Show Job Controls
Bid Cobra

HARRIS IH 10 (0508-01-353)

Items: 200

County: HARRIS
Length: N/A
Highway: IH 10
District: HOUSTON
Control Number: 0508-01-353
DBE Goal: N/A
Project: BR 2020(205)
Guaranty: N/A
Time: 280 WORKING DAYS
Engineer's Estimate: $6,491,828.53
Date: 11/06/2019 (6 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$6,491,828.53
$6,382,061.19
Over/Under Est: -1.69% -$109,767.34
Over/Under Est: 1.2% $78,171.44
Amt Left: 2.94% $187,938.78
$6,588,246.12
Over/Under Est: 1.49% $96,417.59
Amt Left: 3.23% $206,184.93
Delta: -0.28% -$18,246.15
$6,684,419.25
Over/Under Est: 2.97% $192,590.72
Amt Left: 4.74% $302,358.06
Delta: -1.46% -$96,173.13
Over/Under Est: 7.6% $493,662.12
Amt Left: 9.46% $603,429.46
Delta: -4.50% -$301,071.40
Over/Under Est: 30.78% $1,998,212.97
Amt Left: 33.03% $2,107,980.31
Delta: -21.54% -$1,504,550.85

Bid Items & Bid Tabulations

200 Total 0 of 200
HARRIS  |  IH 10  |  HOUSTON  |  0508-01-353  |  11/06/2019  |  $6,491,828.53  |  BR 2020(205)  |  BRIDGE REPL  |  280 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
NBG CONSTRUCTORS, INC.
JAMES CONSTRUCTION GROUP, L.L.C.
ISI CONTRACTING, INC.
FUSED INDUSTRIES, LLC
RAGLE CONSTRUCTION, INC.
ARANDA BROTHERS CONSTRUCTION CO., INC.
PREPARING ROW (TREE) (0" TO 6" DIA)
EA 14.000 $400.000 $3,000.000 $10,000.000 $150.000 $3,500.000 $400.000 $350.000
REMOVING CONC (PAV)
SY 4,002.000 $15.000 $12.000 $25.000 $7.000 $8.000 $10.000 $10.000
REMOVING CONC (RIPRAP)
SY 1,067.000 $10.000 $4.000 $25.000 $4.200 $5.000 $6.000 $10.000
REMOVING CONC (MEDIANS)
SY 7.000 $200.000 $25.000 $43.770 $56.000 $5.000 $24.000 $10.000
REMOVING CONC (SIDEWALKS)
SY 186.000 $10.000 $4.000 $9.670 $3.300 $4.000 $10.000 $10.000
REMOVING CONC (CTB)
LF 188.000 $20.000 $18.000 $17.400 $9.000 $21.000 $25.000 $10.000
REMOVING CONC (APPR SLAB)
SY 581.000 $50.000 $15.000 $11.880 $13.000 $10.000 $10.000 $20.000
REMOVING CONC (WHEELCHAIR RAMP)
SY 70.000 $8.000 $5.000 $43.770 $6.000 $7.000 $25.000 $10.000
REMOVE CONC (RAIL)
LF 272.000 $15.000 $18.000 $12.570 $9.000 $15.000 $20.000 $12.000
REMOVING STAB BASE AND ASPH PAV (7")
SY 737.000 $10.000 $5.000 $5.290 $6.000 $5.000 $3.000 $10.000
EXCAVATION (ROADWAY)
CY 305.000 $100.000 $20.000 $17.220 $18.000 $70.000 $150.000 $15.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 1,699.000 $30.000 $45.000 $27.880 $31.000 $54.000 $18.000 $20.000
BLOCK SODDING
SY 215.000 $10.000 $4.000 $3.750 $3.000 $3.750 $10.000 $6.000
FERTILIZER
AC 0.050 $1,000.000 $1,500.000 $972.000 $775.000 $972.000 $1,200.000 $3,500.000
VEGETATIVE WATERING
MG 6.000 $100.000 $40.000 $9.200 $14.000 $3,100.000 $100.000 $20.000
ASPHALT STAB BASE (GR 2)(PG 64)
TON 245.000 $120.000 $175.000 $146.580 $150.000 $125.000 $125.000 $150.000
CONC PVMT (CONT REINF)(FAST TRK)(12")
SY 3,377.000 $100.000 $100.000 $100.000 $101.000 $123.000 $85.000 $128.000
CONC PVMT (CONT REINF)(FAST TRK)(15")
SY 761.000 $120.000 $140.000 $144.790 $158.000 $148.000 $105.000 $136.000
STRUCT EXCAV
CY 48.000 $15.000 $15.000 $37.040 $14.000 $85.000 $12.000 $12.000
CEM STABIL BKFL
CY 35.000 $100.000 $45.000 $43.230 $42.000 $213.000 $40.000 $55.000
CEMENT STAB BACKFILL (INLET OR MH)
CY 6.000 $200.000 $45.000 $43.230 $42.000 $143.000 $40.000 $55.000
TRENCH EXCAVATION PROTECTION
LF 90.000 $10.000 $1.000 $27.090 $2.000 $40.000 $1.000 $1.000
TEMPORARY SPL SHORING
SF 7,713.000 $40.000 $45.000 $5.420 $4.000 $20.000 $1.000 $22.000
DRILL SHAFT (30 IN)
LF 648.000 $160.000 $275.000 $197.110 $280.000 $178.000 $210.000 $420.000
DRILL SHAFT (36 IN)
LF 900.000 $205.000 $375.000 $284.170 $330.000 $262.000 $280.000 $525.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 15.000 $326.000 $275.000 $253.570 $200.000 $253.000 $253.570 $380.000
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 110.000 $447.000 $360.000 $344.370 $507.000 $344.000 $344.370 $500.000
CL C CONC (ABUT)
CY 107.600 $900.000 $950.000 $1,020.110 $930.000 $1,344.000 $690.000 $1,200.000
CL C CONC (CAP)
CY 178.000 $1,200.000 $975.000 $770.540 $808.000 $1,487.000 $920.000 $1,350.000
CL C CONC (COLUMN)
CY 196.600 $1,200.000 $1,000.000 $900.710 $909.000 $1,217.000 $860.000 $1,300.000
CL C CONC (FOOTING)
CY 267.000 $800.000 $1,100.000 $644.240 $738.000 $950.000 $680.000 $1,100.000
CL HES CONC (APPROACH SLAB)
CY 228.000 $570.000 $500.000 $453.850 $614.000 $355.000 $430.000 $750.000
REINF CONC SLAB
SF 29,274.000 $15.000 $11.000 $13.210 $18.000 $18.000 $17.500 $16.500
BRIDGE MEDIAN
SF 364.000 $14.000 $20.000 $10.540 $10.000 $33.000 $11.500 $7.000
BRIDGE SIDEWALK
SF 4,674.000 $8.000 $6.000 $7.190 $6.600 $22.000 $9.500 $8.000
PRESTR CONC GIRDER (TX28)
LF 4,468.400 $209.000 $125.000 $126.410 $165.000 $164.000 $125.000 $160.000
RIPRAP (CONC)(4 IN)
CY 40.800 $750.000 $450.000 $437.960 $456.000 $530.000 $450.000 $475.000
RIPRAP (CONC)(6 IN)
CY 3.000 $1,000.000 $320.000 $619.140 $466.000 $856.000 $450.000 $850.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 130.100 $750.000 $425.000 $436.290 $726.000 $622.000 $450.000 $450.000
RIPRAP (MOW STRIP)(4 IN)
CY 28.000 $800.000 $400.000 $493.090 $690.000 $670.000 $450.000 $385.000
STR STEEL (MISC NON - BRIDGE)
LB 5,204.000 $10.000 $5.000 $5.810 $6.000 $10.000 $5.500 $37.000
RAIL (TY T221)
LF 137.000 $65.000 $80.000 $85.050 $88.000 $125.000 $85.000 $200.000
RAIL (TY SSTR)
LF 273.000 $100.000 $75.000 $58.830 $73.000 $65.000 $90.000 $90.000
RAIL (TY C221)
LF 540.000 $100.000 $80.000 $74.450 $68.000 $92.000 $65.000 $270.000
SEALED EXPANSION JOINT (4 IN) (SEJ - B)
LF 220.000 $90.000 $65.000 $66.000 $70.000 $85.000 $75.000 $105.000
RC PIPE (CL III)(18 IN)
LF 90.000 $100.000 $100.000 $75.610 $55.000 $150.000 $55.000 $80.000
INLET (COMPL)(TY C)
EA 1.000 $5,000.000 $3,500.000 $4,125.420 $5,000.000 $7,750.000 $5,400.000 $1,850.000
ADJUSTING MANHOLES
EA 3.000 $1,000.000 $500.000 $3,736.180 $400.000 $525.000 $1,050.000 $650.000
ADJUSTING INLETS
EA 4.000 $2,000.000 $800.000 $3,465.760 $400.000 $850.000 $1,050.000 $750.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $120,000.000 $500,000.000 $987,266.640 $500,000.000 $315,000.000 $1,585,000.000 $1,000,000.000
MOBILIZATION
LS 1.000 $565,966.230 $630,000.000 $650,000.000 $660,000.000 $470,000.000 $690,000.000 $800,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $15,000.000 $18,000.000 $11,805.580 $15,500.000 $16,000.000 $40,000.000 $20,000.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 620.000 $30.000 $35.000 $29.500 $22.000 $25.000 $20.000 $40.000
CONSTRUCTION EXITS (REMOVE)
SY 620.000 $10.000 $8.000 $20.000 $8.000 $8.000 $8.000 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,371.000 $5.000 $2.500 $1.890 $4.000 $6.000 $2.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,371.000 $2.000 $0.500 $0.750 $2.600 $2.000 $1.000 $1.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 149.000 $6.000 $6.000 $2.790 $3.000 $31.000 $4.000 $7.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 149.000 $2.000 $1.000 $0.500 $1.000 $5.000 $1.000 $1.000
CONSTRUCTING DETOURS
SY 278.000 $90.000 $150.000 $88.650 $70.000 $103.000 $105.000 $65.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 4,110.000 $25.000 $12.000 $9.690 $19.000 $9.000 $9.000 $60.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 2,100.000 $15.000 $10.000 $5.270 $14.000 $5.000 $6.000 $10.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 4,110.000 $25.000 $8.000 $9.430 $16.000 $8.000 $9.000 $20.000
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 26.000 $100.000 $100.000 $96.390 $244.000 $130.000 $80.000 $105.000
PERM CTB (SSCB)(TY 3)(MOD)
LF 163.000 $175.000 $100.000 $84.160 $115.000 $150.000 $165.000 $120.000
CONC CURB (TY II)
LF 1,198.000 $10.000 $4.000 $6.170 $5.000 $11.000 $8.000 $8.000
CONC SIDEWALKS (4")
SY 159.000 $65.000 $45.000 $55.870 $51.000 $38.000 $45.000 $60.000
CURB RAMPS (TY 2)
EA 2.000 $3,000.000 $1,500.000 $1,629.790 $1,600.000 $2,097.000 $1,450.000 $1,800.000
CURB RAMPS (TY 7)
EA 6.000 $3,000.000 $1,200.000 $1,629.780 $1,600.000 $2,492.000 $1,550.000 $1,650.000
CURB RAMPS (TY 10)
EA 4.000 $2,000.000 $1,300.000 $1,629.880 $1,600.000 $3,407.000 $1,940.000 $1,750.000
CURB RAMPS (TY 20)
EA 2.000 $3,500.000 $1,800.000 $3,370.400 $1,600.000 $5,502.000 $1,200.000 $1,700.000
MTL W-BEAM GD FEN (TIM POST)
LF 150.000 $25.000 $23.000 $21.250 $24.000 $22.000 $21.250 $25.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $4,000.000 $1,700.000 $1,660.000 $2,000.000 $1,660.000 $1,660.000 $1,850.000
REMOVE METAL BEAM GUARD FENCE
LF 138.000 $10.000 $5.000 $2.460 $3.000 $3.000 $2.460 $10.000
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $500.000 $350.000 $340.000 $375.000 $340.000 $340.000 $250.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $500.000 $350.000 $530.000 $375.000 $340.000 $340.000 $1,850.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $5,000.000 $2,800.000 $2,725.000 $3,000.000 $2,725.000 $2,725.000 $2,350.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $1,000.000 $350.000 $340.000 $375.000 $340.000 $340.000 $650.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $3,000.000 $3,000.000 $3,500.000 $1,300.000 $1,500.000 $2,200.000 $2,750.000
CRASH CUSH ATTEN (STKPL)
EA 2.000 $1,500.000 $1,000.000 $1,500.000 $1,200.000 $500.000 $1,200.000 $1,500.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 2.000 $35,000.000 $25,000.000 $12,500.000 $25,000.000 $25,000.000 $22,000.000 $23,500.000
CONDT (PVC) (SCH 40) (2")
LF 380.000 $7.450 $8.500 $7.770 $13.200 $8.000 $7.770 $12.500
CONDT (PVC) (SCH 40) (3") (CONC ENCSE)
LF 2,200.000 $8.070 $8.000 $7.330 $12.000 $8.000 $7.330 $12.000
CONDT (PVC) (SCH 80) (1 1/4")
LF 300.000 $18.000 $8.000 $7.310 $10.000 $8.000 $7.310 $17.000
CONDT (PVC) (SCH 80) (2")
LF 1,280.000 $8.000 $8.000 $7.770 $14.000 $8.000 $7.770 $14.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 1,030.000 $13.000 $13.000 $12.160 $16.000 $12.000 $12.160 $50.000
CONDT (PVC) (SCH 80) (3")
LF 95.000 $20.000 $10.000 $8.630 $20.000 $9.000 $8.630 $16.000
CONDT (PVC) (SCH 80) (3") (BORE)
LF 910.000 $21.000 $14.000 $13.020 $20.000 $13.000 $13.020 $46.000
CONDT (PVC) (SCH 80) (4")
LF 105.000 $15.000 $11.000 $9.610 $34.000 $10.000 $9.610 $20.000
CONDT (PVC) (SCH 80) (4") (BORE)
LF 255.000 $19.000 $16.000 $14.000 $27.000 $14.000 $14.000 $35.000
CONDT (RM) (2")
LF 280.000 $140.000 $53.000 $51.950 $39.000 $51.000 $51.950 $21.000
CONDT (RM) (3")
LF 316.000 $36.200 $65.000 $59.450 $72.000 $60.000 $59.450 $55.000
CONDT (RM) (4")
LF 280.000 $70.000 $68.000 $64.220 $72.000 $64.000 $64.220 $115.000
ELEC CONDR (NO.14) INSULATED
LF 23,570.000 $0.670 $1.000 $0.610 $0.680 $1.000 $0.610 $1.000
ELEC CONDR (NO.8) BARE
LF 115.000 $0.980 $1.100 $0.810 $1.100 $1.000 $0.810 $1.500
ELEC CONDR (NO.8) INSULATED
LF 230.000 $1.280 $1.300 $0.930 $1.100 $1.000 $0.930 $1.500
ELEC CONDR (NO.6) BARE
LF 2,770.000 $2.000 $1.400 $1.000 $1.200 $1.000 $1.000 $1.500
ELEC CONDR (NO.4) BARE
LF 580.000 $2.000 $1.800 $1.310 $1.700 $1.500 $1.310 $2.000
ELEC CONDR (NO.4) INSULATED
LF 1,635.000 $2.000 $1.900 $1.390 $1.800 $1.500 $1.390 $2.000
TRAY CABLE (4 CONDR) (12 AWG)
LF 1,920.000 $2.000 $2.300 $1.650 $2.200 $1.750 $1.650 $2.000
GROUND BOX TY A (122311)W/APRON
EA 7.000 $947.000 $1,300.000 $910.420 $660.000 $910.000 $910.420 $950.000
GROUND BOX TY D (162922)
EA 4.000 $938.000 $1,100.000 $773.350 $607.000 $774.000 $773.350 $650.000
GROUND BOX TY D (162922)W/APRON
EA 15.000 $1,087.000 $1,600.000 $1,149.400 $700.000 $1,150.000 $1,149.400 $950.000
REMOVE GROUND BOX
EA 12.000 $270.000 $240.000 $175.450 $270.000 $180.000 $175.450 $250.000
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
EA 1.000 $4,284.000 $7,500.000 $4,142.440 $4,000.000 $4,143.000 $4,142.440 $4,650.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $500.000 $600.000 $525.250 $560.000 $530.000 $530.000 $450.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000 $600.000 $900.000 $717.880 $995.000 $898.000 $898.000 $505.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 2.000 $2,000.000 $2,500.000 $2,231.180 $3,100.000 $2,835.000 $2,835.000 $2,350.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 4.000 $600.000 $500.000 $401.470 $500.000 $455.000 $455.000 $550.000
REMOVE SM RD SN SUP&AM
EA 2.000 $100.000 $120.000 $65.560 $100.000 $85.000 $85.000 $200.000
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 9,984.000 $1.000 $1.100 $1.000 $1.100 $1.000 $1.000 $1.050
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 15,662.000 $1.000 $1.100 $1.000 $1.100 $1.000 $1.000 $1.100
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 330.000 $1.000 $1.100 $1.000 $1.100 $1.000 $1.000 $1.500
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 59.000 $10.000 $5.300 $5.000 $5.600 $5.000 $5.000 $19.000
WK ZN PAV MRK REMOV (W)(ARROW)
EA 2.000 $200.000 $210.000 $200.000 $225.000 $200.000 $200.000 $240.000
WK ZN PAV MRK REMOV (W)(WORD)
EA 2.000 $250.000 $210.000 $200.000 $225.000 $200.000 $200.000 $350.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 21,337.000 $1.000 $1.100 $1.000 $1.100 $1.000 $1.000 $1.150
REFL PAV MRK TY II (Y) 12" (SLD)
LF 84.000 $1.500 $5.100 $5.000 $5.600 $5.000 $5.000 $25.000
REFL PAV MRK TY II (Y) (ISLAND)
SF 550.000 $1.000 $2.100 $2.000 $2.250 $2.000 $2.000 $6.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 18.000 $400.000 $310.000 $300.000 $335.000 $300.000 $300.000 $250.000
PREFAB PAV MRK TY C (W) (DBL ARROW)
EA 4.000 $475.000 $410.000 $400.000 $445.000 $400.000 $400.000 $420.000
PREFAB PAV MRK TY C (W) (WORD)
EA 18.000 $300.000 $310.000 $300.000 $334.000 $300.000 $300.000 $350.000
PREFAB PAV MRK TY C (W)(BIKE ARROW)
EA 2.000 $300.000 $310.000 $300.000 $334.000 $300.000 $300.000 $200.000
PREFAB PAV MRK TY C (W)(BIKE SYMBOL)
EA 2.000 $400.000 $310.000 $300.000 $334.000 $300.000 $300.000 $275.000
REFL PAV MRKR TY II-C-R
EA 695.000 $10.000 $4.300 $4.000 $4.500 $4.000 $4.000 $6.000
ELIM EXT PAV MRK & MRKS (4")
LF 1,919.000 $1.000 $0.500 $0.450 $0.500 $0.500 $0.450 $1.000
ELIM EXT PAV MRK & MRKS (6")
LF 27,656.000 $0.500 $0.550 $0.500 $0.550 $0.500 $0.500 $1.000
ELIM EXT PAV MRK & MRKS (8")
LF 3,395.000 $0.750 $1.100 $1.000 $1.100 $1.000 $1.000 $1.250
ELIM EXT PAV MRK & MRKS (12")
LF 2,526.000 $1.000 $2.100 $2.000 $2.250 $2.000 $2.000 $2.200
ELIM EXT PAV MRK & MRKS (24")
LF 169.000 $2.000 $3.100 $3.000 $3.350 $3.000 $3.000 $4.500
ELIM EXT PAV MRK & MRKS (ARROW)
EA 10.000 $50.000 $80.000 $75.000 $84.000 $75.000 $75.000 $70.000
ELIM EXT PAV MRK & MRKS (DBL ARROW)
EA 4.000 $100.000 $80.000 $75.000 $84.000 $75.000 $75.000 $100.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 10.000 $50.000 $80.000 $75.000 $84.000 $75.000 $75.000 $85.000
PAV SURF PREP FOR MRK (ISLAND)
SF 550.000 $1.000 $1.100 $1.000 $1.100 $1.000 $1.000 $3.500
PAV SURF PREP FOR MRK (BIKE ARROW)
EA 2.000 $5.000 $11.000 $10.000 $11.000 $10.000 $10.000 $100.000
PAV SURF PREP FOR MRK (BIKE SYMBOL)
EA 2.000 $5.000 $11.000 $10.000 $11.000 $10.000 $10.000 $100.000
PAV SURF PREP FOR MRK (BLAST CLN)(4")
LF 1,789.000 $0.500 $0.120 $0.100 $0.120 $0.250 $0.100 $1.000
PAV SURF PREP FOR MRK (BLAST CLN)(6")
LF 28,662.000 $0.500 $0.220 $0.200 $0.220 $0.250 $0.200 $0.500
PAV SURF PREP FOR MRK (BLAST CLN)(8")
LF 4,123.000 $0.750 $0.270 $0.250 $0.300 $0.250 $0.250 $0.250
PAV SURF PREP FOR MRK (BLAST CLN)(12")
LF 2,614.000 $1.000 $0.520 $0.500 $0.550 $0.500 $0.500 $0.650
PAV SURF PREP FOR MRK (BLAST CLN)(24")
LF 169.000 $2.000 $1.100 $1.000 $1.100 $1.000 $1.000 $1.000
PV SURF PREP FOR MRK (BLST CLN)(ARRWS)
EA 18.000 $30.000 $21.000 $20.000 $23.000 $20.000 $20.000 $55.000
PV SURF PREP MRKS (BLST CLN)(DBL ARW)
EA 4.000 $40.000 $21.000 $20.000 $23.000 $20.000 $20.000 $85.000
PV SURF PRP FOR MRK (BLST CLN)(WORDS)
EA 18.000 $35.000 $21.000 $20.000 $23.000 $20.000 $20.000 $55.000
INSTALL HWY TRF SIG (SYSTEM)
EA 1.000 $31,846.000 $35,000.000 $30,231.610 $54,000.000 $30,200.000 $30,231.610 $35,000.000
REMOVING TRAFFIC SIGNALS
EA 1.000 $2,983.000 $10,000.000 $4,386.250 $4,600.000 $4,400.000 $4,386.250 $4,950.000
TEMP TRAF SIGNALS
EA 2.000 $55,500.000 $60,000.000 $53,873.360 $53,000.000 $54,000.000 $53,873.360 $49,500.000
VEH SIG SEC (12")LED(GRN)
EA 14.000 $200.000 $170.000 $167.140 $260.000 $170.000 $167.140 $250.000
VEH SIG SEC (12")LED(GRN ARW)
EA 8.000 $208.000 $170.000 $167.140 $260.000 $170.000 $167.140 $230.000
VEH SIG SEC (12")LED(YEL)
EA 14.000 $2,001.000 $170.000 $167.140 $260.000 $170.000 $167.140 $235.000
VEH SIG SEC (12")LED(YEL ARW)
EA 6.000 $214.000 $170.000 $167.140 $260.000 $170.000 $167.140 $235.000
VEH SIG SEC (12")LED(RED)
EA 14.000 $202.000 $170.000 $167.140 $260.000 $170.000 $167.140 $235.000
VEH SIG SEC (12")LED(RED ARW)
EA 6.000 $300.000 $170.000 $167.140 $280.000 $170.000 $167.140 $235.000
PED SIG SEC (LED)(2 INDICATIONS)
EA 16.000 $250.000 $255.000 $251.080 $320.000 $250.000 $251.080 $220.000
PED SIG SEC (LED)(COUNTDOWN)
EA 16.000 $500.000 $255.000 $251.080 $255.000 $250.000 $251.080 $300.000
BACK PLATE (12")(3 SEC)
EA 18.000 $80.000 $95.000 $90.910 $146.000 $91.000 $90.910 $150.000
BACK PLATE (12")(4 SEC)
EA 2.000 $100.000 $120.000 $117.530 $175.000 $118.000 $117.530 $150.000
TRF SIG CBL (TY A)(14 AWG)(3 CONDR)
LF 6,475.000 $2.000 $1.300 $1.270 $1.300 $1.250 $1.270 $1.250
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 6,475.000 $2.000 $1.500 $1.420 $1.600 $1.500 $1.420 $1.650
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 9,520.000 $2.000 $1.700 $1.660 $2.100 $1.750 $1.660 $1.750
TRF SIG CBL (TY C)(14 AWG)(2 CONDR)
LF 7,225.000 $1.500 $1.300 $1.220 $1.350 $1.250 $1.220 $1.250
INS TRF SIG PL AM(S)1 ARM(44')
EA 1.000 $8,500.000 $12,000.000 $10,396.930 $14,600.000 $10,400.000 $10,396.930 $12,500.000
INS TRF SIG PL AM(S)1 ARM(50')
EA 1.000 $20,000.000 $15,000.000 $14,532.100 $19,000.000 $14,550.000 $14,532.100 $16,750.000
INS TRF SIG PL AM(S)1 ARM(55')LUM
EA 1.000 $23,000.000 $18,000.000 $16,894.630 $22,000.000 $16,900.000 $16,894.630 $19,000.000
INS TRF SIG PL AM(S)1 ARM(60')LUM
EA 1.000 $25,000.000 $19,000.000 $17,336.280 $22,000.000 $17,350.000 $17,336.280 $19,200.000
INS TRF SIG PL AM(S)1 ARM(65')LUM
EA 2.000 $22,000.000 $20,000.000 $17,823.300 $23,000.000 $17,850.000 $17,823.300 $20,000.000
PED POLE ASSEMBLY
EA 12.000 $1,994.000 $2,100.000 $2,015.130 $2,000.000 $2,015.000 $2,015.130 $2,950.000
PED DETECT PUSH BUTTON (APS)
EA 16.000 $714.000 $600.000 $520.910 $900.000 $520.000 $520.910 $650.000
PED DETECTOR CONTROLLER UNIT
EA 2.000 $3,404.000 $3,000.000 $2,996.260 $4,400.000 $3,000.000 $2,996.260 $2,950.000
VEH LP DETECT (SAWCUT)
LF 1,290.000 $12.000 $10.000 $9.190 $12.000 $9.000 $9.180 $25.000
ORNAMENTAL STEEL FENCE
LF 460.000 $130.000 $210.000 $515.680 $504.000 $520.000 $175.000 $230.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 738.000 $50.000 $60.000 $73.410 $75.000 $170.000 $50.000 $100.000
FIBER OPTIC CBL (SNGLE-MODE)(6 FIBER)
LF 4,210.000 $2.050 $2.500 $2.150 $2.000 $2.000 $2.150 $5.000
FIBER OPTIC CBL (SNGLE-MODE)(144 FIBER)
LF 11,785.000 $3.780 $4.000 $3.540 $4.000 $4.000 $3.540 $6.000
FIBER OPTIC PATCH PANEL (144 POSITION)
EA 2.000 $3,150.000 $2,600.000 $2,571.250 $4,400.000 $2,572.000 $2,571.250 $5,000.000
FIBER OPTIC FUSION SPLICE
EA 84.000 $35.000 $25.000 $22.670 $51.000 $23.000 $22.670 $70.000
ITS MULTI-DUCT CND (PVC-40)(CONC ENCSE)
LF 575.000 $11.950 $13.000 $11.970 $15.000 $12.000 $11.950 $30.000
ITS MULTI-DUCT CND (PVC-80)(BORE)
LF 370.000 $33.690 $48.000 $46.730 $55.000 $47.000 $46.730 $75.000
ITS MULTI-DUCT CND (RMC)
LF 316.000 $64.010 $120.000 $116.710 $80.000 $116.000 $116.710 $105.000
CONDUIT (PREPARE)
LF 1,500.000 $0.530 $2.500 $2.060 $1.000 $2.000 $2.060 $12.000
CTMS RELOCATION (HUB BLDG)
EA 1.000 $11,503.140 $15,000.000 $12,342.000 $18,000.000 $12,342.000 $12,342.000 $8,100.000
FIBER OPTIC VIDEO DATA TRANSMITTER
EA 3.000 $1,502.600 $1,800.000 $1,709.130 $1,800.000 $1,709.000 $1,709.130 $1,550.000
FIBER OPTIC VIDEO DATA RECEIVER
EA 2.000 $1,475.500 $1,800.000 $1,709.130 $1,800.000 $1,709.000 $1,709.130 $1,550.000
MULTIPOLYMER PAV MRK (W)(4")(SLD)
LF 1,309.000 $0.500 $0.620 $0.600 $0.700 $1.000 $0.600 $1.000
MULTIPOLYMER PAV MRK (W)(4")(BRK)
LF 480.000 $0.500 $0.620 $0.600 $0.700 $1.000 $0.600 $1.000
MULTIPOLYMER PAV MRK (W)(6")(SLD)
LF 9,401.000 $0.750 $0.620 $0.600 $0.700 $1.000 $0.600 $1.000
MULTIPOLYMER PAV MRK (W)(6")(BRK)
LF 5,910.000 $0.750 $0.620 $0.600 $0.700 $1.000 $0.600 $1.000
MULTIPOLYMER PAV MRK (W)(6")(DOT)
LF 186.000 $2.000 $0.620 $0.600 $0.700 $1.000 $0.600 $1.000
MULTIPOLYMER PAV MRK (W)(8")(SLD)
LF 4,123.000 $1.100 $0.620 $0.600 $0.700 $1.000 $0.600 $1.000
MULTIPOLYMER PAV MRK (W)(12")(SLD)
LF 2,272.000 $2.000 $4.100 $4.000 $4.500 $4.000 $4.000 $2.000
MULTIPOLYMER PAV MRK (W)(12")(LNDP)
LF 342.000 $4.000 $0.850 $0.800 $1.000 $1.000 $0.800 $2.000
MULTIPOLYMER PAV MRK (W)(24")(SLD)
LF 169.000 $8.000 $6.500 $6.000 $6.650 $6.000 $6.000 $4.000
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
LF 7,665.000 $0.700 $0.620 $0.600 $0.700 $1.000 $0.600 $1.000
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
LF 5,500.000 $0.800 $0.620 $0.600 $0.700 $1.000 $0.600 $1.000
BBU SYSTEM (EXTERNAL BATT CABINET)
EA 1.000 $6,590.000 $6,200.000 $6,095.380 $11,000.000 $6,096.000 $6,095.380 $6,750.000
GPS COMMUNICATIONS UNIT
EA 1.000 $933.000 $1,300.000 $1,193.360 $1,250.000 $1,194.000 $1,193.360 $900.000
TMA (STATIONARY)
DAY 274.000 $250.000 $130.000 $541.730 $300.000 $450.000 $50.000 $200.000
TMA (MOBILE OPERATION)
HR 144.000 $75.000 $55.000 $84.150 $50.000 $75.000 $50.000 $90.000
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
EA 9.000 $2,832.000 $3,000.000 $2,889.720 $3,300.000 $2,890.000 $2,889.720 $3,000.000
VIVDS PROSR SYS
EA 1.000 $13,300.000 $7,500.000 $7,021.030 $7,300.000 $7,021.000 $7,021.030 $9,000.000
VIVDS TEMPORARY
EA 2.000 $11,000.000 $13,000.000 $12,441.830 $19,000.000 $12,442.000 $12,441.830 $11,850.000
Totals: $6,491,828.530 $6,382,061.190 $6,570,000.003 $6,588,246.120 $6,684,419.250 $6,985,490.650 $8,490,041.500