BRAZORIA FM 524 (1004-02-017)

Items: 69

County: BRAZORIA
Length: N/A
Highway: FM 524
District: HOUSTON
Control Number: 1004-02-017
DBE Goal: N/A
Project: STP 2020(665)
Guaranty: N/A
Time: 109 WORKING DAYS
Engineer's Estimate: $2,633,016.84
Date: 03/04/2020 (6 years ago)
Contract Number: N/A
Type: PAVEMENT REPAIR, SEAL COAT AND 1.5 IN ACP OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$2,633,016.84
$2,696,288.71
Over/Under Est: 2.4% $63,271.87
Over/Under Est: 16.48% $433,950.86
Amt Left: 13.75% $370,678.99
Over/Under Est: 17.59% $463,277.76
Amt Left: 14.84% $400,005.89
Delta: -0.96% -$29,326.90

Bid Items & Bid Tabulations

69 Total 0 of 69
BRAZORIA  |  FM 524  |  HOUSTON  |  1004-02-017  |  03/04/2020  |  $2,633,016.84  |  STP 2020(665)  |  PAVMT REPAIR, SEAL COAT AND 1.5 IN A...  |  109 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DURWOOD GREENE CONSTRUCTION CO.
ANGEL BROTHERS HOLDINGS CORP.
JAMES CONSTRUCTION GROUP, L.L.C.
REMOVING STAB BASE AND ASPH PAV (0-4")
SY 774.000 $10.000 $5.000 $8.750 $20.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 9.000 $15.000 $150.000 $350.000 $245.000
BACKFILL (TY A OR B)
STA 537.000 $185.000 $150.000 $195.000 $350.000
BLOCK SODDING
SY 365.000 $4.500 $6.000 $3.750 $5.500
FERTILIZER
AC 0.080 $1,500.000 $1,000.000 $1,500.000 $10,625.000
VEGETATIVE WATERING
MG 9.600 $15.000 $100.000 $29.000 $75.000
ASPHALT STAB BASE (GR 2)(PG 64)
TON 47.000 $80.000 $200.000 $410.000 $370.000
SALV,HAUL&STKPL RCL APH PV(0 TO 1 1/2")
SY 5,942.000 $2.390 $4.500 $1.300 $2.000
ASPH (MULTI OPTION)
GAL 68,230.000 $3.080 $2.500 $3.150 $2.900
AGGR(TY-PB GR-4 SAC-B)
CY 1,375.000 $105.000 $120.000 $180.000 $134.500
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 1,590.000 $50.000 $65.000 $68.000 $75.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 1,220.000 $41.000 $30.000 $40.000 $45.000
PLANE ASPH CONC PAV (1.5")
SY 108,666.000 $0.900 $0.750 $1.500 $1.050
CEM STABIL BKFL
CY 10.000 $110.000 $150.000 $56.000 $48.000
RIPRAP (MOW STRIP)(4 IN)
CY 99.800 $450.000 $700.000 $730.000 $605.000
SET (TY I) (36 IN) (3: 1) (C)
EA 6.000 $4,400.000 $3,600.000 $7,100.000 $7,500.000
MOBILIZATION
LS 1.000 $124,486.000 $110,000.000 $150,000.000 $200,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $3,500.000 $2,500.000 $2,100.000 $14,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 140.000 $3.000 $5.000 $4.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 140.000 $1.000 $1.500 $1.000 $1.000
PCTB MOVE&RESET(F-SHAPE OR SNGL SLPTY1
LF 420.000 $50.000 $30.000 $16.000 $35.000
MTL W-BEAM GD FEN (TIM POST)
LF 975.000 $22.000 $24.000 $21.000 $22.840
MTL THRIE-BEAM GD FEN (TIM POST)
EA 7.000 $2,000.000 $2,000.000 $1,900.000 $1,511.960
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 2.000 $1,130.000 $1,000.000 $1,600.000 $966.070
REMOVE METAL BEAM GUARD FENCE
LF 1,587.500 $3.500 $2.500 $3.250 $2.100
REMOVE TERMINAL ANCHOR SECTION
EA 12.000 $100.000 $200.000 $216.000 $180.740
GUARDRAIL END TREATMENT (INSTALL)
EA 11.000 $2,700.000 $2,900.000 $3,240.000 $2,885.620
GDRL END TRTMT(RETRO W/O HEAD)(WD POST)
EA 6.000 $1,000.000 $1,100.000 $2,160.000 $1,047.790
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 1.000 $22,000.000 $32,000.000 $31,320.000 $31,308.040
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 1.000 $250.000 $250.000 $265.000 $190.000
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 1.000 $250.000 $300.000 $325.000 $250.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 17.000 $500.000 $450.000 $400.000 $496.000
REMOVE SM RD SN SUP&AM
EA 9.000 $80.000 $100.000 $70.000 $83.250
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 18.000 $25.000 $24.000 $22.000 $22.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 78.000 $30.000 $35.000 $32.000 $32.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 470.000 $0.200 $0.280 $0.300 $0.280
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 296,436.000 $0.190 $0.180 $0.200 $0.180
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 3,680.000 $0.500 $0.360 $0.400 $0.360
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 802.000 $1.100 $2.250 $2.500 $2.250
WK ZN PAV MRK NON-REMOV(W)36"(YLD TRI)
EA 30.000 $19.000 $8.000 $8.500 $8.000
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 22,367.000 $0.180 $0.190 $0.200 $0.190
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 136,253.000 $0.180 $0.180 $0.190 $0.180
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,815.000 $0.900 $1.250 $1.350 $1.250
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 344.000 $6.000 $6.750 $7.300 $6.750
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 562.000 $5.540 $6.750 $7.300 $6.750
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
LF 235.000 $0.700 $1.600 $1.700 $1.600
RE PROF PM TYI (BLK)6"(SHADOW)(090MIL)
LF 15,503.000 $0.720 $0.950 $1.000 $0.950
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 235.000 $0.520 $1.600 $1.750 $1.600
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 2,047.000 $0.510 $0.600 $0.650 $0.600
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 5,666.000 $0.520 $0.600 $0.650 $0.600
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
LF 105,047.000 $0.800 $0.800 $0.850 $0.800
REF PROF PAV MRK TY I(Y)6"(BRK)(100MIL)
LF 7,599.000 $0.800 $0.850 $0.900 $0.850
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
LF 51,890.000 $0.800 $0.800 $0.850 $0.800
PREFAB PAV MRK TY C (W) (ARROW)
EA 8.000 $230.000 $250.000 $270.000 $250.000
PREFAB PAV MRK TY C (W) (WORD)
EA 8.000 $240.000 $250.000 $270.000 $250.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 19.000 $65.000 $36.000 $40.000 $36.000
REFL PAV MRKR TY I-C
EA 61.000 $4.500 $4.000 $4.250 $4.000
REFL PAV MRKR TY II-A-A
EA 1,318.000 $4.500 $4.000 $4.250 $4.000
PAV SURF PREP FOR MRK (6")
LF 188,222.000 $0.030 $0.030 $0.030 $0.030
PAV SURF PREP FOR MRK (8")
LF 1,815.000 $0.070 $0.100 $0.110 $0.100
PAV SURF PREP FOR MRK (24")
LF 906.000 $0.280 $0.250 $0.300 $0.250
PAV SURF PREP FOR MRK (ARROW)
EA 8.000 $10.000 $12.000 $13.000 $12.000
PAV SURF PREP FOR MRK (WORD)
EA 8.000 $10.000 $12.000 $13.000 $12.000
PAV SURF PREP FOR MRK (36")(YLD TRI)
EA 19.000 $1.050 $3.500 $3.750 $3.500
D-GR HMA TY-D SAC-B PG70-22
TON 14,903.000 $85.500 $92.000 $94.000 $90.500
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 158.000 $45.000 $50.000 $53.000 $85.000
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 80.000 $24.000 $20.000 $19.000 $18.000
TMA (STATIONARY)
DAY 86.000 $225.000 $100.000 $230.000 $238.000
TMA (MOBILE OPERATION)
DAY 23.000 $340.000 $100.000 $330.000 $550.000
Totals: $2,633,016.840 $2,696,288.710 $3,066,967.705 $3,096,294.600