Show Job Controls
Bid Cobra

FORT BEND SH 36 (0188-02-036)

Items: 256

County: FORT BEND
Length: N/A
Highway: SH 36
District: HOUSTON
Control Number: 0188-02-036
DBE Goal: N/A
Project: STP 2020(056)MM
Guaranty: N/A
Time: 553 WORKING DAYS
Engineer's Estimate: $49,337,047.81
Date: 09/06/2019 (6 years ago)
Contract Number: N/A
Type: WIDEN NON FREEWAY FROM TWO TO FOUR LANES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$49,337,047.81
$42,315,988.83
Over/Under Est: -14.23% -$7,021,058.98
Over/Under Est: -8.41% -$4,150,941.41
Amt Left: 6.78% $2,870,117.57
Over/Under Est: -7.43% -$3,666,404.86
Amt Left: 7.93% $3,354,654.12
Delta: -1.07% -$484,536.55
$49,157,044.39
Over/Under Est: -0.36% -$180,003.42
Amt Left: 16.17% $6,841,055.56
Delta: -7.63% -$3,486,401.44
Over/Under Est: 4.76% $2,350,828.04
Amt Left: 22.15% $9,371,887.02
Delta: -5.15% -$2,530,831.46
Subcontractor Percentage Amount
MCNEIL BROTHERS, INC. 6.84% $3,999,999.02
GMJ PAVING CO. 5.82% $3,403,507.93
ALLSTATE SIGNAL & CONSTRUCTION, LLC 5.48% $3,204,677.57
QUALITY TURF FARMS, L.C. 1.51% $883,040.72
TANDEM LAMARR TRUCKING & EXCAVATING, INC. 1.47% $859,648.91
WEBER-BALKE FOUNDATION COMPANY, INC 1.38% $807,017.35
KAY SAVAGE TRUCKING, INC. 1.29% $754,385.78
A BROTHERS MILLING, LLC 0.94% $549,707.47
WILLOW CITY SIGN & RAIL, INC. 0.79% $461,988.19
A&J REBAR LLC 0.64% $374,268.91
PMI PAVEMENT MARKING, LLC 0.62% $362,573.01
BATTERSON, LLP 0.56% $327,485.30
DOUBLE OAK EROSION, INC. 0.40% $233,918.07
HIGHWAY PAVEMENT SPECIALTIES, INC. 0.22% $128,654.94
CHIRON COMMUNICATION SERVICES, LLC 0.19% $111,111.08
SK CONCRETE SERVICES LLC 0.15% $87,719.28
ANTIGO CONSTRUCTION, INC. 0.15% $87,719.28
SURFACE PREPARATION TECHNOLOGIES, LLC 0.10% $58,479.52
BELLA PAVING, INC. 0.10% $58,479.52
SK CONCRETE SERVICES LLC 0.06% $35,087.71
DORAN STEEL, INC. 0.04% $23,391.81
BUYERS BARRICADES HOUSTON, LLC 0.03% $17,543.86
BUYERS BARRICADES, INC. 0.03% $17,543.86
HI-TECH CONCREE PUMPING SERVICES 0.03% $17,543.86
A-CORE CONCRETE CUTTING OF TEXAS, INC. 0.03% $17,543.86
A&J REBAR LLC 0.02% $11,695.90
YELLOWSTONE LANDSCAPE - CENTRAL, INC. 0.01% $5,847.95
Total: 28.90% $16,900,580.66

Bid Items & Bid Tabulations

256 Total 0 of 256
FORT BEND  |  SH 36  |  HOUSTON  |  0188-02-036  |  09/06/2019  |  $49,337,047.81  |  STP 2020(056)MM  |  WIDEN NON FREEWAY FROM TWO TO FOUR L...  |  553 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
PULICE CONSTRUCTION, INC.
ZACHRY CONSTRUCTION CORPORATION
JAMES CONSTRUCTION GROUP, L.L.C.
WEBBER, LLC
BALFOUR BEATTY INFRASTRUCTURE, INC.
PREPARING ROW
STA 337.430 $8,000.000 $7,000.000 $11,854.310 $4,576.000 $11,000.000 $7,500.000
REMOVING CONC (PAV)
SY 103,772.000 $5.000 $2.000 $4.750 $2.400 $4.350 $4.000
REMOVING CONC (RIPRAP)
SY 200.000 $10.000 $2.000 $8.170 $10.000 $20.000 $10.000
REMOVING CONCRETE(MOW STRIP)
LF 4,771.000 $6.000 $1.000 $3.260 $2.500 $20.000 $2.700
REMOVING STAB BASE AND ASPH PAV(0"-16")
SY 180,604.000 $3.000 $1.000 $3.570 $3.900 $1.600 $5.240
EXCAVATION (ROADWAY)
CY 230,534.000 $5.000 $2.750 $4.000 $6.400 $3.750 $4.500
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 129,422.000 $6.000 $3.000 $8.000 $9.380 $3.750 $14.000
COMPOST MANUF TOPSOIL (4")
SY 337,063.000 $1.000 $0.750 $1.260 $0.590 $0.590 $0.630
BLOCK SODDING
SY 41,519.000 $4.000 $3.500 $3.490 $3.490 $3.490 $3.700
STRAW OR HAY MULCH
SY 715,645.000 $0.200 $0.160 $0.140 $0.140 $0.140 $0.150
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 337,063.000 $0.200 $0.150 $0.160 $0.160 $0.160 $0.170
DRILL SEED (TEMP)(WARM OR COOL)
SY 378,582.000 $0.100 $0.130 $0.130 $0.130 $0.130 $0.140
VEGETATIVE WATERING
MG 18,772.300 $16.800 $13.760 $18.000 $11.880 $5.000 $15.000
LIME TRT (EXST MATL) (6")
SY 319,881.000 $1.900 $1.300 $1.840 $1.550 $2.400 $2.500
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 4,320.000 $140.000 $170.000 $177.000 $178.990 $171.000 $203.550
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
SY 319,881.000 $11.000 $6.500 $7.520 $9.000 $8.800 $10.000
ASPHALT STAB BASE (GR 2)(PG 64)
TON 1,097.000 $110.000 $60.000 $80.630 $80.000 $81.620 $91.560
ASPHALT STAB BASE (GR 4)(PG 64)
TON 17,598.000 $85.000 $65.000 $85.860 $74.140 $86.920 $75.460
SALV, HAUL & STKPL RCL APH PV (3")
SY 180,604.000 $1.000 $0.500 $1.830 $1.420 $1.000 $1.430
D-GR HMA(SQ) TY-C SAC-A PG76-22
TON 68.000 $100.000 $169.880 $261.780 $200.000 $500.000 $212.360
PLANE ASPH CONC PAV (3")
SY 193.000 $2.500 $0.500 $5.680 $32.400 $1.000 $1.630
CONC PVMT (CONT REINF - CRCP) (10")
SY 300,592.000 $50.000 $48.190 $40.000 $47.870 $51.750 $49.000
CONC PVMT (CONT REINF)(FAST TRK)(13")
SY 9,969.000 $95.000 $84.000 $120.000 $89.000 $84.000 $100.000
CEM STABIL BKFL
CY 2,986.000 $80.000 $45.000 $34.430 $41.650 $40.000 $45.000
CUT & RESTORING PAV
SY 495.000 $110.000 $130.000 $138.440 $100.640 $200.000 $125.000
CEMENT STAB BACKFILL (INLET OR MH)
CY 70.000 $40.000 $45.000 $37.480 $36.250 $40.000 $45.000
FLOWABLE BACKFILL
CY 89.000 $150.000 $120.000 $115.490 $300.000 $200.000 $180.000
TRENCH EXCAVATION PROTECTION
LF 283.000 $1.500 $1.000 $12.940 $11.100 $5.000 $15.000
TEMPORARY SPL SHORING
SF 738.000 $13.000 $42.290 $21.380 $41.770 $50.000 $25.870
DRILL SHAFT (24 IN)
LF 3,520.000 $120.000 $128.870 $131.600 $101.810 $124.000 $108.930
DRILL SHAFT (30 IN)
LF 2,140.000 $160.000 $202.160 $130.170 $136.160 $190.000 $153.180
DRILL SHAFT (42 IN)
LF 96.000 $205.000 $316.000 $248.570 $316.000 $316.000 $334.780
DRILL SHAFT (48 IN)
LF 42.000 $265.000 $336.000 $263.590 $336.710 $336.710 $356.720
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 32.000 $290.000 $215.000 $260.000 $215.000 $215.000 $227.780
DRILL SHAFT (TRF SIG POLE) (42 IN)
LF 36.000 $420.000 $294.000 $377.000 $294.000 $294.000 $311.480
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 88.000 $445.000 $336.710 $398.000 $336.710 $336.710 $356.720
CL C CONC (ABUT)
CY 247.600 $850.000 $600.000 $662.860 $788.240 $1,000.000 $800.000
REINF CONC SLAB (BOX BEAM)
SF 12,395.000 $12.000 $10.000 $18.720 $10.290 $18.000 $14.000
REINF CONC SLAB (SLAB BEAM)
SF 7,493.000 $15.000 $13.000 $19.620 $13.540 $18.000 $15.000
SHEAR KEY
CY 129.100 $375.000 $110.000 $332.370 $200.520 $250.000 $185.000
PRESTR CONC BOX BEAM (4B28)
LF 612.000 $250.000 $200.000 $116.960 $156.180 $160.000 $175.000
PRESTR CONC BOX BEAM (5B28)
LF 1,937.320 $280.000 $200.000 $120.240 $155.840 $160.000 $175.000
PRESTR CONC SLAB BEAM (4SB15)
LF 516.000 $180.000 $200.000 $135.460 $159.670 $160.000 $150.000
PRESTR CONC SLAB BEAM (5SB15)
LF 1,032.000 $200.000 $200.000 $139.290 $170.830 $160.000 $150.000
RIPRAP (CONC)(5 IN)
CY 9.000 $400.000 $350.000 $342.610 $451.800 $1,000.000 $500.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 311.000 $410.000 $450.000 $500.000 $320.080 $500.000 $500.000
RIPRAP (STONE TY R)(DRY)(12 IN)
CY 15.000 $200.000 $200.000 $250.000 $182.560 $750.000 $250.000
RIPRAP (MOW STRIP)(4 IN)
CY 243.000 $420.000 $450.000 $431.910 $483.950 $500.000 $600.000
RAIL (TY T223)
LF 791.200 $100.000 $80.000 $78.710 $47.970 $45.000 $110.000
CONC BOX CULV (3 FT X 2 FT)
LF 216.000 $275.000 $200.000 $251.930 $260.000 $245.000 $245.000
CONC BOX CULV (4 FT X 2 FT)
LF 268.000 $300.000 $210.000 $236.460 $260.000 $231.000 $270.000
CONC BOX CULV (5 FT X 3 FT)
LF 657.000 $290.000 $300.000 $350.590 $340.000 $329.000 $385.000
CONC BOX CULV (6 FT X 3 FT)
LF 507.000 $300.000 $440.000 $415.980 $440.000 $400.000 $465.000
RC PIPE (CL III)(12 IN)
LF 40.000 $75.000 $90.000 $173.120 $70.000 $96.000 $75.000
RC PIPE (CL III)(18 IN)
LF 1,469.000 $65.000 $65.000 $64.850 $72.000 $65.000 $77.000
RC PIPE (CL III)(24 IN)
LF 3,864.000 $105.000 $70.000 $64.770 $72.000 $65.000 $80.000
RC PIPE (CL III)(27 IN)
LF 798.000 $120.000 $105.000 $100.850 $88.000 $75.000 $91.000
RC PIPE (CL III)(30 IN)
LF 2,887.000 $75.000 $85.000 $86.390 $89.000 $81.000 $100.000
RC PIPE (CL III)(36 IN)
LF 2,970.000 $100.000 $100.000 $118.110 $120.000 $110.000 $135.000
RC PIPE (ARCH)(CL III)(DES 3)
LF 61.000 $150.000 $300.000 $151.700 $185.000 $175.000 $185.000
INLET (COMPL)(TY A)
EA 26.000 $2,600.000 $3,500.000 $2,722.860 $2,694.600 $3,300.000 $2,600.000
MANH (COMPL)(TY A)
EA 9.000 $4,700.000 $4,500.000 $3,237.860 $3,233.630 $3,800.000 $3,200.000
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(P)
EA 20.000 $5,000.000 $7,000.000 $4,856.060 $5,882.490 $6,200.000 $4,200.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1) (P)
EA 2.000 $5,500.000 $8,500.000 $5,687.740 $6,782.680 $7,300.000 $5,600.000
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
EA 10.000 $5,500.000 $9,100.000 $5,528.650 $6,531.460 $7,000.000 $4,400.000
SET (TY I)(S= 5 FT)(HW= 4 FT)(6:1) (P)
EA 4.000 $8,000.000 $12,000.000 $7,937.740 $9,352.360 $10,100.000 $7,500.000
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C)
EA 6.000 $7,500.000 $10,500.000 $6,780.290 $8,007.330 $8,400.000 $4,100.000
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 4.000 $850.000 $1,200.000 $533.360 $906.640 $1,100.000 $900.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 22.000 $900.000 $1,200.000 $578.360 $953.560 $1,200.000 $950.000
SET (TY II) (18 IN) (RCP) (6: 1) (C)
EA 3.000 $1,700.000 $1,200.000 $613.360 $990.160 $1,200.000 $1,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 1.000 $1,200.000 $1,300.000 $613.360 $991.030 $1,700.000 $1,100.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 1.000 $1,200.000 $1,500.000 $598.360 $975.330 $1,200.000 $1,100.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 28.000 $1,300.000 $1,500.000 $738.360 $1,121.030 $1,400.000 $1,200.000
SET (TY II) (24 IN) (RCP) (4: 1) (P)
EA 2.000 $1,500.000 $1,500.000 $738.360 $1,120.580 $1,400.000 $1,200.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 9.000 $1,600.000 $1,500.000 $808.360 $1,194.270 $1,500.000 $1,300.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 149.000 $1,200.000 $1,500.000 $1,159.530 $1,194.260 $1,500.000 $1,300.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 156.000 $2,000.000 $2,500.000 $1,993.150 $2,042.110 $2,500.000 $2,500.000
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 10.000 $2,600.000 $3,500.000 $2,346.300 $2,622.160 $2,900.000 $3,000.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 168.000 $3,000.000 $4,000.000 $2,991.930 $3,386.270 $3,800.000 $4,000.000
SET (TY II) (DES 3) (RCP) (6: 1) (P)
EA 8.000 $2,700.000 $2,200.000 $873.360 $1,262.200 $1,500.000 $1,500.000
REMOV STR (BOX CULVERT)
EA 24.000 $4,150.000 $55.000 $3,104.460 $1,523.570 $1,000.000 $1,400.000
REMOV STR (INLET)
EA 27.000 $550.000 $300.000 $694.340 $342.910 $500.000 $550.000
REMOV STR (SET)
EA 90.000 $400.000 $225.000 $615.630 $308.020 $500.000 $300.000
REMOV STR (HEADWALL)
EA 26.000 $1,500.000 $80.000 $911.780 $1,975.370 $750.000 $975.000
REMOV STR (PIPE)
LF 6,407.000 $20.000 $11.000 $9.750 $18.920 $15.000 $14.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 2.000 $40,000.000 $10,000.000 $24,840.140 $24,723.000 $50,000.000 $7,000.000
MOBILIZATION
LS 1.000 $4,746,000.000 $4,231,598.880 $4,100,000.000 $4,550,000.000 $4,800,000.000 $5,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 27.000 $10,000.000 $1,695.000 $11,850.480 $5,683.630 $25,000.000 $11,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 4,490.000 $30.000 $32.260 $30.290 $30.290 $30.290 $34.000
ROCK FILTER DAMS (REMOVE)
LF 4,490.000 $9.000 $7.090 $6.400 $6.440 $6.440 $5.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 546.000 $30.000 $32.440 $27.510 $30.230 $30.230 $34.000
CONSTRUCTION EXITS (REMOVE)
SY 546.000 $10.000 $7.310 $9.040 $9.460 $9.460 $5.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 7,333.000 $2.500 $4.610 $2.940 $2.940 $2.940 $3.110
TEMP SEDMT CONT FENCE (REMOVE)
LF 7,333.000 $1.000 $0.540 $0.410 $0.410 $0.410 $0.250
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 140.000 $4.000 $4.390 $8.910 $8.910 $8.910 $9.440
BIODEG EROSN CONT LOGS (REMOVE)
LF 140.000 $1.500 $1.190 $2.910 $2.910 $2.910 $0.250
CONSTRUCTING DETOURS (TY 1)
SY 29,419.000 $70.000 $58.000 $66.950 $84.000 $84.000 $91.180
CONSTRUCTING DETOURS (TY 2)
SY 5,072.000 $60.000 $50.000 $91.820 $48.000 $63.000 $142.760
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 1,140.000 $35.000 $65.000 $35.240 $88.150 $85.000 $85.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 1,500.000 $4.000 $8.000 $3.990 $6.760 $3.000 $8.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 1,140.000 $8.000 $12.000 $7.390 $10.130 $8.000 $7.000
CONC CURB (TY III)
LF 37.000 $20.000 $20.000 $15.490 $11.620 $100.000 $23.970
DRIVEWAYS (CONC)
SY 12,273.000 $60.000 $45.000 $57.730 $45.150 $47.000 $80.000
DRIVEWAYS (BASE)
SY 2,110.000 $18.500 $20.000 $17.470 $30.330 $13.000 $30.000
CONC SIDEWALKS (4")
SY 71.000 $50.000 $55.000 $64.770 $65.390 $50.000 $80.000
MTL W-BEAM GD FEN (TIM POST)
LF 2,675.000 $25.000 $18.500 $22.250 $18.500 $18.500 $19.600
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 20.000 $1,800.000 $1,720.000 $1,575.000 $1,720.000 $1,720.000 $1,822.240
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 12.000 $1,200.000 $1,200.000 $1,300.000 $1,200.000 $1,200.000 $1,271.330
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 75.000 $25.000 $18.800 $25.000 $18.800 $18.800 $19.920
REMOVE METAL BEAM GUARD FENCE
LF 3,465.000 $4.000 $3.000 $4.000 $3.000 $3.000 $3.180
GUARDRAIL END TREATMENT (INSTALL)
EA 18.000 $2,600.000 $2,645.000 $2,525.000 $2,645.000 $2,645.000 $2,802.220
GUARDRAIL END TREATMENT (REMOVE)
EA 32.000 $250.000 $200.000 $250.000 $200.000 $200.000 $211.890
CRASH CUSH ATTEN (MOVE & RESET)
EA 11.000 $2,500.000 $3,450.000 $3,450.000 $3,450.000 $3,450.000 $1,422.890
CRASH CUSH ATTEN (REMOVE)
EA 8.000 $1,300.000 $750.000 $750.000 $750.000 $750.000 $700.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 8.000 $20,000.000 $24,465.000 $24,465.000 $24,465.000 $24,465.000 $26,000.000
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 7.000 $500.000 $411.250 $411.250 $367.000 $50.000 $400.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 70.000 $180.000 $175.320 $295.000 $210.000 $125.000 $160.000
MAILBOX INSTALL-D (WC-POST) TY 3
EA 10.000 $230.000 $231.750 $234.120 $230.000 $125.000 $240.000
CONDT (PVC) (SCH 40) (2") (CONC ENCSE)
LF 795.000 $11.500 $11.060 $11.060 $11.060 $11.060 $11.720
CONDT (PVC) (SCH 40) (3") (CONC ENCSE)
LF 46,620.000 $8.500 $6.710 $6.710 $6.710 $6.710 $7.110
CONDT (PVC) (SCH 80) (1")
LF 820.000 $10.500 $6.610 $6.610 $6.610 $6.610 $7.000
CONDT (PVC) (SCH 80) (2")
LF 3,460.000 $8.500 $7.100 $7.100 $7.100 $7.100 $7.520
CONDT (PVC) (SCH 80) (2") (BORE)
LF 2,095.000 $15.500 $11.720 $11.720 $11.720 $11.720 $12.420
CONDT (PVC) (SCH 80) (3") (BORE)
LF 24,410.000 $15.000 $15.970 $15.970 $15.970 $15.970 $16.920
CONDT (PVC) (SCH 80) (4")
LF 415.000 $18.500 $12.980 $12.980 $12.980 $12.980 $13.750
CONDT (PVC) (SCH 80) (4") (BORE)
LF 955.000 $25.000 $17.780 $17.780 $17.780 $17.780 $18.840
ELEC CONDR (NO.14) INSULATED
LF 35,515.000 $0.800 $0.680 $0.680 $0.680 $0.680 $0.720
ELEC CONDR (NO.8) BARE
LF 845.000 $1.100 $0.850 $0.850 $0.850 $0.850 $0.900
ELEC CONDR (NO.8) INSULATED
LF 3,710.000 $1.100 $0.900 $0.900 $0.900 $0.900 $0.950
ELEC CONDR (NO.6) BARE
LF 5,815.000 $1.500 $1.080 $1.080 $1.080 $1.080 $1.140
ELEC CONDR (NO.4) BARE
LF 60.000 $2.000 $1.950 $1.950 $1.950 $1.950 $2.070
ELEC CONDR (NO.4) INSULATED
LF 105.000 $2.000 $2.450 $2.450 $2.450 $2.450 $2.600
ELEC CONDR (NO.2) BARE
LF 310.000 $2.600 $2.700 $2.700 $2.700 $2.700 $2.860
ELEC CONDR (NO.2) INSULATED
LF 930.000 $2.800 $2.950 $2.950 $2.950 $2.950 $3.130
TRAY CABLE (4 CONDR) (12 AWG)
LF 1,880.000 $2.000 $1.980 $1.980 $1.980 $1.980 $2.100
GROUND BOX TY A (122311)W/APRON
EA 7.000 $1,000.000 $678.000 $678.000 $678.000 $678.000 $718.300
GROUND BOX TY D (162922)W/APRON
EA 34.000 $960.000 $711.000 $711.000 $711.000 $711.000 $753.260
GROUND BOX TY 1 (362422)W/APRON
EA 66.000 $1,800.000 $2,706.000 $2,706.000 $2,706.000 $2,706.000 $2,866.840
GROUND BOX TY 2 (366048)W/APRON
EA 9.000 $1,800.000 $4,465.000 $4,465.000 $4,465.000 $4,465.000 $4,730.400
ELC SRV TY D 120/240 070(NS)SS(E)SP(O)
EA 3.000 $4,950.000 $5,250.000 $5,250.000 $5,250.000 $5,250.000 $5,562.060
ELC SRV TY D 120/240 100(NS)SS(N)SP(O)
EA 9.000 $3,800.000 $4,899.000 $4,899.000 $4,899.000 $4,899.000 $5,190.190
ALUMINUM SIGNS (TY A)
SF 16.000 $35.000 $33.480 $33.320 $19.890 $25.000 $30.720
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 55.000 $450.000 $324.000 $324.000 $324.000 $324.000 $343.260
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 1.000 $475.000 $504.000 $504.000 $504.000 $504.000 $533.960
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 30.000 $590.000 $441.000 $441.000 $441.000 $441.000 $467.210
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 12.000 $885.000 $650.000 $650.000 $650.000 $650.000 $688.640
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 6.000 $620.000 $642.000 $642.000 $642.000 $642.000 $680.160
IN SM RD SN SUP&AM TYS80(1)SB(P-BM)
EA 9.000 $650.000 $669.000 $669.000 $669.000 $669.000 $708.760
IN SM RD SN SUP&AM TYS80(2)SA(T-2EXT)
EA 1.000 $700.000 $1,522.000 $1,522.000 $1,522.000 $1,522.000 $1,612.470
REMOVE SM RD SN SUP&AM
EA 105.000 $85.000 $50.000 $50.000 $50.000 $50.000 $52.970
INS OH SN SUP(25 FT BAL TEE)
EA 2.000 $25,000.000 $22,737.000 $23,225.520 $22,737.000 $22,737.000 $24,088.470
SIGN WALKWAY (36 IN) WITH HNDRL
LF 50.000 $265.000 $269.000 $281.300 $269.000 $269.000 $284.990
INSTL OM ASSM (OM-1)(FLX)GND
EA 1.000 $130.000 $285.000 $285.000 $285.000 $285.000 $301.940
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 69.000 $32.000 $32.000 $32.000 $32.000 $32.000 $33.900
WK ZN PAV MRK NON-REMOV (W)4"(DOT)
LF 56.000 $0.600 $1.500 $1.500 $1.500 $1.500 $1.590
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 31,141.000 $0.250 $0.400 $0.400 $0.400 $0.400 $0.420
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 165.000 $0.350 $1.000 $1.000 $1.000 $1.000 $1.060
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 72.000 $2.000 $5.000 $5.000 $5.000 $5.000 $5.300
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 31,900.000 $0.200 $0.400 $0.400 $0.400 $0.400 $0.420
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 153.000 $5.750 $5.000 $5.000 $5.000 $5.000 $5.300
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 1,528.000 $3.400 $5.000 $5.000 $5.000 $5.000 $5.300
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 95,051.000 $1.000 $0.900 $0.900 $0.900 $0.900 $0.950
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 4,422.000 $1.500 $1.500 $1.500 $1.500 $1.500 $1.590
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 960.000 $8.500 $6.000 $6.000 $6.000 $6.000 $6.360
WK ZN PAV MRK REMOV (W)(ARROW)
EA 10.000 $125.000 $200.000 $200.000 $200.000 $200.000 $211.890
WK ZN PAV MRK REMOV (W)(WORD)
EA 8.000 $125.000 $250.000 $250.000 $250.000 $250.000 $264.860
WK ZN PAV MRK REMOV (Y)4"(DOT)
LF 127.000 $1.500 $1.500 $1.500 $1.500 $1.500 $1.590
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 101,284.000 $0.700 $0.900 $0.900 $0.900 $0.900 $0.950
WK ZN PAV MRK REMOV (Y)24"(SLD)
LF 89.000 $4.500 $6.000 $6.000 $6.000 $6.000 $6.360
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 53.000 $150.000 $125.000 $125.000 $125.000 $125.000 $132.430
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 30.000 $150.000 $150.000 $150.000 $150.000 $150.000 $158.920
PAVEMENT SEALER (ARROW)
EA 53.000 $30.000 $5.000 $5.000 $5.000 $5.000 $5.300
PAVEMENT SEALER (WORD)
EA 30.000 $30.000 $7.000 $7.000 $7.000 $7.000 $7.420
REFL PAV MRKR TY I-C
EA 807.000 $4.000 $5.000 $5.000 $5.000 $5.000 $5.300
REFL PAV MRKR TY II-A-A
EA 1,484.000 $4.000 $5.000 $5.000 $5.000 $5.000 $5.300
REFL PAV MRKR TY II-C-R
EA 324.000 $4.000 $5.000 $5.000 $5.000 $5.000 $5.300
ELIM EXT PAV MRK & MRKS (4")
LF 49,513.000 $0.300 $0.350 $0.350 $0.350 $0.350 $0.370
ELIM EXT PAV MRK & MRKS (8")
LF 415.000 $0.500 $0.750 $0.750 $0.750 $0.750 $0.790
ELIM EXT PAV MRK & MRKS (24")
LF 1,148.000 $2.250 $2.000 $2.000 $2.000 $2.000 $2.120
ELIM EXT PAV MRK & MRKS (ARROW)
EA 5.000 $50.000 $35.000 $35.000 $35.000 $35.000 $37.080
ELIM EXT PAV MRK & MRKS (WORD)
EA 5.000 $50.000 $35.000 $35.000 $35.000 $35.000 $37.080
PAV SURF PREP FOR MRK (4")
LF 13,563.000 $0.050 $0.020 $0.020 $0.020 $0.020 $0.020
PAV SURF PREP FOR MRK (6")
LF 65,796.000 $0.070 $0.030 $0.030 $0.030 $0.030 $0.030
PAV SURF PREP FOR MRK (8")
LF 4,042.000 $0.100 $0.080 $0.080 $0.080 $0.080 $0.080
PAV SURF PREP FOR MRK (12")
LF 912.000 $0.200 $0.120 $0.120 $0.120 $0.120 $0.130
PAV SURF PREP FOR MRK (24")
LF 907.000 $0.850 $0.240 $0.240 $0.240 $0.240 $0.250
PAV SURF PREP FOR MRK (ARROW)
EA 53.000 $10.000 $5.000 $5.000 $5.000 $5.000 $5.300
PAV SURF PREP FOR MRK (WORD)
EA 30.000 $10.000 $5.000 $5.000 $5.000 $5.000 $5.300
INSTALL HWY TRF SIG (FLASH BEACON)
EA 1.000 $20,000.000 $23,750.000 $23,750.000 $23,750.000 $23,750.000 $25,161.680
INSTALL HWY TRF SIG (ISOLATED)
EA 2.000 $33,000.000 $27,755.000 $27,755.000 $27,755.000 $27,755.000 $29,404.740
REMOVING TRAFFIC SIGNALS
EA 2.000 $4,200.000 $3,500.000 $3,500.000 $3,500.000 $3,500.000 $3,708.040
TEMP TRAF SIGNALS
EA 3.000 $50,000.000 $24,971.000 $24,971.000 $24,971.000 $24,971.000 $26,455.260
VEH SIG SEC (12")LED(GRN)
EA 18.000 $250.000 $215.000 $215.000 $215.000 $215.000 $227.780
VEH SIG SEC (12")LED(GRN ARW)
EA 2.000 $250.000 $215.000 $215.000 $215.000 $215.000 $227.780
VEH SIG SEC (12")LED(YEL)
EA 22.000 $250.000 $215.000 $215.000 $215.000 $215.000 $227.780
VEH SIG SEC (12")LED(YEL ARW)
EA 2.000 $250.000 $215.000 $215.000 $215.000 $215.000 $227.780
VEH SIG SEC (12")LED(RED)
EA 19.000 $250.000 $215.000 $215.000 $215.000 $215.000 $227.780
VEH SIG SEC (12")LED(RED ARW)
EA 6.000 $250.000 $215.000 $215.000 $215.000 $215.000 $227.780
PED SIG SEC (LED)(COUNTDOWN)
EA 10.000 $500.000 $588.000 $588.000 $588.000 $588.000 $622.950
BACK PLATE (12")(1 SEC)
EA 8.000 $60.000 $55.000 $55.000 $55.000 $55.000 $58.270
BACK PLATE (12")(3 SEC)
EA 13.000 $95.000 $75.000 $75.000 $75.000 $75.000 $79.460
BACK PLATE (12")(4 SEC)
EA 3.000 $105.000 $95.000 $95.000 $95.000 $95.000 $100.650
BACK PLATE (12")(5 SEC)
EA 2.000 $125.000 $150.000 $150.000 $150.000 $150.000 $158.920
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
LF 2,010.000 $1.350 $1.180 $1.180 $1.180 $1.180 $1.250
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
LF 2,050.000 $1.600 $1.550 $1.550 $1.550 $1.550 $1.640
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
LF 4,625.000 $2.500 $1.870 $1.870 $1.870 $1.870 $1.980
TRF SIG CBL (TY A)(14 AWG)(2 CONDR)
LF 24,615.000 $1.800 $1.010 $1.010 $1.010 $1.010 $1.070
INSTALL RDSD FLASH BEACON ASSEMBLY
EA 1.000 $5,000.000 $4,675.000 $4,675.000 $4,675.000 $4,675.000 $4,952.880
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 4.000 $6,000.000 $6,345.000 $6,345.000 $6,345.000 $6,345.000 $6,722.140
REMOV RDSD FLSH BCN AM (SOLAR PWRD)
EA 5.000 $900.000 $540.000 $468.000 $879.700 $500.000 $180.660
INS TRF SIG PL AM(S)1 ARM(44')
EA 2.000 $7,500.000 $8,570.000 $8,570.000 $8,570.000 $8,570.000 $9,079.400
INS TRF SIG PL AM(S)1 ARM(50')LUM
EA 1.000 $17,000.000 $15,594.000 $15,594.000 $15,594.000 $15,594.000 $16,520.900
INS TRF SIG PL AM(S)1 ARM(55')LUM
EA 1.000 $19,000.000 $16,125.000 $16,125.000 $16,125.000 $16,125.000 $17,083.460
INS TRF SIG PL AM(S)1 ARM(60')LUM
EA 1.000 $20,000.000 $16,496.000 $16,496.000 $16,496.000 $16,496.000 $17,476.510
INS TRF SIG PL AM(S)2 ARM(40-36')LUM
EA 1.000 $11,000.000 $12,521.000 $12,521.000 $12,521.000 $12,521.000 $13,265.240
INS TRF SIG PL AM(S)2 ARM(44-36')LUM
EA 1.000 $11,500.000 $13,667.000 $13,667.000 $13,667.000 $13,667.000 $14,479.360
INS TRF SIG PL AM(S)2 ARM(50-36')LUM
EA 1.000 $18,500.000 $18,601.000 $18,601.000 $18,601.000 $18,601.000 $19,706.630
PED POLE ASSEMBLY
EA 5.000 $1,900.000 $1,235.000 $1,235.000 $1,235.000 $1,235.000 $1,308.410
PED DETECT PUSH BUTTON (APS)
EA 10.000 $700.000 $886.000 $886.000 $886.000 $886.000 $938.660
VEH LP DETECT (SAWCUT)(14 AWG)(ORG)
LF 7,805.000 $12.000 $8.550 $8.550 $8.550 $8.550 $9.060
FULL - WIDTH MOWING
CYC 6.000 $2,000.000 $2,000.000 $1,914.000 $3,611.550 $1,250.000 $2,000.000
LITTER REMOVAL
CYC 6.000 $1,200.000 $1,100.000 $1,121.000 $1,949.460 $1,250.000 $1,400.000
WIDE FLANGE PAVEMENT TERMINALS
LF 652.000 $360.000 $300.000 $409.640 $377.340 $400.000 $500.000
REMOVE CENTERLINE TEXTURING
LF 12,581.000 $4.000 $2.930 $3.400 $3.000 $5.000 $56.420
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 44.000 $60.000 $25.000 $368.180 $104.670 $37.890 $250.000
FIBER OPTIC CBL (SNGLE-MODE)(12 FIBER)
LF 64,625.000 $3.000 $1.710 $1.710 $1.710 $1.710 $1.810
FIBER OPTIC CBL (SNGLE-MODE)(144 FIBER)
LF 35,515.000 $3.900 $3.750 $3.750 $3.750 $3.750 $3.970
FIBER OPTIC SPLICE ENCLOSURE
EA 10.000 $1,500.000 $1,175.000 $1,175.000 $1,175.000 $1,175.000 $1,244.840
FIBER OPTIC PATCH PANEL (12 POSITION)
EA 11.000 $1,490.000 $1,035.000 $1,035.000 $1,035.000 $1,035.000 $1,096.520
FIBER OPTIC PATCH PANEL (144 POSITION)
EA 2.000 $3,500.000 $2,036.000 $2,036.000 $2,036.000 $2,036.000 $2,157.020
FIBER OPTIC FUSION SPLICE
EA 10.000 $1,500.000 $99.780 $99.780 $99.780 $99.780 $105.710
CCTV FIELD EQUIPMENT (ANALOG)
EA 7.000 $9,500.000 $7,892.000 $7,892.000 $7,892.000 $7,892.000 $8,361.090
ITS MULTI-DUCT CND (PVC-40)(CONC ENCSE)
LF 46,620.000 $12.000 $10.850 $10.850 $10.850 $10.850 $11.490
ITS MULTI-DUCT CND (PVC-80)(BORE)
LF 24,410.000 $33.800 $18.250 $18.250 $18.250 $18.250 $19.330
COMMUNICATION HUB BUILDING
EA 1.000 $30,000.000 $22,500.000 $22,500.000 $22,500.000 $22,500.000 $23,837.380
INSTALL DMS (FOUNDATION MTD CABINET)
EA 2.000 $14,000.000 $10,998.000 $10,998.000 $10,998.000 $10,998.000 $11,651.720
RADAR VEHICLE SENSING DEVICE
EA 5.000 $8,800.000 $8,860.000 $8,860.000 $8,860.000 $8,860.000 $9,386.630
FIBER OPTIC VIDEO DATA TRANSMITTER
EA 7.000 $1,550.000 $990.000 $990.000 $990.000 $990.000 $1,048.840
FIBER OPTIC VIDEO DATA RECEIVER
EA 7.000 $1,500.000 $990.000 $990.000 $990.000 $990.000 $1,048.840
MULTIPOLYMER PAV MRK (W)(6")(SLD)
LF 65,796.000 $0.750 $0.720 $0.720 $0.720 $0.720 $0.760
MULTIPOLYMER PAV MRK (W)(6")(BRK)
LF 15,857.000 $0.800 $0.750 $0.750 $0.750 $0.750 $0.790
MULTIPOLYMER PAV MRK (W)(8")(SLD)
LF 4,042.000 $1.000 $1.500 $1.500 $1.500 $1.500 $1.590
MULTIPOLYMER PAV MRK (W)(8")(DOT)
LF 4,385.000 $2.500 $2.000 $2.000 $2.000 $2.000 $2.120
MULTIPOLYMER PAV MRK (W)(12")(SLD)
LF 912.000 $3.000 $3.000 $3.000 $3.000 $3.000 $3.180
MULTIPOLYMER PAV MRK (W)(24")(SLD)
LF 907.000 $5.750 $6.000 $6.000 $6.000 $6.000 $6.360
MULTIPOLYMER PAV MRK (Y)(4")(SLD)
LF 13,563.000 $0.650 $0.700 $0.700 $0.700 $0.700 $0.740
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
LF 59,296.000 $0.750 $0.800 $0.800 $0.800 $0.800 $0.850
MULTIPOLYMER PAV MRK (Y)(6")(BRK)
LF 8,684.000 $0.850 $0.820 $0.820 $0.820 $0.820 $0.870
ITS POLE (55 FT)(110 MPH)
EA 4.000 $14,800.000 $12,902.000 $12,902.000 $12,902.000 $12,902.000 $13,668.890
ITS POLE MNT CAB (TY 2)(CONF 1)
EA 4.000 $5,200.000 $3,975.000 $3,975.000 $3,975.000 $3,975.000 $4,211.270
ETHERNET SWITCH (INSTALL ONLY)
EA 3.000 $700.000 $500.000 $500.000 $500.000 $500.000 $529.720
MPEG 4 VIDEO ENCODER (INSTALL ONLY)
EA 7.000 $800.000 $500.000 $500.000 $500.000 $500.000 $529.720
TERMINAL SERVER (INSTALL ONLY)
EA 3.000 $500.000 $500.000 $500.000 $500.000 $500.000 $529.720
BLUETOOTH DETECTION SYSTEM
EA 5.000 $8,200.000 $4,200.000 $4,200.000 $4,200.000 $4,200.000 $4,449.650
TMA (STATIONARY)
DAY 104.000 $290.000 $250.000 $89.200 $145.000 $350.000 $350.000
TMA (MOBILE OPERATION)
HR 160.000 $28.000 $25.000 $51.340 $80.630 $100.000 $115.000
Totals: $49,337,047.810 $42,315,988.838 $45,186,106.425 $45,670,642.973 $49,157,044.390 $51,687,875.850