PREPARING ROW
|
STA
|
86.000
|
$1,000.000
|
$500.000
|
$500.000
|
$325.000
|
$8,000.000
|
$2,873.890
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
1,111.000
|
$7.000
|
$10.000
|
$7.500
|
$6.000
|
$1.890
|
$20.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
5,292.000
|
$5.370
|
$17.000
|
$15.000
|
$19.000
|
$10.000
|
$9.780
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
9,638.000
|
$13.000
|
$17.000
|
$15.000
|
$20.000
|
$15.000
|
$18.520
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
129,148.000
|
$0.910
|
$0.750
|
$0.500
|
$0.650
|
$0.150
|
$1.270
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
129,148.000
|
$0.120
|
$0.140
|
$0.130
|
$0.140
|
$0.240
|
$0.140
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
64,574.000
|
$0.070
|
$0.090
|
$0.100
|
$0.110
|
$0.190
|
$0.110
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
SY
|
64,574.000
|
$0.070
|
$0.090
|
$0.100
|
$0.110
|
$0.190
|
$0.100
|
|
|
VEGETATIVE WATERING
|
MG
|
2,098.000
|
$9.030
|
$5.000
|
$5.000
|
$28.000
|
$38.630
|
$14.190
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY D)
|
SY
|
8,000.000
|
$1.410
|
$1.500
|
$1.100
|
$1.000
|
$1.290
|
$1.050
|
|
|
PROOF ROLLING
|
HR
|
72.000
|
$75.000
|
$80.000
|
$60.000
|
$98.000
|
$66.540
|
$181.700
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
14,047.000
|
$34.920
|
$45.000
|
$47.500
|
$50.000
|
$49.470
|
$79.040
|
|
|
FL BS(RDWY DEL)(TY D GR 1-2)(FNAL POS)
|
CY
|
9,863.000
|
$30.000
|
$40.000
|
$39.000
|
$50.000
|
$54.330
|
$82.990
|
|
|
REWORK BS MTL (TY C) (8") (ORD COMP)
|
SY
|
68,619.000
|
$3.000
|
$1.000
|
$1.250
|
$2.250
|
$8.000
|
$2.020
|
|
|
CEMENT
|
TON
|
1,068.000
|
$135.000
|
$150.000
|
$150.000
|
$150.000
|
$147.800
|
$207.100
|
|
|
CEMENT TREAT(EXIST MATL)(8")
|
SY
|
89,712.000
|
$2.280
|
$2.000
|
$1.500
|
$3.000
|
$2.180
|
$1.980
|
|
|
EMULS ASPH (BS OR SUBGR TRT)(MS-2)
|
GAL
|
44,865.000
|
$2.200
|
$2.500
|
$1.000
|
$3.250
|
$2.810
|
$5.870
|
|
|
ASPH (CRS-2)
|
GAL
|
37,950.000
|
$2.150
|
$2.700
|
$2.500
|
$2.300
|
$2.300
|
$3.910
|
|
|
AGGR(TY-D GR-4 OR TY-L GR-4)
|
CY
|
623.000
|
$108.000
|
$87.000
|
$104.000
|
$117.000
|
$117.000
|
$150.420
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
1,599.000
|
$3.000
|
$5.000
|
$5.500
|
$2.900
|
$4.430
|
$7.330
|
|
|
CEM STABIL BKFL
|
CY
|
930.500
|
$63.540
|
$100.000
|
$162.000
|
$171.580
|
$131.880
|
$81.620
|
|
|
CUT & RESTORING PAV
|
SY
|
166.000
|
$66.000
|
$100.000
|
$280.000
|
$50.000
|
$50.720
|
$113.980
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
42.000
|
$2.500
|
$20.000
|
$21.000
|
$10.000
|
$25.000
|
$18.280
|
|
|
TEMPORARY SPL SHORING
|
SF
|
2,301.000
|
$20.000
|
$20.000
|
$26.000
|
$17.080
|
$25.580
|
$28.450
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
376.000
|
$150.000
|
$225.000
|
$210.000
|
$200.000
|
$194.930
|
$174.150
|
|
|
CL B CONC (FLUME)
|
CY
|
5.800
|
$970.000
|
$800.000
|
$750.000
|
$800.000
|
$600.140
|
$787.340
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
28.400
|
$890.800
|
$2,000.000
|
$1,560.000
|
$1,650.000
|
$975.570
|
$1,608.980
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
22.400
|
$1,043.770
|
$2,000.000
|
$1,975.000
|
$1,850.000
|
$1,469.070
|
$1,463.650
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
10.400
|
$875.000
|
$2,000.000
|
$2,100.000
|
$2,200.000
|
$1,912.660
|
$1,680.430
|
|
|
REINF CONC SLAB (SLAB BEAM)(HPC)
|
SF
|
5,175.000
|
$22.000
|
$17.000
|
$20.000
|
$31.750
|
$12.200
|
$25.630
|
|
|
APPROACH SLAB (HPC)
|
CY
|
69.000
|
$523.630
|
$500.000
|
$525.000
|
$650.000
|
$498.820
|
$873.450
|
|
|
PRESTR CONC SLAB BEAM (4SB15)
|
LF
|
681.000
|
$132.000
|
$180.000
|
$185.000
|
$200.000
|
$146.370
|
$252.090
|
|
|
PRESTR CONC SLAB BEAM (5SB15)
|
LF
|
454.000
|
$153.190
|
$180.000
|
$200.000
|
$250.000
|
$165.540
|
$252.090
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
3.000
|
$650.000
|
$600.000
|
$525.000
|
$1,000.000
|
$620.380
|
$733.500
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
19.000
|
$180.000
|
$125.000
|
$105.000
|
$225.000
|
$97.300
|
$176.860
|
|
|
RIPRAP (STONE PROTECTION)(30 IN)
|
CY
|
1,031.000
|
$186.510
|
$150.000
|
$105.000
|
$125.000
|
$116.300
|
$148.170
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
83.000
|
$440.180
|
$450.000
|
$550.000
|
$414.000
|
$411.460
|
$759.890
|
|
|
RAIL (TY T1W)
|
LF
|
254.000
|
$230.000
|
$200.000
|
$205.000
|
$170.000
|
$159.870
|
$191.250
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
82.000
|
$85.000
|
$100.000
|
$94.000
|
$85.000
|
$54.310
|
$90.090
|
|
|
GABION MATTRESSES (GALV)(18 IN)
|
SY
|
215.400
|
$164.030
|
$200.000
|
$140.000
|
$330.000
|
$128.000
|
$141.570
|
|
|
GABIONS (3' X 3')(GALV)
|
CY
|
90.200
|
$195.570
|
$400.000
|
$210.000
|
$450.000
|
$389.000
|
$449.300
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
272.000
|
$200.000
|
$300.000
|
$315.000
|
$360.000
|
$252.030
|
$316.010
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
374.000
|
$50.650
|
$60.000
|
$58.000
|
$52.000
|
$67.770
|
$62.160
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
146.000
|
$96.000
|
$110.000
|
$152.000
|
$92.000
|
$155.980
|
$133.480
|
|
|
HEADWALL (CH - PW - 0) (DIA= 30 IN)
|
EA
|
1.000
|
$6,800.000
|
$7,215.000
|
$7,850.000
|
$6,000.000
|
$8,160.590
|
$6,332.200
|
|
|
SET (TY I)(S= 4 FT)(HW= 2 FT)(4:1) (C)
|
EA
|
12.000
|
$4,600.000
|
$6,500.000
|
$6,300.000
|
$2,800.000
|
$4,388.040
|
$8,515.460
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
18.000
|
$780.000
|
$800.000
|
$895.000
|
$950.000
|
$999.260
|
$1,753.700
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
3.000
|
$1,800.000
|
$1,200.000
|
$2,600.000
|
$1,200.000
|
$2,503.100
|
$3,419.360
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$1,425.000
|
$1,400.000
|
$3,100.000
|
$1,500.000
|
$2,344.480
|
$4,156.510
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
2.000
|
$2,114.510
|
$2,500.000
|
$2,100.000
|
$2,000.000
|
$3,011.270
|
$1,967.260
|
|
|
REMOV STR (SET)
|
EA
|
12.000
|
$397.630
|
$345.000
|
$785.000
|
$750.000
|
$272.030
|
$580.400
|
|
|
REMOV STR (PIPE)
|
LF
|
531.000
|
$10.760
|
$12.000
|
$31.000
|
$10.000
|
$21.760
|
$19.490
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
1.000
|
$17,769.000
|
$25,000.000
|
$45,000.000
|
$52,000.000
|
$27,467.630
|
$48,897.270
|
|
|
SALV MATRL (CREDIT ITEM)
|
LS
|
1.000
|
$1.000
|
$1.000
|
$0.010
|
$1.000
|
$0.010
|
$1.220
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$431,273.640
|
$504,000.000
|
$555,000.000
|
$753,485.000
|
$613,613.840
|
$733,459.060
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
16.000
|
$5,000.000
|
$5,000.000
|
$9,350.000
|
$3,500.000
|
$8,269.700
|
$18,336.480
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
3,300.000
|
$26.000
|
$20.000
|
$31.500
|
$30.420
|
$24.450
|
$33.470
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
3,300.000
|
$4.710
|
$3.000
|
$8.680
|
$8.680
|
$6.880
|
$9.210
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
13,658.000
|
$2.730
|
$3.000
|
$3.700
|
$2.500
|
$2.890
|
$3.010
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
13,658.000
|
$0.350
|
$0.500
|
$0.500
|
$0.500
|
$0.440
|
$0.930
|
|
|
CONSTRUCTING DETOURS
|
SY
|
640.000
|
$58.040
|
$50.000
|
$60.000
|
$29.000
|
$38.420
|
$88.920
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
7.000
|
$3,660.000
|
$5,000.000
|
$5,500.000
|
$4,200.000
|
$3,553.970
|
$5,733.370
|
|
|
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
|
LF
|
1,140.000
|
$19.000
|
$12.000
|
$12.500
|
$8.200
|
$8.660
|
$21.410
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
1,140.000
|
$14.000
|
$7.000
|
$13.000
|
$9.150
|
$2.250
|
$6.910
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
1,140.000
|
$14.000
|
$10.000
|
$12.000
|
$7.450
|
$6.730
|
$16.210
|
|
|
PORT CTB (FUR&INST)(F-SHAPE)(TY1)(MOD)
|
LF
|
120.000
|
$210.000
|
$250.000
|
$210.000
|
$215.000
|
$197.990
|
$36.670
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,900.000
|
$28.570
|
$25.000
|
$35.000
|
$26.550
|
$31.080
|
$36.370
|
|
|
TURNOUTS (ACP)
|
SY
|
148.000
|
$32.710
|
$40.000
|
$50.000
|
$31.050
|
$88.200
|
$50.970
|
|
|
INTERSECTIONS (ACP) (TYPE 1)
|
SY
|
1,373.000
|
$35.000
|
$30.000
|
$30.000
|
$26.650
|
$33.650
|
$16.020
|
|
|
INTERSECTIONS (ACP) (TYPE 2)
|
SY
|
1,245.000
|
$50.000
|
$35.000
|
$40.000
|
$35.800
|
$33.530
|
$29.340
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
975.000
|
$25.090
|
$30.000
|
$23.500
|
$22.500
|
$22.000
|
$25.710
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,946.540
|
$2,000.000
|
$2,100.000
|
$1,500.000
|
$1,700.000
|
$1,783.840
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,111.000
|
$2.730
|
$3.000
|
$3.400
|
$3.250
|
$3.000
|
$2.730
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$2,375.000
|
$3,000.000
|
$2,700.000
|
$2,575.000
|
$2,600.000
|
$2,673.700
|
|
|
CRASH CUSH ATTEN (DES SOURCE)
|
EA
|
2.000
|
$2,400.000
|
$4,000.000
|
$2,000.000
|
$1,375.000
|
$3,950.000
|
$4,275.940
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$2,000.000
|
$3,500.000
|
$2,500.000
|
$1,375.000
|
$3,250.000
|
$1,440.890
|
|
|
CRASH CUSH ATTEN (STKPL)
|
EA
|
2.000
|
$1,000.000
|
$3,500.000
|
$1,000.000
|
$800.000
|
$1,500.000
|
$1,423.310
|
|
|
WIRE FENCE (TY D)
|
LF
|
40.000
|
$25.000
|
$60.000
|
$40.000
|
$25.000
|
$95.000
|
$45.520
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
6.000
|
$200.000
|
$200.000
|
$210.000
|
$166.650
|
$190.000
|
$247.240
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 2
|
EA
|
2.000
|
$261.110
|
$250.000
|
$236.000
|
$204.410
|
$220.000
|
$281.900
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 2
|
EA
|
1.000
|
$500.000
|
$400.000
|
$473.000
|
$339.500
|
$420.000
|
$449.500
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
55.000
|
$463.780
|
$500.000
|
$448.000
|
$481.950
|
$425.000
|
$519.050
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
3.000
|
$500.000
|
$550.000
|
$500.000
|
$505.860
|
$475.000
|
$618.670
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
15.000
|
$515.810
|
$575.000
|
$500.000
|
$549.100
|
$475.000
|
$726.200
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$552.830
|
$700.000
|
$579.000
|
$665.000
|
$550.000
|
$717.330
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$759.110
|
$750.000
|
$684.000
|
$702.310
|
$650.000
|
$801.950
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-EXAL)
|
EA
|
4.000
|
$700.000
|
$1,000.000
|
$789.000
|
$906.010
|
$750.000
|
$989.290
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
78.000
|
$72.210
|
$100.000
|
$100.000
|
$73.040
|
$100.000
|
$91.450
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
14.000
|
$77.270
|
$100.000
|
$105.000
|
$84.500
|
$100.000
|
$85.010
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
18.000
|
$36.680
|
$30.000
|
$38.000
|
$36.000
|
$18.000
|
$36.180
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
1,203.000
|
$0.200
|
$1.000
|
$1.000
|
$0.650
|
$0.650
|
$0.280
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
3,956.000
|
$0.200
|
$1.000
|
$1.000
|
$0.800
|
$0.800
|
$0.310
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
96.000
|
$4.400
|
$7.000
|
$6.350
|
$6.000
|
$6.000
|
$5.610
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
1,846.000
|
$0.450
|
$2.500
|
$2.110
|
$2.000
|
$2.000
|
$0.980
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
20.000
|
$10.000
|
$35.000
|
$31.000
|
$30.000
|
$30.000
|
$17.460
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
2,460.000
|
$0.900
|
$1.000
|
$1.250
|
$1.000
|
$0.790
|
$1.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
228.000
|
$4.960
|
$8.000
|
$7.370
|
$7.000
|
$7.000
|
$7.850
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
49,183.000
|
$0.530
|
$0.750
|
$0.680
|
$0.650
|
$0.650
|
$0.660
|
|
|
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
|
LF
|
3,855.000
|
$0.710
|
$1.000
|
$0.790
|
$0.750
|
$0.750
|
$0.680
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
30,931.000
|
$0.580
|
$0.750
|
$0.720
|
$0.680
|
$0.680
|
$0.680
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
474.000
|
$4.000
|
$5.000
|
$4.480
|
$4.250
|
$4.250
|
$3.570
|
|
|
FULL - WIDTH MOWING
|
CYC
|
3.000
|
$4,879.740
|
$2,500.000
|
$2,100.000
|
$3,100.000
|
$4,879.000
|
$4,740.960
|
|
|
D-GR HMA TY-C SAC-B PG64-22
|
TON
|
9,200.000
|
$65.000
|
$72.000
|
$84.000
|
$96.000
|
$86.000
|
$99.020
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$5,125.000
|
$10,000.000
|
$7,500.000
|
$6,000.000
|
$593.750
|
$8,505.040
|
|
|
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
|
LF
|
80.000
|
$3.370
|
$25.000
|
$22.000
|
$21.000
|
$21.000
|
$4.910
|
|
|
TMA (STATIONARY)
|
DAY
|
133.000
|
$190.000
|
$150.000
|
$250.000
|
$235.000
|
$387.500
|
$366.730
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
48.000
|
$40.000
|
$50.000
|
$65.000
|
$10.000
|
$68.010
|
$122.240
|
|
Totals: |
$4,906,992.284
|
$5,387,761.040
|
$5,664,838.550
|
$6,400,668.780
|
$6,831,683.102
|
$7,946,880.054
|