Show Job Controls
Bid Cobra

WALLER FM 1489 (1418-01-012)

Items: 43

County: WALLER
Length: N/A
Highway: FM 1489
District: HOUSTON
Control Number: 1418-01-012
DBE Goal: N/A
Project: C 1418-1-12
Guaranty: N/A
Time: 60 WORKING DAYS
Engineer's Estimate: $1,439,221.80
Date: 01/09/2019 (7 years ago)
Contract Number: N/A
Type: BASE REPAIR,ACP OVERLAY AND PAVEMENT MARKINGS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$1,439,221.80
$1,597,058.40
Over/Under Est: 10.97% $157,836.60
Over/Under Est: 17.05% $245,360.97
Amt Left: 5.48% $87,524.37
Over/Under Est: 19.88% $286,133.93
Amt Left: 8.03% $128,297.33
Delta: -2.42% -$40,772.96
Over/Under Est: 23.38% $336,549.43
Amt Left: 11.19% $178,712.83
Delta: -2.92% -$50,415.50

Bid Items & Bid Tabulations

43 Total 0 of 43
WALLER  |  FM 1489  |  HOUSTON  |  1418-01-012  |  01/09/2019  |  $1,439,221.80  |  C 1418-1-12  |  BASE REPAIR,ACP OVERLAY AND PAVMT MR...  |  60 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ANGEL BROTHERS HOLDINGS CORP.
DURWOOD GREENE CONSTRUCTION CO.
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
JAMES CONSTRUCTION GROUP, L.L.C.
REMOVING CONCRETE(MOW STRIP)
LF 1,592.000 $10.000 $5.000 $15.000 $5.000 $15.000
EXCAVATION (ROADWAY)
CY 89.000 $40.000 $95.000 $35.000 $100.000 $193.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 109.000 $25.000 $41.500 $35.000 $130.000 $125.000
BACKFILL (TY A OR B)
STA 281.180 $100.000 $175.000 $300.000 $150.000 $125.000
ASPHALT STAB BASE (GR 2)(PG 64)
TON 308.000 $100.000 $88.500 $120.000 $100.000 $140.000
SALV, HAUL & STKPL RCL APH PV (0 TO 2")
SY 5,158.000 $1.500 $4.800 $3.000 $3.000 $7.280
SALV,HAUL & STKPL RCL APH PV (2")
SY 95,706.000 $1.000 $1.500 $1.450 $1.850 $1.400
ASPH (MULTI OPTION)
GAL 40,570.000 $2.500 $3.000 $2.600 $2.950 $2.300
AGGR(TY-PB GR-4 SAC-B)
CY 1,014.000 $95.000 $112.700 $105.000 $100.000 $105.000
D-GR HMA TY-D SAC-A PG70-22
TON 8,155.000 $76.000 $76.800 $87.000 $85.000 $84.000
FLEX PAVEMENT STRUCTURE REPAIR (5"-10")
SY 2,000.000 $38.000 $44.000 $44.000 $61.000 $55.000
RIPRAP (MOW STRIP)(4 IN)
CY 69.000 $525.000 $510.000 $675.000 $450.000 $600.000
RAIL (TY T631)
LF 450.000 $100.000 $65.000 $70.000 $62.000 $62.000
REMOVE STR (RAIL)
LF 400.000 $15.000 $6.300 $15.000 $6.000 $6.000
MOBILIZATION
LS 1.000 $42,000.000 $73,000.000 $40,000.000 $80,000.000 $170,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $2,000.000 $2,400.000 $1,700.000 $4,000.000 $2,300.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 52,869.000 $0.200 $0.120 $0.230 $0.200 $0.160
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 26,776.000 $0.250 $0.120 $0.340 $0.200 $0.300
MTL W-BEAM GD FEN (STEEL POST)
LF 800.000 $30.000 $24.500 $27.000 $23.340 $23.340
MTL BEAM GD FEN TRANS (T6)
EA 4.000 $1,000.000 $1,010.000 $900.000 $961.000 $961.000
REMOVE METAL BEAM GUARD FENCE
LF 1,025.000 $4.500 $2.600 $2.000 $2.450 $2.450
REMOVE TERMINAL ANCHOR SECTION
EA 1.000 $250.000 $330.000 $250.000 $312.000 $312.000
GUARDRAIL END TREATMENT (INSTALL)
EA 12.000 $2,800.000 $2,690.000 $2,750.000 $2,562.000 $2,562.000
GUARDRAIL END TREATMENT (REMOVE)
EA 11.000 $300.000 $261.000 $250.000 $344.000 $344.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 24.000 $175.000 $260.000 $225.000 $247.000 $247.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 3.000 $225.000 $295.000 $260.000 $281.000 $281.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 3.000 $425.000 $567.000 $500.000 $540.000 $540.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 59.000 $375.000 $370.000 $425.000 $352.000 $352.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 9.000 $725.000 $620.000 $750.000 $590.000 $590.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)
EA 11.000 $85.000 $68.000 $60.000 $65.000 $65.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 4.000 $85.000 $58.000 $60.000 $55.000 $55.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 38.000 $30.000 $21.000 $40.000 $20.000 $20.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 166,740.000 $0.150 $0.250 $0.230 $0.220 $0.150
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 276.000 $2.000 $2.100 $2.000 $1.000 $1.000
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 11,946.000 $0.150 $0.250 $0.250 $0.200 $0.150
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 86,664.000 $0.150 $0.250 $0.230 $0.220 $0.150
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 92.000 $5.000 $6.300 $6.000 $9.000 $7.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 55,580.000 $0.350 $0.420 $0.400 $0.490 $0.400
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 3,982.000 $0.500 $0.430 $0.410 $0.480 $0.400
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 28,888.000 $0.500 $0.430 $0.410 $0.480 $0.400
REFL PAV MRKR TY II-A-A
EA 562.000 $4.000 $3.700 $3.520 $4.000 $3.250
TMA (STATIONARY)
DAY 27.000 $400.000 $100.000 $300.000 $450.000 $470.000
TMA (MOBILE OPERATION)
DAY 33.000 $300.000 $375.000 $100.000 $200.000 $680.000
Totals: $1,439,221.800 $1,597,058.400 $1,684,582.770 $1,725,355.730 $1,775,771.230