Show Job Controls
Bid Cobra

FALLS CR (0909-38-079)

Items: 50

County: FALLS
Length: N/A
Highway: CR
District: WACO
Control Number: 0909-38-079
DBE Goal: N/A
Project: BR 1702(808)
Guaranty: N/A
Time: 60 WORKING DAYS
Engineer's Estimate: $390,702.00
Date: 10/02/2019 (6 years ago)
Contract Number: N/A
Type: REPL BR & APPRS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$390,702.00
$362,831.10
Over/Under Est: -7.13% -$27,870.90
Over/Under Est: -1.14% -$4,445.21
Amt Left: 6.46% $23,425.69
Over/Under Est: 5.07% $19,815.12
Amt Left: 13.14% $47,686.02
Delta: -6.28% -$24,260.33
Over/Under Est: 11.2% $43,742.08
Amt Left: 19.74% $71,612.98
Delta: -5.83% -$23,926.96
Over/Under Est: 25.06% $97,896.80
Amt Left: 34.66% $125,767.70
Delta: -12.47% -$54,154.72
$499,897.25
Over/Under Est: 27.95% $109,195.25
Amt Left: 37.78% $137,066.15
Delta: -2.31% -$11,298.45

Bid Items & Bid Tabulations

50 Total 0 of 50
FALLS  |  CR  |  WACO  |  0909-38-079  |  10/02/2019  |  $390,702.00  |  BR 1702(808)  |  REPL BR & APPRS  |  60 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ELLIS-MCGINNIS CONSTRUCTION CO.
KNIFE RIVER CORPORATION - SOUTH
JAMES CONSTRUCTION GROUP, L.L.C.
EAST TEXAS BRIDGE, INC.
HODGES AND SON CONSTRUCTION COMPANY, INC.
PIERCE R & B LLC
PREPARING ROW
STA 3.600 $5,000.000 $900.000 $3,000.000 $10,000.000 $4,000.000 $3,500.000 $2,000.000
REMOVING STAB BASE & ASPH PAV (0-6")
SY 592.000 $4.000 $2.300 $4.000 $10.000 $5.000 $22.000 $11.000
EXCAVATION (ROADWAY)
CY 94.000 $20.000 $11.000 $30.000 $15.000 $7.000 $25.000 $40.000
EXCAVATION (CHANNEL)
CY 702.000 $12.000 $11.000 $13.000 $15.000 $7.000 $12.000 $18.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 150.000 $20.000 $13.000 $19.000 $10.000 $15.000 $30.000 $40.000
FURNISHING AND PLACING TOPSOIL (4")
SY 1,392.000 $2.000 $2.000 $1.000 $5.000 $2.000 $4.000 $2.000
BLOCK SODDING
SY 742.000 $4.000 $5.000 $6.250 $5.000 $5.000 $8.000 $5.500
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 650.000 $1.000 $0.700 $1.750 $2.600 $1.000 $5.000 $3.350
BROADCAST SEED (TEMP) (WARM)
SY 696.000 $1.000 $0.700 $1.000 $2.600 $1.000 $3.000 $1.750
BROADCAST SEED (TEMP) (COOL)
SY 696.000 $1.000 $0.700 $1.000 $2.600 $1.000 $3.000 $1.750
VEGETATIVE WATERING
MG 22.800 $30.000 $34.000 $44.000 $15.000 $15.000 $1.000 $50.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 668.000 $2.000 $2.000 $2.000 $2.750 $2.000 $3.000 $1.500
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 155.000 $60.000 $60.000 $65.000 $50.530 $65.000 $65.000 $115.000
PRIME COAT(MC-30 OR AE-P)
GAL 179.000 $6.000 $6.500 $8.000 $6.500 $12.000 $10.000 $7.400
ASPH (CRS-2)
GAL 402.000 $4.000 $5.000 $4.800 $5.000 $12.000 $10.000 $20.000
AGGR(TY-D GR-4 OR TY-L GR-4)
CY 8.000 $400.000 $850.000 $400.000 $850.000 $400.000 $800.000 $925.000
D-GR HMA(SQ) TY-C SAC-B PG64-22
TON 99.000 $140.000 $207.000 $115.000 $234.000 $150.000 $200.000 $250.000
TACK COAT
GAL 108.000 $3.000 $8.500 $0.010 $8.500 $0.010 $10.000 $9.850
CEM STABIL BKFL
CY 42.000 $140.000 $200.000 $148.000 $163.070 $200.000 $200.000 $190.000
DRILL SHAFT (30 IN)
LF 261.000 $260.000 $240.000 $185.000 $179.120 $200.000 $165.000 $215.000
CL C CONC (ABUT)
CY 27.200 $950.000 $920.000 $975.000 $637.420 $850.000 $1,200.000 $1,200.000
REINF CONC SLAB (BOX BEAM)
SF 1,701.000 $15.000 $11.600 $19.960 $12.070 $12.000 $24.000 $24.000
SHEAR KEY
CY 8.600 $370.000 $530.000 $240.000 $445.700 $400.000 $800.000 $475.000
PRESTR CONC BOX BEAM (4B20)
LF 258.000 $170.000 $185.000 $222.000 $213.840 $200.000 $270.000 $255.000
PRESTR CONC BOX BEAM (5B20)
LF 129.000 $180.000 $185.000 $222.000 $180.940 $200.000 $270.000 $225.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 167.000 $90.000 $85.000 $87.000 $71.960 $100.000 $150.000 $130.000
RAIL (TY T223)
LF 162.000 $100.000 $120.000 $100.000 $81.040 $90.000 $110.000 $140.000
RC PIPE (CL III)(24 IN)
LF 22.000 $70.000 $65.000 $77.000 $105.930 $75.000 $120.000 $85.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 2.000 $1,200.000 $650.000 $1,475.000 $1,547.390 $1,000.000 $3,000.000 $1,200.000
REMOV STR (PIPE)
LF 22.000 $15.000 $10.000 $13.000 $41.380 $15.000 $25.000 $25.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $12,500.000 $6,000.000 $9,000.000 $15,774.760 $22,000.000 $10,000.000 $13,500.000
MOBILIZATION
LS 1.000 $40,000.000 $30,500.000 $38,000.000 $40,000.000 $40,000.000 $45,000.000 $50,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $750.000 $765.000 $500.000 $633.360 $10,000.000 $2,000.000 $2,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
CY 96.000 $30.000 $30.000 $32.000 $25.500 $40.000 $5.000 $28.000
ROCK FILTER DAMS (REMOVE)
LF 96.000 $10.000 $9.000 $9.000 $10.500 $5.000 $1.000 $12.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 826.000 $3.000 $3.500 $5.000 $1.600 $3.000 $1.000 $2.800
TEMP SEDMT CONT FENCE (REMOVE)
LF 826.000 $1.000 $1.000 $1.000 $0.650 $1.000 $1.000 $1.800
DRIVEWAYS (ACP)
SY 38.000 $35.000 $55.000 $60.000 $86.350 $65.000 $80.000 $56.000
MTL W-BEAM GD FEN (STEEL POST)
LF 50.000 $22.000 $22.500 $24.000 $30.000 $35.000 $30.000 $26.000
MTL BEAM GD FEN TRANS (TL2)
EA 1.000 $900.000 $825.000 $875.000 $1,350.000 $1,500.000 $1,400.000 $965.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,150.000 $950.000 $1,000.000 $1,200.000 $1,500.000 $1,200.000 $1,060.000
MTL BM GD FEN TRANS (NON - SYM)
EA 2.000 $900.000 $550.000 $575.000 $750.000 $900.000 $800.000 $630.000
REMOVE METAL BEAM GUARD FENCE
LF 133.000 $3.000 $5.000 $3.150 $10.000 $3.000 $4.000 $3.750
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $2,500.000 $2,500.000 $2,650.000 $3,250.000 $3,200.000 $3,500.000 $2,775.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL2)
EA 1.000 $10,000.000 $7,300.000 $9,000.000 $9,720.000 $10,000.000 $10,000.000 $8,000.000
WIRE FENCE (TY C)
LF 139.000 $10.000 $8.200 $12.000 $3.500 $25.000 $20.000 $14.000
REMOVE SM RD SN SUP&AM
EA 2.000 $50.000 $30.000 $25.000 $56.030 $300.000 $200.000 $200.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 4.000 $20.000 $23.000 $25.000 $24.000 $50.000 $25.000 $26.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 2.000 $35.000 $36.500 $39.000 $34.000 $50.000 $40.000 $50.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 28.000 $85.000 $85.000 $50.000 $39.220 $200.000 $95.000 $120.000
Totals: $390,702.000 $362,831.100 $386,256.790 $410,517.124 $434,444.080 $488,598.800 $499,897.250