WALLER FM 359 (0543-01-065)

Items: 71

County: WALLER
Length: N/A
Highway: FM 359
District: HOUSTON
Control Number: 0543-01-065
DBE Goal: N/A
Project: STP 2020(595)
Guaranty: N/A
Time: 75 WORKING DAYS
Engineer's Estimate: $1,753,719.87
Date: 02/07/2020 (6 years ago)
Contract Number: N/A
Type: PLANING, SEAL COAT, ACP OVERLAY AND TEXTURING
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$1,753,719.87
$1,597,357.13
Over/Under Est: -8.92% -$156,362.74
Over/Under Est: 0.17% $3,032.31
Amt Left: 9.98% $159,395.05
$1,910,592.50
Over/Under Est: 8.95% $156,872.63
Amt Left: 19.61% $313,235.37
Delta: -8.76% -$153,840.32
Over/Under Est: 10.27% $180,103.78
Amt Left: 21.06% $336,466.52
Delta: -1.22% -$23,231.15
Over/Under Est: 19.59% $343,601.48
Amt Left: 31.3% $499,964.22
Delta: -8.45% -$163,497.70

Bid Items & Bid Tabulations

71 Total 0 of 71
WALLER  |  FM 359  |  HOUSTON  |  0543-01-065  |  02/07/2020  |  $1,753,719.87  |  STP 2020(595)  |  PLANING, SEAL COAT, ACP OVERLAY AND...  |  75 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ANGEL BROTHERS HOLDINGS CORP.
JAMES CONSTRUCTION GROUP, L.L.C.
SMITH & COMPANY
DURWOOD GREENE CONSTRUCTION CO.
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
REMOVING CONCRETE(MOW STRIP)
LF 1,450.000 $6.000 $5.000 $6.000 $5.000 $10.000 $26.000
EXCAVATION (ROADWAY)
CY 2,073.000 $14.000 $19.500 $12.600 $4.000 $30.000 $21.700
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 395.000 $20.000 $5.000 $18.000 $23.000 $25.000 $38.000
BACKFILL (TY A OR B)
STA 94.680 $175.000 $158.000 $109.000 $500.000 $250.000 $400.000
BLOCK SODDING
SY 5,641.000 $5.500 $4.250 $4.000 $4.250 $2.500 $4.000
STRAW OR HAY MULCH
SY 5,641.000 $0.800 $0.400 $0.350 $0.500 $0.200 $0.350
DRILL SEED (TEMP)(WARM OR COOL)
SY 5,641.000 $0.750 $0.150 $0.120 $0.150 $0.250 $0.150
FERTILIZER
AC 2.340 $750.000 $850.000 $800.000 $700.000 $600.000 $800.000
VEGETATIVE WATERING
MG 279.710 $15.000 $20.000 $22.000 $50.000 $12.000 $10.000
ASPHALT STAB BASE (GR 2)(PG 64)
TON 3,310.600 $85.000 $72.400 $67.000 $70.000 $85.000 $99.700
SALV,HAUL & STKPL RCL APH PV (2")
SY 69,034.000 $1.500 $0.750 $2.250 $2.000 $2.000 $3.200
ASPH (MULTI OPTION)
GAL 28,132.000 $3.300 $3.050 $2.950 $3.000 $3.000 $2.950
AGGR(TY-PB GR-4 SAC-B)
CY 707.000 $130.000 $112.000 $130.000 $115.000 $120.000 $108.100
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 2,000.000 $35.000 $35.500 $31.000 $58.000 $40.000 $41.000
CEM STABIL BKFL
CY 28.690 $85.000 $43.750 $32.000 $125.000 $100.000 $400.000
RIPRAP (MOW STRIP)(4 IN)
CY 87.000 $540.000 $460.000 $401.000 $650.000 $750.000 $650.000
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
LF 24.000 $550.000 $450.000 $1,580.000 $850.000 $1,500.000 $750.000
RC PIPE (CL III)(18 IN)
LF 20.000 $90.000 $156.000 $177.000 $65.000 $950.000 $70.000
RC PIPE (CL III)(24 IN)
LF 20.000 $110.000 $175.000 $205.000 $125.000 $1,000.000 $85.000
WINGWALL (PW - 2) (HW=3 FT)
EA 2.000 $8,000.000 $8,665.000 $6,850.000 $4,500.000 $14,000.000 $12,000.000
SET (TY II) (18 IN) (RCP) (4: 1) (P)
EA 1.000 $1,000.000 $815.000 $1,180.000 $850.000 $1,500.000 $1,500.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 3.000 $1,200.000 $875.000 $1,220.000 $900.000 $1,600.000 $1,000.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 4.000 $1,500.000 $1,130.000 $1,400.000 $1,000.000 $1,950.000 $1,800.000
ADJUSTING MANHOLES
EA 4.000 $700.000 $175.000 $184.000 $2,500.000 $1,500.000 $1,000.000
REMOV STR (SET)
EA 12.000 $400.000 $180.000 $137.000 $750.000 $1,150.000 $400.000
MOBILIZATION
LS 1.000 $105,000.000 $60,000.000 $150,000.000 $175,000.000 $100,000.000 $100,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $4,000.000 $1,130.000 $12,000.000 $15,000.000 $3,500.000 $5,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 270.000 $30.000 $32.000 $30.000 $37.000 $40.000 $30.000
ROCK FILTER DAMS (REMOVE)
LF 270.000 $10.000 $11.000 $10.000 $10.000 $10.000 $10.000
RUMBLE STRIPS (SHOULDER)
LF 16,507.000 $0.300 $0.300 $0.450 $0.300 $0.500 $1.520
RUMBLE STRIPS (CENTERLINE)
LF 8,193.000 $0.400 $0.300 $0.900 $0.300 $0.880 $1.520
MTL W-BEAM GD FEN (TIM POST)
LF 1,100.000 $23.000 $18.000 $17.020 $17.000 $22.000 $22.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,000.000 $1,670.000 $1,575.000 $1,575.000 $2,200.000 $1,600.000
REMOVE METAL BEAM GUARD FENCE
LF 770.000 $3.200 $2.300 $2.200 $2.200 $2.500 $2.500
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $300.000 $320.000 $301.000 $301.000 $250.000 $165.000
GUARDRAIL END TREATMENT (INSTALL)
EA 12.000 $2,800.000 $2,785.000 $2,628.000 $2,628.000 $2,700.000 $2,900.000
GUARDRAIL END TREATMENT (REMOVE)
EA 12.000 $280.000 $320.000 $301.000 $301.000 $350.000 $255.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 11.000 $280.000 $285.000 $269.000 $269.000 $240.000 $210.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 9.000 $315.000 $310.000 $294.000 $294.000 $280.000 $240.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 1.000 $570.000 $630.000 $595.000 $595.000 $650.000 $560.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 29.000 $450.000 $460.000 $434.000 $434.000 $480.000 $480.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 7.000 $605.000 $510.000 $480.000 $480.000 $625.000 $600.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 9.000 $680.000 $765.000 $721.000 $721.000 $775.000 $750.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000 $780.000 $800.000 $758.000 $758.000 $900.000 $1,000.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 1.000 $835.000 $815.000 $767.000 $767.000 $950.000 $925.000
REMOVE SM RD SN SUP&AM
EA 49.000 $85.000 $48.000 $45.000 $45.000 $85.000 $100.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 8.000 $28.000 $21.000 $20.000 $20.000 $25.000 $20.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 22.000 $70.000 $64.000 $60.000 $60.000 $60.000 $55.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 32.000 $40.000 $26.000 $25.000 $25.000 $30.000 $25.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 59,388.000 $0.210 $0.280 $0.260 $0.250 $0.260 $0.250
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 29,694.000 $0.250 $0.300 $0.280 $0.300 $0.280 $0.300
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 456.000 $0.550 $0.530 $0.500 $0.500 $0.500 $1.000
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 626.000 $3.100 $2.150 $2.000 $2.000 $2.000 $2.000
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 29.000 $70.000 $64.000 $60.000 $60.000 $60.000 $85.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 6.000 $87.000 $70.000 $65.000 $65.000 $65.000 $85.000
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 7,680.000 $0.210 $0.280 $0.260 $0.250 $0.260 $0.450
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 19,674.000 $0.220 $0.280 $0.260 $0.250 $0.260 $0.250
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 4,710.000 $0.250 $0.300 $0.280 $0.300 $0.280 $0.550
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 18,363.000 $0.250 $0.300 $0.280 $0.300 $0.280 $0.450
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 152.000 $2.500 $0.850 $0.800 $0.800 $0.800 $1.500
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 216.000 $6.750 $6.350 $6.000 $6.000 $6.000 $10.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 19.000 $160.000 $127.000 $120.000 $120.000 $120.000 $140.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 2.000 $210.000 $150.000 $140.000 $140.000 $140.000 $180.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 29,694.000 $0.530 $0.450 $0.430 $0.450 $0.430 $0.500
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 4,710.000 $0.520 $0.450 $0.430 $0.450 $0.430 $0.600
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 18,363.000 $0.530 $0.450 $0.430 $0.450 $0.430 $0.500
REFL PAV MRKR TY I-C
EA 8.000 $12.000 $5.300 $5.000 $5.000 $5.000 $24.000
REFL PAV MRKR TY II-A-A
EA 537.000 $4.500 $4.250 $4.000 $4.000 $4.000 $4.250
D-GR HMA TY-D SAC-A PG70-22
TON 6,022.750 $92.000 $101.250 $87.000 $94.000 $97.000 $102.050
TMA (STATIONARY)
DAY 63.000 $285.000 $100.000 $237.000 $280.000 $200.000 $325.000
TMA (MOBILE OPERATION)
DAY 12.000 $310.000 $370.000 $547.000 $50.000 $200.000 $325.000
Totals: $1,753,719.870 $1,597,357.145 $1,756,752.180 $1,910,592.500 $1,933,823.650 $2,097,321.358