PREPARING ROW
|
STA
|
420.600
|
$1,500.000
|
$2,709.000
|
$6,316.000
|
$525.000
|
$4,335.000
|
$362.000
|
$1,000.000
|
$1,800.000
|
$7,112.800
|
$4,500.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
1,477.000
|
$10.000
|
$15.000
|
$20.000
|
$4.000
|
$10.000
|
$17.000
|
$12.000
|
$9.000
|
$5.360
|
$9.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
3,065.000
|
$15.000
|
$7.000
|
$9.500
|
$10.000
|
$10.000
|
$20.000
|
$12.000
|
$9.000
|
$5.020
|
$7.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
14.000
|
$5.000
|
$18.000
|
$62.540
|
$50.000
|
$10.000
|
$40.000
|
$20.000
|
$20.000
|
$7.900
|
$60.000
|
|
|
REMOVE STAB BASE AND ASPH PAV (6"-20")
|
SY
|
137,666.000
|
$3.000
|
$3.250
|
$5.420
|
$6.300
|
$4.800
|
$6.200
|
$7.250
|
$5.000
|
$5.470
|
$4.000
|
|
|
REMOVING STAB BASE & ASPH PAV (0-6")
|
SY
|
4,284.000
|
$5.000
|
$7.500
|
$8.480
|
$8.400
|
$14.500
|
$9.000
|
$5.000
|
$3.100
|
$4.390
|
$2.200
|
|
|
REMOVING STAB BASE AND ASPH PAV (5"-8")
|
SY
|
7,110.000
|
$1.900
|
$3.000
|
$2.290
|
$5.250
|
$4.200
|
$3.500
|
$4.000
|
$4.000
|
$3.060
|
$3.900
|
|
|
OBLITERATING ABANDONED ROAD
|
STA
|
78.500
|
$1,100.000
|
$440.000
|
$180.310
|
$400.000
|
$300.000
|
$1,000.000
|
$1,000.000
|
$1,150.000
|
$170.460
|
$70.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
167,394.000
|
$8.500
|
$6.500
|
$4.000
|
$2.500
|
$10.000
|
$8.900
|
$6.000
|
$7.250
|
$5.460
|
$2.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
160.000
|
$12.400
|
$11.000
|
$36.000
|
$25.000
|
$30.000
|
$25.000
|
$15.000
|
$20.000
|
$21.630
|
$30.000
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
|
CY
|
182,236.000
|
$7.500
|
$5.500
|
$9.000
|
$7.500
|
$7.000
|
$9.000
|
$9.000
|
$10.500
|
$11.300
|
$16.000
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
|
CY
|
11,133.000
|
$17.000
|
$14.500
|
$6.370
|
$28.000
|
$25.000
|
$15.000
|
$15.000
|
$11.000
|
$13.190
|
$47.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
420.600
|
$200.000
|
$330.000
|
$86.280
|
$200.000
|
$310.000
|
$160.000
|
$200.000
|
$225.000
|
$26.600
|
$450.000
|
|
|
BLADING
|
STA
|
420.600
|
$120.000
|
$163.000
|
$113.000
|
$800.000
|
$60.000
|
$85.000
|
$200.000
|
$175.000
|
$55.940
|
$130.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
500,852.000
|
$1.000
|
$0.770
|
$1.180
|
$0.720
|
$0.770
|
$1.000
|
$1.500
|
$2.250
|
$1.580
|
$4.500
|
|
|
STRAW/HAY MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
150,635.000
|
$0.250
|
$0.290
|
$0.830
|
$0.290
|
$0.290
|
$0.240
|
$0.250
|
$0.370
|
$0.290
|
$0.900
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
350,217.000
|
$0.140
|
$0.110
|
$0.650
|
$0.180
|
$0.110
|
$0.110
|
$0.120
|
$0.160
|
$0.110
|
$0.290
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
317,086.000
|
$0.120
|
$0.090
|
$0.630
|
$0.150
|
$0.090
|
$0.110
|
$0.120
|
$0.200
|
$0.090
|
$0.290
|
|
|
VEGETATIVE WATERING
|
MG
|
57,711.600
|
$5.000
|
$1.000
|
$0.010
|
$1.050
|
$6.000
|
$0.010
|
$4.000
|
$1.000
|
$17.880
|
$4.000
|
|
|
FL BS (CMP IN PLC)(TY D GR1-2)(12")
|
SY
|
228,779.000
|
$17.000
|
$16.000
|
$17.610
|
$18.000
|
$15.000
|
$17.800
|
$20.000
|
$18.750
|
$14.990
|
$17.250
|
|
|
LIME TRT (EXST MATL) (12")
|
SY
|
228,779.000
|
$4.500
|
$3.600
|
$3.410
|
$4.250
|
$4.150
|
$4.250
|
$3.000
|
$2.000
|
$3.740
|
$5.800
|
|
|
LIME (HYD, COM, OR QK(SLURRY))
|
TON
|
7,925.000
|
$160.000
|
$193.000
|
$158.830
|
$168.000
|
$160.000
|
$180.000
|
$190.000
|
$220.000
|
$184.860
|
$184.000
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
45,754.000
|
$3.000
|
$5.200
|
$3.840
|
$4.100
|
$4.200
|
$3.700
|
$5.000
|
$4.500
|
$4.370
|
$4.750
|
|
|
ASPH (CRS-2P)
|
GAL
|
57,199.000
|
$3.000
|
$3.680
|
$3.720
|
$4.000
|
$3.380
|
$3.900
|
$4.000
|
$4.000
|
$3.510
|
$3.900
|
|
|
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
|
GAL
|
48,044.000
|
$3.350
|
$3.830
|
$3.870
|
$4.150
|
$3.400
|
$3.900
|
$4.000
|
$4.000
|
$3.530
|
$3.900
|
|
|
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
|
CY
|
2,176.000
|
$120.000
|
$100.600
|
$121.600
|
$123.000
|
$154.050
|
$150.000
|
$105.000
|
$145.000
|
$160.130
|
$180.000
|
|
|
SUPERPAVE MIXTURES SP-B PG64-22
|
TON
|
50,333.000
|
$65.000
|
$83.000
|
$75.940
|
$88.000
|
$79.150
|
$90.240
|
$92.000
|
$98.000
|
$84.350
|
$90.000
|
|
|
SUPERPAVE MIXTURES SP-C PG64-22
|
TON
|
48,727.000
|
$95.000
|
$85.000
|
$80.850
|
$93.000
|
$86.000
|
$93.740
|
$95.000
|
$100.000
|
$90.690
|
$90.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
583.000
|
$2.500
|
$9.750
|
$2.500
|
$16.800
|
$11.610
|
$9.000
|
$8.000
|
$11.500
|
$4.570
|
$4.800
|
|
|
FLOWABLE BACKFILL
|
CY
|
50.000
|
$140.000
|
$120.000
|
$162.400
|
$350.000
|
$180.000
|
$165.000
|
$300.000
|
$205.000
|
$201.380
|
$125.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
5,044.000
|
$25.000
|
$43.000
|
$29.840
|
$27.500
|
$5.000
|
$40.000
|
$35.000
|
$30.000
|
$49.730
|
$12.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
3,036.000
|
$150.000
|
$142.000
|
$150.000
|
$210.000
|
$140.000
|
$165.000
|
$155.000
|
$130.000
|
$127.410
|
$150.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
277.500
|
$1,000.000
|
$1,054.000
|
$1,100.000
|
$1,000.000
|
$1,200.000
|
$900.000
|
$950.000
|
$900.000
|
$784.650
|
$820.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
148.300
|
$1,000.000
|
$1,200.000
|
$1,000.000
|
$1,000.000
|
$1,000.000
|
$900.000
|
$950.000
|
$900.000
|
$999.800
|
$1,040.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
59.700
|
$1,000.000
|
$1,300.000
|
$1,200.000
|
$1,500.000
|
$1,200.000
|
$900.000
|
$950.000
|
$900.000
|
$809.940
|
$1,570.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
50,140.000
|
$20.000
|
$21.000
|
$15.200
|
$18.000
|
$18.000
|
$19.000
|
$24.000
|
$17.500
|
$14.830
|
$18.400
|
|
|
APPROACH SLAB (HPC)
|
CY
|
373.800
|
$450.000
|
$462.000
|
$390.000
|
$500.000
|
$470.000
|
$550.000
|
$540.000
|
$490.000
|
$542.270
|
$480.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
714.000
|
$140.000
|
$182.000
|
$120.000
|
$200.000
|
$135.000
|
$150.000
|
$160.000
|
$145.000
|
$134.230
|
$162.000
|
|
|
PRESTR CONC GIRDER (TX34)
|
LF
|
1,908.000
|
$135.000
|
$179.000
|
$125.000
|
$220.000
|
$130.000
|
$150.000
|
$160.000
|
$145.000
|
$132.360
|
$156.000
|
|
|
PRESTR CONC GIRDER (TX40)
|
LF
|
536.890
|
$135.000
|
$189.000
|
$130.000
|
$240.000
|
$150.000
|
$150.000
|
$160.000
|
$145.000
|
$146.290
|
$157.000
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
3,345.000
|
$138.000
|
$191.000
|
$136.000
|
$280.000
|
$150.000
|
$150.000
|
$160.000
|
$145.000
|
$147.130
|
$189.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
58.900
|
$500.000
|
$546.000
|
$612.070
|
$600.000
|
$725.000
|
$500.000
|
$400.000
|
$480.000
|
$463.430
|
$500.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
442.000
|
$130.000
|
$179.000
|
$100.890
|
$157.500
|
$160.000
|
$130.000
|
$135.000
|
$155.000
|
$125.250
|
$200.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
7,048.000
|
$105.000
|
$140.000
|
$100.000
|
$157.500
|
$170.000
|
$115.000
|
$135.000
|
$135.000
|
$102.910
|
$20.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
223.000
|
$420.000
|
$504.000
|
$475.000
|
$450.000
|
$450.000
|
$500.000
|
$440.000
|
$500.000
|
$639.040
|
$500.000
|
|
|
RAIL (TY T552)(HPC)
|
LF
|
2,378.000
|
$65.000
|
$59.000
|
$55.000
|
$50.000
|
$62.000
|
$68.000
|
$90.000
|
$78.000
|
$53.960
|
$66.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
|
LF
|
497.000
|
$80.000
|
$91.000
|
$96.520
|
$60.000
|
$100.000
|
$75.000
|
$75.000
|
$65.000
|
$63.280
|
$74.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
|
LF
|
70.000
|
$480.000
|
$539.000
|
$320.000
|
$400.000
|
$600.000
|
$900.000
|
$800.000
|
$400.000
|
$319.790
|
$1,350.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
|
LF
|
44.000
|
$520.000
|
$675.000
|
$420.000
|
$450.000
|
$900.000
|
$550.000
|
$800.000
|
$460.000
|
$692.390
|
$800.000
|
|
|
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
|
LF
|
19.000
|
$530.000
|
$721.000
|
$475.000
|
$500.000
|
$1,075.000
|
$900.000
|
$800.000
|
$525.000
|
$831.200
|
$950.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
|
LF
|
93.000
|
$680.000
|
$593.000
|
$475.000
|
$650.000
|
$650.000
|
$700.000
|
$1,000.000
|
$400.000
|
$830.980
|
$560.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
|
LF
|
149.000
|
$650.000
|
$730.000
|
$1,101.200
|
$700.000
|
$760.000
|
$650.000
|
$1,000.000
|
$455.000
|
$900.190
|
$800.000
|
|
|
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
|
LF
|
42.000
|
$692.000
|
$660.000
|
$575.000
|
$800.000
|
$1,200.000
|
$900.000
|
$1,000.000
|
$555.000
|
$969.540
|
$930.000
|
|
|
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
|
LF
|
22.000
|
$600.000
|
$830.000
|
$680.000
|
$850.000
|
$1,430.000
|
$900.000
|
$1,500.000
|
$660.000
|
$1,107.310
|
$980.000
|
|
|
CONC BOX CULV (6 FT X 2 FT) (EXTEND)
|
LF
|
19.000
|
$650.000
|
$820.000
|
$520.000
|
$750.000
|
$1,180.000
|
$900.000
|
$1,000.000
|
$550.000
|
$692.480
|
$900.000
|
|
|
CONC BOX CULV (5 FT X 6.5 FT)(EXTEND)
|
LF
|
22.000
|
$749.000
|
$645.000
|
$620.000
|
$850.000
|
$1,800.000
|
$900.000
|
$1,000.000
|
$625.000
|
$1,073.150
|
$1,230.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
2,282.000
|
$45.000
|
$57.000
|
$58.000
|
$50.000
|
$74.000
|
$50.000
|
$45.000
|
$38.000
|
$75.010
|
$88.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
1,012.000
|
$55.000
|
$71.000
|
$88.000
|
$60.000
|
$84.000
|
$68.000
|
$55.000
|
$50.000
|
$85.530
|
$116.000
|
|
|
WINGWALL (FW - 0) (HW=5 FT)
|
EA
|
2.000
|
$7,910.000
|
$12,945.000
|
$10,500.000
|
$12,000.000
|
$16,000.000
|
$10,000.000
|
$6,000.000
|
$6,400.000
|
$10,671.620
|
$6,850.000
|
|
|
WINGWALL (PW - 1) (HW=3 FT)
|
EA
|
2.000
|
$4,600.000
|
$8,454.000
|
$6,700.000
|
$12,000.000
|
$8,000.000
|
$10,000.000
|
$5,000.000
|
$6,500.000
|
$7,093.850
|
$6,350.000
|
|
|
WINGWALL (PW - 1) (HW=4 FT)
|
EA
|
1.000
|
$7,970.000
|
$11,000.000
|
$8,700.000
|
$14,000.000
|
$9,500.000
|
$10,000.000
|
$6,000.000
|
$7,500.000
|
$7,587.950
|
$6,850.000
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
6.000
|
$13,500.000
|
$19,000.000
|
$17,000.000
|
$18,000.000
|
$18,000.000
|
$18,000.000
|
$12,000.000
|
$12,500.000
|
$12,229.330
|
$13,500.000
|
|
|
WINGWALL (PW - 2) (HW=4 FT)
|
EA
|
1.000
|
$6,800.000
|
$12,000.000
|
$6,000.000
|
$13,000.000
|
$7,500.000
|
$10,000.000
|
$4,500.000
|
$7,000.000
|
$6,920.550
|
$5,200.000
|
|
|
WINGWALL (PW - 2) (HW=5 FT)
|
EA
|
6.000
|
$8,880.000
|
$13,800.000
|
$9,840.000
|
$14,000.000
|
$12,000.000
|
$18,000.000
|
$7,000.000
|
$9,000.000
|
$11,344.340
|
$9,450.000
|
|
|
WINGWALL (PW - 2) (HW=6 FT)
|
EA
|
1.000
|
$9,400.000
|
$22,600.000
|
$9,600.000
|
$17,000.000
|
$20,000.000
|
$25,000.000
|
$14,000.000
|
$14,500.000
|
$15,470.520
|
$18,500.000
|
|
|
WINGWALL (PW - 2) (HW=7 FT)
|
EA
|
4.000
|
$18,000.000
|
$26,000.000
|
$25,000.000
|
$24,000.000
|
$22,000.000
|
$30,000.000
|
$17,000.000
|
$18,500.000
|
$19,287.940
|
$19,500.000
|
|
|
WINGWALL (PW - 2) (HW=8 FT)
|
EA
|
2.000
|
$20,000.000
|
$28,300.000
|
$26,000.000
|
$25,000.000
|
$24,000.000
|
$32,000.000
|
$19,000.000
|
$20,500.000
|
$19,744.720
|
$21,000.000
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
|
EA
|
5.000
|
$5,300.000
|
$11,600.000
|
$4,330.000
|
$8,000.000
|
$7,000.000
|
$7,000.000
|
$3,000.000
|
$6,500.000
|
$7,174.260
|
$2,500.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
1.000
|
$5,500.000
|
$17,500.000
|
$7,550.000
|
$10,000.000
|
$8,000.000
|
$7,500.000
|
$6,000.000
|
$8,500.000
|
$7,839.220
|
$5,400.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
1.000
|
$6,000.000
|
$10,500.000
|
$3,525.000
|
$90,000.000
|
$8,000.000
|
$7,000.000
|
$6,000.000
|
$8,600.000
|
$7,112.660
|
$3,500.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
4.000
|
$6,100.000
|
$20,500.000
|
$7,810.000
|
$10,000.000
|
$9,000.000
|
$7,500.000
|
$6,500.000
|
$9,200.000
|
$10,138.200
|
$8,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
134.000
|
$600.000
|
$400.000
|
$800.000
|
$700.000
|
$1,650.000
|
$550.000
|
$550.000
|
$590.000
|
$953.530
|
$745.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
52.000
|
$800.000
|
$705.000
|
$900.000
|
$950.000
|
$1,900.000
|
$750.000
|
$900.000
|
$900.000
|
$1,233.640
|
$1,110.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
18.000
|
$1,500.000
|
$3,650.000
|
$2,659.600
|
$2,500.000
|
$4,500.000
|
$1,500.000
|
$1,000.000
|
$5,000.000
|
$1,250.000
|
$760.000
|
|
|
REMOV STR (SET)
|
EA
|
36.000
|
$400.000
|
$542.000
|
$500.000
|
$250.000
|
$500.000
|
$350.000
|
$500.000
|
$150.000
|
$567.920
|
$435.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
36.000
|
$1,100.000
|
$1,215.000
|
$500.000
|
$2,500.000
|
$3,700.000
|
$1,100.000
|
$500.000
|
$1,275.000
|
$1,409.620
|
$2,100.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
1.000
|
$25,000.000
|
$23,000.000
|
$17,000.000
|
$15,000.000
|
$20,000.000
|
$25,000.000
|
$22,000.000
|
$16,500.000
|
$14,006.780
|
$30,000.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
4.000
|
$50,000.000
|
$26,000.000
|
$28,000.000
|
$45,000.000
|
$35,000.000
|
$30,000.000
|
$55,000.000
|
$42,000.000
|
$32,408.150
|
$75,000.000
|
|
|
REMOV STR (DRIVEWAY CULVERT)
|
EA
|
83.000
|
$600.000
|
$653.000
|
$250.000
|
$400.000
|
$500.000
|
$550.000
|
$450.000
|
$250.000
|
$423.270
|
$800.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$2,963,600.510
|
$3,000,000.000
|
$3,450,000.000
|
$3,427,500.000
|
$3,600,000.000
|
$3,500,000.000
|
$2,700,000.000
|
$3,000,000.000
|
$3,662,000.000
|
$3,620,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
38.000
|
$6,000.000
|
$2,390.000
|
$39,000.000
|
$21,000.000
|
$20,000.000
|
$12,000.000
|
$6,000.000
|
$6,500.000
|
$11,716.920
|
$19,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
400.000
|
$30.000
|
$34.000
|
$27.620
|
$26.250
|
$25.000
|
$35.000
|
$35.000
|
$27.000
|
$27.620
|
$42.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
400.000
|
$8.000
|
$8.000
|
$10.360
|
$13.130
|
$5.000
|
$5.000
|
$9.000
|
$9.000
|
$10.360
|
$8.500
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
3,900.000
|
$17.000
|
$15.000
|
$26.690
|
$22.050
|
$30.000
|
$15.000
|
$25.000
|
$21.500
|
$26.690
|
$18.500
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
3,900.000
|
$6.500
|
$8.000
|
$8.230
|
$11.550
|
$1.000
|
$2.000
|
$13.000
|
$7.700
|
$8.230
|
$8.500
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
263,694.000
|
$1.500
|
$1.350
|
$1.710
|
$1.420
|
$1.350
|
$2.200
|
$2.100
|
$1.850
|
$1.710
|
$1.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
263,694.000
|
$0.500
|
$0.300
|
$0.340
|
$0.110
|
$0.050
|
$0.700
|
$0.750
|
$0.550
|
$0.340
|
$0.320
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
59,850.000
|
$2.500
|
$2.950
|
$2.870
|
$2.890
|
$2.750
|
$4.000
|
$5.000
|
$3.950
|
$2.870
|
$3.500
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
59,850.000
|
$1.500
|
$0.350
|
$0.370
|
$1.050
|
$0.050
|
$1.000
|
$1.000
|
$0.700
|
$0.370
|
$0.370
|
|
|
CONSTRUCTING DETOURS
|
SY
|
40,590.000
|
$55.000
|
$37.000
|
$26.120
|
$39.000
|
$55.000
|
$42.000
|
$40.000
|
$49.500
|
$40.090
|
$46.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
2,760.000
|
$22.000
|
$29.000
|
$7.700
|
$25.000
|
$30.000
|
$50.000
|
$90.000
|
$80.000
|
$47.390
|
$13.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
2,340.000
|
$7.000
|
$16.500
|
$1.880
|
$5.000
|
$7.000
|
$13.000
|
$5.000
|
$9.000
|
$6.010
|
$5.300
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
2,760.000
|
$6.500
|
$8.000
|
$4.830
|
$7.500
|
$7.000
|
$12.000
|
$10.000
|
$12.000
|
$5.560
|
$9.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
890.000
|
$38.000
|
$40.000
|
$72.310
|
$50.000
|
$70.000
|
$52.000
|
$55.000
|
$45.000
|
$58.210
|
$75.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
2,516.000
|
$80.000
|
$72.000
|
$88.000
|
$84.000
|
$75.000
|
$100.000
|
$95.000
|
$80.000
|
$64.370
|
$60.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
4,079.000
|
$37.000
|
$33.500
|
$55.000
|
$50.000
|
$65.000
|
$45.000
|
$55.000
|
$48.000
|
$59.810
|
$60.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
4,091.000
|
$17.000
|
$21.000
|
$25.000
|
$19.000
|
$35.000
|
$19.000
|
$32.000
|
$38.000
|
$14.820
|
$50.000
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
21,262.000
|
$0.160
|
$0.200
|
$0.250
|
$0.270
|
$0.360
|
$0.500
|
$0.500
|
$0.440
|
$0.370
|
$0.270
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
2,037.500
|
$19.000
|
$20.000
|
$18.860
|
$20.240
|
$17.000
|
$18.000
|
$22.000
|
$22.000
|
$17.950
|
$20.000
|
|
|
TERMINAL ANCHOR SECTION
|
EA
|
1.000
|
$700.000
|
$1,100.000
|
$625.000
|
$670.810
|
$850.000
|
$900.000
|
$1,100.000
|
$1,100.000
|
$825.000
|
$688.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
20.000
|
$1,500.000
|
$1,450.000
|
$1,260.000
|
$1,843.330
|
$1,575.000
|
$1,700.000
|
$1,800.000
|
$1,500.000
|
$1,295.000
|
$1,350.000
|
|
|
SHORT RADIUS
|
LF
|
37.000
|
$33.000
|
$35.000
|
$20.690
|
$22.210
|
$25.000
|
$27.000
|
$55.000
|
$55.000
|
$33.850
|
$22.000
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
25.000
|
$100.000
|
$55.000
|
$45.000
|
$48.300
|
$40.000
|
$45.000
|
$75.000
|
$70.000
|
$56.000
|
$48.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
2,580.000
|
$3.000
|
$2.000
|
$1.950
|
$2.090
|
$2.000
|
$2.500
|
$3.000
|
$2.750
|
$2.000
|
$2.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
21.000
|
$2,150.000
|
$2,450.000
|
$2,525.000
|
$2,710.080
|
$2,275.000
|
$2,500.000
|
$3,000.000
|
$2,750.000
|
$2,575.000
|
$2,600.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
24.000
|
$260.000
|
$250.000
|
$200.000
|
$214.660
|
$250.000
|
$270.000
|
$250.000
|
$220.000
|
$225.000
|
$210.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
4.000
|
$1,775.000
|
$1,000.000
|
$1,275.000
|
$2,100.000
|
$1,000.000
|
$1,800.000
|
$3,000.000
|
$2,750.000
|
$1,275.000
|
$1,350.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
6.000
|
$850.000
|
$750.000
|
$700.000
|
$1,575.000
|
$1,000.000
|
$1,000.000
|
$1,200.000
|
$1,100.000
|
$695.000
|
$750.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
6.000
|
$9,000.000
|
$7,500.000
|
$7,535.000
|
$9,450.000
|
$15,000.000
|
$11,000.000
|
$10,000.000
|
$10,000.000
|
$7,569.000
|
$10,000.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
35.000
|
$400.000
|
$180.000
|
$250.000
|
$193.190
|
$225.000
|
$240.000
|
$250.000
|
$290.000
|
$254.470
|
$190.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
2.000
|
$500.000
|
$264.750
|
$350.000
|
$284.160
|
$275.000
|
$290.000
|
$300.000
|
$335.000
|
$271.320
|
$275.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
1.000
|
$600.000
|
$545.000
|
$450.000
|
$584.950
|
$475.000
|
$500.000
|
$700.000
|
$700.000
|
$564.690
|
$570.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
365.000
|
$15.000
|
$10.000
|
$10.000
|
$10.730
|
$10.000
|
$13.000
|
$10.000
|
$27.000
|
$10.260
|
$8.800
|
|
|
ELEC CONDR (NO.12) BARE
|
LF
|
365.000
|
$1.400
|
$1.200
|
$1.200
|
$1.290
|
$1.200
|
$1.000
|
$2.000
|
$2.500
|
$1.810
|
$1.550
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
1,295.000
|
$1.100
|
$1.500
|
$1.500
|
$1.610
|
$1.500
|
$1.000
|
$2.000
|
$2.500
|
$1.960
|
$1.700
|
|
|
GROUND BOX TY BATTERY (162915)W/APRON
|
EA
|
2.000
|
$1,000.000
|
$1,830.000
|
$1,830.000
|
$1,964.140
|
$1,830.000
|
$1,800.000
|
$1,500.000
|
$3,800.000
|
$1,476.850
|
$1,270.000
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
1.000
|
$275.000
|
$725.000
|
$725.000
|
$778.140
|
$725.000
|
$1,200.000
|
$700.000
|
$3,000.000
|
$705.800
|
$610.000
|
|
|
ELC SRV TY T 120/240 000(NS)GS(N)GC(O)
|
EA
|
2.000
|
$5,620.000
|
$8,500.000
|
$8,500.000
|
$9,123.050
|
$8,500.000
|
$5,300.000
|
$7,000.000
|
$11,250.000
|
$7,117.320
|
$6,100.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
44.000
|
$25.000
|
$75.000
|
$16.000
|
$25.760
|
$25.000
|
$26.000
|
$32.000
|
$90.000
|
$34.340
|
$30.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
76.000
|
$480.000
|
$375.000
|
$375.000
|
$482.990
|
$425.000
|
$450.000
|
$600.000
|
$650.000
|
$569.160
|
$580.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
7.000
|
$600.000
|
$375.000
|
$375.000
|
$681.550
|
$525.000
|
$560.000
|
$900.000
|
$930.000
|
$797.430
|
$820.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
10.000
|
$550.000
|
$425.000
|
$425.000
|
$590.320
|
$525.000
|
$560.000
|
$900.000
|
$800.000
|
$767.170
|
$790.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$580.000
|
$550.000
|
$550.000
|
$745.950
|
$600.000
|
$640.000
|
$1,300.000
|
$1,025.000
|
$1,182.930
|
$1,200.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
1.000
|
$530.000
|
$600.000
|
$600.000
|
$928.400
|
$850.000
|
$900.000
|
$1,500.000
|
$1,250.000
|
$1,386.900
|
$1,420.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
5.000
|
$840.000
|
$650.000
|
$650.000
|
$869.370
|
$550.000
|
$600.000
|
$1,500.000
|
$1,200.000
|
$1,333.450
|
$1,350.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
4.000
|
$950.000
|
$750.000
|
$750.000
|
$939.140
|
$850.000
|
$900.000
|
$1,000.000
|
$1,250.000
|
$936.170
|
$950.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
8.000
|
$970.000
|
$750.000
|
$750.000
|
$1,019.640
|
$850.000
|
$900.000
|
$1,000.000
|
$1,440.000
|
$967.120
|
$980.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
|
EA
|
1.000
|
$940.000
|
$750.000
|
$750.000
|
$960.600
|
$850.000
|
$900.000
|
$1,300.000
|
$1,350.000
|
$1,193.170
|
$1,225.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
24.000
|
$20.500
|
$10.000
|
$10.000
|
$19.320
|
$20.000
|
$22.000
|
$25.000
|
$44.000
|
$26.970
|
$18.500
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
60.000
|
$32.000
|
$10.000
|
$10.000
|
$22.540
|
$20.000
|
$22.000
|
$35.000
|
$80.000
|
$15.250
|
$22.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
72.000
|
$65.000
|
$55.000
|
$55.000
|
$45.080
|
$55.000
|
$60.000
|
$55.000
|
$33.000
|
$59.940
|
$43.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(DOT)
|
LF
|
126.000
|
$1.400
|
$1.000
|
$1.000
|
$1.070
|
$1.000
|
$1.050
|
$1.100
|
$1.100
|
$1.020
|
$1.050
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
142,612.000
|
$0.500
|
$0.560
|
$0.560
|
$0.600
|
$0.560
|
$0.600
|
$0.600
|
$0.600
|
$0.570
|
$0.580
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
143,224.000
|
$0.500
|
$0.560
|
$0.560
|
$0.600
|
$0.560
|
$0.600
|
$0.600
|
$0.600
|
$0.570
|
$0.580
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
6,021.000
|
$1.000
|
$0.900
|
$0.800
|
$2.100
|
$1.250
|
$0.600
|
$2.000
|
$1.200
|
$0.760
|
$1.550
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
5,095.000
|
$1.250
|
$0.900
|
$0.800
|
$2.100
|
$1.250
|
$0.600
|
$2.000
|
$1.200
|
$0.790
|
$2.600
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,386.000
|
$0.760
|
$1.000
|
$1.000
|
$1.070
|
$1.000
|
$1.050
|
$1.100
|
$1.100
|
$1.020
|
$1.050
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
125.000
|
$3.800
|
$3.300
|
$3.300
|
$3.540
|
$3.300
|
$3.600
|
$4.000
|
$3.650
|
$3.370
|
$3.500
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
403.000
|
$5.500
|
$5.300
|
$5.300
|
$5.690
|
$5.300
|
$5.700
|
$6.000
|
$5.800
|
$5.410
|
$5.500
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
18.000
|
$112.000
|
$130.000
|
$130.000
|
$139.530
|
$130.000
|
$138.000
|
$140.000
|
$140.000
|
$132.650
|
$135.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
9.000
|
$140.000
|
$150.000
|
$150.000
|
$161.000
|
$150.000
|
$160.000
|
$160.000
|
$165.000
|
$153.050
|
$155.000
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
2,891.000
|
$3.800
|
$3.000
|
$3.000
|
$3.220
|
$3.000
|
$3.200
|
$4.000
|
$3.300
|
$3.060
|
$3.100
|
|
|
PAVEMENT SEALER 4"
|
LF
|
162,210.000
|
$0.120
|
$0.100
|
$0.100
|
$0.110
|
$0.100
|
$0.100
|
$0.110
|
$0.110
|
$0.100
|
$0.110
|
|
|
PAVEMENT SEALER 8"
|
LF
|
1,386.000
|
$0.350
|
$0.200
|
$0.200
|
$0.210
|
$0.200
|
$0.200
|
$0.220
|
$0.220
|
$0.200
|
$0.210
|
|
|
PAVEMENT SEALER 12"
|
LF
|
3,016.000
|
$0.800
|
$2.000
|
$2.000
|
$2.150
|
$2.000
|
$2.000
|
$2.200
|
$2.200
|
$2.040
|
$2.100
|
|
|
PAVEMENT SEALER 24"
|
LF
|
403.000
|
$1.800
|
$2.000
|
$2.000
|
$2.150
|
$2.000
|
$2.000
|
$2.200
|
$2.200
|
$2.040
|
$2.100
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
18.000
|
$29.000
|
$25.000
|
$25.000
|
$26.830
|
$25.000
|
$25.000
|
$30.000
|
$27.500
|
$25.510
|
$26.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
9.000
|
$35.000
|
$35.000
|
$35.000
|
$37.570
|
$35.000
|
$35.000
|
$40.000
|
$38.500
|
$35.710
|
$36.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
330.000
|
$0.350
|
$1.000
|
$1.000
|
$1.070
|
$1.000
|
$1.100
|
$1.100
|
$1.100
|
$1.020
|
$1.050
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
83,009.000
|
$0.300
|
$0.420
|
$0.420
|
$0.450
|
$0.420
|
$0.450
|
$0.460
|
$0.460
|
$0.430
|
$0.450
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
4,080.000
|
$0.330
|
$1.000
|
$1.000
|
$1.070
|
$1.000
|
$1.100
|
$1.100
|
$1.100
|
$1.020
|
$1.020
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
74,791.000
|
$0.300
|
$0.420
|
$0.420
|
$0.450
|
$0.420
|
$0.450
|
$0.460
|
$0.460
|
$0.430
|
$0.450
|
|
REFL PAV MRKR TY I-C
|
EA
|
88.000
|
$3.500
|
$5.000
|
$5.000
|
$5.370
|
$5.000
|
$6.000
|
$6.000
|
$5.500
|
$5.100
|
$5.100
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,916.000
|
$3.300
|
$3.200
|
$3.200
|
$3.430
|
$3.200
|
$3.500
|
$4.000
|
$3.500
|
$3.270
|
$3.300
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
41,120.000
|
$0.350
|
$0.380
|
$0.380
|
$0.410
|
$0.380
|
$0.400
|
$0.420
|
$0.420
|
$0.390
|
$0.400
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
231.000
|
$1.500
|
$3.000
|
$3.000
|
$3.220
|
$3.000
|
$3.500
|
$3.500
|
$3.300
|
$3.060
|
$3.100
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
6.000
|
$60.000
|
$50.000
|
$50.000
|
$53.670
|
$50.000
|
$55.000
|
$55.000
|
$55.000
|
$51.020
|
$6.200
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
5.000
|
$70.000
|
$50.000
|
$50.000
|
$53.670
|
$50.000
|
$55.000
|
$55.000
|
$55.000
|
$51.020
|
$5.100
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
8.000
|
$350.000
|
$400.000
|
$400.000
|
$429.320
|
$400.000
|
$210.000
|
$250.000
|
$690.000
|
$272.830
|
$240.000
|
|
|
INSTALL RDSD FLASH BEACON ASSEMBLY
|
EA
|
2.000
|
$4,500.000
|
$7,500.000
|
$7,500.000
|
$8,049.750
|
$7,500.000
|
$5,000.000
|
$6,000.000
|
$9,500.000
|
$6,387.280
|
$5,500.000
|
|
|
REMOVE RDSD FLASH BEACON ASSEMBLY
|
EA
|
2.000
|
$500.000
|
$1,950.000
|
$1,950.000
|
$2,092.940
|
$1,950.000
|
$700.000
|
$900.000
|
$1,800.000
|
$1,046.160
|
$900.000
|
|
|
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
|
EA
|
2.000
|
$6,500.000
|
$10,250.000
|
$10,250.000
|
$11,001.330
|
$10,250.000
|
$6,800.000
|
$7,000.000
|
$12,000.000
|
$7,732.700
|
$6,700.000
|
|
|
REMOV RDSD FLSH BCN AM (SOLAR PWRD)
|
EA
|
2.000
|
$1,150.000
|
$1,950.000
|
$1,950.000
|
$2,092.940
|
$1,950.000
|
$800.000
|
$1,100.000
|
$1,800.000
|
$1,144.910
|
$1,000.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
10.000
|
$3,300.000
|
$2,850.000
|
$3,600.000
|
$10,500.000
|
$500.000
|
$4,200.000
|
$3,500.000
|
$6,000.000
|
$2,496.010
|
$5,700.000
|
|
|
LITTER REMOVAL
|
CYC
|
10.000
|
$2,040.000
|
$1,150.000
|
$3,300.000
|
$5,250.000
|
$500.000
|
$2,000.000
|
$500.000
|
$5,000.000
|
$1,256.190
|
$6,600.000
|
|
|
NO. OF WORKING DAYS
|
$/D
|
5,000.000
|
$804.000
|
$660.000
|
$604.000
|
$699.000
|
$525.000
|
$750.000
|
$775.000
|
$804.000
|
$800.000
|
$750.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
6.000
|
$9,000.000
|
$21,000.000
|
$9,000.000
|
$15,750.000
|
$9,000.000
|
$10,000.000
|
$15,000.000
|
$16,000.000
|
$3,361.120
|
$15,500.000
|
|
|
TMA (STATIONARY)
|
EA
|
3.000
|
$525.000
|
$10,500.000
|
$14,000.000
|
$10,500.000
|
$500.000
|
$25,000.000
|
$30,000.000
|
$16,000.000
|
$29,129.670
|
$0.010
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
454.000
|
$10.500
|
$44.000
|
$60.000
|
$25.000
|
$75.000
|
$50.000
|
$30.000
|
$12.000
|
$61.650
|
$170.000
|
|
Totals: |
$37,208,362.940
|
$36,563,466.660
|
$38,518,359.932
|
$39,453,271.290
|
$39,587,001.930
|
$39,936,815.096
|
$40,568,755.830
|
$41,468,736.520
|
$41,937,718.421
|
$44,107,590.140
|