PREPARING ROW
|
STA
|
437.880
|
$10,000.000
|
$38,500.000
|
$8,727.000
|
$41,335.530
|
$17,665.000
|
$43,000.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
257,951.000
|
$6.000
|
$6.000
|
$3.770
|
$3.330
|
$2.600
|
$3.750
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
20,420.000
|
$10.000
|
$6.000
|
$4.190
|
$3.470
|
$1.950
|
$6.000
|
|
|
REMOVE CONC (GUTTER)
|
LF
|
2,980.000
|
$7.500
|
$6.000
|
$3.480
|
$4.940
|
$2.400
|
$10.000
|
|
|
REMOVE CONC (RAIL)
|
LF
|
469.000
|
$14.000
|
$10.000
|
$3.400
|
$6.620
|
$9.350
|
$25.000
|
|
|
REMOVING STAB BASE & ASPH PAV (8"-10")
|
SY
|
158,096.000
|
$3.000
|
$8.000
|
$3.410
|
$4.380
|
$2.450
|
$2.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(8")
|
SY
|
517.000
|
$3.000
|
$8.000
|
$4.330
|
$9.910
|
$15.300
|
$2.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
417,606.000
|
$8.000
|
$10.000
|
$4.300
|
$2.330
|
$3.250
|
$8.000
|
|
|
EXCAVATION (SPECIAL)
|
CY
|
47,805.000
|
$6.000
|
$10.000
|
$5.550
|
$6.170
|
$4.550
|
$11.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
1,482,198.000
|
$5.100
|
$6.260
|
$9.670
|
$8.130
|
$7.500
|
$12.000
|
|
|
EMBANK(FINAL)(DC)(TY E)(CSBE)
|
CY
|
8,289.000
|
$10.000
|
$40.000
|
$49.740
|
$5.000
|
$57.250
|
$34.000
|
|
|
EMB(FNL)(DC)(TYE)(CSBE)(RWALL FND IMPR
|
CY
|
3,783.000
|
$40.000
|
$40.000
|
$50.130
|
$6.000
|
$57.250
|
$50.000
|
|
|
BLADING
|
HR
|
200.000
|
$100.000
|
$125.000
|
$113.230
|
$245.000
|
$500.000
|
$150.000
|
|
|
FURNISHING AND PLACING TOPSOIL (3")
|
SY
|
48,743.000
|
$1.400
|
$1.000
|
$6.690
|
$1.200
|
$1.000
|
$1.000
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
1,115,734.000
|
$0.250
|
$0.220
|
$0.220
|
$0.220
|
$0.200
|
$0.220
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
1,115,734.000
|
$0.250
|
$0.220
|
$0.220
|
$0.220
|
$0.200
|
$0.220
|
|
|
DRILL SEEDING (PERM)(WARM OR COOL)
|
SY
|
1,115,734.000
|
$0.200
|
$0.130
|
$0.130
|
$0.130
|
$0.150
|
$0.130
|
|
|
VEGETATIVE WATERING
|
MG
|
9,391.500
|
$20.000
|
$20.000
|
$22.690
|
$22.040
|
$23.000
|
$7.000
|
|
|
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
|
CY
|
65,442.000
|
$65.000
|
$50.000
|
$76.090
|
$70.000
|
$78.500
|
$62.000
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
16,785.000
|
$160.000
|
$180.000
|
$168.140
|
$50.000
|
$166.000
|
$200.000
|
|
|
LIME TRT (SUBGRADE)(8")
|
SY
|
2,829.000
|
$4.500
|
$2.000
|
$5.540
|
$5.000
|
$10.500
|
$2.000
|
|
|
LIME TRT (SUBGRADE)(6")
|
SY
|
883,163.000
|
$2.000
|
$2.000
|
$1.290
|
$3.000
|
$2.400
|
$2.000
|
|
|
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
|
SY
|
592,209.000
|
$6.000
|
$4.000
|
$6.060
|
$12.300
|
$9.200
|
$15.000
|
|
|
ASPHALT STAB BASE (GR 4)(PG 64)
|
TON
|
43,527.000
|
$70.000
|
$72.000
|
$68.310
|
$68.100
|
$82.750
|
$75.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
59,002.000
|
$4.250
|
$3.000
|
$4.200
|
$4.190
|
$4.000
|
$5.000
|
|
|
AGGR(TY-PE GR-3 SAC-B)
|
CY
|
3,471.000
|
$92.000
|
$142.000
|
$136.620
|
$136.200
|
$130.000
|
$100.000
|
|
|
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
|
GAL
|
118,004.000
|
$3.400
|
$3.500
|
$3.150
|
$3.140
|
$4.500
|
$5.000
|
|
|
D-GR HMA TY-B PG70-22
|
TON
|
48,007.000
|
$75.000
|
$70.000
|
$77.770
|
$77.530
|
$79.250
|
$90.000
|
|
|
D-GR HMA TY-D SAC-B PG76-22
|
TON
|
32,335.000
|
$75.000
|
$82.000
|
$84.070
|
$83.810
|
$94.250
|
$90.000
|
|
|
D-GR HMA TY-D PG76-22 (LEVEL-UP)
|
TON
|
32,822.000
|
$90.000
|
$82.000
|
$84.070
|
$83.810
|
$94.250
|
$90.000
|
|
|
TACK COAT
|
GAL
|
74,484.000
|
$3.000
|
$3.500
|
$2.780
|
$2.780
|
$2.000
|
$3.000
|
|
|
PLANE ASPH CONC PAV (4")
|
SY
|
77,411.000
|
$3.500
|
$4.000
|
$1.400
|
$2.710
|
$1.800
|
$1.500
|
|
|
CONC PVMT (CONT REINF - CRCP) (14")
|
SY
|
572,403.000
|
$50.000
|
$36.250
|
$62.550
|
$60.000
|
$65.000
|
$50.000
|
|
|
CONC PVMT (CRCP)(JCT TERMINAL)(14")
|
SY
|
1,206.000
|
$52.000
|
$115.000
|
$125.660
|
$86.310
|
$97.750
|
$80.000
|
|
|
STRUCT EXCAV
|
CY
|
3,783.000
|
$10.000
|
$7.000
|
$4.000
|
$11.000
|
$10.000
|
$20.000
|
|
|
CEM STABIL BKFL
|
CY
|
17,488.300
|
$50.000
|
$47.800
|
$50.980
|
$50.000
|
$47.000
|
$70.000
|
|
|
CUT AND RESTORE PAV (FLEX BASE)
|
SY
|
148.000
|
$40.000
|
$250.000
|
$86.620
|
$200.000
|
$153.000
|
$100.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
78.000
|
$200.000
|
$150.000
|
$116.650
|
$163.160
|
$216.000
|
$100.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
17,562.000
|
$6.000
|
$2.500
|
$0.550
|
$2.570
|
$1.650
|
$1.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
14,102.000
|
$10.000
|
$15.000
|
$24.610
|
$27.000
|
$16.500
|
$25.000
|
|
|
FOUNDATON LOADTEST(D4945)(DRILLD SHAFT)
|
EA
|
9.000
|
$12,000.000
|
$25,000.000
|
$15,506.730
|
$25,000.000
|
$15,000.000
|
$25,000.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
2,058.000
|
$90.000
|
$50.000
|
$100.020
|
$100.000
|
$99.000
|
$75.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
19,988.000
|
$160.000
|
$150.000
|
$189.540
|
$145.000
|
$187.000
|
$200.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
11,579.000
|
$220.000
|
$200.000
|
$232.390
|
$200.000
|
$258.000
|
$200.000
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
110.000
|
$320.000
|
$416.000
|
$643.360
|
$590.000
|
$584.000
|
$300.000
|
|
|
DRILL SHAFT (72 IN)
|
LF
|
1,800.000
|
$500.000
|
$450.000
|
$521.100
|
$680.000
|
$536.000
|
$800.000
|
|
|
DRILL SHAFT (84 IN)
|
LF
|
1,092.000
|
$850.000
|
$650.000
|
$684.300
|
$1,300.000
|
$697.000
|
$900.000
|
|
|
DRILL SHAFT (NON - REINFORCED) (12 IN)
|
LF
|
77.000
|
$100.000
|
$59.000
|
$160.440
|
$90.000
|
$59.000
|
$100.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
784.000
|
$200.000
|
$131.000
|
$170.950
|
$165.000
|
$171.000
|
$131.000
|
|
|
DRILL SHAFT (96 IN)
|
LF
|
1,632.000
|
$875.000
|
$750.000
|
$811.360
|
$700.000
|
$834.000
|
$943.000
|
|
|
CL C CONC (ABUT)
|
CY
|
1,188.800
|
$850.000
|
$900.000
|
$630.000
|
$781.280
|
$1,040.000
|
$850.000
|
|
|
CL C CONC (CAP)
|
CY
|
2,633.600
|
$900.000
|
$900.000
|
$700.000
|
$900.000
|
$890.000
|
$1,000.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
2,327.900
|
$900.000
|
$800.000
|
$700.000
|
$781.150
|
$907.000
|
$900.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
711.200
|
$500.000
|
$200.000
|
$320.000
|
$351.740
|
$531.000
|
$450.000
|
|
|
CL C CONC (SIGN COLUMN)
|
CY
|
466.000
|
$1,000.000
|
$800.000
|
$740.000
|
$868.430
|
$1,360.000
|
$1,000.000
|
|
|
CL C CONC (SIGN FOOTING)
|
CY
|
186.000
|
$800.000
|
$800.000
|
$840.000
|
$818.750
|
$1,390.000
|
$525.000
|
|
|
REINF CONC SLAB
|
SF
|
520,065.000
|
$13.500
|
$15.000
|
$12.110
|
$12.000
|
$18.400
|
$16.000
|
|
|
APPROACH SLAB
|
CY
|
2,223.600
|
$425.000
|
$200.000
|
$360.000
|
$432.140
|
$522.000
|
$400.000
|
|
|
RETAINING WALL (TEMP WALL)
|
SF
|
166,254.000
|
$10.500
|
$12.000
|
$7.350
|
$5.000
|
$9.600
|
$15.000
|
|
|
RETAINING WALL (MSE)(HORIZONTAL SCHEME)
|
SF
|
74,556.000
|
$40.000
|
$65.000
|
$22.000
|
$32.000
|
$58.500
|
$32.000
|
|
|
PRESTR CONC GIRDER (TX34)
|
LF
|
2,801.500
|
$145.000
|
$80.000
|
$125.000
|
$118.000
|
$138.000
|
$135.000
|
|
|
PRESTR CONC GIRDER (TX40)
|
LF
|
14,285.500
|
$150.000
|
$90.000
|
$129.000
|
$119.000
|
$130.000
|
$135.000
|
|
|
PRESTR CONC GIRDER (TX46)
|
LF
|
12,803.440
|
$130.000
|
$95.000
|
$133.000
|
$122.000
|
$132.000
|
$155.000
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
21,659.630
|
$135.000
|
$105.000
|
$134.000
|
$126.000
|
$128.000
|
$142.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
4,082.000
|
$350.000
|
$450.000
|
$280.000
|
$300.000
|
$380.000
|
$350.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
700.000
|
$400.000
|
$450.000
|
$290.000
|
$400.000
|
$398.000
|
$375.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
12.500
|
$450.000
|
$450.000
|
$750.000
|
$900.000
|
$386.000
|
$450.000
|
|
|
RIPRAP (CONC) (CL B) (4")
|
CY
|
27.000
|
$350.000
|
$450.000
|
$615.000
|
$780.000
|
$382.000
|
$450.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
419.000
|
$150.000
|
$150.000
|
$170.000
|
$150.000
|
$193.000
|
$60.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
6,989.000
|
$200.000
|
$150.000
|
$159.710
|
$90.000
|
$176.000
|
$85.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
179.000
|
$500.000
|
$500.000
|
$470.740
|
$500.000
|
$541.000
|
$475.000
|
|
|
ELASTOMERIC BEARING (EE5)
|
EA
|
28.000
|
$3,000.000
|
$3,000.000
|
$1,870.450
|
$2,318.880
|
$1,200.000
|
$1,250.000
|
|
|
ELASTOMERIC BEARING (F7)
|
EA
|
14.000
|
$3,000.000
|
$3,000.000
|
$3,508.790
|
$3,877.880
|
$2,760.000
|
$2,800.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
1,026.000
|
$15.000
|
$25.000
|
$25.630
|
$25.630
|
$32.000
|
$16.000
|
|
|
STR STEEL (PLATE GIRDER)
|
LB
|
2,534,273.000
|
$1.500
|
$1.500
|
$1.580
|
$1.690
|
$1.600
|
$1.630
|
|
|
RAIL (TY SSTR)
|
LF
|
13,160.000
|
$50.000
|
$30.000
|
$35.500
|
$18.000
|
$47.000
|
$45.000
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOTS)
|
LF
|
12,752.000
|
$54.000
|
$30.000
|
$36.220
|
$32.000
|
$48.500
|
$55.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
2,924.000
|
$110.000
|
$100.000
|
$96.910
|
$122.140
|
$121.000
|
$118.000
|
|
|
SEALED EXPANSION JOINT (5 IN) (SEJ - M)
|
LF
|
373.000
|
$115.000
|
$100.000
|
$97.580
|
$120.420
|
$128.000
|
$122.000
|
|
|
CMP (GAL STL BIT COAT 24 IN)
|
LF
|
1,440.000
|
$100.000
|
$53.550
|
$47.950
|
$45.000
|
$62.500
|
$68.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
343.000
|
$130.000
|
$213.250
|
$182.830
|
$180.000
|
$202.000
|
$200.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
1,282.000
|
$300.000
|
$266.700
|
$250.770
|
$244.000
|
$247.000
|
$250.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
790.000
|
$250.000
|
$279.300
|
$249.560
|
$265.000
|
$255.000
|
$262.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
2,566.000
|
$250.000
|
$363.650
|
$316.960
|
$330.000
|
$318.000
|
$325.000
|
|
|
CONC BOX CULV (6 FT X 4 FT)
|
LF
|
886.000
|
$300.000
|
$390.650
|
$348.800
|
$340.000
|
$340.000
|
$350.000
|
|
|
CONC BOX CULV (7 FT X 3 FT)
|
LF
|
830.000
|
$450.000
|
$426.650
|
$384.060
|
$365.000
|
$373.000
|
$400.000
|
|
|
CONC BOX CULV (9 FT X 6 FT)
|
LF
|
1,140.000
|
$750.000
|
$687.950
|
$612.380
|
$600.000
|
$615.000
|
$650.000
|
|
|
CONC BOX CULV (10 FT X 9 FT)
|
LF
|
1,817.000
|
$800.000
|
$904.150
|
$849.150
|
$800.000
|
$819.000
|
$810.000
|
|
|
RC PIPE (CL III)(12 IN)
|
LF
|
82.000
|
$55.000
|
$90.750
|
$43.980
|
$55.800
|
$57.250
|
$65.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
8,555.000
|
$55.000
|
$78.050
|
$50.330
|
$42.470
|
$44.000
|
$75.000
|
|
|
RC PIPE (CL III)(21 IN)
|
LF
|
194.000
|
$60.000
|
$104.550
|
$64.890
|
$89.070
|
$64.500
|
$85.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
5,138.000
|
$55.000
|
$87.750
|
$63.940
|
$65.200
|
$64.500
|
$95.000
|
|
|
JCTBOX(COMPL)(PJB)(6FTX6FT)
|
EA
|
3.000
|
$8,000.000
|
$7,083.000
|
$5,106.600
|
$10,425.180
|
$6,290.000
|
$8,000.000
|
|
|
INLET (COMPL)(POD)(SFG)(3FTX3FT)
|
EA
|
3.000
|
$4,000.000
|
$3,762.000
|
$4,537.110
|
$6,419.500
|
$5,670.000
|
$4,200.000
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
64.000
|
$5,000.000
|
$4,262.000
|
$4,368.950
|
$5,452.190
|
$5,250.000
|
$4,800.000
|
|
|
MANH(COMPL)(TY 1 )
|
EA
|
5.000
|
$6,000.000
|
$3,676.000
|
$3,197.370
|
$5,194.500
|
$4,450.000
|
$6,200.000
|
|
|
WINGWALL (FW - S) (HW=4 FT)
|
EA
|
1.000
|
$8,500.000
|
$17,252.000
|
$10,408.310
|
$12,667.200
|
$9,120.000
|
$7,200.000
|
|
|
WINGWALL (FW - S) (HW=8 FT)
|
EA
|
2.000
|
$25,000.000
|
$29,211.000
|
$31,452.610
|
$22,242.830
|
$21,260.000
|
$17,000.000
|
|
|
WINGWALL (PW - 1) (HW=11 FT)
|
EA
|
1.000
|
$30,000.000
|
$57,933.000
|
$43,270.810
|
$51,887.920
|
$48,290.000
|
$52,000.000
|
|
|
WINGWALL (PW - 2) (HW=11 FT)
|
EA
|
2.000
|
$25,000.000
|
$71,270.000
|
$47,660.660
|
$93,350.750
|
$117,000.000
|
$80,000.000
|
|
|
WINGWALL (PW - 2) (HW=5 FT)
|
EA
|
1.000
|
$13,000.000
|
$21,634.000
|
$15,016.870
|
$14,358.930
|
$16,010.000
|
$10,000.000
|
|
|
WINGWALL (PW - 2) (HW=6 FT)
|
EA
|
1.000
|
$15,000.000
|
$22,056.000
|
$14,346.060
|
$11,824.640
|
$18,290.000
|
$15,000.000
|
|
|
WINGWALL (SW - 0) (HW=11 FT)
|
EA
|
1.000
|
$15,000.000
|
$29,888.000
|
$30,148.020
|
$28,369.780
|
$25,300.000
|
$20,000.000
|
|
|
WINGWALL (SW - 0) (HW=3 FT)
|
EA
|
1.000
|
$5,000.000
|
$16,367.000
|
$4,434.940
|
$3,890.290
|
$6,070.000
|
$7,200.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
3.000
|
$8,500.000
|
$8,992.000
|
$5,829.410
|
$7,290.800
|
$10,320.000
|
$9,900.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(6:1) (P)
|
EA
|
2.000
|
$8,500.000
|
$10,829.000
|
$8,582.770
|
$7,866.630
|
$9,920.000
|
$11,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
7.000
|
$11,000.000
|
$15,816.000
|
$7,079.980
|
$6,058.640
|
$10,020.000
|
$12,500.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
2.000
|
$12,000.000
|
$15,990.000
|
$7,227.110
|
$6,856.620
|
$19,160.000
|
$15,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$1,000.000
|
$872.000
|
$1,197.290
|
$1,146.960
|
$1,110.000
|
$1,400.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$1,100.000
|
$1,047.000
|
$1,381.180
|
$1,339.520
|
$1,150.000
|
$2,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
44.000
|
$1,000.000
|
$1,047.000
|
$1,381.170
|
$1,339.800
|
$1,150.000
|
$1,700.000
|
|
|
SET (TY II) (21 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$1,200.000
|
$967.000
|
$1,297.110
|
$1,255.720
|
$1,290.000
|
$1,800.000
|
|
|
SET (TY II) (21 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$1,250.000
|
$1,282.000
|
$1,628.150
|
$1,583.550
|
$1,380.000
|
$2,250.000
|
|
|
SET (TY II) (24 IN) (CMP) (4: 1) (C)
|
EA
|
4.000
|
$1,650.000
|
$1,081.000
|
$1,092.170
|
$1,252.110
|
$1,540.000
|
$2,000.000
|
|
|
SET (TY II) (24 IN) (CMP) (4: 1) (P)
|
EA
|
7.000
|
$1,400.000
|
$1,081.000
|
$1,092.170
|
$1,242.930
|
$1,530.000
|
$2,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
19.000
|
$1,650.000
|
$1,081.000
|
$1,297.100
|
$1,241.960
|
$1,430.000
|
$2,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (P)
|
EA
|
2.000
|
$1,650.000
|
$1,081.000
|
$1,297.110
|
$1,241.960
|
$1,550.000
|
$2,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$1,700.000
|
$1,397.000
|
$1,628.150
|
$1,583.550
|
$1,370.000
|
$2,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
32.000
|
$1,800.000
|
$1,396.000
|
$1,628.130
|
$1,583.550
|
$1,370.000
|
$2,500.000
|
|
|
PIPE (PVC) (SCH 40) (6 IN)
|
LF
|
243.000
|
$45.000
|
$50.000
|
$19.510
|
$39.150
|
$23.500
|
$30.000
|
|
|
REMOV STR (BRIDGE 500 - 999 FT LENGTH)
|
EA
|
8.000
|
$150,000.000
|
$50,000.000
|
$150,000.000
|
$80,000.000
|
$158,900.000
|
$202,625.000
|
|
|
REMOV STR (SMALL)
|
EA
|
75.000
|
$1,500.000
|
$5,127.000
|
$1,760.990
|
$596.840
|
$2,730.000
|
$1,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$15,500,000.000
|
$18,261,516.000
|
$17,000,000.000
|
$17,700,000.000
|
$18,800,000.000
|
$19,000,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
42.000
|
$25,000.000
|
$15,000.000
|
$25,288.890
|
$9,680.400
|
$28,840.000
|
$12,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
748.000
|
$25.000
|
$31.000
|
$27.460
|
$27.460
|
$27.500
|
$35.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
748.000
|
$10.000
|
$10.000
|
$7.430
|
$7.430
|
$7.450
|
$8.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
975.000
|
$30.000
|
$32.000
|
$28.630
|
$28.630
|
$28.600
|
$30.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
975.000
|
$10.000
|
$10.000
|
$7.070
|
$7.070
|
$7.050
|
$7.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
12.000
|
$100.000
|
$250.000
|
$186.740
|
$200.000
|
$112.000
|
$65.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
30,333.000
|
$2.500
|
$2.000
|
$1.990
|
$1.990
|
$2.000
|
$2.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
30,333.000
|
$0.750
|
$1.000
|
$0.400
|
$0.400
|
$0.400
|
$0.500
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,060.000
|
$4.000
|
$4.000
|
$3.440
|
$3.440
|
$3.450
|
$3.500
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,060.000
|
$2.000
|
$1.000
|
$0.400
|
$0.400
|
$0.400
|
$0.400
|
|
|
CONSTRUCTING DETOURS
|
SY
|
58,445.000
|
$40.000
|
$72.000
|
$55.610
|
$65.000
|
$61.500
|
$42.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
47,018.000
|
$55.000
|
$10.000
|
$53.180
|
$10.000
|
$31.250
|
$50.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
13,750.000
|
$30.000
|
$30.000
|
$46.920
|
$15.000
|
$41.250
|
$50.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
400.000
|
$55.000
|
$30.000
|
$92.370
|
$15.000
|
$43.750
|
$60.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
19,821.000
|
$10.000
|
$4.000
|
$2.810
|
$8.000
|
$3.400
|
$5.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
4,127.000
|
$5.000
|
$4.000
|
$2.800
|
$10.000
|
$4.100
|
$5.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
140.000
|
$5.000
|
$4.000
|
$3.860
|
$10.000
|
$45.250
|
$5.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
31,994.000
|
$9.000
|
$4.000
|
$0.010
|
$9.000
|
$9.750
|
$8.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
2,427.000
|
$6.000
|
$4.000
|
$4.740
|
$15.000
|
$7.400
|
$8.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
200.000
|
$6.000
|
$4.000
|
$17.580
|
$15.000
|
$8.750
|
$8.000
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
41,790.000
|
$55.000
|
$30.000
|
$48.080
|
$55.000
|
$51.500
|
$65.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
12,697.000
|
$25.000
|
$25.000
|
$16.730
|
$13.310
|
$20.000
|
$5.000
|
|
|
CONC CURB & GUTTER (ARMOR CURB)
|
LF
|
40.000
|
$300.000
|
$350.000
|
$145.500
|
$224.350
|
$200.000
|
$255.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
927.000
|
$80.000
|
$100.000
|
$48.870
|
$75.000
|
$82.000
|
$62.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
5,749.000
|
$50.000
|
$24.000
|
$46.520
|
$60.000
|
$154.000
|
$35.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
131,155.000
|
$0.150
|
$0.500
|
$0.210
|
$0.100
|
$0.100
|
$0.100
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
5,011.000
|
$3.000
|
$4.500
|
$1.500
|
$1.500
|
$2.000
|
$2.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
13.000
|
$150.000
|
$233.000
|
$150.000
|
$150.000
|
$170.000
|
$175.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
1.000
|
$200.000
|
$143.000
|
$150.000
|
$150.000
|
$105.000
|
$110.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$200.000
|
$215.000
|
$150.000
|
$150.000
|
$170.000
|
$175.000
|
|
|
RM MTL BM GD FEN TRANS (T101)
|
EA
|
17.000
|
$200.000
|
$158.000
|
$150.000
|
$150.000
|
$120.000
|
$125.000
|
|
|
REMOVE CABLE BARRIER
|
LF
|
21,494.000
|
$6.000
|
$6.000
|
$3.500
|
$3.500
|
$3.500
|
$4.000
|
|
|
REMOVE CABLE BARRIER TERMINAL SECTION
|
EA
|
22.000
|
$650.000
|
$313.000
|
$1,000.000
|
$1,000.000
|
$250.000
|
$260.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
18.000
|
$250.000
|
$375.000
|
$150.000
|
$150.000
|
$250.000
|
$260.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
14.000
|
$2,500.000
|
$1,380.000
|
$1,500.000
|
$1,500.000
|
$1,380.000
|
$1,430.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
27.000
|
$1,000.000
|
$690.000
|
$1,000.000
|
$1,000.000
|
$690.000
|
$715.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
42.000
|
$10,000.000
|
$24,600.000
|
$24,946.000
|
$24,946.600
|
$24,600.000
|
$26,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
33.000
|
$10,000.000
|
$7,700.000
|
$8,000.000
|
$8,000.000
|
$770.000
|
$8,000.000
|
|
|
CHAIN LINK FENCE (INSTALL) (8')
|
LF
|
382.000
|
$85.000
|
$87.000
|
$30.000
|
$70.000
|
$87.000
|
$90.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
7.000
|
$250.000
|
$160.000
|
$199.950
|
$199.950
|
$160.000
|
$250.000
|
|
|
REMOVE RD IL ASM (SHOE-BASE)
|
EA
|
22.000
|
$1,000.000
|
$1,796.000
|
$581.720
|
$588.700
|
$582.000
|
$300.000
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
30.000
|
$1,000.000
|
$724.000
|
$923.370
|
$934.450
|
$923.000
|
$725.000
|
|
|
IN RD IL (TY SA) 40B-8 (250W EQ) LED
|
EA
|
11.000
|
$3,000.000
|
$2,460.000
|
$3,014.600
|
$3,050.770
|
$3,010.000
|
$2,500.000
|
|
|
IN RD IL (TY SA) 40T-8 (250W EQ) LED
|
EA
|
98.000
|
$3,000.000
|
$2,546.000
|
$2,890.240
|
$2,924.920
|
$2,890.000
|
$2,550.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
22,620.000
|
$8.000
|
$8.750
|
$4.910
|
$4.970
|
$4.900
|
$10.000
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
3,135.000
|
$15.000
|
$14.000
|
$8.150
|
$8.250
|
$8.150
|
$14.000
|
|
|
CONDT (PVC) (SCH 40) (3") (CONC ENCSE)
|
LF
|
130,460.000
|
$10.000
|
$6.500
|
$7.770
|
$7.860
|
$7.750
|
$7.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
8,380.000
|
$5.000
|
$8.000
|
$5.360
|
$5.420
|
$5.350
|
$8.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
3,920.000
|
$15.000
|
$8.500
|
$8.510
|
$8.620
|
$8.500
|
$9.000
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
2,910.000
|
$12.000
|
$9.000
|
$4.680
|
$4.740
|
$4.700
|
$9.000
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
35,410.000
|
$25.000
|
$7.750
|
$10.100
|
$10.220
|
$10.100
|
$8.000
|
|
|
CONDT (RM) (3/4")
|
LF
|
1,235.000
|
$15.000
|
$8.000
|
$10.890
|
$11.020
|
$10.900
|
$8.000
|
|
|
CONDT (RM) (3")
|
LF
|
11,870.000
|
$33.000
|
$38.000
|
$22.670
|
$22.940
|
$22.700
|
$38.000
|
|
|
ELEC CONDR (NO.14) INSULATED
|
LF
|
75,030.000
|
$1.500
|
$0.500
|
$0.410
|
$0.410
|
$0.400
|
$0.500
|
|
|
ELEC CONDR (NO.10) BARE
|
LF
|
110.000
|
$1.250
|
$1.000
|
$1.140
|
$1.150
|
$1.150
|
$1.000
|
|
|
ELEC CONDR (NO.10) INSULATED
|
LF
|
330.000
|
$1.500
|
$1.050
|
$0.700
|
$0.710
|
$0.700
|
$1.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
14,660.000
|
$1.000
|
$1.100
|
$0.720
|
$0.720
|
$0.700
|
$1.000
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
54,480.000
|
$1.000
|
$1.250
|
$0.800
|
$0.810
|
$0.800
|
$1.300
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
10,970.000
|
$1.000
|
$1.300
|
$0.880
|
$0.890
|
$0.900
|
$1.300
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
35,505.000
|
$1.100
|
$1.500
|
$1.000
|
$1.010
|
$1.000
|
$1.500
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
6,085.000
|
$1.500
|
$1.700
|
$1.190
|
$1.210
|
$1.200
|
$1.700
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
15,630.000
|
$1.500
|
$1.900
|
$1.290
|
$1.310
|
$1.300
|
$2.000
|
|
|
ELEC CONDR (NO.2) BARE
|
LF
|
5,430.000
|
$2.000
|
$2.450
|
$1.640
|
$1.660
|
$1.650
|
$2.500
|
|
|
ELEC CONDR (NO.2) INSULATED
|
LF
|
23,780.000
|
$2.500
|
$2.600
|
$1.840
|
$1.870
|
$1.850
|
$2.600
|
|
|
ELEC CONDR (NO.2/0) BARE
|
LF
|
2,140.000
|
$3.000
|
$3.500
|
$3.590
|
$3.630
|
$3.600
|
$3.500
|
|
|
ELEC CONDR (NO.2/0) INSULATED
|
LF
|
6,420.000
|
$3.000
|
$3.850
|
$3.870
|
$3.920
|
$3.850
|
$4.000
|
|
|
GROUND BOX TY A (122311)
|
EA
|
17.000
|
$650.000
|
$565.000
|
$417.450
|
$422.460
|
$417.000
|
$565.000
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
63.000
|
$700.000
|
$888.000
|
$780.020
|
$789.380
|
$780.000
|
$888.000
|
|
|
ELC SRV TY A 120/240 060(NS)SS(E)SP(O)
|
EA
|
8.000
|
$5,200.000
|
$4,923.000
|
$4,365.450
|
$4,417.840
|
$4,370.000
|
$5,000.000
|
|
|
ELC SRV TY A 120/240 100(NS)SS(E)SP(O)
|
EA
|
1.000
|
$5,000.000
|
$5,900.000
|
$4,616.650
|
$4,672.050
|
$4,620.000
|
$5,900.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(N)SP(O)
|
EA
|
3.000
|
$5,000.000
|
$4,060.000
|
$3,429.250
|
$3,470.400
|
$3,430.000
|
$4,060.000
|
|
|
ELC SRV TY D 120/240 100(NS)SS(N)SP(O)
|
EA
|
7.000
|
$4,000.000
|
$6,500.000
|
$3,487.420
|
$3,529.270
|
$3,490.000
|
$6,500.000
|
|
|
ELC SRV TY D 120/240 150(NS)GS(N)TP(O)
|
EA
|
1.000
|
$6,000.000
|
$2,495.000
|
$2,199.820
|
$2,226.220
|
$2,200.000
|
$2,500.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
348.080
|
$25.000
|
$22.150
|
$61.650
|
$35.000
|
$22.200
|
$23.000
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
2,824.000
|
$25.000
|
$18.250
|
$32.150
|
$34.950
|
$32.250
|
$23.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
2.000
|
$450.000
|
$505.000
|
$546.990
|
$435.000
|
$505.000
|
$525.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
14.000
|
$500.000
|
$475.000
|
$618.840
|
$470.000
|
$475.000
|
$500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
68.000
|
$700.000
|
$570.000
|
$573.030
|
$545.000
|
$570.000
|
$600.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
23.000
|
$640.000
|
$675.000
|
$670.580
|
$705.000
|
$675.000
|
$700.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
13.000
|
$820.000
|
$755.000
|
$685.030
|
$680.000
|
$755.000
|
$785.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
4.000
|
$915.000
|
$895.000
|
$830.340
|
$735.000
|
$895.000
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
|
EA
|
3.000
|
$950.000
|
$1,010.000
|
$1,033.050
|
$835.000
|
$1,010.000
|
$1,050.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
|
EA
|
4.000
|
$1,600.000
|
$1,745.000
|
$1,880.160
|
$1,835.000
|
$1,750.000
|
$1,807.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
148.000
|
$360.000
|
$325.000
|
$380.120
|
$305.000
|
$325.000
|
$350.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
91.000
|
$400.000
|
$410.000
|
$414.580
|
$355.000
|
$410.000
|
$450.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
8.000
|
$2,500.000
|
$1,490.000
|
$2,290.340
|
$2,325.000
|
$1,490.000
|
$1,550.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
|
EA
|
7.000
|
$2,500.000
|
$1,520.000
|
$2,318.340
|
$2,215.650
|
$4,520.000
|
$1,600.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
311.000
|
$80.000
|
$125.000
|
$75.000
|
$75.000
|
$75.000
|
$90.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
2,165.700
|
$4.000
|
$4.150
|
$6.340
|
$4.250
|
$6.350
|
$5.000
|
|
|
REMOVE LRSA
|
EA
|
3.000
|
$1,000.000
|
$1,575.000
|
$1,302.330
|
$2,500.000
|
$1,300.000
|
$600.000
|
|
|
INS OH SN SUP(10 FT BAL TEE)(SPAN ONLY)
|
EA
|
4.000
|
$8,000.000
|
$6,674.000
|
$5,625.790
|
$7,415.000
|
$5,630.000
|
$7,000.000
|
|
|
INS OH SN SUP(15 FT BAL TEE)(SPAN ONLY)
|
EA
|
8.000
|
$9,900.000
|
$7,220.000
|
$6,597.270
|
$6,450.000
|
$6,600.000
|
$8,000.000
|
|
|
INS OH SN SUP(25 FT CANT)(SPAN ONLY)
|
EA
|
2.000
|
$18,000.000
|
$8,754.000
|
$9,897.600
|
$12,200.000
|
$9,900.000
|
$9,000.000
|
|
|
INS OH SN SUP(30 FT CANT)(SPAN ONLY)
|
EA
|
3.000
|
$13,500.000
|
$10,145.000
|
$11,009.530
|
$13,106.000
|
$11,010.000
|
$10,000.000
|
|
|
INS OH SN SUP(35 FT CANT)(SPAN ONLY)
|
EA
|
2.000
|
$14,000.000
|
$10,845.000
|
$12,098.050
|
$14,300.000
|
$12,100.000
|
$11,000.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
|
EA
|
121.000
|
$40.000
|
$47.000
|
$47.750
|
$60.000
|
$47.000
|
$70.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
230.000
|
$15.000
|
$19.500
|
$13.500
|
$30.000
|
$19.500
|
$20.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(FLX)GND
|
EA
|
68.000
|
$80.000
|
$47.000
|
$48.500
|
$60.000
|
$47.000
|
$70.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
44.000
|
$15.000
|
$19.500
|
$13.500
|
$30.000
|
$19.500
|
$17.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
164.000
|
$20.000
|
$20.000
|
$13.500
|
$30.000
|
$20.000
|
$21.000
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(FLX)GND
|
EA
|
93.000
|
$45.000
|
$48.000
|
$48.000
|
$60.000
|
$48.000
|
$95.000
|
|
|
INSTL OM ASSM (OM-1)(FLX)GND
|
EA
|
16.000
|
$70.000
|
$47.000
|
$260.000
|
$350.000
|
$47.000
|
$50.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
45.000
|
$68.000
|
$49.000
|
$54.950
|
$60.000
|
$49.000
|
$51.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
63,751.000
|
$0.700
|
$0.850
|
$0.850
|
$0.950
|
$0.850
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(DOT)
|
LF
|
2,545.000
|
$1.500
|
$1.500
|
$1.500
|
$2.000
|
$1.500
|
$1.500
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
96,195.000
|
$0.700
|
$0.800
|
$0.800
|
$0.800
|
$0.800
|
$0.800
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
5,546.000
|
$1.500
|
$1.400
|
$1.400
|
$1.800
|
$1.400
|
$1.500
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
149.000
|
$6.500
|
$6.000
|
$6.000
|
$15.000
|
$6.000
|
$6.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
97,865.000
|
$0.700
|
$0.850
|
$0.850
|
$0.800
|
$0.850
|
$0.850
|
|
PREFAB PAV MRK TY B (W)(6")(BRK)CNTST
|
LF
|
42,305.000
|
$7.500
|
$10.500
|
$10.500
|
$9.990
|
$10.500
|
$10.500
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
28.000
|
$225.000
|
$195.000
|
$195.000
|
$220.000
|
$195.000
|
$195.000
|
|
PREFAB PAV MRK TY C (W) (DBL ARROW)
|
EA
|
18.000
|
$350.000
|
$400.000
|
$400.000
|
$355.000
|
$400.000
|
$400.000
|
|
PREFAB PAV MRK TY C (W) (UTURN ARROW)
|
EA
|
13.000
|
$450.000
|
$350.000
|
$350.000
|
$355.000
|
$350.000
|
$350.000
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
28.000
|
$450.000
|
$450.000
|
$450.000
|
$500.000
|
$450.000
|
$450.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
57.000
|
$250.000
|
$265.000
|
$265.000
|
$300.000
|
$265.000
|
$265.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
20.000
|
$40.000
|
$60.000
|
$60.000
|
$40.000
|
$60.000
|
$60.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
117.000
|
$4.000
|
$5.000
|
$5.000
|
$6.000
|
$5.000
|
$5.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
523.000
|
$4.000
|
$5.000
|
$5.000
|
$4.000
|
$5.000
|
$5.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
5,104.000
|
$4.000
|
$4.750
|
$4.750
|
$3.500
|
$4.750
|
$5.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
30,827.000
|
$0.500
|
$0.350
|
$0.350
|
$0.700
|
$0.350
|
$0.350
|
|
|
REMOVE RDSD FLASH BEACON ASSEMBLY
|
EA
|
4.000
|
$850.000
|
$800.000
|
$493.930
|
$499.860
|
$494.000
|
$500.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
10.000
|
$7,000.000
|
$2,800.000
|
$5,295.390
|
$1,600.000
|
$13,730.000
|
$2,500.000
|
|
|
LITTER REMOVAL
|
CYC
|
50.000
|
$9,000.000
|
$2,000.000
|
$2,510.490
|
$1,088.620
|
$18,640.000
|
$835.000
|
|
|
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
|
CYC
|
50.000
|
$8,000.000
|
$3,200.000
|
$1,252.170
|
$1,110.660
|
$7,140.000
|
$835.000
|
|
|
CLEANING / SWEEPING (CENTER MEDIAN)
|
CYC
|
50.000
|
$7,700.000
|
$2,300.000
|
$750.000
|
$1,660.710
|
$6,830.000
|
$1,250.000
|
|
|
NO. OF WORKING DAYS
|
$/D
|
22,000.000
|
$1,400.000
|
$1,033.000
|
$1,229.000
|
$1,100.000
|
$900.000
|
$1,360.000
|
|
|
WICK DRAINS
|
LF
|
39,060.000
|
$2.600
|
$10.000
|
$6.020
|
$5.420
|
$0.450
|
$0.500
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
859.000
|
$80.000
|
$10.000
|
$110.110
|
$141.140
|
$200.000
|
$90.000
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(12 FIBER)
|
LF
|
75,185.000
|
$3.000
|
$3.050
|
$1.720
|
$1.740
|
$1.700
|
$3.000
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(144 FIBER)
|
LF
|
29,545.000
|
$4.000
|
$5.400
|
$3.430
|
$3.470
|
$3.450
|
$5.000
|
|
|
FIBER OPTIC PATCH PANEL (12 POSITION)
|
EA
|
15.000
|
$3,000.000
|
$476.000
|
$761.400
|
$770.540
|
$761.000
|
$500.000
|
|
|
FIBER OPTIC PATCH PANEL (144 POSITION)
|
EA
|
5.000
|
$8,500.000
|
$1,445.000
|
$8,347.130
|
$8,447.290
|
$8,350.000
|
$1,500.000
|
|
|
ITS GRND MNT CAB (TY 4) (CONF 2)
|
EA
|
3.000
|
$14,000.000
|
$8,832.000
|
$4,742.940
|
$4,799.850
|
$4,740.000
|
$900.000
|
|
|
ITS GRND MNT CAB (TY 6) (CONF 2)
|
EA
|
3.000
|
$14,000.000
|
$11,340.000
|
$9,105.640
|
$9,214.910
|
$9,110.000
|
$12,000.000
|
|
|
CCTV FIELD EQUIPMENT (ANALOG)
|
EA
|
10.000
|
$10,000.000
|
$7,085.000
|
$6,630.250
|
$6,709.810
|
$6,630.000
|
$7,000.000
|
|
|
CCTV MOUNT (POLE)
|
EA
|
10.000
|
$500.000
|
$170.000
|
$513.830
|
$520.000
|
$514.000
|
$175.000
|
|
|
ITS MULTI-DUCT CND (PVC-40)(CONC ENCSE)
|
LF
|
66,960.000
|
$15.000
|
$8.000
|
$9.710
|
$9.830
|
$9.700
|
$8.000
|
|
|
ITS MULTI-DUCT CND (PVC-80)(BORE)
|
LF
|
16,140.000
|
$34.000
|
$15.000
|
$15.220
|
$15.410
|
$15.200
|
$15.000
|
|
|
ITS MULTI-DUCT CND (RMC)
|
LF
|
5,940.000
|
$60.000
|
$64.000
|
$46.080
|
$46.640
|
$46.000
|
$65.000
|
|
|
INSTALL DMS (FOUNDATION MTD CABINET)
|
EA
|
3.000
|
$25,000.000
|
$30,945.000
|
$5,295.310
|
$5,358.860
|
$5,300.000
|
$31,000.000
|
|
MULTIPOLYMER PAV MRK (W)(6")(SLD)
|
LF
|
177,296.000
|
$0.500
|
$0.650
|
$0.650
|
$0.610
|
$0.650
|
$0.650
|
|
MULTIPOLYMER PAV MRK (W)(6")(BRK)
|
LF
|
19,015.000
|
$0.600
|
$0.650
|
$0.650
|
$0.650
|
$0.650
|
$0.650
|
|
MULTIPOLYMER PAV MRK (W)(6")(DOT)
|
LF
|
1,342.000
|
$1.500
|
$1.250
|
$1.250
|
$3.000
|
$1.250
|
$1.250
|
|
MULTIPOLYMER PAV MRK (W)(8")(SLD)
|
LF
|
34,174.000
|
$1.000
|
$1.200
|
$1.200
|
$1.100
|
$1.200
|
$1.200
|
|
MULTIPOLYMER PAV MRK (W)(12")(SLD)
|
LF
|
3,516.000
|
$3.000
|
$3.000
|
$3.000
|
$3.250
|
$3.000
|
$3.000
|
|
MULTIPOLYMER PAV MRK (W)(12")(LNDP)
|
LF
|
676.000
|
$0.500
|
$3.000
|
$3.000
|
$3.250
|
$3.000
|
$3.000
|
|
MULTIPOLYMER PAV MRK (W)(24")(SLD)
|
LF
|
829.000
|
$6.000
|
$6.000
|
$6.000
|
$6.000
|
$6.000
|
$6.000
|
|
MULTIPOLYMER PAV MRK (Y)(4")(SLD)
|
LF
|
18,880.000
|
$0.600
|
$0.550
|
$0.550
|
$0.550
|
$0.550
|
$0.550
|
|
MULTIPOLYMER PAV MRK (Y)(4")(BRK)
|
LF
|
164.000
|
$2.000
|
$0.800
|
$0.800
|
$0.550
|
$0.800
|
$1.000
|
|
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
|
LF
|
162,737.000
|
$0.500
|
$0.650
|
$0.650
|
$0.590
|
$0.650
|
$0.650
|
|
MULTIPOLYMER PAV MRK (Y)(8")(SLD)
|
LF
|
591.000
|
$11.000
|
$1.300
|
$1.300
|
$2.000
|
$1.300
|
$1.300
|
|
MULTIPOLYMER PAV MRK (Y)(24")(SLD)
|
LF
|
3,604.000
|
$5.000
|
$6.000
|
$6.000
|
$6.000
|
$6.000
|
$6.000
|
|
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
|
LF
|
19,015.000
|
$0.750
|
$0.750
|
$0.750
|
$0.650
|
$0.750
|
$0.750
|
|
|
ITS POLE (55 FT)(110 MPH)
|
EA
|
10.000
|
$15,000.000
|
$12,190.000
|
$11,692.080
|
$11,832.380
|
$11,690.000
|
$12,200.000
|
|
|
ITS POLE MNT CAB (TY 2)(CONF 1)
|
EA
|
10.000
|
$6,000.000
|
$4,030.000
|
$2,942.830
|
$2,978.140
|
$2,940.000
|
$4,100.000
|
|
|
ETHERNET SWITCH (INSTALL ONLY)
|
EA
|
15.000
|
$1,000.000
|
$130.000
|
$197.570
|
$199.940
|
$198.000
|
$130.000
|
|
|
MPEG 4 VIDEO ENCODER (INSTALL ONLY)
|
EA
|
13.000
|
$850.000
|
$150.000
|
$197.570
|
$199.940
|
$198.000
|
$150.000
|
|
|
BLUETOOTH DETECTION SYSTEM
|
EA
|
2.000
|
$6,000.000
|
$4,070.000
|
$7,118.710
|
$7,204.130
|
$7,120.000
|
$4,100.000
|
|
|
ETHERNET/FIBER MEDIA CONV (SM)
|
EA
|
6.000
|
$850.000
|
$920.000
|
$1,250.980
|
$1,265.990
|
$1,250.000
|
$1,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
1,590.000
|
$300.000
|
$318.000
|
$402.650
|
$196.940
|
$500.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
200.000
|
$200.000
|
$831.000
|
$714.720
|
$414.720
|
$1,500.000
|
$200.000
|
|
|
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
|
EA
|
169.000
|
$2,900.000
|
$4,496.000
|
$2,940.400
|
$2,975.650
|
$2,940.000
|
$4,500.000
|
|
|
ITS RVSD (DATA COLLECT ONLY) SYS
|
EA
|
8.000
|
$9,000.000
|
$6,100.000
|
$6,104.800
|
$6,178.060
|
$6,100.000
|
$6,100.000
|
|
|
TEMP INCIDENT DETECT & SURVEIL SYS
|
EA
|
2.000
|
$300,000.000
|
$179,995.000
|
$85,350.000
|
$85,350.000
|
$84,600.000
|
$100,000.000
|
|
Totals: |
$195,525,805.900
|
$191,395,295.327
|
$198,029,850.139
|
$205,280,801.522
|
$210,039,775.491
|
$230,462,130.370
|