Items: 191

County: JEFFERSON
Length: N/A
Highway: IH 10
District: BEAUMONT
Control Number: 0739-02-161
DBE Goal: N/A
Project: NH 1702(506)
Guaranty: N/A
Time: 770 WORKING DAYS
Engineer's Estimate: $101,970,747.52
Date: 08/09/2017 (8 years ago)
Contract Number: N/A
Type: WIDEN FREEWAY FROM 4 TO 6 LANES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$101,970,747.52
Over/Under Est: 6.22% $6,344,620.44
Over/Under Est: 17.56% $17,909,290.97
Amt Left: 10.68% $11,564,670.53
Subcontractor Percentage Amount
ESSARY, HART & MACWILLIAM, INC. 5.74% $6,801,669.81
ANGEL BROTHERS ENTERPRISES, LTD. 0.83% $983,516.72
SOUTHWEST ROAD & SAFETY CONTRACTORS, LTD. 0.60% $710,975.94
BATTERSON, LLP 0.57% $675,427.14
ALLSTATE SIGNAL & CONSTRUCTION, LLC 0.48% $568,780.75
AMERICAN REMEDIATION OPTIONS, INC. 0.42% $497,683.16
TEXAS MATERIALS GROUP, INC. 0.28% $331,788.77
HIGHWAY PAVEMENT SPECIALTIES, INC. 0.19% $225,142.38
SK CONCRETE SERVICES LLC 0.17% $201,443.18
SWEEPING CORPORATION OF AMERICA, LLC 0.17% $201,443.18
BORTUNCO 0.14% $165,894.39
KMA CONTRACTORS SERVICES INC. 0.13% $154,044.79
DUSTROL, INC. 0.06% $71,097.59
URETEK USA, INC. 0.06% $71,097.59
KELLER NORTH AMERICA, INC. 0.05% $59,247.99
SCOTT DERR PAINTING CO, LLC 0.05% $59,247.99
PENHALL COMPANY (AUSTIN) 0.04% $47,398.40
HAYWOOD BAKER 0.02% $23,699.20
AGGREGATE TECHNOLOGIES, INC. 0.01% $11,849.60
A-CORE CONCRETE CUTTING OF TEXAS, INC. 0.00% $0.00
GULF COAST ASPHALT & PAVING, INC. (BAYTOWN) 0.00% $0.00
BATTEN DRILLING, INC. 0.00% $0.00
Total: 10.01% $11,861,448.57

Bid Items & Bid Tabulations

191 Total 0 of 191
JEFFERSON  |  IH 10  |  BEAUMONT  |  0739-02-161  |  08/09/2017  |  $101,970,747.52  |  NH 1702(506)  |  WIDEN FREEWAY FROM 4 TO 6 LANES  |  770 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
WILLIAMS BROTHERS CONSTRUCTION CO., INC.
JAMES CONSTRUCTION GROUP, L.L.C.
PREPARING ROW
STA 341.800 $8,000.000 $31,800.000 $5,000.000
REMOVING CONC (PAV)
SY 188,041.000 $6.000 $2.750 $4.000
REMOVING CONC (RIPRAP)
SY 4,274.000 $8.000 $5.000 $6.400
REMOVING CONC (APPR SLAB)
SY 899.000 $6.000 $6.000 $22.000
REMOVING CONC (FLUME)
SY 71.000 $42.000 $6.000 $5.000
REMOVING STAB BASE & ASPH PAV (7"-12")
SY 277,267.000 $4.000 $5.000 $2.500
REMOVE STAB BASE & ASPH PAV (13"-18")
SY 74,567.000 $12.000 $10.000 $5.000
EXCAVATION (ROADWAY)
CY 245,267.000 $8.000 $10.000 $7.200
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 706,124.000 $7.000 $6.000 $8.800
EMBANKMENT (FINAL)(ORD COMP)(TY C1)(AS)
CY 9,193.640 $20.000 $40.000 $34.000
FURNISHING AND PLACING TOPSOIL (4")
SY 891,171.000 $1.000 $1.000 $0.010
DRILL SEEDING (TEMP) (WARM)
SY 445,586.000 $0.100 $0.150 $0.080
DRILL SEEDING (TEMP) (COOL)
SY 445,586.000 $0.100 $0.150 $0.080
DRILL SEEDING (PERM)(WARM OR COOL)
SY 891,171.000 $0.120 $0.250 $0.110
FERTILIZER
AC 184.000 $500.000 $650.000 $393.800
VEGETATIVE WATERING
MG 22,497.000 $16.000 $20.000 $3.000
FL BS (CMP IN PLC)(TYB GR1-2)(FNAL POS)
CY 21,189.000 $40.000 $50.000 $66.000
FL BS (CMP IN PLACE) (TY D GR 1-2)(10")
SY 20,911.000 $40.000 $15.000 $22.000
LIME (HYD, COM, OR QK(SLURRY))
TON 10,626.000 $160.000 $160.000 $161.000
LIME TRT (EXST MATL)(8")
SY 536,680.000 $1.500 $1.500 $2.000
CEM TRT(PLNT MX) (CL L)(TYA)(GR1-2)(6")
SY 536,680.000 $9.000 $9.000 $17.500
PRIME COAT(MC-30 OR AE-P)
GAL 4,182.000 $3.500 $3.350 $3.920
ASPH (AC-20XP)
GAL 18,394.000 $3.300 $2.570 $2.460
ASPH (RC-250)
GAL 102,437.000 $3.130 $2.870 $3.140
AGGR(TY-PD GR-4 SAC-A)
CY 392.000 $160.000 $101.830 $228.010
AGGR (TY-D GR-5)
CY 4,097.000 $150.000 $73.020 $122.370
D-GR HMA(SQ) TY-C SAC-A PG70-22
TON 2,300.000 $97.000 $70.110 $92.290
CONC PVMT (CONT REINF - CRCP) (10")
SY 69,106.000 $50.000 $45.000 $56.250
CONC PVMT (CONT REINF - CRCP) (13")
SY 443,072.000 $50.000 $42.600 $62.500
CEM STABIL BKFL
CY 4,052.000 $69.000 $40.000 $89.500
TEMPORARY SPL SHORING
SF 87,021.000 $14.000 $15.000 $20.000
PRESTR CONC PIL (18 IN SQ)
LF 35,388.000 $69.000 $111.000 $68.000
PRESTR CONC PIL (24 IN SQ)
LF 38,472.000 $73.000 $122.000 $94.000
DRILL SHAFT (SIGN MTS) (12 IN)
LF 40.000 $100.000 $50.000 $122.000
DRILL SHAFT (SIGN MTS) (48 IN)
LF 274.000 $535.000 $592.460 $375.000
CL C CONC (ABUT)
CY 873.400 $837.000 $800.000 $560.000
CL C CONC (CAP)
CY 1,107.200 $819.000 $800.000 $600.000
CL C CONC (COLUMN)
CY 782.500 $802.000 $700.000 $540.000
CL C CONC (FOOTING)
CY 563.000 $620.630 $800.000 $520.000
CLASS S CONC UTILITY PROTECTION PADDING
CY 118.100 $640.000 $1,330.000 $1,800.000
REINF CONC SLAB
SF 176,226.000 $18.520 $15.000 $12.000
APPROACH SLAB
CY 3,175.000 $290.000 $200.000 $430.000
SLAB SPAN
CY 324.000 $1,000.000 $500.000 $680.000
RETAINING WALL (MSE)
SF 153,221.000 $38.000 $35.000 $61.000
RETAINING WALL (CONC BLOCK)
SF 84.000 $57.000 $60.000 $45.000
PRESTR CONC GIRDER (TX28)
LF 1,477.500 $127.000 $90.000 $152.000
PRESTR CONC GIRDER (TX34)
LF 953.760 $117.420 $95.000 $155.000
PRESTR CONC GIRDER (TX54)
LF 7,636.120 $122.000 $115.000 $154.000
PRESTR CONC GIRDER (TX70)
LF 10,467.790 $150.000 $135.000 $160.000
CONCRETE PAINT FINISH
SF 132,692.000 $0.270 $0.200 $0.300
OPAQUE SEALER FINISH
SF 132,692.000 $0.280 $0.200 $0.300
RIPRAP (CONC)(4 IN)
CY 365.000 $450.000 $450.000 $410.000
RIPRAP (CONC)(5 IN)
CY 306.000 $450.000 $450.000 $370.000
RIPRAP (CONC)(CL B)(5 IN)
CY 122.000 $450.000 $450.000 $370.000
RIPRAP (STONE TY R)(DRY)(12 IN)
CY 2,494.300 $476.000 $120.000 $120.000
RIPRAP (MOW STRIP)(4 IN)
CY 677.000 $467.500 $550.000 $560.000
RAIL (TY SSTR)
LF 17,585.400 $41.000 $30.000 $30.000
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
LF 1,844.400 $97.520 $100.000 $80.000
CONC BOX CULV (4 FT X 2 FT)
LF 201.000 $150.000 $156.400 $180.000
CONC BOX CULV (4 FT X 3 FT)
LF 11.000 $160.000 $168.750 $520.000
CONC BOX CULV (6 FT X 3 FT)
LF 38.000 $600.000 $223.700 $380.000
RC PIPE (CL III)(18 IN)
LF 22.000 $79.000 $76.400 $70.000
RC PIPE (CL III)(24 IN)
LF 2,028.000 $100.000 $54.950 $55.000
RC PIPE (CL III)(36 IN)
LF 1,757.000 $130.000 $93.050 $90.000
RC PIPE (CL III)(42 IN)
LF 347.000 $300.000 $117.000 $102.000
JCTBOX(COMPL)(PJB)(3FTX3FT)
EA 8.000 $3,134.000 $483.870 $2,500.000
INLET (COMPL)(PSL)(FG)(4FTX4FT-3FTX3FT)
EA 1.000 $4,400.000 $3,553.000 $3,800.000
INLET (COMPL)(RWI)(TY I)
EA 4.000 $4,300.000 $4,553.000 $3,500.000
HEADWALL (CH - PW - S) (DIA= 42 IN)
EA 1.000 $9,000.000 $11,913.000 $17,500.000
WINGWALL (PW - 1) (HW=3 FT)
EA 1.000 $6,800.000 $9,510.000 $6,800.000
WINGWALL (PW - 1) (HW=5 FT)
EA 2.000 $9,300.000 $11,352.000 $15,500.000
WINGWALL (PW - 1) (HW=7 FT)
EA 1.000 $16,700.000 $13,009.000 $15,200.000
SET (TY I)(S= 4 FT)(HW= 2 FT)(4:1) (C)
EA 1.000 $5,800.000 $6,669.000 $8,500.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C)
EA 1.000 $8,000.000 $7,103.000 $9,500.000
SET (TY II) (18 IN) (RCP) (4: 1) (P)
EA 2.000 $1,000.000 $981.000 $1,150.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 4.000 $1,100.000 $1,081.000 $1,350.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 32.000 $1,200.000 $1,081.000 $1,450.000
SET (TY II) (36 IN) (RCP) (3: 1) (P)
EA 1.000 $3,000.000 $2,267.000 $2,400.000
SET (TY II) (36 IN) (RCP) (6: 1) (C)
EA 4.000 $4,500.000 $3,762.000 $2,800.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 9.000 $3,500.000 $3,762.000 $3,600.000
SET (TY II) (42 IN) (RCP) (4: 1) (C)
EA 1.000 $2,500.000 $5,762.000 $6,000.000
REMOV STR (INLET)
EA 4.000 $800.000 $581.000 $940.000
REMOV STR (SET)
EA 7.000 $428.000 $649.000 $580.000
REMOV STR (WINGWALL)
EA 1.000 $1,700.000 $1,203.000 $1,400.000
REMOV STR (HEADWALL)
EA 6.000 $1,300.000 $1,603.000 $950.000
REMOV STR (PIPE)
LF 666.000 $575.000 $21.650 $13.800
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 6.000 $25,000.000 $66,897.500 $70,000.000
REMOV STR (SMALL FENCE)
LF 215.000 $4.320 $6.000 $4.000
MOBILIZATION
LS 1.000 $7,000,000.000 $11,075,939.000 $12,050,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 52.000 $4,000.000 $15,000.000 $28,650.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 4,400.000 $27.000 $30.000 $37.000
ROCK FILTER DAMS (REMOVE)
LF 4,400.000 $10.000 $6.000 $11.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 1,731.000 $36.000 $29.000 $28.000
CONSTRUCTION EXITS (REMOVE)
SY 2,230.000 $13.000 $7.000 $17.310
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,115.000 $2.000 $2.000 $2.800
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,115.000 $1.000 $0.500 $0.750
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 1,924.000 $7.000 $6.000 $6.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,084.000 $1.000 $1.000 $1.000
CONSTRUCTING DETOURS (TY 1)
SY 84,323.000 $49.000 $49.210 $65.000
CONSTRUCTING DETOURS (TY 2)
SY 115,401.000 $69.000 $51.110 $65.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 31,440.000 $10.000 $30.000 $19.800
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 3,820.000 $32.000 $6.000 $28.450
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 80.000 $33.000 $35.000 $26.450
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 276,870.000 $2.840 $3.000 $2.210
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 5,240.000 $5.000 $4.000 $6.250
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 120.000 $6.000 $4.000 $27.260
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 31,440.000 $5.740 $3.000 $2.610
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 3,820.000 $6.000 $5.000 $5.120
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 80.000 $6.000 $5.000 $19.570
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 35,700.000 $48.000 $30.000 $37.700
DRIVEWAYS (CONC)
SY 1,672.000 $70.000 $60.000 $65.000
RUMBLE STRIPS (SHOULDER) CONCRETE
LF 131,349.000 $1.000 $0.500 $0.420
MTL W-BEAM GD FEN (STEEL POST)
LF 5,875.000 $23.000 $20.750 $23.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 14.000 $1,500.000 $1,970.000 $2,069.600
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 18.000 $900.000 $925.000 $1,100.000
REMOVE METAL BEAM GUARD FENCE
LF 5,500.000 $3.000 $3.500 $2.500
REMOVE TERMINAL ANCHOR SECTION
EA 8.000 $212.000 $212.000 $125.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 28.000 $250.000 $220.000 $175.000
GUARDRAIL END TREATMENT (INSTALL)
EA 26.000 $2,300.000 $2,210.000 $2,050.000
GUARDRAIL END TREATMENT (REMOVE)
EA 26.000 $250.000 $395.000 $150.000
CRASH CUSH ATTEN (INSTL)
EA 14.000 $8,975.000 $11,500.000 $12,358.160
CRASH CUSH ATTEN (MOVE & RESET)
EA 96.000 $1,585.000 $1,730.000 $1,500.000
CRASH CUSH ATTEN (REMOVE)
EA 11.000 $890.000 $1,085.000 $900.000
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 8.000 $1,500.000 $1,421.320 $1,294.010
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 12.000 $3,128.000 $3,323.840 $3,316.270
CONDT (PVC) (SCH 40) (2")
LF 3,410.000 $8.280 $8.880 $9.490
CONDT (RM) (3/4")
LF 200.000 $17.000 $18.180 $24.070
ELEC CONDR (NO.12) BARE
LF 200.000 $1.050 $1.240 $1.080
ELEC CONDR (NO.12) INSULATED
LF 400.000 $1.240 $1.260 $1.080
ELEC CONDR (NO.8) BARE
LF 3,360.000 $1.910 $1.450 $1.200
ELEC CONDR (NO.8) INSULATED
LF 6,720.000 $1.990 $1.490 $1.320
GROUND BOX TY A (122311)W/APRON
EA 20.000 $849.020 $913.620 $842.610
ELC SRV TY A 240/480 060(SS)SS(E)SP(O)
EA 2.000 $5,529.000 $4,624.140 $6,524.200
ALUMINUM SIGNS (TY G)
SF 180.000 $30.000 $21.450 $29.480
ALUMINUM SIGNS (TY O)
SF 1,102.750 $22.000 $20.770 $18.420
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 90.000 $465.000 $425.000 $425.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 14.000 $462.000 $610.000 $610.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 14.000 $700.000 $560.000 $560.000
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 4.000 $592.000 $480.000 $480.000
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
EA 3.000 $638.000 $630.000 $630.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 2.000 $660.000 $575.000 $575.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 8.000 $665.000 $705.000 $705.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 14.000 $770.000 $675.000 $675.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 7.000 $773.000 $745.000 $745.000
IN SM RD SN SUP&AM TYS80(1)SB(T)
EA 1.000 $929.000 $700.000 $700.000
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
EA 4.000 $1,400.000 $1,425.000 $1,425.000
IN SM RD SN SUP&AM TYS80(2)SB(P-EXAL)
EA 1.000 $1,500.000 $1,520.000 $1,520.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 7.000 $2,016.970 $1,440.000 $1,612.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
EA 6.000 $2,025.000 $1,475.000 $1,612.000
REMOVE SM RD SN SUP&AM
EA 218.000 $100.000 $100.000 $50.000
INSTALL LRSS (STRUCT STEEL)
LB 1,342.000 $6.000 $3.600 $5.870
RELOCATE LRSA
EA 1.000 $3,405.000 $3,835.000 $1,500.000
REMOVE LRSA
EA 7.000 $1,928.000 $825.000 $250.000
INS OH SN SUP(30 FT CANT)
EA 8.000 $2,200.000 $20,123.150 $19,415.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 9.000 $20.030 $19.000 $19.000
INSTL DEL ASSM (D-DW)SZ 1(FLX)GND
EA 18.000 $84.000 $46.000 $46.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 48,179.000 $0.250 $0.500 $0.130
WK ZN PAV MRK NON-REMOV (W)4"(DOT)
LF 1,664.000 $0.470 $0.750 $0.130
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 221,610.000 $0.260 $0.400 $0.130
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 8,453.000 $0.380 $0.650 $0.220
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 166,113.000 $0.230 $0.400 $0.130
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 26,012.000 $0.690 $0.700 $0.430
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 105,975.000 $0.520 $0.650 $0.430
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 14,452.000 $1.250 $2.000 $0.980
WK ZN PAV MRK REMOV (W)12"(LNDP)
LF 2,568.000 $2.060 $3.000 $2.450
WK ZN PAV MRK REMOV (W)12"(SLD)
LF 600.000 $2.420 $3.000 $2.450
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 123,705.000 $0.540 $0.650 $0.430
REFL PAV MRK TY I (W)4"(DOT)(090MIL)
LF 878.000 $1.640 $2.000 $0.390
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 12,399.000 $0.860 $1.000 $0.730
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
LF 1,299.000 $2.870 $3.000 $1.840
RE PV MRK TY I(BLACK)4"(SHADOW)(090MIL)
LF 35,680.000 $0.650 $1.000 $0.490
PAVEMENT SEALER 4"
LF 209,517.000 $0.130 $0.250 $0.010
PAVEMENT SEALER 8"
LF 12,399.000 $0.200 $0.500 $0.060
PAVEMENT SEALER 12"
LF 1,299.000 $0.550 $1.500 $0.120
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 36,590.000 $0.350 $0.500 $0.480
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 104,249.000 $0.350 $0.500 $0.480
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 1,350.000 $0.300 $0.500 $0.480
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 105,268.000 $0.300 $0.500 $0.480
PREFAB PAV MRK TY C (W) (ARROW)
EA 8.000 $200.000 $250.000 $226.470
PREFAB PAV MRK TY C (W) (WORD)
EA 1.000 $285.000 $300.000 $275.440
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 35.000 $38.000 $50.000 $42.850
REFL PAV MRKR TY II-A-A
EA 128.000 $2.840 $3.000 $4.900
REFL PAV MRKR TY II-C-R
EA 2,409.000 $4.170 $3.500 $4.900
ELIM EXT PAV MRK & MRKS (4")
LF 75,394.000 $0.480 $0.500 $0.310
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 9.000 $6,300.000 $3,459.480 $7,516.070
PED POLE ASSEMBLY
EA 5.000 $2,000.000 $1,832.610 $1,853.740
GEOGRID REINFORCE EMBANKMENTS (TY A)
SY 25,786.000 $2.000 $2.000 $1.600
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $16,500.000 $1,000.000 $16,000.000
SPS-INS (20W) 480W (250AH) 1X50A(2)
EA 5.000 $2,433.000 $2,067.560 $4,559.720
VISIBILITY SENSOR
EA 5.000 $10,000.000 $15,862.300 $19,182.580
SYSTEM INTEGRATION
LS 1.000 $15,000.000 $8,967.150 $10,802.240
Totals: $101,970,747.517 $108,315,367.968 $119,880,038.495