PREPARING ROW
|
STA
|
43.000
|
$1,750.000
|
$1,000.000
|
$6,500.000
|
$10,000.000
|
$2,300.000
|
$1,500.000
|
$2,500.000
|
$5,400.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
524.000
|
$12.000
|
$7.000
|
$9.000
|
$5.000
|
$10.000
|
$5.000
|
$16.000
|
$14.000
|
|
|
REMOVING CONC (CTB)
|
LF
|
337.000
|
$10.000
|
$25.000
|
$28.000
|
$19.000
|
$23.000
|
$19.000
|
$20.000
|
$45.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(0"-16")
|
SY
|
9,225.000
|
$8.000
|
$4.000
|
$6.000
|
$8.000
|
$3.000
|
$4.000
|
$5.500
|
$3.300
|
|
|
OBLITERATING ABANDONED ROAD
|
STA
|
9.000
|
$1,500.000
|
$224.830
|
$700.000
|
$500.000
|
$1,000.000
|
$1,900.000
|
$1,500.000
|
$250.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
11,431.000
|
$11.000
|
$9.500
|
$9.000
|
$4.000
|
$11.000
|
$8.000
|
$8.000
|
$6.600
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
51,618.000
|
$15.000
|
$14.500
|
$20.000
|
$18.500
|
$20.000
|
$18.500
|
$25.000
|
$20.000
|
|
|
SPEC EXCAV WORK (BACKHOE)
|
HR
|
30.000
|
$120.000
|
$95.620
|
$75.000
|
$100.000
|
$45.000
|
$85.000
|
$55.000
|
$85.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
61,610.000
|
$1.500
|
$2.250
|
$1.200
|
$1.500
|
$1.000
|
$1.200
|
$2.500
|
$2.100
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
61,610.000
|
$0.200
|
$0.150
|
$0.170
|
$0.150
|
$0.200
|
$0.200
|
$0.150
|
$0.190
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
36,083.000
|
$0.150
|
$0.150
|
$0.130
|
$0.150
|
$0.120
|
$0.150
|
$0.150
|
$0.120
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
SY
|
36,082.000
|
$0.150
|
$0.150
|
$0.130
|
$0.150
|
$0.120
|
$0.150
|
$0.150
|
$0.120
|
|
|
VEGETATIVE WATERING
|
MG
|
1,953.000
|
$20.000
|
$15.000
|
$19.000
|
$15.000
|
$5.000
|
$20.000
|
$40.000
|
$19.230
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
3,674.000
|
$2.000
|
$1.130
|
$1.500
|
$3.000
|
$1.200
|
$1.600
|
$1.100
|
$1.600
|
|
|
PROOF ROLLING
|
HR
|
10.000
|
$90.000
|
$66.120
|
$72.000
|
$70.000
|
$45.000
|
$79.500
|
$55.000
|
$100.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
|
CY
|
6,084.000
|
$35.000
|
$28.000
|
$29.250
|
$36.000
|
$39.000
|
$44.000
|
$38.000
|
$34.000
|
|
|
LIME (HYDRATED LIME (DRY))
|
TON
|
148.000
|
$175.000
|
$180.000
|
$170.000
|
$160.000
|
$165.000
|
$165.000
|
$165.000
|
$159.300
|
|
|
LIME TRT (SUBGRADE)(8")
|
SY
|
10,225.000
|
$3.000
|
$7.500
|
$2.950
|
$4.000
|
$2.500
|
$3.000
|
$4.000
|
$4.000
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
4,328.000
|
$4.000
|
$3.500
|
$3.300
|
$3.500
|
$3.300
|
$3.600
|
$3.500
|
$3.310
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
4,118.000
|
$80.000
|
$75.000
|
$72.000
|
$77.000
|
$78.000
|
$82.500
|
$71.000
|
$71.280
|
|
|
D-GR HMA TY-D SAC-B PG70-22
|
TON
|
2,060.000
|
$95.000
|
$83.000
|
$80.000
|
$80.000
|
$85.000
|
$97.500
|
$80.000
|
$79.430
|
|
|
D-GR HMA TY-D PG70-22
|
TON
|
963.000
|
$95.000
|
$83.000
|
$80.000
|
$80.000
|
$85.000
|
$95.000
|
$80.000
|
$79.430
|
|
|
CEM STABIL BKFL
|
CY
|
381.400
|
$115.000
|
$130.000
|
$135.000
|
$140.000
|
$130.000
|
$170.000
|
$115.000
|
$150.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
3,373.000
|
$15.000
|
$17.000
|
$22.000
|
$0.450
|
$18.500
|
$8.000
|
$15.000
|
$5.000
|
|
|
TEMPORARY SPL SHORING (SOIL NAIL)
|
SF
|
1,175.000
|
$30.000
|
$23.000
|
$32.000
|
$26.000
|
$22.000
|
$37.000
|
$40.000
|
$37.520
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
272.000
|
$60.000
|
$72.850
|
$73.000
|
$106.000
|
$100.000
|
$102.000
|
$70.000
|
$78.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,120.000
|
$175.000
|
$128.390
|
$130.000
|
$175.000
|
$155.000
|
$175.000
|
$115.000
|
$128.000
|
|
|
CL C CONC (ABUT)
|
CY
|
166.000
|
$900.000
|
$650.000
|
$575.000
|
$800.000
|
$750.000
|
$605.000
|
$550.000
|
$800.000
|
|
|
CL C CONC (CAP)
|
CY
|
46.000
|
$1,100.000
|
$750.000
|
$1,000.000
|
$1,400.000
|
$1,200.000
|
$1,440.000
|
$900.000
|
$1,200.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
62.000
|
$1,100.000
|
$700.000
|
$850.000
|
$1,250.000
|
$750.000
|
$1,001.000
|
$950.000
|
$1,000.000
|
|
|
CL C CONC (MISC)
|
CY
|
2.000
|
$750.000
|
$859.340
|
$600.000
|
$2,300.000
|
$2,000.000
|
$1,400.000
|
$370.000
|
$1,600.000
|
|
|
REINF CONC SLAB
|
SF
|
24,963.000
|
$16.750
|
$13.000
|
$16.000
|
$16.300
|
$16.000
|
$14.250
|
$14.000
|
$16.000
|
|
|
BRIDGE SIDEWALK
|
SF
|
4,259.000
|
$10.500
|
$9.070
|
$8.000
|
$9.000
|
$10.500
|
$10.000
|
$8.000
|
$9.000
|
|
|
APPROACH SLAB
|
CY
|
153.300
|
$410.000
|
$450.000
|
$320.000
|
$390.000
|
$425.000
|
$420.000
|
$350.000
|
$450.000
|
|
|
RETAINING WALL (MSE)
|
SF
|
11,806.000
|
$55.000
|
$50.000
|
$45.000
|
$45.500
|
$43.500
|
$50.000
|
$39.500
|
$48.600
|
|
|
RETAINING WALL (TEMP WALL)
|
SF
|
7,447.000
|
$20.000
|
$12.000
|
$7.000
|
$8.000
|
$7.500
|
$10.000
|
$16.000
|
$8.500
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
3,346.320
|
$155.000
|
$134.000
|
$140.000
|
$153.000
|
$147.000
|
$151.000
|
$123.000
|
$145.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
57.000
|
$450.000
|
$400.000
|
$410.000
|
$625.000
|
$400.000
|
$430.000
|
$350.000
|
$380.000
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
66.000
|
$450.000
|
$481.100
|
$450.000
|
$750.000
|
$425.000
|
$406.000
|
$375.000
|
$380.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
7.000
|
$135.000
|
$205.130
|
$160.000
|
$130.000
|
$230.000
|
$142.000
|
$155.000
|
$180.000
|
|
|
RIPRAP (CONC)(FLUME)
|
CY
|
35.000
|
$400.000
|
$586.460
|
$410.000
|
$625.000
|
$425.000
|
$470.000
|
$425.000
|
$800.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
107.700
|
$450.000
|
$484.720
|
$415.000
|
$625.000
|
$375.000
|
$440.000
|
$450.000
|
$560.000
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
306.000
|
$15.000
|
$12.830
|
$18.000
|
$13.000
|
$35.000
|
$20.000
|
$17.000
|
$10.000
|
|
|
RAIL (TY SSTR)
|
LF
|
1,042.000
|
$65.000
|
$60.850
|
$74.000
|
$60.000
|
$55.000
|
$82.000
|
$62.000
|
$60.000
|
|
|
RAIL (TY C402)
|
LF
|
586.600
|
$130.000
|
$148.070
|
$146.000
|
$120.000
|
$150.000
|
$160.000
|
$130.000
|
$170.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
|
LF
|
183.900
|
$80.000
|
$81.440
|
$72.000
|
$77.000
|
$75.000
|
$72.000
|
$60.000
|
$80.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
292.000
|
$60.000
|
$64.740
|
$65.000
|
$45.000
|
$60.000
|
$65.000
|
$80.000
|
$48.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
112.000
|
$80.000
|
$75.350
|
$100.000
|
$77.000
|
$90.000
|
$68.000
|
$82.000
|
$62.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (P)
|
EA
|
2.000
|
$900.000
|
$938.610
|
$1,600.000
|
$835.000
|
$900.000
|
$1,300.000
|
$1,100.000
|
$750.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$1,000.000
|
$1,161.960
|
$1,700.000
|
$1,090.000
|
$1,000.000
|
$2,000.000
|
$1,100.000
|
$900.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$1,600.000
|
$1,487.600
|
$1,800.000
|
$1,290.000
|
$1,100.000
|
$2,100.000
|
$1,300.000
|
$1,050.000
|
|
|
REMOV STR (PIPE)
|
LF
|
120.000
|
$20.000
|
$10.140
|
$20.000
|
$16.000
|
$23.000
|
$13.000
|
$10.000
|
$12.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$200,000.000
|
$75,000.000
|
$105,000.000
|
$34,000.000
|
$65,000.000
|
$96,900.000
|
$100,000.000
|
$50,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$650,300.000
|
$603,000.000
|
$580,850.000
|
$400,000.000
|
$640,000.000
|
$500,000.000
|
$620,000.000
|
$690,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
22.000
|
$7,500.000
|
$5,000.000
|
$1,200.000
|
$2,000.000
|
$8,000.000
|
$7,000.000
|
$2,000.000
|
$17,100.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
40.000
|
$25.000
|
$22.050
|
$27.000
|
$50.000
|
$23.000
|
$32.000
|
$25.000
|
$24.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
30.000
|
$30.000
|
$23.080
|
$23.000
|
$57.000
|
$26.000
|
$40.000
|
$25.000
|
$26.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
70.000
|
$10.000
|
$10.260
|
$10.000
|
$19.000
|
$17.000
|
$9.000
|
$10.000
|
$17.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
224.000
|
$20.000
|
$11.280
|
$12.000
|
$10.500
|
$10.000
|
$16.000
|
$12.000
|
$10.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
224.000
|
$10.000
|
$8.210
|
$10.000
|
$6.500
|
$7.000
|
$8.000
|
$8.000
|
$6.750
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
11,413.000
|
$3.000
|
$1.950
|
$2.000
|
$3.000
|
$2.000
|
$3.000
|
$2.000
|
$2.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
11,413.000
|
$1.000
|
$0.510
|
$0.500
|
$0.300
|
$0.100
|
$0.250
|
$0.500
|
$0.340
|
|
|
CONSTRUCTING DETOURS
|
SY
|
5,665.000
|
$65.000
|
$42.000
|
$55.000
|
$60.000
|
$45.000
|
$57.000
|
$45.000
|
$55.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
|
LF
|
80.000
|
$15.000
|
$13.000
|
$50.000
|
$20.000
|
$20.000
|
$35.000
|
$12.000
|
$9.270
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 1)
|
LF
|
80.000
|
$15.000
|
$13.000
|
$10.000
|
$19.000
|
$20.000
|
$25.000
|
$12.000
|
$9.270
|
|
|
PORT CTB (DES SOURCE) (SAFETY SH)(TY 2)
|
LF
|
7,910.000
|
$12.000
|
$7.000
|
$7.000
|
$8.000
|
$12.000
|
$14.000
|
$10.000
|
$6.380
|
|
|
PORT CTB (STKPL)(SAFETY SH)
|
LF
|
7,910.000
|
$10.000
|
$7.000
|
$6.000
|
$7.500
|
$8.000
|
$15.000
|
$10.000
|
$6.150
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
162.000
|
$60.000
|
$90.000
|
$55.000
|
$103.000
|
$100.000
|
$125.000
|
$60.000
|
$110.000
|
|
|
PERM CTB (SGL SLOPE) (TY 3) (42 )
|
LF
|
175.000
|
$155.000
|
$110.000
|
$160.000
|
$189.000
|
$150.000
|
$135.000
|
$65.000
|
$190.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,048.000
|
$60.000
|
$40.000
|
$25.000
|
$27.000
|
$25.000
|
$30.000
|
$20.000
|
$19.340
|
|
|
TURNOUTS (SURF TREAT)
|
SY
|
39.000
|
$40.000
|
$50.000
|
$77.000
|
$55.000
|
$78.000
|
$50.000
|
$60.000
|
$53.970
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,394.000
|
$20.000
|
$20.450
|
$22.000
|
$21.000
|
$21.000
|
$22.500
|
$20.000
|
$20.450
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,500.000
|
$1,445.000
|
$1,500.000
|
$1,650.000
|
$1,600.000
|
$1,600.000
|
$1,545.000
|
$1,445.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
3.000
|
$1,000.000
|
$940.000
|
$950.000
|
$940.000
|
$900.000
|
$1,100.000
|
$900.000
|
$940.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
2,810.000
|
$2.500
|
$1.000
|
$1.000
|
$1.600
|
$2.000
|
$1.000
|
$2.000
|
$1.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$110.000
|
$100.000
|
$105.000
|
$195.000
|
$200.000
|
$104.000
|
$185.000
|
$100.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
3.000
|
$2,500.000
|
$2,735.000
|
$2,800.000
|
$2,700.000
|
$2,800.000
|
$3,002.000
|
$2,535.000
|
$2,735.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
5.000
|
$200.000
|
$200.000
|
$200.000
|
$240.000
|
$250.000
|
$204.000
|
$250.000
|
$200.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
7.000
|
$7,500.000
|
$7,065.000
|
$7,100.000
|
$20,000.000
|
$11,000.000
|
$12,500.000
|
$13,500.000
|
$7,065.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,700.000
|
$1,500.000
|
$1,600.000
|
$675.000
|
$700.000
|
$1,750.000
|
$3,500.000
|
$1,500.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
7.000
|
$825.000
|
$750.000
|
$760.000
|
$1,100.000
|
$600.000
|
$660.000
|
$850.000
|
$750.000
|
|
|
PIPE UNDERDRAINS (TY 6) (6")
|
LF
|
486.000
|
$24.000
|
$32.760
|
$26.000
|
$32.000
|
$16.000
|
$42.000
|
$20.000
|
$30.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
3.000
|
$215.000
|
$189.000
|
$170.000
|
$180.000
|
$185.000
|
$197.000
|
$190.000
|
$165.000
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
4.000
|
$1,300.000
|
$2,250.000
|
$2,300.000
|
$2,300.000
|
$2,800.000
|
$2,500.000
|
$2,300.000
|
$2,250.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
259.000
|
$13.000
|
$21.500
|
$22.000
|
$22.000
|
$22.000
|
$23.000
|
$22.000
|
$21.500
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
4,065.000
|
$16.000
|
$14.500
|
$15.000
|
$14.600
|
$15.000
|
$15.000
|
$15.000
|
$14.500
|
|
|
CONDT (RM) (3/4")
|
LF
|
132.000
|
$25.000
|
$50.000
|
$52.000
|
$51.000
|
$51.000
|
$54.000
|
$51.000
|
$50.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
20.000
|
$1,100.000
|
$1,400.000
|
$1,450.000
|
$1,450.000
|
$2,000.000
|
$1,500.000
|
$1,500.000
|
$1,400.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
48.000
|
$420.000
|
$425.000
|
$480.000
|
$410.000
|
$420.000
|
$500.000
|
$430.000
|
$405.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
4.000
|
$560.000
|
$510.000
|
$850.000
|
$630.000
|
$630.000
|
$700.000
|
$510.000
|
$691.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
2.000
|
$510.000
|
$497.000
|
$825.000
|
$470.000
|
$470.000
|
$500.000
|
$500.000
|
$488.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$575.000
|
$675.000
|
$510.000
|
$600.000
|
$600.000
|
$650.000
|
$700.000
|
$654.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
2.000
|
$1,450.000
|
$1,695.000
|
$1,250.000
|
$2,600.000
|
$3,000.000
|
$2,800.000
|
$1,700.000
|
$1,840.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
40.000
|
$375.000
|
$315.000
|
$105.000
|
$285.000
|
$295.000
|
$300.000
|
$315.000
|
$395.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
20.000
|
$24.000
|
$18.000
|
$16.000
|
$26.000
|
$16.000
|
$27.000
|
$18.000
|
$15.750
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
375.000
|
$0.300
|
$0.300
|
$0.300
|
$1.000
|
$0.310
|
$0.350
|
$0.300
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
9,900.000
|
$0.350
|
$0.240
|
$0.300
|
$0.300
|
$0.250
|
$0.250
|
$0.240
|
$0.240
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
8,350.000
|
$0.300
|
$0.240
|
$0.300
|
$0.300
|
$0.250
|
$0.250
|
$0.240
|
$0.240
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
150.000
|
$0.750
|
$1.000
|
$1.050
|
$1.500
|
$1.100
|
$1.100
|
$1.000
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
7,550.000
|
$0.650
|
$0.470
|
$0.500
|
$0.600
|
$0.480
|
$0.500
|
$0.470
|
$0.470
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
173.000
|
$6.100
|
$6.000
|
$6.500
|
$7.500
|
$6.100
|
$6.500
|
$0.600
|
$6.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
9,000.000
|
$0.650
|
$0.470
|
$0.500
|
$0.600
|
$0.500
|
$0.500
|
$0.470
|
$0.470
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
1,060.000
|
$0.700
|
$0.700
|
$0.700
|
$0.710
|
$0.710
|
$0.750
|
$0.700
|
$0.700
|
|
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
|
LF
|
471.000
|
$2.500
|
$2.220
|
$2.250
|
$2.250
|
$2.250
|
$2.500
|
$2.220
|
$2.220
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
264.000
|
$7.500
|
$4.440
|
$4.500
|
$4.500
|
$4.500
|
$4.000
|
$4.440
|
$4.440
|
|
REFL PAV MRK TY I (W)(ARROW)(090MIL)
|
EA
|
4.000
|
$105.000
|
$120.000
|
$122.000
|
$122.000
|
$121.000
|
$130.000
|
$12.000
|
$120.000
|
|
REFL PAV MRK TY I (W)(WORD)(090MIL)
|
EA
|
4.000
|
$150.000
|
$120.000
|
$122.000
|
$122.000
|
$121.000
|
$130.000
|
$12.000
|
$120.000
|
|
REFL PAV MRK TY I (Y)12"(SLD)(090MIL)
|
LF
|
348.000
|
$3.000
|
$2.500
|
$2.750
|
$2.600
|
$2.550
|
$2.750
|
$2.500
|
$2.500
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
287.000
|
$9.250
|
$4.440
|
$4.750
|
$4.500
|
$4.500
|
$5.000
|
$4.440
|
$4.440
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
615.000
|
$0.400
|
$0.750
|
$0.750
|
$0.770
|
$0.780
|
$1.000
|
$0.750
|
$0.750
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
5,280.000
|
$0.400
|
$0.400
|
$0.400
|
$0.410
|
$0.410
|
$0.400
|
$0.400
|
$0.400
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
9,303.000
|
$0.400
|
$0.400
|
$0.400
|
$0.410
|
$0.410
|
$0.400
|
$0.400
|
$0.400
|
|
REFL PAV MRKR TY I-C
|
EA
|
65.000
|
$6.000
|
$5.000
|
$5.250
|
$5.200
|
$5.100
|
$5.500
|
$5.000
|
$5.000
|
|
REFL PAV MRKR TY I-R
|
EA
|
32.000
|
$6.000
|
$5.000
|
$5.250
|
$5.200
|
$5.100
|
$5.500
|
$5.000
|
$5.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
168.000
|
$6.000
|
$5.000
|
$5.250
|
$5.200
|
$5.100
|
$5.500
|
$5.000
|
$5.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
275.000
|
$0.700
|
$2.000
|
$2.250
|
$2.100
|
$2.100
|
$2.000
|
$3.000
|
$2.000
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
60.000
|
$3.500
|
$4.000
|
$4.250
|
$4.100
|
$4.100
|
$4.000
|
$5.000
|
$4.000
|
|
|
NO. OF WORKING DAYS
|
$/D
|
3,000.000
|
$263.000
|
$240.000
|
$223.000
|
$225.000
|
$245.000
|
$225.000
|
$260.000
|
$263.000
|
|
|
GEOGRID REINFORCE EMBANKMENTS (TY A)
|
SY
|
1,500.000
|
$2.250
|
$2.680
|
$1.750
|
$3.000
|
$3.000
|
$3.600
|
$4.000
|
$2.420
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$4,800.000
|
$3,750.000
|
$8,000.000
|
$5,000.000
|
$10,000.000
|
$8,000.000
|
$16,000.000
|
$4,330.000
|
|
|
TMA (STATIONARY)
|
EA
|
4.000
|
$10,000.000
|
$19,000.000
|
$7,200.000
|
$2,200.000
|
$10,000.000
|
$12,000.000
|
$18,000.000
|
$8,118.750
|
|
Totals: |
$7,792,809.850
|
$6,748,948.612
|
$7,089,546.450
|
$7,279,447.890
|
$7,305,358.870
|
$7,431,891.520
|
$7,434,120.320
|
$7,711,972.280
|