PREPARING ROW
|
STA
|
107.000
|
$3,500.000
|
$4,500.000
|
$20,961.000
|
$7,100.000
|
$17,450.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
2,507.000
|
$10.000
|
$14.000
|
$9.760
|
$5.000
|
$7.250
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
3,096.000
|
$11.000
|
$19.000
|
$7.730
|
$6.000
|
$6.500
|
|
|
REMOVING CONC (CTB)
|
LF
|
3,550.000
|
$9.000
|
$23.010
|
$7.330
|
$15.000
|
$18.190
|
|
|
REMOVING STAB BASE & ASPH PAV (8"-14")
|
SY
|
33,137.000
|
$3.750
|
$8.000
|
$8.060
|
$5.500
|
$7.100
|
|
|
OBLITERATING ABANDONED ROAD
|
SY
|
3,025.000
|
$15.000
|
$12.000
|
$5.680
|
$9.000
|
$9.500
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
28,630.000
|
$12.000
|
$19.000
|
$9.330
|
$11.000
|
$17.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
22,072.000
|
$12.000
|
$23.500
|
$21.140
|
$9.000
|
$41.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
64,098.000
|
$1.500
|
$2.500
|
$0.340
|
$4.500
|
$3.900
|
|
|
BLOCK SODDING
|
SY
|
5,853.000
|
$6.000
|
$5.000
|
$5.000
|
$6.000
|
$6.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
32,050.000
|
$0.250
|
$0.250
|
$0.120
|
$0.200
|
$0.130
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
32,050.000
|
$0.250
|
$0.250
|
$0.120
|
$0.200
|
$0.130
|
|
|
CELL FBR MLCH SEED(PERM)(URBAN)(CLAY)
|
SY
|
64,098.000
|
$0.500
|
$0.500
|
$0.240
|
$0.400
|
$0.290
|
|
|
VEGETATIVE WATERING
|
MG
|
1,621.000
|
$20.000
|
$20.000
|
$20.870
|
$25.000
|
$24.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
5,406.000
|
$1.250
|
$2.250
|
$1.190
|
$1.500
|
$1.200
|
|
|
PROOF ROLLING
|
HR
|
174.000
|
$100.000
|
$120.000
|
$71.370
|
$100.000
|
$100.000
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
71,247.000
|
$4.000
|
$4.100
|
$2.970
|
$5.000
|
$4.500
|
|
|
LIME (HYD, COM, OR QK(SLURRY))
|
TON
|
961.000
|
$180.000
|
$232.000
|
$199.950
|
$220.000
|
$200.000
|
|
|
CEM TRT(PLNT MX) (CL L)(TYA)(GR1-2)(6")
|
SY
|
63,693.000
|
$14.000
|
$19.000
|
$20.670
|
$25.000
|
$18.000
|
|
|
CEM TRT(PLN MX)(CL L)(TYA)(GR1-2)(10")
|
SY
|
3,209.000
|
$35.000
|
$35.000
|
$37.350
|
$45.000
|
$36.000
|
|
|
ASPHALT STAB BASE (GR 2)(PG 64)
|
TON
|
14,936.000
|
$77.000
|
$83.000
|
$99.150
|
$70.000
|
$87.000
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
16,727.000
|
$4.000
|
$4.000
|
$5.310
|
$4.000
|
$4.600
|
|
|
D-GR HMA(SQ) TY-C PG70-22
|
TON
|
518.000
|
$70.000
|
$84.000
|
$200.670
|
$120.000
|
$150.000
|
|
|
D-GR HMA TY-D PG 70-22 (LEVEL-UP)
|
TON
|
8,460.000
|
$110.000
|
$72.000
|
$113.320
|
$102.000
|
$100.000
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
|
TON
|
12,093.000
|
$130.000
|
$125.000
|
$177.060
|
$125.000
|
$120.000
|
|
|
PLANE ASPH CONC PAV (3 1/2")
|
SY
|
63,952.000
|
$3.000
|
$3.400
|
$2.290
|
$2.000
|
$2.300
|
|
|
CONC PVMT (CONT REINF - CRCP) (10")
|
SY
|
2,506.000
|
$100.000
|
$81.000
|
$60.120
|
$65.000
|
$80.000
|
|
|
FULL - DEPTH REPAIR CPJR (15")
|
SY
|
2.000
|
$500.000
|
$4,300.000
|
$525.760
|
$125.000
|
$3,400.000
|
|
|
CEM STABIL BKFL
|
CY
|
2,018.000
|
$80.000
|
$110.000
|
$76.940
|
$110.000
|
$76.000
|
|
|
CUT & RESTORING PAV
|
SY
|
80.000
|
$100.000
|
$155.000
|
$100.310
|
$125.000
|
$400.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
2,862.000
|
$5.000
|
$15.000
|
$5.400
|
$1.500
|
$23.500
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
468.000
|
$65.000
|
$98.500
|
$73.470
|
$85.000
|
$105.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,196.000
|
$180.000
|
$240.000
|
$256.890
|
$225.000
|
$276.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
34.000
|
$235.000
|
$1,100.000
|
$447.450
|
$250.000
|
$760.000
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
2,536.000
|
$550.000
|
$420.000
|
$454.610
|
$450.000
|
$480.000
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
76.000
|
$220.000
|
$450.000
|
$200.000
|
$225.000
|
$180.000
|
|
|
DRILL SHAFT (SIGN MTS) (48 IN)
|
LF
|
175.000
|
$500.000
|
$1,126.000
|
$763.000
|
$775.000
|
$450.000
|
|
|
DRILL SHAFT (SIGN MTS) (54 IN)
|
LF
|
120.000
|
$500.000
|
$1,225.000
|
$872.000
|
$1,000.000
|
$550.000
|
|
|
CL C CONC (ABUT)(HPC)(EXTEND)
|
CY
|
104.400
|
$1,100.000
|
$1,700.000
|
$1,262.080
|
$1,200.000
|
$2,667.000
|
|
|
CL C CONC (CAP)(HPC)(EXTEND)
|
CY
|
266.600
|
$2,600.000
|
$1,600.000
|
$1,581.160
|
$1,400.000
|
$1,870.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
154.700
|
$1,000.000
|
$1,300.000
|
$713.610
|
$1,600.000
|
$1,560.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
199.000
|
$400.000
|
$510.000
|
$813.320
|
$400.000
|
$654.000
|
|
|
REINF CONC SLAB (EXTEND SLAB)(HPC)
|
SF
|
44,221.000
|
$30.000
|
$18.500
|
$26.060
|
$40.000
|
$33.000
|
|
|
APPROACH SLAB (EXTEND) (HPC)
|
CY
|
155.300
|
$535.000
|
$740.000
|
$512.040
|
$600.000
|
$750.000
|
|
|
RETAINING WALL (CONC BLOCK)
|
SF
|
13,737.000
|
$60.000
|
$28.000
|
$28.620
|
$45.000
|
$41.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
4,182.420
|
$147.000
|
$175.000
|
$124.790
|
$175.000
|
$167.000
|
|
|
PRESTR CONC GIRDER (TX40)
|
LF
|
1,293.840
|
$130.000
|
$195.000
|
$173.150
|
$185.000
|
$170.000
|
|
|
PENETRATING CONCRETE SURFACE TREATMENT
|
SY
|
1,452.000
|
$10.000
|
$45.000
|
$3.730
|
$40.000
|
$14.400
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
35.000
|
$970.000
|
$180.000
|
$253.710
|
$165.000
|
$151.000
|
|
|
CONC STR REPAIR (STANDARD)
|
SF
|
420.000
|
$211.000
|
$60.000
|
$169.000
|
$65.000
|
$49.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
116.800
|
$400.000
|
$560.000
|
$328.770
|
$500.000
|
$550.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
105.000
|
$500.000
|
$615.000
|
$375.280
|
$500.000
|
$550.000
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
41.000
|
$445.000
|
$545.000
|
$375.300
|
$500.000
|
$550.000
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
326.000
|
$460.000
|
$620.000
|
$284.890
|
$500.000
|
$680.000
|
|
|
RIPRAP (CONC)(FLUME)
|
CY
|
116.000
|
$440.000
|
$615.000
|
$592.050
|
$500.000
|
$550.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
174.000
|
$445.000
|
$700.000
|
$592.050
|
$500.000
|
$580.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL3)
|
LF
|
726.000
|
$25.000
|
$8.500
|
$17.860
|
$8.000
|
$6.750
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL7)
|
LF
|
152.000
|
$20.000
|
$56.000
|
$25.310
|
$60.000
|
$47.000
|
|
|
CLEANING AND SEALING JOINTS (CL 3)
|
LF
|
302.000
|
$30.000
|
$10.500
|
$18.840
|
$10.000
|
$8.600
|
|
|
CLEAN & PAINT EXIST STR (SYSTEM II)
|
LS
|
1.000
|
$450,000.000
|
$400,000.000
|
$827,000.000
|
$900,000.000
|
$1,000,000.000
|
|
|
SPOT CLEAN & PAINT EXT STR(SPL PRT SYS)
|
LS
|
1.000
|
$20,000.000
|
$225,000.000
|
$162,577.000
|
$200,000.000
|
$250,000.000
|
|
|
RAIL (TY SSTR)(HPC)
|
LF
|
1,880.400
|
$42.000
|
$88.500
|
$52.000
|
$80.000
|
$52.000
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOTS)
|
LF
|
1,419.000
|
$60.000
|
$92.000
|
$44.470
|
$70.000
|
$56.000
|
|
|
SEALED EXPANSION JOINT (5 IN) (SEJ - A)
|
LF
|
110.000
|
$100.000
|
$86.000
|
$136.300
|
$200.000
|
$210.000
|
|
|
HEADER TYPE EXPANSION JOINT
|
LF
|
542.000
|
$160.000
|
$151.000
|
$150.940
|
$100.000
|
$80.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
131.000
|
$200.000
|
$400.000
|
$236.460
|
$600.000
|
$440.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
525.000
|
$60.000
|
$59.000
|
$50.990
|
$125.000
|
$106.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
1,447.000
|
$70.000
|
$120.000
|
$59.140
|
$135.000
|
$117.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
1,160.000
|
$90.000
|
$155.000
|
$73.410
|
$195.000
|
$200.000
|
|
|
MANH (COMPL)(PRM)(48IN)
|
EA
|
1.000
|
$3,850.000
|
$3,200.000
|
$7,739.810
|
$10,000.000
|
$4,800.000
|
|
|
INLET (COMPL)(PCO)(5FT)(RIGHT)
|
EA
|
2.000
|
$4,675.000
|
$6,100.000
|
$3,405.000
|
$10,000.000
|
$6,720.000
|
|
|
INLET(COMPL)(PSL)(SFG)(3FTX5FT-3FTX5FT)
|
EA
|
49.000
|
$5,200.000
|
$5,600.000
|
$3,618.740
|
$10,000.000
|
$4,075.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 2 FT)(4:1) (C)
|
EA
|
4.000
|
$6,600.000
|
$4,800.000
|
$3,707.990
|
$10,000.000
|
$5,400.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
10.000
|
$1,000.000
|
$990.000
|
$1,734.660
|
$2,000.000
|
$1,220.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$800.000
|
$1,050.000
|
$1,825.600
|
$4,000.000
|
$1,270.000
|
|
|
ADJUSTING INLET (CAP)
|
EA
|
2.000
|
$2,000.000
|
$2,500.000
|
$966.510
|
$2,000.000
|
$1,160.000
|
|
|
REMOV STR (SET)
|
EA
|
4.000
|
$500.000
|
$680.000
|
$740.210
|
$2,500.000
|
$840.000
|
|
|
REMOV STR (PIPE)
|
LF
|
3,636.000
|
$150.000
|
$32.000
|
$7.360
|
$65.000
|
$14.500
|
|
|
REMOVE STR (RAIL)
|
LF
|
150.000
|
$16.000
|
$27.000
|
$4.000
|
$35.000
|
$2.800
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,760,000.000
|
$1,519,000.000
|
$2,300,000.000
|
$2,250,000.000
|
$2,550,500.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
28.000
|
$6,500.000
|
$930.000
|
$18,195.260
|
$15,000.000
|
$8,000.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
156.000
|
$35.000
|
$30.750
|
$39.500
|
$40.000
|
$41.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
156.000
|
$10.000
|
$12.400
|
$9.000
|
$15.000
|
$9.300
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
128.000
|
$140.000
|
$171.000
|
$118.640
|
$175.000
|
$185.000
|
|
|
BULLDOZER WORK (EROSION & SEDMT CONT)
|
HR
|
128.000
|
$140.000
|
$194.000
|
$97.560
|
$250.000
|
$140.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,763.000
|
$5.000
|
$4.500
|
$3.000
|
$4.000
|
$3.100
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,763.000
|
$2.000
|
$2.000
|
$1.000
|
$2.000
|
$1.200
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
830.000
|
$5.000
|
$8.750
|
$5.500
|
$6.000
|
$5.700
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
830.000
|
$2.000
|
$2.500
|
$1.000
|
$1.500
|
$1.200
|
|
|
CONSTRUCTING DETOURS (TY 1)
|
SY
|
2,615.000
|
$80.000
|
$79.000
|
$109.470
|
$90.000
|
$112.000
|
|
|
CONSTRUCTING DETOURS (TY 2)
|
SY
|
4,628.000
|
$65.000
|
$25.000
|
$25.770
|
$100.000
|
$33.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
10,530.000
|
$40.000
|
$61.000
|
$46.460
|
$65.000
|
$73.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
1,680.000
|
$40.000
|
$66.000
|
$48.160
|
$50.000
|
$84.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$40.000
|
$82.750
|
$45.990
|
$55.000
|
$104.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
28,010.000
|
$10.000
|
$12.000
|
$5.710
|
$10.000
|
$8.850
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
820.000
|
$10.000
|
$14.000
|
$9.330
|
$15.000
|
$26.850
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$10.000
|
$21.000
|
$11.680
|
$35.000
|
$54.800
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
9,780.000
|
$10.000
|
$12.500
|
$6.940
|
$12.000
|
$10.800
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
1,680.000
|
$10.000
|
$14.000
|
$5.760
|
$21.000
|
$9.250
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$10.000
|
$21.000
|
$5.760
|
$17.000
|
$32.700
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
3,490.000
|
$55.000
|
$79.000
|
$43.190
|
$75.000
|
$73.250
|
|
|
PERM CTB (TRAN SSCB TO CTB) (MOD)
|
LF
|
30.000
|
$300.000
|
$75.000
|
$113.270
|
$350.000
|
$452.000
|
|
|
CONC CURB (TY I)
|
LF
|
2,649.000
|
$20.000
|
$24.000
|
$3.970
|
$15.000
|
$26.850
|
|
|
CONC CURB (TY II)
|
LF
|
5,964.000
|
$20.000
|
$24.000
|
$3.970
|
$15.000
|
$20.200
|
|
|
DRIVEWAYS (ACP)
|
SY
|
173.000
|
$50.000
|
$34.000
|
$94.460
|
$80.000
|
$48.500
|
|
|
DRIVEWAYS (CONC) (FAST TRACK)
|
SY
|
24.000
|
$100.000
|
$185.000
|
$150.530
|
$150.000
|
$270.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
18,536.000
|
$0.200
|
$0.600
|
$0.480
|
$0.400
|
$0.360
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
3,600.000
|
$22.000
|
$27.000
|
$19.500
|
$24.000
|
$20.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
6.000
|
$2,000.000
|
$1,700.000
|
$1,380.000
|
$2,000.000
|
$1,435.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
6.000
|
$1,300.000
|
$1,200.000
|
$1,030.000
|
$1,100.000
|
$1,070.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,150.000
|
$4.000
|
$2.500
|
$4.000
|
$3.000
|
$4.150
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$430.000
|
$185.000
|
$250.000
|
$225.000
|
$255.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
3.000
|
$255.000
|
$185.000
|
$250.000
|
$130.000
|
$255.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
6.000
|
$443.000
|
$370.000
|
$250.000
|
$250.000
|
$255.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
6.000
|
$2,500.000
|
$3,400.000
|
$2,350.000
|
$3,200.000
|
$2,400.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
3.000
|
$610.000
|
$308.000
|
$250.000
|
$300.000
|
$255.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
8.000
|
$3,000.000
|
$1,850.000
|
$2,000.000
|
$3,000.000
|
$2,020.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
5.000
|
$1,790.000
|
$1,500.000
|
$900.000
|
$1,500.000
|
$910.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
7.000
|
$13,290.000
|
$40,000.000
|
$21,000.000
|
$25,000.000
|
$21,200.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
|
EA
|
1.000
|
$36,500.000
|
$64,000.000
|
$34,000.000
|
$38,000.000
|
$34,200.000
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
36.000
|
$514.000
|
$310.000
|
$475.000
|
$600.000
|
$510.000
|
|
|
REMOVE RD IL ASM (U/P)
|
EA
|
14.000
|
$177.000
|
$310.000
|
$790.000
|
$1,000.000
|
$170.000
|
|
|
IN RD IL (U/P) (TY 2) (150W EQ) LED
|
EA
|
10.000
|
$16.000
|
$2,800.000
|
$1,640.000
|
$2,000.000
|
$1,150.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
1,030.000
|
$7.250
|
$9.500
|
$16.900
|
$21.000
|
$8.300
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
162.000
|
$20.000
|
$21.000
|
$52.200
|
$65.000
|
$21.000
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
150.000
|
$13.450
|
$11.000
|
$21.000
|
$26.000
|
$10.250
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
270.000
|
$25.000
|
$23.000
|
$34.100
|
$42.000
|
$30.000
|
|
|
CONDT (RM) (3/4")
|
LF
|
396.000
|
$23.500
|
$18.000
|
$68.900
|
$85.000
|
$30.000
|
|
|
CONDT (RM) (1 1/2")
|
LF
|
120.000
|
$20.000
|
$21.000
|
$40.100
|
$50.000
|
$31.000
|
|
|
ELEC CONDR (NO.10) BARE
|
LF
|
496.000
|
$3.400
|
$2.000
|
$1.850
|
$3.000
|
$4.150
|
|
|
ELEC CONDR (NO.10) INSULATED
|
LF
|
992.000
|
$4.000
|
$2.000
|
$1.850
|
$3.000
|
$1.800
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
1,479.000
|
$1.500
|
$2.250
|
$1.900
|
$3.000
|
$1.800
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
3,042.000
|
$1.500
|
$2.250
|
$2.000
|
$3.000
|
$1.800
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
420.000
|
$1.500
|
$2.250
|
$2.050
|
$3.000
|
$150.000
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
840.000
|
$1.500
|
$2.500
|
$2.200
|
$3.000
|
$135.000
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
15.000
|
$1,000.000
|
$2,100.000
|
$1,950.000
|
$2,500.000
|
$1,200.000
|
|
|
ELC SRV TY A 240/480 060(NS)SS(T)TP(O)
|
EA
|
3.000
|
$6,500.000
|
$7,000.000
|
$8,160.000
|
$10,000.000
|
$9,000.000
|
|
|
ELC SRV TY D 120/240 060(NS)GS(N)GC(O)
|
EA
|
2.000
|
$7,500.000
|
$7,200.000
|
$8,465.000
|
$12,000.000
|
$9,000.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
294.000
|
$28.000
|
$31.000
|
$27.090
|
$37.000
|
$31.200
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
945.000
|
$25.000
|
$30.000
|
$22.480
|
$39.000
|
$66.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY O)
|
SF
|
156.000
|
$25.000
|
$38.000
|
$30.000
|
$51.000
|
$57.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
23.000
|
$500.000
|
$495.000
|
$455.000
|
$1,000.000
|
$410.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
21.000
|
$600.000
|
$710.000
|
$656.000
|
$1,250.000
|
$625.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
15.000
|
$710.000
|
$860.000
|
$857.000
|
$1,250.000
|
$815.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
8.000
|
$765.000
|
$990.000
|
$818.000
|
$1,300.000
|
$795.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
6.000
|
$2,180.000
|
$3,000.000
|
$285.000
|
$4,500.000
|
$1,884.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
49.000
|
$80.000
|
$155.000
|
$150.000
|
$100.000
|
$67.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
3,402.000
|
$7.000
|
$11.000
|
$6.770
|
$100.000
|
$7.200
|
|
|
REMOVE LRSA
|
EA
|
7.000
|
$9,000.000
|
$2,500.000
|
$1,000.000
|
$0.600
|
$830.000
|
|
|
INS OH SN SUP(30 FT CANT)
|
EA
|
6.000
|
$29,000.000
|
$32,000.000
|
$22,930.000
|
$1.500
|
$34,800.000
|
|
|
INS OH SN SUP(40 FT CANT)
|
EA
|
3.000
|
$32,000.000
|
$38,000.000
|
$28,855.000
|
$1.500
|
$37,200.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
|
EA
|
24.000
|
$45.000
|
$52.000
|
$25.000
|
$2.250
|
$90.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
8.000
|
$23.000
|
$12.500
|
$25.000
|
$2.000
|
$46.500
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(FLX)GND
|
EA
|
6.000
|
$33.000
|
$50.000
|
$50.000
|
$1.500
|
$15.500
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
36.000
|
$18.000
|
$9.500
|
$17.500
|
$7.000
|
$46.500
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(FLX)GND
|
EA
|
34.000
|
$76.000
|
$62.000
|
$45.000
|
$0.600
|
$15.500
|
|
|
INSTL DEL ASSM (D-DY)SZ 1(FLX)GND
|
EA
|
26.000
|
$90.000
|
$50.000
|
$45.000
|
$0.600
|
$46.500
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
|
EA
|
80.000
|
$24.000
|
$37.000
|
$20.000
|
$0.600
|
$21.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
5,210.000
|
$0.500
|
$1.500
|
$0.300
|
$1.000
|
$0.360
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
20,080.000
|
$0.300
|
$0.750
|
$0.300
|
$1.500
|
$0.360
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ENTR GORE)
|
EA
|
3.000
|
$400.000
|
$493.000
|
$365.000
|
$500.000
|
$375.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)(EXIT GORE)
|
EA
|
3.000
|
$400.000
|
$493.000
|
$325.000
|
$500.000
|
$335.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
20,660.000
|
$0.300
|
$0.450
|
$0.300
|
$2.000
|
$0.360
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(DOT)
|
LF
|
8,529.000
|
$1.000
|
$0.450
|
$0.100
|
$3.000
|
$0.120
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
19,360.000
|
$1.000
|
$1.250
|
$0.460
|
$1.000
|
$0.550
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
73,995.000
|
$1.000
|
$0.950
|
$0.460
|
$1.000
|
$0.550
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
1,090.000
|
$1.500
|
$1.250
|
$1.000
|
$2.000
|
$1.200
|
|
|
WK ZN PAV MRK REMOV (W)12"(LNDP)
|
LF
|
426.000
|
$3.500
|
$6.200
|
$2.500
|
$7.000
|
$2.550
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
72,690.000
|
$1.000
|
$0.950
|
$0.460
|
$1.000
|
$0.470
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
11,900.000
|
$1.500
|
$1.000
|
$1.750
|
$1.000
|
$2.150
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
3,400.000
|
$1.100
|
$1.000
|
$1.600
|
$1.000
|
$2.150
|
|
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
|
LF
|
1,584.000
|
$3.000
|
$3.100
|
$1.750
|
$7.000
|
$1.800
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
3,000.000
|
$2.500
|
$3.000
|
$1.600
|
$7.000
|
$1.650
|
|
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
|
LF
|
2,222.000
|
$1.000
|
$1.900
|
$0.950
|
$3.000
|
$0.960
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
1,128.000
|
$3.000
|
$4.950
|
$5.000
|
$7.000
|
$6.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
12,790.000
|
$0.500
|
$0.500
|
$0.450
|
$1.000
|
$0.540
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
31,675.000
|
$0.500
|
$0.500
|
$0.450
|
$1.000
|
$0.540
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
32,243.000
|
$0.500
|
$0.500
|
$0.450
|
$1.000
|
$0.540
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
8.000
|
$218.390
|
$430.000
|
$350.000
|
$500.000
|
$360.000
|
|
PREFAB PAV MRK TY C (W) (U-ST ARROW)
|
EA
|
6.000
|
$550.000
|
$430.000
|
$200.000
|
$500.000
|
$240.000
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
11.000
|
$630.000
|
$500.000
|
$200.000
|
$500.000
|
$240.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
8.000
|
$300.000
|
$370.000
|
$400.000
|
$500.000
|
$415.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
226.000
|
$4.250
|
$4.300
|
$3.000
|
$4.000
|
$3.100
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
2,265.000
|
$4.000
|
$5.000
|
$3.000
|
$4.000
|
$3.100
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
56,305.000
|
$0.500
|
$1.000
|
$0.400
|
$1.000
|
$0.410
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
3,540.000
|
$0.600
|
$1.600
|
$0.800
|
$1.000
|
$0.820
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
357.000
|
$4.500
|
$5.000
|
$200.000
|
$3.000
|
$2.050
|
|
|
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
|
LF
|
1,110.000
|
$26.000
|
$24.000
|
$25.820
|
$25.000
|
$19.750
|
|
|
BRIDGE JOINT REPLACEMENT (SEJ)
|
LF
|
152.000
|
$430.000
|
$560.000
|
$203.080
|
$700.000
|
$540.000
|
|
|
CARBON FIBER REINF POLYMER PROTECTION
|
SF
|
1,119.100
|
$47.000
|
$68.000
|
$48.380
|
$0.400
|
$57.000
|
|
|
REPLACE ELASTOMERIC BEARING PADS
|
EA
|
20.000
|
$5,000.000
|
$11,500.000
|
$2,365.600
|
$0.400
|
$5,840.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$11,000.000
|
$9,300.000
|
$10,807.920
|
$20,000.000
|
$13,000.000
|
|
|
CCTV FIELD EQUIPMENT (DIGITAL)
|
EA
|
2.000
|
$10,000.000
|
$13,500.000
|
$8,935.000
|
$12,000.000
|
$18,000.000
|
|
|
ITS POLE (40 FT)(90 MPH)
|
EA
|
2.000
|
$8,300.000
|
$13,000.000
|
$10,175.000
|
$15,000.000
|
$10,800.000
|
|
|
ITS POLE MNT CAB (TY 1)(CONF 1)
|
EA
|
2.000
|
$39,500.000
|
$6,300.000
|
$4,910.000
|
$7,500.000
|
$9,600.000
|
|
|
TMA (STATIONARY)
|
EA
|
4.000
|
$12,465.000
|
$10,500.000
|
$10,807.920
|
$20,000.000
|
$20,900.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
72.000
|
$500.000
|
$190.000
|
$728.650
|
$500.000
|
$205.000
|
|
|
ITS GND BOX(PCAST) TY 1 (243660)W/APRN
|
EA
|
4.000
|
$4,000.000
|
$5,700.000
|
$4,435.000
|
$5,500.000
|
$4,800.000
|
|
Totals: |
$21,091,620.910
|
$21,735,071.850
|
$23,501,495.609
|
$24,894,592.340
|
$25,994,667.190
|