JEFFERSON US 69 (0200-11-095)

Items: 205

County: JEFFERSON
Length: N/A
Highway: US 69
District: BEAUMONT
Control Number: 0200-11-095
DBE Goal: N/A
Project: NH 1802(412)
Guaranty: N/A
Time: 652 WORKING DAYS
Engineer's Estimate: $25,665,190.55
Date: 07/10/2018 (7 years ago)
Contract Number: N/A
Type: WIDEN FREEWAY FROM 4 TO 6 LANES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$25,665,190.55
$31,528,539.20
Over/Under Est: 22.85% $5,863,348.65
Over/Under Est: 24.5% $6,288,814.85
Amt Left: 1.35% $425,466.20
Over/Under Est: 32.67% $8,385,896.59
Amt Left: 8% $2,522,547.94
Delta: -6.56% -$2,097,081.74
Subcontractor Percentage Amount
NORMAN HIGHWAY CONSTRUCTORS, INC. 9.35% $2,971,393.58
WEBBER BARRIER SERVICES, LLC. 5.63% $1,789,192.07
ALLSTATE SIGNAL & CONSTRUCTION, LLC 3.54% $1,124,998.21
TRICON PRECAST, LTD. 1.83% $581,566.87
AMERICAN REMEDIATION OPTIONS, INC. 1.78% $565,677.07
W.W. FOUNDATION DRILLING, LTD. 1.60% $508,473.77
HB FARMER FOUNDATION, LLC 1.60% $508,473.77
DUSTROL, INC. 1.11% $352,753.68
CRABTREE BARRICADE SYSTEMS, INC. 1.06% $336,863.87
CPAVE, INC. 0.69% $219,279.31
BREDA COMPANY, INC. 0.64% $203,389.51
BATTEN DRILLING, INC. 0.47% $149,364.17
MIRE TRUCKING & SERVICES LLC 0.12% $38,135.53
JOHN WRIGHT CONSTRUCTION 0.06% $19,067.77
APEX HIGHWAY SERVICES, LLC 0.03% $9,533.88
PROFESSIONAL TRAFFIC CONTROL LLC 0.03% $9,533.88
HOUSTON SAWING & DRILLING 0.01% $3,177.96
Total: 29.55% $9,390,874.90

Bid Items & Bid Tabulations

205 Total 0 of 205
JEFFERSON  |  US 69  |  BEAUMONT  |  0200-11-095  |  07/10/2018  |  $25,665,190.55  |  NH 1802(412)  |  WIDEN FREEWAY FROM 4 TO 6 LANES  |  652 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
OLDCASTLE MATERIALS TEXAS, INC.
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY
JAMES CONSTRUCTION GROUP, L.L.C.
PREPARING ROW
STA 192.000 $3,000.000 $3,195.000 $10,000.000 $15,625.000
REMOVING CONC (PAV)
SY 12,332.000 $5.000 $16.000 $9.000 $10.420
REMOVING CONC (RIPRAP)
SY 11,154.000 $8.000 $6.500 $5.000 $4.730
REMOVING CONC (RIPRAP)
CY 30.000 $200.000 $165.000 $100.000 $59.090
REMOVING CONC (RETAINING WALLS)
SY 349.000 $38.000 $30.000 $25.000 $18.510
REMOVING STAB BASE & ASPH PAV (8"-14")
SY 26,974.000 $4.000 $7.750 $8.000 $6.170
EXCAVATION (ROADWAY)
CY 54,314.000 $10.000 $16.000 $12.000 $8.660
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 11,815.000 $7.000 $29.000 $12.000 $2.970
FURNISHING AND PLACING TOPSOIL (4")
SY 75,233.000 $1.000 $3.500 $6.000 $0.640
BLOCK SODDING
SY 27,371.000 $4.000 $3.600 $6.000 $3.500
BROADCAST SEED (TEMP) (WARM)
SY 37,619.000 $0.150 $0.120 $0.200 $0.120
BROADCAST SEED (TEMP) (COOL)
SY 37,619.000 $0.150 $0.120 $0.200 $0.120
CELL FBR MLCH SEED(PERM)(URBAN)(CLAY)
SY 75,233.000 $0.350 $0.250 $0.400 $0.240
VEGETATIVE WATERING
MG 1,864.000 $15.000 $25.000 $35.000 $19.650
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 2,605.000 $1.000 $0.890 $2.500 $0.860
PROOF ROLLING
HR 279.000 $75.000 $95.000 $85.000 $91.470
ASPHALT STAB BASE (GR 2)(PG 64)
TON 40,022.000 $80.000 $78.000 $85.000 $74.290
D-GR HMA TY-D PG 70-22 (LEVEL-UP)
TON 7,547.000 $90.000 $91.000 $110.000 $99.050
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 23,675.000 $110.000 $130.000 $115.000 $136.460
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 2,532.000 $1.500 $4.800 $3.000 $2.990
PLANE ASPH CONC PAV (1.5")
SY 30,600.000 $1.500 $1.800 $3.000 $1.020
CONC PVMT (CONT REINF - CRCP) (10")
SY 6,615.000 $49.000 $63.000 $65.000 $90.000
CONC PVMT (CONT REINF - CRCP) (13")
SY 78,635.000 $48.000 $73.000 $67.000 $90.000
CONC PVMT (JOINTED - CPCD) (10")
SY 704.000 $100.000 $88.000 $100.000 $75.000
FULL-DEPTH REPAIR CPJR (VAR DEPTH)
CY 140.000 $725.000 $265.000 $200.000 $255.000
CEM STABIL BKFL
CY 3,010.800 $60.000 $65.000 $70.000 $64.420
CEMENT STAB BACKFILL (INLET OR MH)
CY 1,211.000 $43.000 $65.000 $70.000 $60.710
TRENCH EXCAVATION PROTECTION
LF 7,142.000 $5.000 $3.100 $1.000 $2.070
DRILL SHAFT (18 IN)
LF 284.000 $70.000 $81.000 $100.000 $66.650
DRILL SHAFT (30 IN)
LF 740.000 $115.000 $205.000 $125.000 $171.260
DRILL SHAFT (36 IN)
LF 766.000 $160.000 $270.000 $175.000 $244.550
DRILL SHAFT (48 IN)
LF 600.000 $280.000 $465.000 $275.000 $437.260
DRILL SHAFT (SIGN MTS) (24 IN)
LF 80.000 $185.000 $225.000 $250.000 $228.760
DRILL SHAFT (SIGN MTS) (36 IN)
LF 342.000 $225.000 $345.000 $375.000 $302.450
DRILL SHAFT (SIGN MTS) (54 IN)
LF 68.000 $430.000 $500.000 $675.000 $532.780
DRILL SHAFT (HIGH MAST POLE) (60 IN)
LF 176.000 $550.000 $630.000 $625.000 $704.360
CL C CONC (ABUT)(EXTEND)
CY 52.800 $860.000 $2,400.000 $1,100.000 $1,678.950
CL C CONC (ABUT)(HPC)(EXTEND)
CY 42.800 $715.000 $1,900.000 $1,300.000 $1,172.030
CL C CONC (CAP)(EXTEND)
CY 29.600 $1,430.000 $3,000.000 $1,100.000 $1,105.770
CL C CONC (CAP)(HPC)(EXTEND)
CY 52.500 $2,629.000 $2,600.000 $1,400.000 $976.490
CL C CONC (COLUMN)
CY 28.400 $945.000 $1,800.000 $900.000 $963.650
CL C CONC (COLUMN)(HPC)
CY 34.400 $870.000 $1,900.000 $1,200.000 $810.570
REINF CONC SLAB (EXTEND SLAB)
SF 9,630.000 $21.000 $38.000 $16.000 $34.590
REINF CONC SLAB (EXTEND SLAB)(HPC)
SF 8,194.000 $20.000 $38.000 $18.000 $36.270
APPROACH SLAB (EXTEND) (HPC)
CY 215.500 $615.000 $570.000 $400.000 $508.490
RETAINING WALL (CONC BLOCK)
SF 11,784.000 $60.000 $50.000 $65.000 $29.580
PRESTR CONC GIRDER (TX28)
LF 1,151.040 $115.000 $140.000 $140.000 $137.960
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 10.000 $150.000 $732.000 $1,000.000 $391.500
RIPRAP (CONC)(4 IN)
CY 122.000 $345.000 $465.000 $400.000 $337.590
RIPRAP (CONC)(5 IN)
CY 83.000 $475.000 $465.000 $450.000 $385.690
RIPRAP (CONC)(CL B)
CY 12.800 $345.000 $510.000 $500.000 $581.430
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 600.700 $390.000 $460.000 $500.000 $292.230
RIPRAP (CONC)(FLUME)
CY 111.500 $400.000 $480.000 $350.000 $609.780
RIPRAP (MOW STRIP)(4 IN)
CY 204.000 $440.000 $480.000 $500.000 $609.780
RESIZING AND SEALING JOINTS
LF 208.000 $15.000 $45.000 $25.000 $44.000
STR STEEL (ROLLED BEAM)
LB 308,620.000 $2.000 $1.950 $1.850 $1.930
RAIL (TY SSTR)
LF 882.500 $35.000 $76.000 $55.000 $74.480
RAIL (TY SSTR)(HPC)
LF 919.800 $45.000 $76.000 $60.000 $60.660
RAIL (TY T80SS) (MOD)
LF 6,294.000 $170.000 $133.000 $85.000 $62.510
SEALED EXPANSION JOINT (5 IN) (SEJ - A)
LF 23.800 $205.000 $213.000 $125.000 $168.060
ARMOR JOINT (SEALED)
LF 271.000 $98.000 $94.000 $115.000 $86.580
HEADER TYPE EXPANSION JOINT
LF 277.000 $75.000 $160.000 $80.000 $155.000
ARMOR JOINT (MOD)
LF 47.400 $100.000 $160.000 $80.000 $86.580
CONC BOX CULV (7 FT X 3 FT)
LF 541.000 $430.000 $425.000 $500.000 $363.170
CONC BOX CULV (7 FT X 5 FT)
LF 452.000 $390.000 $495.000 $550.000 $411.800
CONC BOX CULV (8 FT X 5 FT)
LF 333.000 $525.000 $575.000 $600.000 $451.870
CONC BOX CULV (9 FT X 5 FT)
LF 375.000 $465.000 $680.000 $800.000 $501.650
RC PIPE (CL III)(18 IN)
LF 420.000 $59.000 $61.000 $50.000 $86.670
RC PIPE (CL III)(24 IN)
LF 4,033.000 $65.000 $68.000 $80.000 $107.270
RC PIPE (CL III)(30 IN)
LF 32.000 $87.000 $198.000 $175.000 $118.330
MANH (COMPL)(PRM)(48IN)
EA 7.000 $3,450.000 $4,080.000 $2,500.000 $3,950.020
JCTBOX(COMPL)(PJB)(8FTX8FT)
EA 1.000 $15,000.000 $15,200.000 $7,800.000 $12,677.690
INLET(COMPL)(PSL)(SFG)(4FTX4FT-4FTX4FT)
EA 9.000 $4,300.000 $6,000.000 $4,000.000 $5,812.340
INLET(COMPL)(PSL)(SFG)(3FTX5FT-3FTX5FT)
EA 93.000 $5,100.000 $4,700.000 $4,000.000 $3,295.610
SET (TY II) (30 IN) (CMP) (4: 1) (C)
EA 1.000 $1,300.000 $2,550.000 $5,000.000 $1,811.650
SLOT DRAIN (ALUM COAT STL) (18 IN)
LF 240.000 $60.000 $182.000 $575.000 $285.370
SLOT DRAIN (ALUM COAT STL) (24 IN)
LF 1,000.000 $60.000 $192.000 $250.000 $304.940
JACK BOR OR TUN PIPE(24 IN)(RC)(CL III)
LF 53.000 $600.000 $405.000 $1,000.000 $518.300
CLEAN EXIST CULVERTS
EA 3.000 $1,200.000 $1,510.000 $2,000.000 $2,000.000
REMOV STR (INLET)
EA 17.000 $870.000 $510.000 $750.000 $793.990
REMOV STR (PIPE)
LF 1,785.000 $15.000 $15.500 $15.000 $17.300
REMOVE STR (RAIL)
LF 6,978.000 $10.000 $15.000 $20.000 $17.500
MOBILIZATION
LS 1.000 $1,800,000.000 $2,460,000.000 $3,000,000.000 $3,350,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 44.000 $6,500.000 $3,000.000 $5,000.000 $12,782.600
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 156.000 $22.000 $30.000 $30.000 $29.000
CONSTRUCTION EXITS (REMOVE)
SY 156.000 $6.000 $7.100 $10.000 $7.000
BACKHOE WORK (EROSION & SEDMT CONT)
HR 159.000 $66.000 $175.000 $100.000 $54.370
BULLDOZER WORK (EROSION & SEDMT CONT)
HR 159.000 $66.000 $140.000 $100.000 $66.210
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,062.000 $3.000 $2.900 $5.000 $2.850
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,062.000 $1.000 $0.800 $2.000 $0.750
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 2,774.000 $5.000 $5.350 $6.000 $5.250
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,774.000 $1.300 $1.050 $1.000 $1.000
CONSTRUCTING DETOURS
SY 12,541.000 $50.000 $90.000 $65.000 $100.270
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 10,740.000 $40.000 $45.000 $60.000 $38.290
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 1,000.000 $25.000 $80.000 $30.000 $44.740
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 40.000 $50.000 $110.000 $40.000 $44.740
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 43,830.000 $6.000 $8.000 $10.000 $7.370
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 500.000 $5.000 $17.000 $10.000 $11.770
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 20.000 $7.000 $45.000 $10.000 $11.790
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 8,040.000 $20.000 $10.500 $7.000 $5.360
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 1,000.000 $7.000 $9.000 $7.000 $13.010
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 40.000 $9.000 $31.000 $7.000 $13.300
PTB (FUR & INST)(STEEL)
LF 480.000 $85.000 $88.000 $25.000 $141.650
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 12,958.000 $50.000 $69.000 $65.000 $48.400
PERM CTB (SGL SLOPE) (TY 3) (42 )
LF 510.000 $180.000 $130.000 $175.000 $132.420
PERM CTB (TRAN SSCB TO CTB) (MOD)
LF 50.000 $300.000 $300.000 $350.000 $73.910
CONC CURB (TY I)
LF 2,500.000 $10.000 $18.000 $15.000 $4.010
CONC CURB (TY II)
LF 2,390.000 $15.000 $18.000 $20.000 $4.010
DRIVEWAYS (CONC) (FAST TRACK)
SY 216.000 $75.000 $105.000 $80.000 $61.180
RUMBLE STRIPS (SHOULDER)
LF 68,666.000 $0.200 $0.100 $0.300 $0.100
MTL W-BEAM GD FEN (TIM POST)
LF 3,925.000 $20.000 $19.000 $25.000 $18.750
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 12.000 $1,650.000 $1,400.000 $2,000.000 $1,375.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 11.000 $1,000.000 $1,020.000 $1,500.000 $999.000
REMOVE METAL BEAM GUARD FENCE
LF 3,100.000 $3.400 $2.550 $5.000 $2.500
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 7.000 $160.000 $255.000 $150.000 $250.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 13.000 $250.000 $255.000 $375.000 $250.000
REMOVE CABLE BARRIER
LF 9,301.000 $7.400 $4.300 $8.000 $8.870
REMOVE CABLE BARRIER TERMINAL SECTION
EA 12.000 $1,045.000 $970.000 $1,000.000 $370.540
GUARDRAIL END TREATMENT (INSTALL)
EA 11.000 $2,200.000 $2,400.000 $2,800.000 $2,375.000
GUARDRAIL END TREATMENT (REMOVE)
EA 5.000 $325.000 $255.000 $300.000 $250.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 16.000 $1,800.000 $1,925.000 $1,800.000 $1,900.000
CRASH CUSH ATTEN (REMOVE)
EA 9.000 $2,000.000 $910.000 $1,000.000 $900.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 5.000 $20,000.000 $18,000.000 $20,000.000 $17,800.000
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
EA 1.000 $40,000.000 $28,800.000 $35,000.000 $28,500.000
CRASH CUSHION ATTEN (INSTALL)(REACT)(N)
EA 3.000 $22,000.000 $18,000.000 $22,000.000 $17,800.000
REMOVE RD IL ASM (SHOE-BASE)
EA 17.000 $400.000 $570.000 $650.000 $605.180
IN RD IL (U/P) (TY 2) (150W EQ) LED
EA 28.000 $1,300.000 $1,180.000 $1,000.000 $1,247.230
HI MST IL POLE (150 FT)(100 MPH)
EA 5.000 $30,000.000 $36,000.000 $32,000.000 $38,021.510
HI MST IL ASM (12-400W)(ASYM)(TY A)
EA 5.000 $43,000.000 $33,000.000 $30,000.000 $34,216.470
CONDT (PVC) (SCH 40) (2")
LF 3,642.000 $10.000 $12.000 $9.000 $12.740
CONDT (PVC) (SCH 80) (2") (BORE)
LF 365.000 $22.000 $24.000 $20.000 $25.180
CONDT (RM) (3/4")
LF 1,355.000 $26.000 $24.000 $20.000 $25.580
ELEC CONDR (NO.10) BARE
LF 1,435.000 $2.000 $3.350 $3.000 $3.560
ELEC CONDR (NO.10) INSULATED
LF 2,870.000 $2.000 $4.000 $3.000 $4.230
ELEC CONDR (NO.8) BARE
LF 4,173.000 $1.500 $1.450 $3.000 $1.520
ELEC CONDR (NO.8) INSULATED
LF 8,346.000 $1.500 $1.600 $3.000 $1.680
ELEC CONDR (NO.6) BARE
LF 658.000 $2.000 $1.700 $3.000 $1.770
ELEC CONDR (NO.6) INSULATED
LF 1,316.000 $2.250 $1.900 $3.000 $1.990
GROUND BOX TY A (122311)
EA 5.000 $750.000 $915.000 $725.000 $864.340
GROUND BOX TY A (122311)W/APRON
EA 21.000 $1,000.000 $975.000 $900.000 $1,036.640
ELC SRV TY A 240/480 060(NS)SS(T)TP(O)
EA 5.000 $4,000.000 $6,600.000 $4,000.000 $6,943.490
ELC SRV TY A 240/480 100(SS)SS(T)TP(O)
EA 1.000 $4,500.000 $6,600.000 $7,500.000 $6,943.490
ALUMINUM SIGNS (TY G)
SF 72.000 $25.000 $30.000 $18.000 $31.030
ALUMINUM SIGNS (TY O)
SF 563.000 $21.000 $30.000 $16.000 $31.510
REPLACE EXISTING ALUMINUM SIGNS(TY O)
SF 322.000 $24.000 $30.000 $16.000 $31.510
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 14.000 $480.000 $380.000 $500.000 $375.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 14.000 $600.000 $590.000 $550.000 $585.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 7.000 $550.000 $840.000 $500.000 $830.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 5.000 $685.000 $700.000 $650.000 $697.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000 $640.000 $745.000 $750.000 $739.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 10.000 $1,650.000 $2,600.000 $1,700.000 $1,650.000
INSTALL LRSS (STRUCT STEEL)
LB 351.000 $6.500 $5.900 $4.500 $6.260
RELOCATE LRSA
EA 6.000 $3,200.000 $4,250.000 $7,500.000 $4,528.530
RELOCATE LRSS (SIGN ONLY)
EA 8.000 $2,000.000 $1,655.000 $1,000.000 $1,762.280
INS OH SN SUP(40 FT CANT)
EA 2.000 $22,200.000 $20,100.000 $19,000.000 $21,388.420
INS OH SN SUP(60 FT BRDG)
EA 1.000 $23,000.000 $30,900.000 $40,000.000 $32,932.460
INS OH SN SUP(75 FT BRDG)
EA 2.000 $31,620.000 $34,500.000 $50,000.000 $36,675.170
INS OH SN SUP(80 FT BRDG)
EA 1.000 $28,000.000 $35,900.000 $50,000.000 $38,296.040
REMOVE OVERHD SIGN SUP
EA 4.000 $9,000.000 $7,000.000 $5,000.000 $7,403.890
REMOVE OVERHD SIGN SUP (SIGN ONLY)
EA 4.000 $1,000.000 $895.000 $600.000 $945.030
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
EA 29.000 $55.000 $46.000 $75.000 $45.000
INSTL DEL ASSM (D-SY)SZ 1(FLX)GND
EA 18.000 $72.000 $46.000 $70.000 $45.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 133.000 $20.000 $15.500 $20.000 $15.000
INSTL DEL ASSM (D-DW)SZ 1(FLX)GND
EA 10.000 $46.000 $76.000 $65.000 $75.000
INSTL DEL ASSM (D-DY)SZ 1(FLX)GND
EA 20.000 $92.000 $46.000 $110.000 $45.000
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
EA 100.000 $30.000 $22.000 $23.000 $21.000
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 31,367.000 $0.800 $0.500 $0.650 $0.450
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 107,306.000 $0.600 $0.500 $0.600 $0.450
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 5,085.000 $1.700 $0.550 $1.250 $0.800
WK ZN PAV MRK REMOV (W)12"(LNDP)
LF 2,832.000 $3.000 $3.000 $3.250 $2.900
WK ZN PAV MRK REMOV (W)12"(SLD)
LF 57.000 $3.000 $3.100 $4.000 $3.000
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 24.000 $5.500 $6.600 $12.000 $6.500
WK ZN PAV MRK REMOV (W)(ARROW)
EA 4.000 $120.000 $142.000 $120.000 $140.000
WK ZN PAV MRK REMOV (W)(ENTR GORE)
EA 21.000 $520.000 $355.000 $1,000.000 $350.000
WK ZN PAV MRK REMOV (W)(EXIT GORE)
EA 27.000 $600.000 $500.000 $1,200.000 $495.000
WK ZN PAV MRK REMOV (W)(WORD)
EA 4.000 $165.000 $195.000 $150.000 $195.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 97,700.000 $0.600 $0.450 $0.600 $0.420
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 7,503.000 $1.000 $1.900 $1.000 $0.920
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,348.000 $1.100 $1.900 $0.850 $1.120
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 9,483.000 $0.700 $0.720 $0.750 $0.700
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
LF 1,617.000 $2.000 $2.050 $1.850 $2.000
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 3,886.000 $2.700 $1.850 $2.650 $1.800
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1.000 $5.000 $510.000 $5.500 $500.000
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 100.000 $3.000 $2.300 $3.000 $2.250
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 20,120.000 $0.350 $0.360 $0.380 $0.350
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 47,112.000 $0.400 $0.360 $0.280 $0.350
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 45,733.000 $0.400 $0.360 $0.280 $0.350
PREFAB PAV MRK TY C (W) (ARROW)
EA 19.000 $200.000 $182.000 $200.000 $180.000
PREFAB PAV MRK TY C (W) (UTURN ARROW)
EA 2.000 $389.000 $308.000 $200.000 $305.000
PREFAB PAV MRK TY C (W) (WORD)
EA 21.000 $265.000 $262.000 $200.000 $260.000
PREFAB PAV MRK TY C (MULTI) (SHIELD)
EA 6.000 $1,680.000 $1,480.000 $350.000 $1,475.000
REFL PAV MRKR TY II-C-R
EA 3,588.000 $3.400 $2.500 $3.500 $2.450
ELIM EXT PAV MRK & MRKS (4")
LF 94,508.000 $0.550 $0.260 $0.400 $0.250
ELIM EXT PAV MRK & MRKS (8")
LF 120.000 $0.350 $1.050 $0.800 $1.000
ELIM EXT PAV MRK & MRKS (24")
LF 12.000 $3.000 $5.100 $2.750 $5.000
CRACK CLEANING AND SEALING (JCP)
LF 2,500.000 $4.000 $4.000 $8.000 $3.950
SPALLING REPAIR (POLYMERIC) (SEMIRIGID)
GAL 100.000 $65.000 $56.000 $48.000 $55.000
FIBER REINFORCED POLYMER PATCHING MATLS
LB 200.000 $4.000 $56.000 $10.000 $55.000
STORM SEWER CLEANING (PIPE)(19"-24"DIA)
LF 680.000 $40.000 $52.000 $40.000 $30.000
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
LF 150.000 $65.000 $26.000 $50.000 $25.500
CARBON FIBER REINF POLYMER PROTECTION
SF 886.200 $25.000 $50.000 $50.000 $49.000
TERMINAL ANCHOR JOINT CONT REINF
CY 68.000 $615.000 $735.000 $300.000 $992.660
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $12,000.000 $20,000.000 $12,000.000 $11,242.420
TMA (STATIONARY)
EA 4.000 $15,000.000 $20,000.000 $15,000.000 $22.490
TMA (MOBILE OPERATION)
DAY 72.000 $200.000 $104.000 $250.000 $76.360
Totals: $25,665,190.550 $31,528,539.200 $31,954,005.400 $34,051,087.201