FORT BEND FM 762 (0543-03-076)

Items: 56

County: FORT BEND
Length: N/A
Highway: FM 762
District: HOUSTON
Control Number: 0543-03-076
DBE Goal: N/A
Project: STP 2020(026)
Guaranty: N/A
Time: 45 WORKING DAYS
Engineer's Estimate: $759,186.36
Date: 09/06/2019 (6 years ago)
Contract Number: N/A
Type: BASE REPAIR, PLANING AND 2" ACP OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$759,186.36
$791,783.80
Over/Under Est: 4.29% $32,597.44
Over/Under Est: 15.24% $115,705.79
Amt Left: 10.5% $83,108.35
Over/Under Est: 43.01% $326,524.14
Amt Left: 37.12% $293,926.70
Delta: -24.10% -$210,818.35

Bid Items & Bid Tabulations

56 Total 0 of 56
FORT BEND  |  FM 762  |  HOUSTON  |  0543-03-076  |  09/06/2019  |  $759,186.36  |  STP 2020(026)  |  BASE REPAIR, PLANING AND 2" ACP OVER...  |  45 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ANGEL BROTHERS HOLDINGS CORP.
DURWOOD GREENE CONSTRUCTION CO.
JAMES CONSTRUCTION GROUP, L.L.C.
REMOVING CONC (PAV)
SY 124.000 $80.000 $60.000 $120.000 $75.000
REMOVING CONC (MEDIANS)
SY 3.800 $200.000 $225.000 $200.000 $1,310.000
REMOVING CONC (CURB)
LF 25.000 $50.000 $35.000 $15.000 $85.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 85.000 $30.000 $30.000 $40.000 $35.000
SALV,HAUL & STKPL RCL APH PV (2")
SY 41,167.000 $1.750 $1.800 $3.500 $4.500
D-GR HMA TY-C SAC-A PG76-22
TON 4,528.000 $85.000 $89.000 $95.000 $99.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 76.000 $50.000 $99.000 $80.000 $520.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(9")
SY 100.000 $60.000 $101.000 $120.000 $460.000
RIPRAP (CONC)(6 IN)
CY 0.400 $550.000 $5,600.000 $3,500.000 $4,500.000
ADJUSTING MANHOLES
EA 10.000 $1,000.000 $675.000 $500.000 $285.000
MOBILIZATION
LS 1.000 $70,000.000 $75,000.000 $40,000.000 $100,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $4,500.000 $985.000 $5,000.000 $14,425.000
CONC CURB (DOWEL)
LF 60.000 $150.000 $40.000 $70.000 $150.000
CONC SIDEWALKS (6")
SY 83.000 $80.000 $78.000 $75.000 $100.000
CURB RAMPS (TY 1)
EA 2.000 $2,000.000 $2,800.000 $2,700.000 $2,200.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 12.000 $150.000 $250.000 $375.000 $215.000
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 62.500 $50.000 $25.000 $27.000 $21.650
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 52.000 $490.000 $435.000 $425.000 $383.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 14.000 $500.000 $500.000 $500.000 $442.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 4.000 $630.000 $715.000 $750.000 $627.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $780.000 $760.000 $800.000 $670.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 1.000 $815.000 $1,050.000 $1,100.000 $923.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 1.000 $550.000 $385.000 $400.000 $340.000
REMOVE SM RD SN SUP&AM
EA 72.000 $80.000 $53.500 $75.000 $47.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 4.000 $58.000 $74.000 $30.000 $65.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 6,930.000 $0.400 $0.400 $0.350 $0.330
WK ZN PAV MRK NON-REMOV (W)6"(DOT)
LF 508.000 $0.900 $1.150 $1.000 $1.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 24,120.000 $0.410 $0.400 $0.350 $0.330
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 3,020.000 $0.410 $1.150 $0.750 $1.000
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
LF 3,608.000 $1.300 $2.250 $2.250 $2.000
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 1,230.000 $2.500 $1.500 $3.500 $4.000
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 24.000 $50.000 $102.000 $100.000 $90.000
WK ZN PAV MRK NON-REMOV (W)(DBL ARW)
EA 6.000 $98.000 $150.000 $150.000 $130.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 24.000 $65.000 $115.000 $120.000 $100.000
WK ZN PAV MRK NON-REMOV(W)36"(YLD TRI)
EA 22.000 $12.000 $29.000 $20.000 $25.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 30,936.000 $0.400 $0.400 $0.350 $0.330
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 254.000 $1.750 $3.000 $2.000 $2.300
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,510.000 $1.000 $1.500 $1.250 $1.200
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 1,959.000 $1.750 $3.500 $3.500 $3.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 656.000 $6.300 $7.000 $8.000 $6.000
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
LF 3,465.000 $0.600 $0.750 $0.850 $0.650
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 3,465.000 $0.600 $0.750 $0.600 $0.600
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 14,500.000 $0.440 $0.700 $0.600 $0.600
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 15,468.000 $0.470 $0.700 $0.600 $0.600
PREFAB PAV MRK TY C (W) (ARROW)
EA 12.000 $318.000 $450.000 $300.000 $400.000
PREFAB PAV MRK TY C (W) (DBL ARROW)
EA 3.000 $450.000 $510.000 $400.000 $450.000
PREFAB PAV MRK TY C (W) (WORD)
EA 12.000 $280.000 $375.000 $300.000 $330.000
PREFAB PAV MRK TY C (W) (RR XING)
EA 3.000 $630.000 $750.000 $750.000 $650.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 11.000 $35.000 $57.000 $85.000 $50.000
REFL PAV MRKR TY I-C
EA 264.000 $4.500 $4.500 $5.000 $4.000
REFL PAV MRKR TY II-A-A
EA 386.000 $3.700 $4.500 $5.000 $4.000
ELIM EXT PAV MRK & MRKS (12")
LF 310.000 $1.200 $6.000 $1.000 $5.000
ELIM EXT PAV MRK & MRKS (24")
LF 82.000 $3.000 $6.000 $2.000 $5.000
VEH LP DETECT (SAWCUT)
LF 1,745.000 $12.000 $10.500 $11.000 $9.250
TMA (STATIONARY)
DAY 45.000 $284.000 $275.000 $450.000 $500.000
TMA (MOBILE OPERATION)
DAY 9.000 $375.000 $450.000 $450.000 $800.000
Totals: $759,186.360 $791,783.800 $874,892.150 $1,085,710.505