CHAMBERS SH 124 (0367-01-070)

Items: 42

County: CHAMBERS
Length: N/A
Highway: SH 124
District: BEAUMONT
Control Number: 0367-01-070
DBE Goal: N/A
Project: NH 2020(641)
Guaranty: N/A
Time: 52 WORKING DAYS
Engineer's Estimate: $2,843,823.40
Date: 02/07/2020 (6 years ago)
Contract Number: N/A
Type: OV-OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$2,843,823.40
$2,844,750.22
Over/Under Est: 0.03% $926.82
Over/Under Est: 1.39% $39,454.96
Amt Left: 1.35% $38,528.14
Over/Under Est: 5.26% $149,536.89
Amt Left: 5.22% $148,610.07
Delta: -3.82% -$110,081.93

Bid Items & Bid Tabulations

42 Total 0 of 42
CHAMBERS  |  SH 124  |  BEAUMONT  |  0367-01-070  |  02/07/2020  |  $2,843,823.40  |  NH 2020(641)  |  OV-OVERLAY  |  52 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ANGEL BROTHERS HOLDINGS CORP.
TEXAS MATERIALS GROUP, INC.
JAMES CONSTRUCTION GROUP, L.L.C.
REMOVING CONCRETE(MOW STRIP)
LF 1,200.000 $10.000 $10.000 $3.700 $10.000
BACKFILL (TY A OR B)
STA 218.170 $200.000 $120.000 $239.000 $37.000
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 1,000.000 $0.300 $1.600 $1.520 $2.530
VEGETATIVE WATERING
MG 8.400 $50.000 $200.000 $225.000 $80.000
D-GR HMA (SQ) TY-D PG64_22(LEVEL-UP)
TON 8,355.000 $80.000 $85.000 $83.000 $94.000
TACK COAT
GAL 9,946.000 $4.000 $2.300 $4.250 $2.250
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 11,741.000 $110.000 $130.000 $117.000 $119.000
TACK COAT
GAL 10,675.000 $4.000 $2.300 $4.100 $2.250
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 2,000.000 $80.000 $82.000 $100.000 $73.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 1,000.000 $60.000 $49.000 $58.000 $27.000
PLANE ASPH CONC PAV(0" TO 2")
SY 7,774.000 $2.500 $1.450 $5.000 $2.250
RIPRAP (MOW STRIP)(4 IN)
CY 48.000 $500.000 $550.000 $600.000 $460.000
CLEANING AND SEALING EXIST JOINTS(CL3)
LF 308.000 $5.000 $35.000 $45.000 $58.000
MOBILIZATION
LS 1.000 $250,000.000 $75,600.000 $129,900.000 $265,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $2,500.000 $1,500.000 $2,000.000 $13,425.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 250.000 $40.000 $32.000 $36.100 $53.560
ROCK FILTER DAMS (REMOVE)
LF 250.000 $10.000 $11.000 $10.100 $18.570
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 500.000 $5.000 $7.200 $5.100 $6.940
BIODEG EROSN CONT LOGS (REMOVE)
LF 500.000 $1.000 $1.000 $1.040 $2.110
INTRSCT, DRVWAYS, & TURNOUT (ACP)
SY 545.000 $100.000 $35.000 $61.000 $24.000
RUMBLE STRIPS (SHOULDER)
LF 43,634.000 $0.200 $0.170 $0.130 $0.170
RUMBLE STRIPS (CENTERLINE)
LF 21,817.000 $0.200 $0.170 $0.140 $0.350
MTL W-BEAM GD FEN (TIM POST)
LF 950.000 $20.000 $23.000 $20.500 $22.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $2,000.000 $2,500.000 $1,375.000 $1,575.000
REMOVE METAL BEAM GUARD FENCE
LF 950.000 $3.000 $4.100 $2.550 $4.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 8.000 $300.000 $260.000 $255.000 $250.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $2,500.000 $2,600.000 $2,375.000 $2,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 8.000 $500.000 $260.000 $255.000 $250.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 4.000 $15.000 $29.000 $18.250 $28.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BR)
EA 20.000 $30.000 $29.000 $34.500 $28.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 86,828.000 $0.250 $0.260 $0.160 $0.150
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 24.000 $30.000 $5.050 $6.100 $6.000
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 9,200.000 $0.250 $0.270 $0.160 $0.150
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 16,090.000 $0.250 $0.270 $0.160 $0.150
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 3,031.000 $1.000 $1.500 $1.680 $0.440
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 43,414.000 $0.300 $0.330 $0.530 $0.520
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 4,600.000 $0.350 $0.370 $0.530 $0.520
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 8,045.000 $0.300 $0.330 $0.530 $0.520
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 24.000 $40.000 $16.000 $15.100 $15.000
REFL PAV MRKR TY II-A-A
EA 328.000 $4.000 $5.100 $3.550 $3.500
TMA (STATIONARY)
DAY 52.000 $250.000 $60.000 $415.000 $238.000
TMA (MOBILE OPERATION)
DAY 32.000 $250.000 $60.000 $104.000 $548.000
Totals: $2,843,823.400 $2,844,750.220 $2,883,278.360 $2,993,360.290