PREPARING ROW
|
STA
|
375.000
|
$1,000.000
|
$750.000
|
$1,245.420
|
$723.393
|
$500.000
|
$2,835.000
|
$3,700.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
319.000
|
$14.000
|
$14.000
|
$17.880
|
$21.440
|
$32.000
|
$12.310
|
$14.440
|
|
|
REMOV STAB BASE AND ASPH PAV (2"-15")
|
SY
|
16,798.000
|
$5.000
|
$6.700
|
$7.540
|
$9.462
|
$18.000
|
$3.060
|
$9.870
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
16,533.000
|
$6.500
|
$11.750
|
$14.550
|
$12.711
|
$16.000
|
$5.560
|
$16.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
5,646.000
|
$9.000
|
$7.250
|
$14.550
|
$7.492
|
$16.000
|
$20.440
|
$2.910
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
69,171.000
|
$0.700
|
$1.000
|
$1.320
|
$1.175
|
$1.600
|
$0.530
|
$8.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
AC
|
14.290
|
$730.000
|
$800.000
|
$925.000
|
$656.250
|
$980.000
|
$675.000
|
$714.470
|
|
|
VEGETATIVE WATERING
|
MG
|
1,185.000
|
$12.000
|
$16.000
|
$24.360
|
$20.091
|
$35.000
|
$32.000
|
$24.250
|
|
|
SOIL RETENTION BLANKETS (CL 2) (TY E)
|
SY
|
21.000
|
$1.550
|
$10.750
|
$2.500
|
$29.400
|
$16.000
|
$30.000
|
$27.480
|
|
|
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
|
CY
|
22,339.000
|
$47.000
|
$51.000
|
$52.010
|
$53.122
|
$66.000
|
$57.400
|
$63.000
|
|
|
LIME TRT (EXST MATL)(8")
|
SY
|
80,386.000
|
$2.500
|
$2.750
|
$3.420
|
$3.990
|
$4.500
|
$4.960
|
$2.980
|
|
|
LIME (HYD, COM OR QK)(SLURRY)
|
TON
|
1,593.000
|
$185.000
|
$160.000
|
$162.750
|
$174.698
|
$180.000
|
$181.560
|
$159.790
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
10,505.000
|
$3.500
|
$4.200
|
$3.950
|
$3.981
|
$4.000
|
$3.560
|
$3.750
|
|
|
D-GR HMA TY-C PG64-22
|
TON
|
34,850.000
|
$70.000
|
$69.000
|
$70.050
|
$85.790
|
$96.000
|
$83.930
|
$79.000
|
|
|
D-GR HMA TY-D PG76-22
|
TON
|
25,413.000
|
$80.000
|
$73.700
|
$71.790
|
$88.662
|
$94.000
|
$83.930
|
$86.000
|
|
|
TOM (ASPHALT) PG 76-22
|
TON
|
738.000
|
$87.000
|
$102.000
|
$110.820
|
$104.046
|
$120.000
|
$106.810
|
$121.000
|
|
|
TOM - C (AGGREGATE) SAC - B
|
TON
|
11,252.000
|
$87.000
|
$102.000
|
$110.820
|
$104.046
|
$120.000
|
$106.810
|
$121.000
|
|
|
TACK COAT
|
GAL
|
15,693.000
|
$3.000
|
$2.500
|
$3.080
|
$2.912
|
$3.500
|
$3.050
|
$3.350
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
17,200.000
|
$30.000
|
$30.000
|
$27.940
|
$41.317
|
$45.000
|
$40.690
|
$35.460
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
163,783.000
|
$1.500
|
$1.600
|
$1.720
|
$2.880
|
$3.000
|
$2.110
|
$1.270
|
|
|
TEMPORARY SPL SHORING
|
SF
|
801.000
|
$13.000
|
$15.750
|
$15.140
|
$47.250
|
$38.000
|
$49.440
|
$29.580
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
498.000
|
$425.000
|
$445.000
|
$434.320
|
$555.510
|
$500.000
|
$448.370
|
$366.720
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
26.000
|
$110.000
|
$258.000
|
$170.000
|
$232.600
|
$130.000
|
$210.830
|
$207.260
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
501.000
|
$425.000
|
$464.000
|
$468.550
|
$608.010
|
$450.000
|
$595.830
|
$508.780
|
|
|
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
|
LF
|
15.000
|
$425.000
|
$500.000
|
$513.750
|
$509.250
|
$1,030.000
|
$532.900
|
$493.250
|
|
|
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
|
LF
|
20.000
|
$550.000
|
$590.000
|
$605.250
|
$525.000
|
$1,045.000
|
$549.390
|
$581.100
|
|
|
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
|
LF
|
8.000
|
$515.000
|
$645.000
|
$660.380
|
$525.000
|
$1,300.000
|
$549.390
|
$634.020
|
|
|
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
|
LF
|
11.000
|
$590.000
|
$590.000
|
$600.840
|
$551.250
|
$1,150.000
|
$576.850
|
$576.870
|
|
|
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
|
LF
|
9.000
|
$625.000
|
$835.000
|
$856.620
|
$630.000
|
$1,410.000
|
$659.260
|
$822.430
|
|
|
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
|
LF
|
6.000
|
$680.000
|
$875.000
|
$918.360
|
$735.000
|
$1,300.000
|
$769.140
|
$1,890.260
|
|
|
CONC BOX CULV (8 FT X 5 FT)(EXTEND)
|
LF
|
12.000
|
$900.000
|
$890.000
|
$918.360
|
$945.000
|
$1,480.000
|
$988.890
|
$881.710
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
2,095.000
|
$52.000
|
$66.000
|
$66.140
|
$52.500
|
$95.000
|
$54.940
|
$63.500
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
9.000
|
$150.000
|
$480.000
|
$489.500
|
$262.500
|
$470.000
|
$274.690
|
$469.960
|
|
|
RC PIPE (ARCH)(CL III)(DES 1)
|
LF
|
444.000
|
$120.000
|
$160.000
|
$173.800
|
$194.250
|
$180.000
|
$203.270
|
$166.870
|
|
|
RC PIPE (ARCH)(CL III)(DES 2)
|
LF
|
32.000
|
$240.000
|
$190.000
|
$206.160
|
$210.000
|
$184.000
|
$219.750
|
$197.930
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
2.000
|
$8,700.000
|
$4,825.000
|
$4,950.080
|
$7,875.000
|
$17,845.000
|
$8,240.780
|
$5,661.180
|
|
|
WINGWALL (PW - 1) (HW=3 FT)
|
EA
|
5.000
|
$4,400.000
|
$3,850.000
|
$3,957.860
|
$5,775.000
|
$9,200.000
|
$6,043.230
|
$4,217.020
|
|
|
WINGWALL (PW - 1) (HW=4 FT)
|
EA
|
3.000
|
$7,200.000
|
$5,150.000
|
$5,280.820
|
$7,350.000
|
$11,100.000
|
$7,691.390
|
$5,845.240
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
4.000
|
$9,500.000
|
$6,400.000
|
$6,603.780
|
$9,450.000
|
$14,100.000
|
$9,888.930
|
$7,681.680
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
5.000
|
$16,000.000
|
$9,300.000
|
$9,580.440
|
$14,175.000
|
$19,100.000
|
$14,833.390
|
$10,661.150
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
1.000
|
$17,000.000
|
$11,800.000
|
$12,116.110
|
$18,900.000
|
$25,400.000
|
$19,777.850
|
$13,798.240
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
86.000
|
$1,200.000
|
$975.000
|
$981.200
|
$945.000
|
$1,800.000
|
$988.890
|
$942.040
|
|
|
SET (TY II) (36 IN) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$2,800.000
|
$3,750.000
|
$4,398.840
|
$4,200.000
|
$3,100.000
|
$4,395.080
|
$4,406.040
|
|
|
SET (TY II) (DES 1) (RCP) (6: 1) (P)
|
EA
|
30.000
|
$4,500.000
|
$2,350.000
|
$2,193.910
|
$945.000
|
$2,400.000
|
$988.890
|
$2,151.480
|
|
|
SET (TY II) (DES 2) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$780.000
|
$1,800.000
|
$2,193.910
|
$1,260.000
|
$1,540.000
|
$1,318.530
|
$2,174.040
|
|
|
REMOV STR (SET)
|
EA
|
76.000
|
$700.000
|
$400.000
|
$417.840
|
$630.000
|
$500.000
|
$659.260
|
$434.670
|
|
|
REMOV STR (WINGWALL)
|
EA
|
17.000
|
$1,200.000
|
$1,170.000
|
$1,201.690
|
$1,050.000
|
$1,000.000
|
$1,098.770
|
$777.290
|
|
|
REMOV STR (HEADWALL)
|
EA
|
1.000
|
$1,300.000
|
$1,170.000
|
$1,201.690
|
$1,050.000
|
$1,000.000
|
$1,098.770
|
$1,347.020
|
|
|
REMOV STR (PIPE)
|
LF
|
1,872.000
|
$14.000
|
$17.000
|
$16.430
|
$31.500
|
$32.000
|
$32.960
|
$17.650
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,117,300.000
|
$1,064,730.000
|
$1,130,178.910
|
$1,482,003.662
|
$150,000.000
|
$1,500,000.000
|
$1,532,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
42.000
|
$5,000.000
|
$2,400.000
|
$2,451.320
|
$4,878.485
|
$1,100.000
|
$9,904.340
|
$8,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
1,380.000
|
$24.000
|
$23.000
|
$23.500
|
$24.675
|
$33.000
|
$22.750
|
$24.080
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
75.000
|
$24.000
|
$28.500
|
$29.500
|
$30.975
|
$36.000
|
$67.500
|
$71.450
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
205.000
|
$47.000
|
$50.000
|
$75.000
|
$78.750
|
$66.000
|
$49.500
|
$52.390
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,660.000
|
$11.000
|
$10.500
|
$12.500
|
$13.125
|
$18.000
|
$15.000
|
$15.880
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
32,627.000
|
$2.200
|
$1.600
|
$1.890
|
$1.985
|
$3.500
|
$2.300
|
$2.430
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
32,627.000
|
$0.600
|
$0.650
|
$0.250
|
$0.263
|
$1.300
|
$0.950
|
$1.010
|
|
|
DRIVEWAYS (ACP)
|
SY
|
7,491.000
|
$35.000
|
$34.750
|
$35.040
|
$34.048
|
$40.000
|
$54.030
|
$47.010
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
270.000
|
$95.000
|
$89.000
|
$85.550
|
$136.500
|
$95.000
|
$61.150
|
$66.410
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
7,075.000
|
$18.500
|
$22.000
|
$19.390
|
$20.700
|
$22.000
|
$21.460
|
$22.710
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
300.000
|
$150.000
|
$62.000
|
$53.870
|
$52.500
|
$59.000
|
$58.140
|
$61.540
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,500.000
|
$2,125.000
|
$2,154.740
|
$2,011.800
|
$1,600.000
|
$1,575.000
|
$1,667.090
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
9.000
|
$995.000
|
$1,175.000
|
$1,023.500
|
$997.500
|
$1,150.000
|
$1,125.000
|
$1,190.780
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
4,908.000
|
$2.500
|
$1.000
|
$2.150
|
$2.100
|
$1.000
|
$1.000
|
$1.990
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
41.000
|
$2,250.000
|
$2,900.000
|
$2,477.960
|
$2,415.000
|
$2,800.000
|
$2,761.000
|
$2,922.440
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
42.000
|
$250.000
|
$155.000
|
$215.470
|
$210.000
|
$152.000
|
$150.000
|
$158.770
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
33.000
|
$220.000
|
$160.000
|
$250.000
|
$183.750
|
$158.000
|
$175.000
|
$165.070
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 2
|
EA
|
9.000
|
$240.000
|
$275.000
|
$275.000
|
$206.850
|
$266.000
|
$197.000
|
$277.520
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 2
|
EA
|
5.000
|
$360.000
|
$450.000
|
$550.000
|
$357.000
|
$431.000
|
$340.000
|
$132.310
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
17.000
|
$470.000
|
$475.000
|
$425.000
|
$481.950
|
$465.000
|
$459.000
|
$484.900
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
29.000
|
$530.000
|
$550.000
|
$450.000
|
$511.350
|
$543.000
|
$487.000
|
$566.310
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
|
EA
|
2.000
|
$730.000
|
$775.000
|
$600.000
|
$601.650
|
$751.000
|
$573.000
|
$783.360
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
4.000
|
$560.000
|
$625.000
|
$700.000
|
$653.100
|
$612.000
|
$622.000
|
$638.520
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
38.000
|
$80.000
|
$75.000
|
$65.000
|
$94.500
|
$101.000
|
$90.000
|
$105.850
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
|
EA
|
3.000
|
$50.000
|
$43.000
|
$65.000
|
$75.600
|
$42.000
|
$72.000
|
$43.340
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
14.000
|
$55.000
|
$49.000
|
$75.000
|
$75.600
|
$48.000
|
$72.000
|
$50.120
|
|
|
INSTL OM ASSM (OM-3L)(FLX)SRF
|
EA
|
18.000
|
$180.000
|
$240.000
|
$85.000
|
$183.750
|
$233.000
|
$175.000
|
$243.450
|
|
|
INSTL OM ASSM (OM-3R)(FLX)SRF
|
EA
|
23.000
|
$180.000
|
$240.000
|
$85.000
|
$183.750
|
$233.000
|
$175.000
|
$243.450
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
13.000
|
$14.000
|
$20.000
|
$15.000
|
$26.250
|
$19.000
|
$25.000
|
$19.850
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
104.000
|
$14.000
|
$20.000
|
$15.000
|
$26.250
|
$19.000
|
$25.000
|
$19.320
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
73,700.000
|
$0.150
|
$0.230
|
$0.220
|
$0.231
|
$0.220
|
$0.220
|
$0.260
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
89,400.000
|
$0.200
|
$0.230
|
$0.220
|
$0.231
|
$0.220
|
$0.220
|
$0.260
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
1,848.000
|
$3.500
|
$3.150
|
$3.000
|
$3.150
|
$3.050
|
$3.000
|
$3.180
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
1,000.000
|
$1.000
|
$1.000
|
$1.250
|
$1.441
|
$0.840
|
$0.750
|
$7.820
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,000.000
|
$1.000
|
$1.000
|
$1.250
|
$1.441
|
$1.700
|
$0.790
|
$7.820
|
|
|
WK ZN PAV MRK SHT TERM RMV (Y)(4")
|
LF
|
73,700.000
|
$1.100
|
$0.950
|
$1.500
|
$1.232
|
$1.350
|
$1.070
|
$0.070
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
1,515.000
|
$0.750
|
$0.520
|
$0.500
|
$0.525
|
$0.500
|
$0.500
|
$2.650
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
2,971.000
|
$0.750
|
$0.700
|
$0.670
|
$0.704
|
$0.700
|
$0.670
|
$1.010
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
14.000
|
$150.000
|
$125.000
|
$121.000
|
$127.050
|
$123.000
|
$121.000
|
$158.770
|
|
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
|
EA
|
10.000
|
$510.000
|
$375.000
|
$366.000
|
$384.300
|
$370.000
|
$366.000
|
$264.620
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
14.000
|
$140.000
|
$140.000
|
$137.000
|
$143.850
|
$139.000
|
$137.000
|
$185.230
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(090MIL)
|
LF
|
81,696.000
|
$0.400
|
$0.660
|
$0.640
|
$0.672
|
$0.650
|
$0.640
|
$0.790
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(090MIL)
|
LF
|
96,270.000
|
$0.400
|
$0.660
|
$0.640
|
$0.672
|
$0.650
|
$0.640
|
$0.790
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
6,020.000
|
$0.400
|
$0.380
|
$0.360
|
$0.378
|
$0.370
|
$0.360
|
$0.370
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
84.000
|
$15.000
|
$13.000
|
$12.000
|
$12.600
|
$12.170
|
$12.000
|
$9.530
|
|
REFL PAV MRKR TY I-C
|
EA
|
452.000
|
$3.000
|
$4.150
|
$4.000
|
$4.200
|
$4.060
|
$4.000
|
$5.290
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
2,693.000
|
$3.000
|
$3.500
|
$3.370
|
$3.539
|
$3.420
|
$3.370
|
$5.290
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
8,066.000
|
$1.500
|
$0.650
|
$0.630
|
$0.662
|
$0.640
|
$0.630
|
$0.530
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
185,504.000
|
$0.200
|
$0.060
|
$0.050
|
$0.053
|
$0.050
|
$0.050
|
$0.010
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
2,971.000
|
$0.700
|
$0.160
|
$0.150
|
$0.158
|
$0.150
|
$0.150
|
$0.020
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
84.000
|
$2.000
|
$1.050
|
$1.000
|
$1.050
|
$1.010
|
$1.000
|
$0.060
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
24.000
|
$11.000
|
$37.000
|
$35.000
|
$36.750
|
$35.490
|
$35.000
|
$5.290
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
14.000
|
$35.000
|
$37.000
|
$35.000
|
$36.750
|
$35.490
|
$35.000
|
$5.290
|
|
|
SPALLING REPAIR (HYDRAULIC CEMENT)
|
CF
|
58.000
|
$220.000
|
$250.000
|
$250.000
|
$1,207.500
|
$425.000
|
$872.930
|
$405.540
|
|
|
CNC CRACK REPAIR (DISCRETE)(INJECT)
|
LF
|
20.000
|
$130.000
|
$230.000
|
$100.000
|
$346.500
|
$350.000
|
$414.820
|
$529.620
|
|
|
BONDING COURSE
|
GAL
|
19,107.000
|
$2.000
|
$2.800
|
$3.290
|
$3.984
|
$3.400
|
$3.050
|
$3.940
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
80.000
|
$60.000
|
$75.000
|
$261.970
|
$280.000
|
$76.000
|
$150.300
|
$190.000
|
|
|
TMA (STATIONARY)
|
EA
|
2.000
|
$7,500.000
|
$25,000.000
|
$7,858.980
|
$28,000.000
|
$51,000.000
|
$19,238.190
|
$10,200.000
|
|
|
TMA (STATIONARY)
|
DAY
|
80.000
|
$200.000
|
$200.000
|
$209.570
|
$252.000
|
$51.000
|
$105.210
|
$180.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
20.000
|
$250.000
|
$350.000
|
$366.750
|
$504.000
|
$76.000
|
$637.400
|
$650.000
|
|
Totals: |
$12,289,976.950
|
$12,225,105.210
|
$12,774,997.090
|
$14,708,233.916
|
$14,869,107.610
|
$15,484,258.890
|
$15,999,620.836
|