Show Job Controls
Bid Cobra

EASTLAND CR (0923-09-063)

Items: 40

County: EASTLAND
Length: N/A
Highway: CR
District: BROWNWOOD
Control Number: 0923-09-063
DBE Goal: N/A
Project: BR 2020(702)
Guaranty: N/A
Time: 136 WORKING DAYS
Engineer's Estimate: $907,023.20
Date: 06/04/2020 (6 years ago)
Contract Number: N/A
Type: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$907,023.20
Over/Under Est: -5.31% -$48,200.40
$869,520.52
Over/Under Est: -4.13% -$37,502.68
Amt Left: 1.25% $10,697.72
Over/Under Est: 2.81% $25,512.76
Amt Left: 8.58% $73,713.16
Delta: -7.25% -$63,015.44
$1,137,080.25
Over/Under Est: 25.36% $230,057.05
Amt Left: 32.4% $278,257.45
Delta: -21.93% -$204,544.29
Over/Under Est: 45.53% $412,927.39
Amt Left: 53.69% $461,127.79
Delta: -16.08% -$182,870.34

Bid Items & Bid Tabulations

40 Total 0 of 40
EASTLAND  |  CR  |  BROWNWOOD  |  0923-09-063  |  06/04/2020  |  $907,023.20  |  BR 2020(702)  |  REPLACE BRIDGE AND APPROACHES  |  136 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HODGES AND SON CONSTRUCTION COMPANY, INC.
PIERCE R & B LLC
SCOTT TUCKER CONSTRUCTION COMPANY, LLC
FNH CONSTRUCTION, LLC
JAMES CONSTRUCTION GROUP, L.L.C.
PREPARING ROW
STA 7.300 $3,000.000 $4,000.000 $2,500.000 $2,746.010 $13,698.000 $17,808.000
EXCAVATION (ROADWAY)
CY 83.000 $30.000 $40.000 $48.000 $152.470 $30.000 $50.690
EXCAVATION (CHANNEL)
CY 405.000 $30.000 $20.000 $32.000 $56.610 $35.000 $2.780
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 557.000 $32.000 $20.000 $32.000 $58.080 $35.000 $20.980
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 725.000 $2.000 $4.000 $3.300 $4.280 $2.000 $6.000
BROADCAST SEED (TEMP) (WARM)
SY 362.000 $2.000 $2.000 $1.000 $4.570 $2.000 $12.750
BROADCAST SEED (TEMP) (COOL)
SY 362.000 $2.000 $2.000 $1.000 $4.570 $2.000 $12.750
VEGETATIVE WATERING
MG 33.000 $50.000 $1.000 $25.000 $138.140 $100.000 $23.260
SOIL RETENTION BLANKETS (CL 2) (TY G)
SY 700.000 $5.000 $6.000 $4.300 $6.660 $6.500 $9.790
FL BS (CMP IN PLC)(TY D GR 3)(FNAL POS)
CY 322.000 $100.000 $100.000 $74.000 $86.740 $60.000 $91.140
CEM STABIL BKFL
CY 112.000 $240.000 $250.000 $260.000 $272.210 $350.000 $175.370
DRILL SHAFT (24 IN)
LF 282.000 $220.000 $170.000 $171.000 $176.970 $285.000 $262.240
DRILL SHAFT (30 IN)
LF 270.000 $250.000 $190.000 $250.000 $271.220 $325.000 $348.520
CORE HOLE
EA 4.000 $200.000 $500.000 $200.000 $250.000 $500.000 $250.000
CL C CONC (ABUT)
CY 54.800 $1,200.000 $1,200.000 $1,350.000 $965.580 $1,000.000 $1,222.720
REINF CONC SLAB (BOX BEAM)
SF 1,962.000 $28.000 $24.000 $24.000 $28.310 $20.000 $50.000
REINF CONC SLAB (SLAB BEAM)
SF 1,300.000 $28.000 $24.000 $26.000 $32.210 $20.000 $50.000
PRESTR CONC BOX BEAM (4B28)
LF 298.000 $220.000 $280.000 $235.000 $202.360 $185.000 $259.890
PRESTR CONC BOX BEAM (5B28)
LF 149.000 $210.000 $280.000 $223.000 $229.990 $185.000 $316.750
PRESTR CONC SLAB BEAM (5SB15)
LF 247.110 $220.000 $230.000 $252.000 $226.910 $185.000 $203.040
RAIL (TY T223)
LF 318.000 $120.000 $130.000 $119.000 $167.360 $150.000 $238.210
GABION MATTRESSES (GALV)(12 IN)
SY 352.000 $170.000 $90.000 $180.000 $134.630 $185.000 $116.330
GABIONS (3' X 3')(GALV)
CY 156.000 $280.000 $300.000 $300.000 $246.620 $300.000 $364.070
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 2.000 $15,000.000 $18,000.000 $8,500.000 $13,233.020 $50,000.000 $85,000.000
MOBILIZATION
LS 1.000 $91,000.000 $80,000.000 $86,000.000 $96,740.000 $110,000.000 $125,484.220
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $2,500.000 $2,000.000 $2,000.000 $1,674.010 $8,500.000 $1,085.500
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 50.000 $60.000 $5.000 $40.000 $84.730 $30.000 $48.000
ROCK FILTER DAMS (REMOVE)
LF 50.000 $15.000 $5.000 $10.000 $56.890 $15.000 $22.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,479.000 $5.000 $3.000 $2.600 $3.660 $4.000 $3.180
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,479.000 $2.000 $1.000 $0.850 $2.010 $2.000 $0.800
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 100.000 $8.000 $8.000 $6.000 $23.630 $18.000 $7.880
BIODEG EROSN CONT LOGS (REMOVE)
LF 100.000 $2.000 $1.000 $2.800 $20.630 $9.000 $4.440
MTL W-BEAM GD FEN (STEEL POST)
LF 187.500 $32.000 $35.000 $22.500 $35.970 $35.000 $21.000
MTL BEAM GD FEN TRANS (TL2)
EA 8.000 $1,500.000 $1,200.000 $960.000 $1,191.440 $1,850.000 $900.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,200.000 $1,400.000 $1,050.000 $2,281.510 $1,850.000 $925.000
GUARDRAIL END TREATMENT (INSTALL)
EA 7.000 $2,500.000 $2,600.000 $2,685.000 $2,683.070 $2,850.000 $2,525.000
WIRE FENCE (TY C)
LF 744.000 $15.000 $20.000 $15.000 $15.500 $20.000 $13.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 12.000 $35.000 $30.000 $30.000 $28.000 $100.000 $24.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 2.000 $24.000 $100.000 $50.000 $0.500 $100.000 $32.870
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 22.000 $35.000 $30.000 $38.000 $28.000 $100.000 $33.000
Totals: $907,023.200 $858,822.800 $869,520.520 $932,535.962 $1,137,080.250 $1,319,950.590