|
$0.910
|
$0.600
|
$0.500
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
40.000
|
$1.600
|
$0.810
|
$1.500
|
$1.500
|
$1.650
|
$2.000
|
$1.000
|
$1.650
|
$1.500
|
$0.810
|
$1.090
|
$2.500
|
$3.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
725.000
|
$2.000
|
$0.880
|
$1.100
|
$1.100
|
$1.250
|
$1.200
|
$1.000
|
$1.200
|
$1.100
|
$0.880
|
$1.270
|
$4.000
|
$4.000
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
325.000
|
$4.000
|
$2.800
|
$2.500
|
$2.500
|
$2.850
|
$2.500
|
$3.150
|
$2.750
|
$2.500
|
$2.800
|
$3.570
|
$5.000
|
$5.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
35.000
|
$6.000
|
$6.700
|
$5.000
|
$5.000
|
$5.750
|
$5.000
|
$7.000
|
$5.450
|
$5.000
|
$6.700
|
$7.370
|
$10.000
|
$10.000
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
50.000
|
$3.500
|
$2.800
|
$3.500
|
$3.500
|
$3.900
|
$4.000
|
$3.100
|
$4.000
|
$3.500
|
$2.800
|
$3.700
|
$5.000
|
$5.000
|
|
REFL PAV MRK TY II (Y) 12" (SLD)
|
LF
|
140.000
|
$1.000
|
$1.300
|
$1.250
|
$1.250
|
$1.400
|
$1.500
|
$1.700
|
$1.400
|
$1.250
|
$1.300
|
$3.230
|
$1.200
|
$1.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
2,940.000
|
$1.000
|
$0.060
|
$0.250
|
$0.250
|
$0.300
|
$0.300
|
$0.500
|
$0.300
|
$0.250
|
$0.060
|
$0.230
|
$0.050
|
$0.100
|
|
|
PAVEMENT SEALER 6"
|
LF
|
900.000
|
$1.000
|
$0.080
|
$0.300
|
$0.300
|
$0.350
|
$0.300
|
$0.400
|
$0.350
|
$0.300
|
$0.080
|
$0.150
|
$0.100
|
$0.100
|
|
|
PAVEMENT SEALER 8"
|
LF
|
860.000
|
$1.000
|
$0.140
|
$0.400
|
$0.400
|
$0.450
|
$0.400
|
$0.400
|
$0.450
|
$0.400
|
$0.140
|
$0.430
|
$0.150
|
$0.150
|
|
|
PAVEMENT SEALER 12"
|
LF
|
375.000
|
$1.000
|
$0.370
|
$1.000
|
$1.000
|
$1.150
|
$1.000
|
$0.800
|
$1.100
|
$1.000
|
$0.370
|
$1.300
|
$0.250
|
$0.250
|
|
|
PAVEMENT SEALER 24"
|
LF
|
135.000
|
$1.500
|
$0.590
|
$2.000
|
$2.000
|
$2.250
|
$2.000
|
$0.950
|
$2.200
|
$0.500
|
$0.590
|
$2.500
|
$0.500
|
$0.500
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
3.000
|
$25.000
|
$47.000
|
$15.000
|
$15.000
|
$17.000
|
$15.000
|
$65.000
|
$17.000
|
$15.000
|
$47.000
|
$50.170
|
$12.000
|
$15.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
5.000
|
$25.000
|
$47.000
|
$15.000
|
$15.000
|
$17.000
|
$15.000
|
$60.000
|
$16.000
|
$15.000
|
$47.000
|
$2.500
|
$15.000
|
$15.000
|
|
|
PAVEMENT SEALER (UTURN ARROW)
|
EA
|
2.000
|
$30.000
|
$47.000
|
$15.000
|
$15.000
|
$17.000
|
$15.000
|
$60.000
|
$16.000
|
$15.000
|
$47.000
|
$66.600
|
$15.000
|
$15.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
3.000
|
$220.000
|
$280.000
|
$270.000
|
$265.000
|
$300.000
|
$300.000
|
$325.000
|
$300.000
|
$265.000
|
$280.000
|
$273.310
|
$215.000
|
$200.000
|
|
PREFAB PAV MRK TY C (W) (UTURN ARROW)
|
EA
|
2.000
|
$375.000
|
$350.000
|
$390.000
|
$385.000
|
$430.000
|
$400.000
|
$395.000
|
$420.000
|
$385.000
|
$350.000
|
$563.730
|
$300.000
|
$300.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
5.000
|
$280.000
|
$320.000
|
$320.000
|
$320.000
|
$360.000
|
$400.000
|
$395.000
|
$350.000
|
$320.000
|
$320.000
|
$353.600
|
$270.000
|
$300.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
25.000
|
$4.000
|
$5.700
|
$4.000
|
$4.000
|
$4.500
|
$4.000
|
$7.000
|
$5.000
|
$4.000
|
$5.700
|
$4.100
|
$15.000
|
$15.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
151.000
|
$4.000
|
$5.700
|
$4.000
|
$4.000
|
$4.500
|
$4.000
|
$6.000
|
$5.000
|
$4.000
|
$5.700
|
$5.040
|
$15.000
|
$15.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
1,110.000
|
$1.000
|
$0.650
|
$0.450
|
$0.450
|
$0.500
|
$0.500
|
$0.950
|
$0.500
|
$0.450
|
$0.650
|
$0.660
|
$0.350
|
$0.500
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
720.000
|
$1.000
|
$0.980
|
$0.500
|
$0.500
|
$0.550
|
$0.500
|
$1.350
|
$0.550
|
$0.500
|
$0.980
|
$0.930
|
$0.750
|
$0.750
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
2.000
|
$40.000
|
$79.000
|
$25.000
|
$25.000
|
$28.000
|
$30.000
|
$95.000
|
$30.000
|
$25.000
|
$79.000
|
$59.270
|
$30.000
|
$30.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
4.000
|
$40.000
|
$130.000
|
$35.000
|
$35.000
|
$40.000
|
$40.000
|
$145.000
|
$38.000
|
$35.000
|
$130.000
|
$70.250
|
$35.000
|
$40.000
|
|
|
ELIM EXT PAV MRK & MRKS (UTURN ARROW)
|
EA
|
2.000
|
$55.000
|
$130.000
|
$30.000
|
$30.000
|
$34.000
|
$30.000
|
$155.000
|
$33.000
|
$30.000
|
$130.000
|
$76.720
|
$35.000
|
$40.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
2,940.000
|
$0.100
|
$0.020
|
$0.020
|
$0.020
|
$0.020
|
$0.020
|
$0.200
|
$0.020
|
$0.020
|
$0.020
|
$0.120
|
$0.020
|
$0.050
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
900.000
|
$0.100
|
$0.020
|
$0.030
|
$0.030
|
$0.030
|
$0.030
|
$0.200
|
$0.030
|
$0.030
|
$0.020
|
$0.140
|
$0.050
|
$0.100
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
860.000
|
$0.100
|
$0.050
|
$0.040
|
$0.040
|
$0.050
|
$0.040
|
$0.200
|
$0.040
|
$0.040
|
$0.050
|
$0.200
|
$0.100
|
$0.200
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
375.000
|
$0.500
|
$0.060
|
$0.060
|
$0.060
|
$0.070
|
$0.060
|
$0.500
|
$0.070
|
$0.060
|
$0.060
|
$0.580
|
$0.150
|
$0.200
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
135.000
|
$0.500
|
$0.130
|
$0.120
|
$0.120
|
$0.140
|
$0.130
|
$0.300
|
$0.140
|
$0.500
|
$0.130
|
$0.940
|
$0.200
|
$0.200
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
6.000
|
$5.000
|
$7.900
|
$2.500
|
$2.500
|
$2.800
|
$3.000
|
$9.000
|
$3.000
|
$2.500
|
$7.900
|
$21.140
|
$12.000
|
$15.000
|
|
|
PAV SURF PREP FOR MRK (UTURN ARR)
|
EA
|
2.000
|
$10.000
|
$7.900
|
$2.500
|
$2.500
|
$2.800
|
$3.000
|
$9.000
|
$3.000
|
$2.500
|
$7.900
|
$21.340
|
$15.000
|
$15.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
8.000
|
$7.000
|
$7.900
|
$2.500
|
$2.500
|
$2.800
|
$3.000
|
$9.000
|
$3.000
|
$2.500
|
$7.900
|
$28.000
|
$15.000
|
$15.000
|
|
|
INSTALL HWY TRF SIG (ISOLATED)
|
EA
|
1.000
|
$35,000.000
|
$29,250.000
|
$38,000.000
|
$29,250.000
|
$40,000.000
|
$30,000.000
|
$30,500.000
|
$32,000.000
|
$28,105.000
|
$28,104.850
|
$39,248.180
|
$43,065.000
|
$35,000.000
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
1.000
|
$3,500.000
|
$2,775.000
|
$3,000.000
|
$4,775.000
|
$2,850.000
|
$3,000.000
|
$2,350.000
|
$3,000.000
|
$1,846.000
|
$1,846.440
|
$6,968.720
|
$3,015.000
|
$5,000.000
|
|
|
TEMP TRAF SIGNALS
|
EA
|
1.000
|
$41,000.000
|
$31,175.000
|
$40,000.000
|
$31,175.000
|
$33,000.000
|
$35,000.000
|
$19,200.000
|
$35,000.000
|
$17,477.000
|
$17,477.350
|
$31,320.000
|
$34,865.000
|
$22,500.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
6.000
|
$190.000
|
$210.000
|
$160.000
|
$210.000
|
$170.000
|
$210.000
|
$220.000
|
$230.000
|
$192.000
|
$191.940
|
$359.890
|
$185.000
|
$250.000
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
6.000
|
$200.000
|
$210.000
|
$160.000
|
$210.000
|
$170.000
|
$210.000
|
$220.000
|
$230.000
|
$210.000
|
$194.500
|
$350.720
|
$185.000
|
$250.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
6.000
|
$190.000
|
$210.000
|
$160.000
|
$210.000
|
$170.000
|
$210.000
|
$220.000
|
$230.000
|
$192.000
|
$191.940
|
$385.940
|
$185.000
|
$250.000
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
6.000
|
$200.000
|
$210.000
|
$160.000
|
$210.000
|
$170.000
|
$210.000
|
$215.000
|
$230.000
|
$210.000
|
$194.500
|
$337.780
|
$185.000
|
$250.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
6.000
|
$195.000
|
$210.000
|
$160.000
|
$210.000
|
$170.000
|
$210.000
|
$220.000
|
$230.000
|
$189.500
|
$189.390
|
$341.770
|
$185.000
|
$250.000
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
6.000
|
$200.000
|
$210.000
|
$160.000
|
$210.000
|
$210.000
|
$210.000
|
$220.000
|
$230.000
|
$192.000
|
$191.940
|
$335.050
|
$185.000
|
$250.000
|
|
|
VEH SIG SEC (12")LED(GRN U-TURN ARW)
|
EA
|
1.000
|
$175.000
|
$225.000
|
$180.000
|
$225.000
|
$200.000
|
$230.000
|
$350.000
|
$250.000
|
$289.000
|
$289.100
|
$376.730
|
$215.000
|
$400.000
|
|
|
VEH SIG SEC (12")LED(YEL U-TURN ARW)
|
EA
|
1.000
|
$175.000
|
$225.000
|
$180.000
|
$225.000
|
$200.000
|
$230.000
|
$300.000
|
$250.000
|
$231.500
|
$231.570
|
$359.830
|
$215.000
|
$400.000
|
|
|
VEH SIG SEC (12")LED(RED U-TURN ARW)
|
EA
|
2.000
|
$175.000
|
$225.000
|
$180.000
|
$225.000
|
$200.000
|
$230.000
|
$285.000
|
$250.000
|
$213.750
|
$213.670
|
$359.830
|
$215.000
|
$400.000
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
6.000
|
$400.000
|
$515.000
|
$315.000
|
$515.000
|
$350.000
|
$500.000
|
$495.000
|
$560.000
|
$421.000
|
$420.950
|
$909.810
|
$380.000
|
$500.000
|
|
|
BACK PLATE (12")(3 SEC)
|
EA
|
12.000
|
$100.000
|
$130.000
|
$80.000
|
$130.000
|
$90.000
|
$130.000
|
$75.000
|
$145.000
|
$60.750
|
$60.740
|
$131.970
|
$95.000
|
$100.000
|
|
|
BACK PLATE (12")(4 SEC)
|
EA
|
1.000
|
$110.000
|
$155.000
|
$103.000
|
$155.000
|
$115.000
|
$160.000
|
$75.000
|
$170.000
|
$64.500
|
$64.580
|
$132.330
|
$125.000
|
$100.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
|
LF
|
1,380.000
|
$1.500
|
$1.050
|
$1.300
|
$1.050
|
$1.450
|
$1.200
|
$1.250
|
$1.150
|
$1.000
|
$1.090
|
$2.240
|
$1.550
|
$1.500
|
|
|
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
|
LF
|
1,547.000
|
$1.700
|
$1.400
|
$1.700
|
$1.400
|
$1.850
|
$1.500
|
$1.750
|
$1.550
|
$1.500
|
$1.380
|
$1.920
|
$2.000
|
$1.500
|
|
|
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
|
LF
|
2,554.000
|
$2.000
|
$1.900
|
$2.000
|
$1.900
|
$2.250
|
$2.000
|
$2.350
|
$2.100
|
$1.750
|
$1.850
|
$2.800
|
$2.400
|
$2.000
|
|
|
TRF SIG CBL (TY C)(14 AWG)(2 CONDR)
|
LF
|
8,380.000
|
$1.300
|
$1.000
|
$1.200
|
$1.000
|
$1.300
|
$1.000
|
$1.400
|
$1.100
|
$1.000
|
$1.020
|
$1.600
|
$1.400
|
$1.500
|
|
|
INS TRF SIG PL AM (S)1 ARM(28')
|
EA
|
1.000
|
$3,700.000
|
$4,550.000
|
$4,800.000
|
$4,550.000
|
$5,300.000
|
$5,000.000
|
$5,502.000
|
$5,000.000
|
$4,984.000
|
$4,983.920
|
$5,369.130
|
$5,700.000
|
$7,500.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(36')
|
EA
|
1.000
|
$6,100.000
|
$4,875.000
|
$5,200.000
|
$4,875.000
|
$5,700.000
|
$5,000.000
|
$6,450.000
|
$5,300.000
|
$5,915.000
|
$5,914.570
|
$7,934.400
|
$6,130.000
|
$7,500.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(44')
|
EA
|
1.000
|
$8,000.000
|
$5,775.000
|
$6,600.000
|
$5,775.000
|
$7,300.000
|
$6,000.000
|
$7,685.000
|
$6,300.000
|
$7,137.000
|
$7,137.050
|
$8,981.270
|
$7,825.000
|
$9,000.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
2.000
|
$1,600.000
|
$1,575.000
|
$1,500.000
|
$1,575.000
|
$1,700.000
|
$1,700.000
|
$2,950.000
|
$1,750.000
|
$2,471.000
|
$2,471.360
|
$2,371.570
|
$1,795.000
|
$5,000.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
5.000
|
$750.000
|
$615.000
|
$610.000
|
$615.000
|
$680.000
|
$650.000
|
$1,350.000
|
$680.000
|
$680.750
|
$680.830
|
$1,077.100
|
$725.000
|
$1,000.000
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
1.000
|
$3,600.000
|
$3,125.000
|
$3,900.000
|
$3,125.000
|
$4,100.000
|
$3,200.000
|
$4,350.000
|
$3,500.000
|
$3,753.000
|
$3,753.330
|
$4,483.250
|
$4,640.000
|
$5,000.000
|
|
|
VEH LP DETECT (SAWCUT)
|
LF
|
1,625.000
|
$10.000
|
$9.750
|
$8.200
|
$9.750
|
$9.000
|
$10.000
|
$21.000
|
$11.000
|
$9.750
|
$17.500
|
$12.750
|
$9.700
|
$25.000
|
|
|
PRECST LONG SPAN CLV STR (55'X14'X108')
|
LF
|
107.040
|
$3,900.000
|
$6,900.000
|
$7,200.000
|
$7,000.000
|
$6,800.000
|
$7,450.000
|
$7,000.000
|
$7,400.000
|
$7,420.000
|
$5,500.000
|
$225.500
|
$6,915.000
|
$8,500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
137.000
|
$30.000
|
$25.730
|
$40.000
|
$200.000
|
$60.000
|
$50.000
|
$60.000
|
$56.000
|
$14.000
|
$40.000
|
$114.810
|
$75.000
|
$100.000
|
|
|
VIVDS TEMPORARY
|
EA
|
1.000
|
$10,000.000
|
$13,375.000
|
$15,000.000
|
$13,375.000
|
$11,600.000
|
$14,000.000
|
$13,500.000
|
$14,500.000
|
$10,645.000
|
$15,000.000
|
$19,655.540
|
$12,425.000
|
$12,500.000
|
|
MULTIPOLYMER PAV MRK (W)(6")(SLD)
|
LF
|
80.000
|
$1.000
|
$1.000
|
$2.250
|
$2.250
|
$2.400
|
$2.500
|
$1.500
|
$2.450
|
$2.250
|
$1.000
|
$0.710
|
$7.200
|
$7.000
|
|
MULTIPOLYMER PAV MRK (W)(6")(BRK)
|
LF
|
410.000
|
$1.000
|
$1.000
|
$2.500
|
$2.500
|
$2.400
|
$3.000
|
$1.500
|
$2.750
|
$2.500
|
$1.000
|
$0.780
|
$7.200
|
$7.000
|
|
MULTIPOLYMER PAV MRK (W)(8")(SLD)
|
LF
|
135.000
|
$1.500
|
$2.600
|
$3.250
|
$3.250
|
$2.800
|
$3.500
|
$3.000
|
$3.550
|
$3.250
|
$2.600
|
$1.570
|
$9.600
|
$10.000
|
|
MULTIPOLYMER PAV MRK (W)(24")(SLD)
|
LF
|
100.000
|
$7.000
|
$10.000
|
$5.500
|
$5.500
|
$4.000
|
$6.000
|
$13.000
|
$6.000
|
$5.500
|
$10.000
|
$9.780
|
$18.000
|
$20.000
|
|
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
|
LF
|
410.000
|
$1.000
|
$1.000
|
$2.750
|
$2.750
|
$3.000
|
$3.000
|
$1.600
|
$3.000
|
$2.750
|
$1.000
|
$0.910
|
$7.200
|
$10.000
|
|
|
BBU SYSTEM (EXTERNAL BATT CABINET)
|
EA
|
1.000
|
$6,700.000
|
$6,775.000
|
$7,300.000
|
$6,775.000
|
$8,000.000
|
$7,000.000
|
$7,500.000
|
$7,400.000
|
$6,405.000
|
$6,404.930
|
$9,297.490
|
$8,650.000
|
$10,000.000
|
|
|
GPS COMMUNICATIONS UNIT
|
EA
|
1.000
|
$900.000
|
$875.000
|
$930.000
|
$875.000
|
$1,000.000
|
$900.000
|
$850.000
|
$960.000
|
$668.750
|
$668.770
|
$1,274.720
|
$1,110.000
|
$2,000.000
|
|
Totals: |
$3,429,857.843
|
$3,815,251.200
|
$3,944,600.850
|
$3,995,167.152
|
$3,997,644.750
|
$4,090,759.950
|
$4,155,040.290
|
$4,321,975.270
|
$4,377,968.675
|
$4,517,008.520
|
$4,576,082.083
|
$4,684,291.800
|
$5,175,486.250
|