PREPARING ROW
|
STA
|
725.000
|
$6,000.000
|
$7,966.890
|
$11,130.000
|
$1,000.000
|
$9,500.000
|
$9,400.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
187,560.000
|
$5.000
|
$2.000
|
$4.560
|
$5.050
|
$3.480
|
$6.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
744.000
|
$8.000
|
$4.000
|
$8.310
|
$20.000
|
$3.950
|
$7.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
1,935.000
|
$15.000
|
$5.000
|
$13.480
|
$20.000
|
$7.590
|
$7.000
|
|
|
REMOVING CONC (CTB)
|
LF
|
691.000
|
$20.000
|
$4.000
|
$6.100
|
$20.000
|
$18.850
|
$11.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(0"-16")
|
SY
|
4,323.000
|
$3.000
|
$6.000
|
$7.690
|
$20.000
|
$1.530
|
$4.230
|
|
|
REM STAB BASE & ASPH (6"-12")
|
SY
|
28,170.000
|
$3.600
|
$5.750
|
$2.700
|
$7.000
|
$2.890
|
$4.740
|
|
|
RMV STAB BS & ASPH PAV(11.5"-22")
|
SY
|
339,031.000
|
$4.500
|
$1.000
|
$2.830
|
$2.200
|
$4.410
|
$5.480
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
464,453.000
|
$7.750
|
$1.000
|
$2.540
|
$4.900
|
$5.960
|
$0.500
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
268,241.000
|
$6.400
|
$5.000
|
$21.000
|
$9.770
|
$6.680
|
$16.000
|
|
|
EMBANK(FINAL)(DC)(TY E)(CSBE)
|
CY
|
598.000
|
$35.000
|
$30.000
|
$37.060
|
$45.000
|
$53.590
|
$48.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
744,186.000
|
$1.000
|
$1.100
|
$1.190
|
$0.680
|
$1.190
|
$0.710
|
|
|
BLOCK SODDING
|
SY
|
174,273.000
|
$2.500
|
$2.000
|
$2.960
|
$2.960
|
$2.960
|
$3.090
|
|
|
STRAW OR HAY MULCH
|
SY
|
742,670.000
|
$0.150
|
$0.160
|
$0.140
|
$0.140
|
$0.140
|
$0.150
|
|
|
DRILL SEEDING (TEMP)(WARM OR COOL)
|
AC
|
33,387.000
|
$0.200
|
$0.100
|
$0.100
|
$0.100
|
$0.100
|
$0.010
|
|
|
DRILL SEEDING (PERM)(WARM OR COOL)
|
SY
|
742,760.000
|
$0.200
|
$0.140
|
$0.180
|
$0.180
|
$0.180
|
$0.190
|
|
|
FERTILIZER
|
AC
|
153.760
|
$700.000
|
$450.000
|
$484.000
|
$484.000
|
$484.000
|
$504.950
|
|
|
VEGETATIVE WATERING
|
MG
|
18,450.800
|
$25.000
|
$16.000
|
$10.400
|
$25.000
|
$12.750
|
$14.000
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
695,552.000
|
$1.780
|
$1.200
|
$1.740
|
$2.200
|
$2.130
|
$2.950
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
9,390.000
|
$160.000
|
$170.000
|
$181.600
|
$179.000
|
$180.000
|
$180.000
|
|
|
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
|
SY
|
695,552.000
|
$6.000
|
$5.000
|
$8.730
|
$10.900
|
$7.400
|
$9.750
|
|
|
ASPHALT STAB BASE (GR 2)(PG 64)
|
TON
|
12,255.000
|
$100.000
|
$71.440
|
$76.290
|
$73.000
|
$89.000
|
$93.090
|
|
|
ASPHALT STAB BASE (GR 4)(PG 64)
|
TON
|
38,255.000
|
$60.000
|
$67.580
|
$81.510
|
$78.000
|
$74.000
|
$77.440
|
|
|
SALV,HAUL& STKPL RCL APH PV(VAR DEPTH)
|
SY
|
367,201.000
|
$2.560
|
$0.250
|
$3.890
|
$1.200
|
$2.880
|
$1.330
|
|
|
D-GR HMA(SQ) TY-C SAC-B PG70-22
|
TON
|
2,314.000
|
$90.000
|
$101.430
|
$114.950
|
$110.000
|
$89.000
|
$93.160
|
|
|
D-GR HMA(SQ) TY-D SAC-A PG70-22
|
TON
|
1,786.000
|
$90.000
|
$101.430
|
$114.950
|
$97.530
|
$93.180
|
$113.120
|
|
|
TACK COAT
|
GAL
|
1,690.000
|
$3.000
|
$6.000
|
$5.500
|
$5.500
|
$3.000
|
$3.130
|
|
|
CONC PVMT (CONT REINF - CRCP) (10")
|
SY
|
643,451.000
|
$45.000
|
$46.180
|
$30.550
|
$50.500
|
$47.760
|
$51.000
|
|
|
CONC PVMT (CONT REINF)(FAST TRK)(13")
|
SY
|
9,205.000
|
$86.700
|
$72.290
|
$85.000
|
$85.000
|
$84.010
|
$110.000
|
|
|
CEM STABIL BKFL
|
CY
|
11,277.000
|
$50.000
|
$27.000
|
$37.280
|
$36.000
|
$42.300
|
$47.000
|
|
|
CUT & RESTORING PAV
|
SY
|
451.000
|
$95.000
|
$220.000
|
$132.980
|
$260.000
|
$146.020
|
$200.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
132.000
|
$150.000
|
$100.000
|
$122.860
|
$190.000
|
$104.500
|
$200.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
1,209.000
|
$2.500
|
$1.000
|
$7.270
|
$5.000
|
$9.720
|
$15.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
400.000
|
$70.000
|
$68.500
|
$49.950
|
$61.000
|
$56.500
|
$55.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
2,032.000
|
$150.000
|
$215.310
|
$157.310
|
$200.000
|
$166.310
|
$200.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
378.000
|
$190.000
|
$314.970
|
$346.960
|
$297.460
|
$297.460
|
$310.000
|
|
|
DRILL SHAFT (54 IN)
|
LF
|
70.000
|
$275.000
|
$389.710
|
$709.440
|
$625.790
|
$625.790
|
$650.000
|
|
|
DRILL SHAFT (NON - REINFORCED) (12 IN)
|
LF
|
7.000
|
$100.000
|
$70.780
|
$69.260
|
$80.000
|
$80.000
|
$72.260
|
|
|
DRILL SHAFT (TRF SIG POLE) (30 IN)
|
LF
|
11.000
|
$210.000
|
$154.330
|
$263.220
|
$263.220
|
$263.220
|
$274.610
|
|
|
DRILL SHAFT (TRF SIG POLE) (48 IN)
|
LF
|
44.000
|
$350.000
|
$344.250
|
$350.430
|
$350.430
|
$350.430
|
$365.600
|
|
|
CL C CONC (ABUT)
|
CY
|
134.800
|
$1,000.000
|
$550.000
|
$657.140
|
$1,250.000
|
$633.250
|
$900.000
|
|
|
CL C CONC (CAP)
|
CY
|
114.000
|
$1,000.000
|
$850.000
|
$731.200
|
$1,250.000
|
$687.770
|
$1,000.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
26.200
|
$900.000
|
$860.000
|
$828.210
|
$1,250.000
|
$933.030
|
$1,200.000
|
|
|
CL C CONC (MISC)
|
CY
|
117.200
|
$820.000
|
$500.000
|
$276.930
|
$550.000
|
$481.290
|
$1,200.000
|
|
|
REINF CONC SLAB
|
SF
|
14,658.000
|
$15.000
|
$13.000
|
$17.530
|
$25.000
|
$14.640
|
$16.500
|
|
|
RETAINING WALL (CONC BLOCK)
|
SF
|
102.000
|
$30.000
|
$40.000
|
$39.490
|
$100.000
|
$101.410
|
$95.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
1,959.600
|
$120.000
|
$120.000
|
$116.300
|
$120.000
|
$111.710
|
$138.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
22.500
|
$400.000
|
$450.000
|
$425.000
|
$1,000.000
|
$524.340
|
$550.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
266.800
|
$425.000
|
$360.000
|
$435.000
|
$500.000
|
$375.580
|
$500.000
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
198.600
|
$495.000
|
$350.000
|
$412.000
|
$500.000
|
$315.330
|
$500.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
934.700
|
$150.000
|
$80.000
|
$110.000
|
$125.000
|
$130.560
|
$200.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
479.600
|
$500.000
|
$385.000
|
$444.000
|
$500.000
|
$535.360
|
$700.000
|
|
|
RAIL (TY SSTR)
|
LF
|
764.000
|
$40.000
|
$58.000
|
$38.000
|
$57.000
|
$81.640
|
$115.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
244.000
|
$100.000
|
$100.000
|
$112.550
|
$175.000
|
$85.490
|
$95.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)
|
LF
|
1,374.000
|
$155.000
|
$260.000
|
$211.010
|
$250.000
|
$235.270
|
$280.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
950.000
|
$160.000
|
$260.000
|
$206.330
|
$255.000
|
$231.110
|
$280.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)
|
LF
|
102.000
|
$220.000
|
$290.000
|
$241.960
|
$290.000
|
$259.200
|
$325.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
256.000
|
$220.000
|
$340.000
|
$260.510
|
$315.000
|
$266.630
|
$370.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
682.000
|
$230.000
|
$345.000
|
$273.510
|
$340.000
|
$284.370
|
$400.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
728.000
|
$250.000
|
$410.000
|
$329.020
|
$390.000
|
$319.280
|
$500.000
|
|
|
CONC BOX CULV (6 FT X 6 FT)
|
LF
|
350.000
|
$300.000
|
$560.000
|
$440.520
|
$525.000
|
$425.010
|
$650.000
|
|
|
CONC BOX CULV (8 FT X 4 FT)
|
LF
|
434.000
|
$375.000
|
$620.000
|
$540.150
|
$600.000
|
$485.250
|
$720.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
3,366.000
|
$50.000
|
$55.000
|
$51.730
|
$65.000
|
$50.220
|
$75.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
8,546.000
|
$60.000
|
$62.000
|
$59.620
|
$75.000
|
$62.480
|
$88.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
4,676.000
|
$85.000
|
$82.000
|
$70.720
|
$90.000
|
$78.010
|
$100.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
852.000
|
$105.000
|
$140.000
|
$103.800
|
$140.000
|
$96.930
|
$138.000
|
|
|
INLET (COMPL)(PSL)(SH)(3FTX3FT-3FTX3FT)
|
EA
|
41.000
|
$3,500.000
|
$4,000.000
|
$4,142.500
|
$5,000.000
|
$3,026.700
|
$3,350.000
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-3FTX3FT)
|
EA
|
1.000
|
$4,200.000
|
$4,000.000
|
$4,402.500
|
$5,000.000
|
$3,825.030
|
$4,000.000
|
|
|
INLET (COMPL)(PSL)(FG)(6FTX6FT-3FTX3FT)
|
EA
|
1.000
|
$16,000.000
|
$5,000.000
|
$3,432.500
|
$5,000.000
|
$2,855.030
|
$4,800.000
|
|
|
INLET (COMPL)(TY A)
|
EA
|
1.000
|
$2,500.000
|
$4,000.000
|
$3,512.500
|
$5,000.000
|
$2,424.620
|
$4,700.000
|
|
|
WINGWALL (FW - 0) (HW=5 FT)
|
EA
|
2.000
|
$10,500.000
|
$12,000.000
|
$12,048.520
|
$7,500.000
|
$10,954.880
|
$10,000.000
|
|
|
WINGWALL (FW - 0) (HW=6 FT)
|
EA
|
2.000
|
$8,000.000
|
$12,000.000
|
$16,802.400
|
$8,000.000
|
$12,611.490
|
$11,000.000
|
|
|
WINGWALL (FW - S) (HW=5 FT)
|
EA
|
1.000
|
$6,500.000
|
$5,000.000
|
$11,581.700
|
$6,500.000
|
$13,454.800
|
$16,000.000
|
|
|
WINGWALL (FW - S) (HW=6 FT)
|
EA
|
2.000
|
$3,000.000
|
$5,000.000
|
$10,360.390
|
$8,000.000
|
$11,147.770
|
$14,000.000
|
|
|
WINGWALL (PW - 1) (HW=10 FT)
|
EA
|
1.000
|
$3,600.000
|
$30,000.000
|
$60,358.680
|
$20,000.000
|
$25,563.840
|
$50,000.000
|
|
|
WINGWALL (PW - 1) (HW=4 FT)
|
EA
|
1.000
|
$9,500.000
|
$5,500.000
|
$13,934.590
|
$10,000.000
|
$10,414.130
|
$14,000.000
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
4.000
|
$10,500.000
|
$10,000.000
|
$17,920.340
|
$14,000.000
|
$11,034.970
|
$16,000.000
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
5.000
|
$13,500.000
|
$12,000.000
|
$21,584.350
|
$16,000.000
|
$13,269.430
|
$21,000.000
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
2.000
|
$20,000.000
|
$15,000.000
|
$27,551.910
|
$17,500.000
|
$17,620.360
|
$26,000.000
|
|
|
WINGWALL (PW - 1) (HW=9 FT)
|
EA
|
1.000
|
$28,500.000
|
$25,000.000
|
$49,995.800
|
$19,000.000
|
$24,251.160
|
$41,000.000
|
|
|
WINGWALL (SW - 0) (HW=5 FT)
|
EA
|
5.000
|
$9,000.000
|
$4,000.000
|
$10,177.020
|
$6,000.000
|
$10,524.060
|
$11,000.000
|
|
|
WINGWALL (SW - 0) (HW=6 FT)
|
EA
|
5.000
|
$9,500.000
|
$4,100.000
|
$13,718.930
|
$6,700.000
|
$12,570.030
|
$9,800.000
|
|
|
WINGWALL (SW - 0) (HW=7 FT)
|
EA
|
2.000
|
$10,000.000
|
$5,000.000
|
$16,307.200
|
$4,000.000
|
$16,628.510
|
$12,000.000
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
|
EA
|
4.000
|
$5,000.000
|
$5,200.000
|
$3,871.210
|
$5,400.000
|
$10,470.260
|
$3,300.000
|
|
|
SET (TY I)(S=3 FT)(HW= 5 FT)(4:1)(C)
|
EA
|
5.000
|
$6,400.000
|
$6,000.000
|
$6,298.990
|
$1,100.000
|
$11,798.710
|
$4,700.000
|
|
|
SET (TY I)(S=3 FT)(HW= 6 FT)(4:1)(C)
|
EA
|
5.000
|
$9,000.000
|
$6,100.000
|
$7,842.010
|
$1,700.000
|
$12,837.110
|
$6,100.000
|
|
|
SET (TY I)(S=3 FT)(HW= 7 FT)(3:1)(C)
|
EA
|
2.000
|
$10,750.000
|
$6,500.000
|
$10,118.090
|
$1,600.000
|
$14,021.100
|
$6,800.000
|
|
|
SET (TY I)(S= 3 FT)(HW= 7 FT)(6:1) (P)
|
EA
|
1.000
|
$6,500.000
|
$8,700.000
|
$13,151.600
|
$13,500.000
|
$19,002.950
|
$9,000.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 2 FT)(6:1) (P)
|
EA
|
3.000
|
$2,500.000
|
$5,100.000
|
$6,180.040
|
$7,500.000
|
$12,919.430
|
$4,800.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
4.000
|
$3,000.000
|
$6,200.000
|
$9,315.010
|
$700.000
|
$11,994.680
|
$6,100.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 6 FT)(4:1) (C)
|
EA
|
6.000
|
$6,500.000
|
$6,200.000
|
$9,945.070
|
$800.000
|
$12,998.670
|
$6,600.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
4.000
|
$3,750.000
|
$6,500.000
|
$4,992.870
|
$6,100.000
|
$10,490.690
|
$3,300.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (P)
|
EA
|
2.000
|
$6,800.000
|
$6,500.000
|
$6,721.680
|
$8,100.000
|
$13,800.360
|
$5,400.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
2.000
|
$4,500.000
|
$8,000.000
|
$9,975.010
|
$650.000
|
$12,090.390
|
$7,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (3: 1) (C)
|
EA
|
4.000
|
$750.000
|
$1,000.000
|
$533.360
|
$1,100.000
|
$1,150.020
|
$690.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
40.000
|
$700.000
|
$1,000.000
|
$583.360
|
$1,150.000
|
$1,200.010
|
$765.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
49.000
|
$1,000.000
|
$1,000.000
|
$618.360
|
$1,200.000
|
$1,200.010
|
$845.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
34.000
|
$1,100.000
|
$1,400.000
|
$909.570
|
$1,400.000
|
$1,365.010
|
$990.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
247.000
|
$1,250.000
|
$1,200.000
|
$889.930
|
$1,500.000
|
$1,440.010
|
$1,160.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
40.000
|
$1,500.000
|
$1,500.000
|
$1,131.730
|
$1,600.000
|
$2,269.190
|
$1,300.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
71.000
|
$2,200.000
|
$1,500.000
|
$1,650.940
|
$2,300.000
|
$2,764.190
|
$2,000.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
12.000
|
$2,500.000
|
$2,500.000
|
$1,417.860
|
$1,900.000
|
$2,479.190
|
$1,600.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
26.000
|
$3,200.000
|
$2,500.000
|
$3,040.900
|
$4,300.000
|
$4,024.190
|
$3,300.000
|
|
|
REMOV STR (INLET)
|
EA
|
41.000
|
$500.000
|
$300.000
|
$538.090
|
$500.000
|
$644.950
|
$590.000
|
|
|
REMOV STR (SET)
|
EA
|
54.000
|
$400.000
|
$200.000
|
$147.600
|
$500.000
|
$623.280
|
$300.000
|
|
|
REMOV STR (PIPE)
|
LF
|
605.000
|
$20.000
|
$12.000
|
$10.570
|
$25.000
|
$16.800
|
$12.500
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
87.000
|
$40.000
|
$50.000
|
$62.910
|
$100.000
|
$43.190
|
$30.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$80,000.000
|
$25,000.000
|
$34,256.120
|
$100,000.000
|
$67,272.780
|
$90,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$3,870,972.000
|
$7,597,969.070
|
$8,000,000.000
|
$8,500,000.000
|
$8,462,010.000
|
$9,775,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
46.000
|
$6,658.470
|
$4,000.000
|
$4,500.000
|
$20,000.000
|
$10,860.830
|
$12,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
2,043.000
|
$35.000
|
$33.180
|
$28.540
|
$28.540
|
$28.540
|
$29.780
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
2,043.000
|
$10.000
|
$6.600
|
$5.890
|
$5.890
|
$5.890
|
$5.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
1,232.000
|
$35.000
|
$27.710
|
$30.030
|
$30.030
|
$30.030
|
$31.330
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,232.000
|
$15.000
|
$7.020
|
$7.640
|
$7.640
|
$7.640
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
24,475.000
|
$2.500
|
$5.220
|
$2.880
|
$2.880
|
$2.880
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
24,475.000
|
$1.000
|
$0.470
|
$0.430
|
$0.430
|
$0.430
|
$0.250
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
574.000
|
$10.000
|
$3.220
|
$4.890
|
$4.890
|
$4.890
|
$5.100
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
574.000
|
$2.000
|
$0.460
|
$0.890
|
$0.890
|
$0.890
|
$0.250
|
|
|
CONSTRUCTING DETOURS (TY 1)
|
SY
|
22,261.000
|
$70.000
|
$62.000
|
$58.790
|
$61.000
|
$77.780
|
$68.200
|
|
|
CONSTRUCTING DETOURS (TY 2)
|
SY
|
11,292.000
|
$40.000
|
$42.000
|
$54.730
|
$64.000
|
$69.310
|
$81.240
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
360.000
|
$55.000
|
$50.000
|
$54.160
|
$70.000
|
$67.430
|
$80.000
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
8,670.000
|
$20.000
|
$9.000
|
$6.970
|
$10.000
|
$7.370
|
$9.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
|
LF
|
1,540.000
|
$10.000
|
$9.000
|
$8.450
|
$10.000
|
$6.530
|
$9.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
14,220.000
|
$7.000
|
$7.000
|
$1.500
|
$2.000
|
$3.950
|
$3.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
460.000
|
$7.000
|
$7.000
|
$1.900
|
$5.000
|
$5.400
|
$3.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
120.000
|
$7.000
|
$7.000
|
$13.520
|
$5.000
|
$18.800
|
$10.000
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
8,670.000
|
$15.000
|
$9.000
|
$7.170
|
$10.000
|
$7.130
|
$7.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 1)
|
LF
|
1,540.000
|
$15.000
|
$9.000
|
$8.790
|
$10.000
|
$6.350
|
$7.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 2)
|
LF
|
360.000
|
$15.000
|
$9.000
|
$13.000
|
$10.000
|
$9.980
|
$7.000
|
|
|
PORT CTB CONNECT HARDWARE
|
EA
|
79.000
|
$65.000
|
$75.000
|
$72.590
|
$60.000
|
$50.000
|
$85.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
10,430.000
|
$50.000
|
$40.000
|
$62.640
|
$60.000
|
$54.750
|
$66.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,324.000
|
$25.000
|
$29.510
|
$34.340
|
$13.000
|
$38.000
|
$90.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
109,570.000
|
$0.250
|
$0.170
|
$0.140
|
$0.080
|
$0.130
|
$0.080
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
6,562.500
|
$25.000
|
$18.000
|
$18.000
|
$18.000
|
$18.000
|
$18.780
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,000.000
|
$1,755.000
|
$1,755.000
|
$1,755.000
|
$1,755.000
|
$1,830.950
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
28.000
|
$1,000.000
|
$1,232.000
|
$1,232.000
|
$1,232.000
|
$1,232.000
|
$1,285.320
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
LF
|
600.000
|
$25.000
|
$18.000
|
$18.000
|
$18.000
|
$18.000
|
$18.780
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
4.000
|
$1,200.000
|
$792.000
|
$792.000
|
$792.000
|
$792.000
|
$826.280
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
50.000
|
$30.000
|
$67.000
|
$67.000
|
$67.000
|
$67.000
|
$69.900
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
2,801.000
|
$5.000
|
$2.000
|
$2.000
|
$2.000
|
$2.000
|
$2.090
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
43.000
|
$3,000.000
|
$2,593.000
|
$2,593.000
|
$2,593.000
|
$2,593.000
|
$2,705.220
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
1.000
|
$300.000
|
$250.000
|
$250.000
|
$250.000
|
$250.000
|
$260.820
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
67.000
|
$3,000.000
|
$3,425.000
|
$3,425.000
|
$3,425.000
|
$3,425.000
|
$1,400.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
32.000
|
$3,000.000
|
$500.000
|
$500.000
|
$500.000
|
$500.000
|
$650.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
32.000
|
$20,000.000
|
$16,000.000
|
$23,725.000
|
$23,725.000
|
$23,725.000
|
$28,000.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 1
|
EA
|
25.000
|
$385.000
|
$263.270
|
$263.270
|
$190.000
|
$300.000
|
$190.000
|
|
|
CONDT (PVC) (SCH 40) (2") (CONC ENCSE)
|
LF
|
2,193.000
|
$14.000
|
$9.550
|
$14.310
|
$14.310
|
$14.310
|
$14.930
|
|
|
CONDT (PVC) (SCH 40) (3") (CONC ENCSE)
|
LF
|
128,040.000
|
$8.200
|
$6.000
|
$6.820
|
$6.820
|
$6.820
|
$7.120
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
2,115.000
|
$8.000
|
$7.140
|
$4.810
|
$4.810
|
$4.810
|
$5.020
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
360.000
|
$15.000
|
$13.870
|
$10.600
|
$10.600
|
$10.600
|
$11.060
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
455.000
|
$10.000
|
$14.210
|
$6.100
|
$6.100
|
$6.100
|
$6.360
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
10,355.000
|
$18.000
|
$17.000
|
$15.510
|
$15.510
|
$15.550
|
$16.180
|
|
|
CONDT (RM) (3")
|
LF
|
530.000
|
$35.000
|
$29.000
|
$46.230
|
$46.230
|
$46.230
|
$48.230
|
|
|
ELEC CONDR (NO.14) INSULATED
|
LF
|
69,091.000
|
$0.650
|
$0.680
|
$0.630
|
$0.630
|
$0.630
|
$0.660
|
|
|
ELEC CONDR (NO.12) BARE
|
LF
|
2,969.000
|
$0.900
|
$0.780
|
$0.680
|
$0.680
|
$0.680
|
$0.710
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
5,938.000
|
$0.950
|
$0.780
|
$0.670
|
$0.670
|
$0.670
|
$0.700
|
|
|
ELEC CONDR (NO.10) BARE
|
LF
|
3,937.000
|
$1.000
|
$0.780
|
$0.720
|
$0.720
|
$0.720
|
$0.750
|
|
|
ELEC CONDR (NO.10) INSULATED
|
LF
|
7,874.000
|
$1.050
|
$0.800
|
$0.720
|
$0.720
|
$0.720
|
$0.750
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
1,025.000
|
$1.250
|
$0.860
|
$0.830
|
$0.830
|
$0.830
|
$0.870
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
560.000
|
$1.350
|
$1.020
|
$1.060
|
$1.060
|
$1.060
|
$1.110
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
105.000
|
$1.500
|
$1.810
|
$1.340
|
$1.340
|
$1.340
|
$1.410
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
210.000
|
$1.600
|
$2.260
|
$1.480
|
$1.480
|
$1.480
|
$1.540
|
|
|
ELEC CONDR (NO.3) INSULATED
|
LF
|
3,075.000
|
$2.000
|
$1.870
|
$1.440
|
$1.440
|
$1.440
|
$1.500
|
|
|
TRAY CABLE (4 CONDR) (12 AWG)
|
LF
|
825.000
|
$2.000
|
$1.620
|
$1.630
|
$1.630
|
$1.630
|
$1.700
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
79.000
|
$670.000
|
$666.050
|
$793.000
|
$793.000
|
$793.000
|
$827.320
|
|
|
GROUND BOX TY D (162922)
|
EA
|
2.000
|
$720.000
|
$654.310
|
$694.160
|
$694.160
|
$694.160
|
$724.200
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
6.000
|
$770.000
|
$706.660
|
$1,174.360
|
$1,174.360
|
$1,174.360
|
$1,225.180
|
|
|
ELC SRV TY D 120/240 060(NS)GS(N)SP(O)
|
EA
|
1.000
|
$5,865.000
|
$4,535.060
|
$3,438.330
|
$3,438.330
|
$3,438.330
|
$3,587.130
|
|
|
ELC SRV TY D 120/240 100(NS)SS(N)SP(O)
|
EA
|
24.000
|
$3,200.000
|
$4,896.060
|
$3,438.330
|
$3,438.330
|
$3,438.330
|
$3,587.130
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
32.000
|
$40.000
|
$36.080
|
$34.000
|
$34.000
|
$34.000
|
$26.040
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
235.000
|
$430.000
|
$340.610
|
$321.000
|
$321.000
|
$321.000
|
$334.890
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
34.000
|
$450.000
|
$583.590
|
$550.000
|
$550.000
|
$550.000
|
$573.800
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
49.000
|
$510.000
|
$413.820
|
$390.000
|
$390.000
|
$390.000
|
$406.880
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U-EXAL)
|
EA
|
4.000
|
$750.000
|
$867.970
|
$818.000
|
$818.000
|
$818.000
|
$853.400
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
29.000
|
$605.000
|
$643.010
|
$606.000
|
$606.000
|
$606.000
|
$632.230
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
$890.000
|
$691.820
|
$652.000
|
$652.000
|
$652.000
|
$680.220
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
3.000
|
$630.000
|
$648.320
|
$611.000
|
$611.000
|
$611.000
|
$637.440
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-EXAL)
|
EA
|
4.000
|
$800.000
|
$1,014.390
|
$956.000
|
$956.000
|
$956.000
|
$997.370
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
3.000
|
$400.000
|
$397.910
|
$375.000
|
$375.000
|
$375.000
|
$391.230
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
163.000
|
$100.000
|
$53.050
|
$50.000
|
$50.000
|
$50.000
|
$52.160
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
284.000
|
$8.000
|
$4.400
|
$4.150
|
$4.150
|
$7.340
|
$7.660
|
|
|
INS OH SN SUP(25 FT BAL TEE)
|
EA
|
2.000
|
$21,500.000
|
$23,151.960
|
$22,000.000
|
$21,766.050
|
$21,766.050
|
$22,708.040
|
|
|
INS OH SN SUP(25 FT CANT)
|
EA
|
1.000
|
$15,000.000
|
$27,505.170
|
$26,000.000
|
$25,977.350
|
$25,977.350
|
$27,101.590
|
|
|
SIGN WALKWAY (36 IN) WITH HNDRL
|
LF
|
75.000
|
$200.000
|
$358.700
|
$235.000
|
$290.950
|
$290.950
|
$303.540
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
4.000
|
$20.000
|
$15.920
|
$15.000
|
$15.000
|
$15.000
|
$15.650
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
4.000
|
$20.000
|
$15.920
|
$15.000
|
$15.000
|
$15.000
|
$15.650
|
|
|
INSTL DEL ASSM (D-DY)SZ 2(WC)GND
|
EA
|
50.000
|
$40.000
|
$50.930
|
$48.000
|
$48.000
|
$48.000
|
$50.080
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
107.000
|
$30.000
|
$33.950
|
$32.000
|
$32.000
|
$32.000
|
$33.380
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
28.000
|
$105.000
|
$33.950
|
$32.000
|
$32.000
|
$32.000
|
$33.390
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
10.000
|
$30.000
|
$33.960
|
$32.000
|
$32.000
|
$32.000
|
$33.390
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
81.000
|
$1.500
|
$4.000
|
$4.000
|
$4.000
|
$4.000
|
$4.170
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
575.000
|
$0.200
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
$1.040
|
|
|
WK ZN PAV MRK REMOV (W)4"(DOT)
|
LF
|
532.000
|
$0.500
|
$2.000
|
$2.000
|
$2.000
|
$2.000
|
$2.090
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
179,990.000
|
$0.500
|
$0.950
|
$0.950
|
$0.950
|
$0.950
|
$0.990
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
1,174.000
|
$1.500
|
$2.000
|
$2.000
|
$2.000
|
$2.000
|
$2.090
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
588.000
|
$4.000
|
$11.000
|
$11.000
|
$11.000
|
$11.000
|
$11.480
|
|
|
WK ZN PAV MRK REMOV (W)(ARROW)
|
EA
|
18.000
|
$150.000
|
$200.000
|
$200.000
|
$200.000
|
$200.000
|
$208.660
|
|
|
WK ZN PAV MRK REMOV (W)(WORD)
|
EA
|
10.000
|
$150.000
|
$250.000
|
$250.000
|
$250.000
|
$250.000
|
$260.820
|
|
|
WK ZN PAV MRK REMOV (Y)4"(BRK)
|
LF
|
17,008.000
|
$0.500
|
$0.980
|
$0.980
|
$0.980
|
$0.980
|
$1.020
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
77,539.000
|
$0.500
|
$0.980
|
$0.980
|
$0.980
|
$0.980
|
$1.020
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
115.000
|
$250.000
|
$400.000
|
$400.000
|
$400.000
|
$400.000
|
$417.310
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
109.000
|
$250.000
|
$300.000
|
$300.000
|
$300.000
|
$300.000
|
$312.980
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
562.000
|
$40.000
|
$75.000
|
$75.000
|
$75.000
|
$75.000
|
$78.250
|
|
PREFAB PAV MRK TY C(EVAC SYM, BLUE/WHT)
|
EA
|
25.000
|
$1,500.000
|
$300.000
|
$300.000
|
$300.000
|
$300.000
|
$312.980
|
|
REFL PAV MRKR TY I-C
|
EA
|
604.000
|
$4.000
|
$4.000
|
$4.000
|
$4.000
|
$4.000
|
$4.170
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,211.000
|
$4.000
|
$4.000
|
$4.000
|
$4.000
|
$4.000
|
$4.170
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
3,387.000
|
$4.000
|
$4.000
|
$4.000
|
$4.000
|
$4.000
|
$4.170
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
22,217.000
|
$0.100
|
$0.890
|
$0.890
|
$0.890
|
$0.890
|
$0.930
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
70.000
|
$1.500
|
$5.000
|
$5.000
|
$5.000
|
$5.000
|
$5.220
|
|
|
INSTALL HWY TRF SIG (SYSTEM)
|
EA
|
1.000
|
$30,000.000
|
$23,365.000
|
$25,529.110
|
$25,529.110
|
$25,529.110
|
$26,633.950
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
1.000
|
$1,500.000
|
$2,500.000
|
$2,415.000
|
$2,415.000
|
$2,415.000
|
$2,519.520
|
|
|
TEMP TRAF SIGNALS
|
EA
|
1.000
|
$41,000.000
|
$31,917.000
|
$15,870.410
|
$15,870.410
|
$15,870.410
|
$16,557.240
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
4.000
|
$225.000
|
$418.760
|
$225.400
|
$225.400
|
$225.400
|
$235.160
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
2.000
|
$225.000
|
$418.760
|
$225.400
|
$225.400
|
$225.400
|
$235.160
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
1.000
|
$225.000
|
$418.760
|
$225.400
|
$225.400
|
$225.400
|
$235.150
|
|
|
BACK PLATE (12")(1 SEC)
|
EA
|
7.000
|
$75.000
|
$88.450
|
$51.750
|
$51.750
|
$51.750
|
$53.990
|
|
|
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
|
LF
|
1,470.000
|
$1.700
|
$1.850
|
$1.800
|
$1.800
|
$1.800
|
$1.880
|
|
|
INS TRF SIG PL AM (S)1 ARM(24')
|
EA
|
1.000
|
$4,500.000
|
$7,424.870
|
$6,974.750
|
$6,974.750
|
$6,974.750
|
$7,276.600
|
|
|
INS TRF SIG PL AM(S)1 ARM(50')LUM
|
EA
|
1.000
|
$16,000.000
|
$18,156.500
|
$19,883.500
|
$19,883.500
|
$19,883.500
|
$20,744.010
|
|
|
INS TRF SIG PL AM(S)1 ARM(65')LUM
|
EA
|
1.000
|
$18,000.000
|
$20,135.680
|
$21,927.050
|
$21,927.050
|
$21,927.050
|
$22,876.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
12.000
|
$1,800.000
|
$1,877.200
|
$2,588.420
|
$2,588.420
|
$2,588.420
|
$2,700.440
|
|
|
STRIP MOWING
|
CYC
|
12.000
|
$10,000.000
|
$1,000.000
|
$1,000.000
|
$1,250.000
|
$2,329.340
|
$6,700.000
|
|
|
LITTER REMOVAL
|
CYC
|
12.000
|
$2,250.000
|
$1,111.340
|
$1,121.170
|
$1,250.000
|
$1,208.300
|
$4,800.000
|
|
|
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
|
CYC
|
12.000
|
$3,500.000
|
$2,351.390
|
$2,351.390
|
$1,250.000
|
$2,623.340
|
$400.000
|
|
|
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
|
CYC
|
12.000
|
$3,500.000
|
$1,522.800
|
$1,537.890
|
$1,250.000
|
$75.000
|
$2,000.000
|
|
|
REMOVE SHOULDER TEXTURING
|
LF
|
3,409.000
|
$3.000
|
$2.860
|
$2.500
|
$5.000
|
$5.000
|
$3.410
|
|
|
WIDE FLANGE PAVEMENT TERMINALS
|
LF
|
178.000
|
$300.000
|
$373.830
|
$422.270
|
$500.000
|
$311.540
|
$500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
240.000
|
$85.000
|
$24.380
|
$227.460
|
$100.000
|
$174.000
|
$85.000
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(12 FIBER)
|
LF
|
185,437.000
|
$3.900
|
$2.000
|
$2.290
|
$2.290
|
$2.290
|
$2.390
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(144 FIBER)
|
LF
|
68,869.000
|
$6.400
|
$3.500
|
$3.350
|
$3.350
|
$3.350
|
$3.490
|
|
|
FIBER OPTIC SPLICE ENCLOSURE
|
EA
|
4.000
|
$2,800.000
|
$1,153.400
|
$1,345.500
|
$1,345.500
|
$1,345.500
|
$1,403.730
|
|
|
FIBER OPTIC PATCH PANEL (12 POSITION)
|
EA
|
30.000
|
$1,000.000
|
$1,015.310
|
$908.500
|
$908.500
|
$908.500
|
$947.820
|
|
|
FIBER OPTIC PATCH PANEL (144 POSITION)
|
EA
|
4.000
|
$3,000.000
|
$2,035.140
|
$1,529.500
|
$1,529.500
|
$1,529.500
|
$1,595.690
|
|
|
FIBER OPTIC FUSION SPLICE
|
EA
|
396.000
|
$65.000
|
$53.240
|
$15.180
|
$15.180
|
$15.180
|
$15.840
|
|
|
ITS GRND MNT CAB (TY 6) (CONF 2)
|
EA
|
4.000
|
$15,000.000
|
$10,153.130
|
$19,781.660
|
$19,781.660
|
$19,781.660
|
$20,637.760
|
|
|
CCTV FIELD EQUIPMENT (ANALOG)
|
EA
|
14.000
|
$7,800.000
|
$6,144.220
|
$7,440.500
|
$7,440.500
|
$7,440.500
|
$7,762.510
|
|
|
CCTV MOUNT (POLE)
|
EA
|
14.000
|
$650.000
|
$1,384.440
|
$14,249.650
|
$14,249.650
|
$14,249.650
|
$14,866.340
|
|
|
ITS MULTI-DUCT CND (PVC-40)(CONC ENCSE)
|
LF
|
128,098.000
|
$11.750
|
$8.000
|
$9.390
|
$9.390
|
$9.390
|
$9.800
|
|
|
ITS MULTI-DUCT CND (PVC-80)(BORE)
|
LF
|
10,481.000
|
$36.500
|
$22.640
|
$24.340
|
$24.340
|
$24.340
|
$25.390
|
|
|
ITS MULTI-DUCT CND (RMC)
|
LF
|
530.000
|
$70.000
|
$52.050
|
$71.460
|
$71.460
|
$71.460
|
$74.550
|
|
|
INSTALL DMS (FOUNDATION MTD CABINET)
|
EA
|
3.000
|
$17,000.000
|
$10,016.850
|
$8,781.060
|
$8,781.060
|
$8,781.060
|
$9,161.080
|
|
|
FIBER OPTIC VIDEO DATA TRANSMITTER
|
EA
|
14.000
|
$2,200.000
|
$995.000
|
$1,331.700
|
$1,331.700
|
$1,331.700
|
$1,389.330
|
|
|
FIBER OPTIC VIDEO DATA RECEIVER
|
EA
|
16.000
|
$2,200.000
|
$995.000
|
$1,331.700
|
$1,331.700
|
$1,331.700
|
$1,389.330
|
|
MULTIPOLYMER PAV MRK (W)(6")(SLD)
|
LF
|
138,984.000
|
$0.620
|
$0.620
|
$0.620
|
$0.620
|
$0.620
|
$0.650
|
|
MULTIPOLYMER PAV MRK (W)(6")(BRK)
|
LF
|
33,189.000
|
$0.720
|
$0.620
|
$0.620
|
$0.620
|
$0.620
|
$0.650
|
|
MULTIPOLYMER PAV MRK (W)(8")(SLD)
|
LF
|
44,652.000
|
$1.000
|
$0.800
|
$0.800
|
$0.800
|
$0.800
|
$0.830
|
|
MULTIPOLYMER PAV MRK (W)(8")(DOT)
|
LF
|
146.000
|
$1.000
|
$2.000
|
$2.000
|
$2.000
|
$2.000
|
$2.090
|
|
MULTIPOLYMER PAV MRK (W)(24")(SLD)
|
LF
|
498.000
|
$6.000
|
$10.000
|
$10.000
|
$10.000
|
$10.000
|
$10.430
|
|
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
|
LF
|
144,799.000
|
$0.620
|
$0.620
|
$0.620
|
$0.620
|
$0.620
|
$0.650
|
|
MULTIPOLYMER PAV MRK (Y)(6")(BRK)
|
LF
|
5,208.000
|
$0.600
|
$0.620
|
$0.620
|
$0.620
|
$0.620
|
$0.650
|
|
|
BBU SYSTEM (EXTERNAL BATT CABINET)
|
EA
|
1.000
|
$7,000.000
|
$5,665.900
|
$5,888.000
|
$5,888.000
|
$5,888.000
|
$6,142.820
|
|
|
SPS-INS (40W) 960W (500AH) 2X50A(1)
|
EA
|
4.000
|
$4,000.000
|
$8,212.750
|
$9,888.850
|
$9,888.850
|
$9,888.850
|
$10,316.820
|
|
|
ITS POLE (55 FT)(130 MPH)
|
EA
|
14.000
|
$16,000.000
|
$13,709.880
|
$14,962.650
|
$14,962.650
|
$14,962.650
|
$15,610.200
|
|
|
ITS POLE MNT CAB (TY 1)(CONF 1)
|
EA
|
16.000
|
$4,600.000
|
$4,503.480
|
$4,117.000
|
$4,117.000
|
$4,117.000
|
$4,295.170
|
|
|
ITS POLE MNT CAB (TY 2)(CONF 1)
|
EA
|
14.000
|
$5,800.000
|
$4,000.000
|
$5,819.000
|
$5,819.000
|
$5,819.000
|
$6,070.830
|
|
|
TMA (STATIONARY)
|
DAY
|
111.000
|
$280.000
|
$250.000
|
$89.200
|
$500.000
|
$720.720
|
$165.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
488.000
|
$25.000
|
$25.000
|
$51.340
|
$125.000
|
$89.260
|
$115.000
|
|
|
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
|
EA
|
176.000
|
$2,500.000
|
$2,100.000
|
$1,908.950
|
$1,908.950
|
$1,908.950
|
$1,991.560
|
|
|
ITS RVSD (DATA COLLECT ONLY) SYS
|
EA
|
24.000
|
$8,900.000
|
$9,000.000
|
$9,142.500
|
$9,142.500
|
$9,142.000
|
$9,538.170
|
|
|
SANITARY SEWER (8IN) (PVC) (C900)
|
LF
|
621.000
|
$85.000
|
$38.000
|
$118.000
|
$82.000
|
$118.000
|
$123.110
|
|
|
SANITARY SEWER (12IN) (PVC) (C900)
|
LF
|
6,372.000
|
$170.000
|
$46.000
|
$150.000
|
$101.000
|
$150.000
|
$156.490
|
|
|
CASING (STEEL) (SANITARY SEWER) (16 IN)
|
LF
|
104.000
|
$180.000
|
$120.000
|
$263.000
|
$209.000
|
$263.000
|
$274.380
|
|
|
MANHOLES (SAN SEWER) (TY 1)
|
EA
|
13.000
|
$5,800.000
|
$8,000.000
|
$8,800.000
|
$2,883.000
|
$8,800.000
|
$9,180.840
|
|
|
ABAND/FILL EXIST SAN SWR PIPE (8IN)
|
LF
|
2,606.000
|
$15.000
|
$7.000
|
$10.000
|
$13.000
|
$10.000
|
$10.430
|
|
|
ABAND/FILL EXIST SAN SWR PIPE (10IN)
|
LF
|
2,591.000
|
$16.000
|
$8.000
|
$11.000
|
$15.000
|
$11.000
|
$11.480
|
|
|
SWR (DROP MANHOLE 4' DIA)DEPTH 14'-16'
|
EA
|
15.000
|
$10,600.000
|
$8,500.000
|
$13,000.000
|
$4,610.000
|
$13,000.000
|
$13,562.610
|
|
|
ABAND/FILL EXIST SAN SWR PIPE (6IN)
|
LF
|
2,088.000
|
$15.000
|
$7.000
|
$9.000
|
$12.000
|
$2.000
|
$9.390
|
|
|
CASING (STEEL)(SANITARY SEWER)(24IN)
|
LF
|
455.000
|
$200.000
|
$200.000
|
$388.000
|
$299.000
|
$388.000
|
$404.790
|
|
|
WATER MAIN PIPE (PVC) (2IN)
|
LF
|
125.000
|
$100.000
|
$58.000
|
$39.000
|
$59.000
|
$39.000
|
$40.690
|
|
|
WATER MAIN PIPE (PVC) (6IN)
|
LF
|
8,490.000
|
$50.000
|
$35.000
|
$57.000
|
$49.000
|
$57.000
|
$59.470
|
|
|
WATER MAIN PIPE (PVC) (8IN)
|
LF
|
3,904.000
|
$180.000
|
$45.000
|
$62.000
|
$54.000
|
$62.000
|
$64.680
|
|
|
CASING STEEL (12IN)
|
LF
|
289.000
|
$140.000
|
$140.000
|
$213.000
|
$148.000
|
$213.000
|
$222.220
|
|
|
TAPPING VALVE AND VALVE (6IN X 6IN)
|
EA
|
1.000
|
$3,000.000
|
$5,500.000
|
$5,700.000
|
$5,265.000
|
$5,700.000
|
$5,946.680
|
|
|
TAPPING SLEEVE AND VALVE (8IN X 8IN)
|
EA
|
3.000
|
$4,000.000
|
$6,000.000
|
$6,500.000
|
$5,739.000
|
$6,500.000
|
$6,781.300
|
|
|
FIRE HYDRANT ASSEMBLY
|
EA
|
3.000
|
$6,000.000
|
$5,400.000
|
$6,500.000
|
$1,764.000
|
$6,500.000
|
$6,781.300
|
|
|
REMOVING AND SALVAGING WATER METER
|
EA
|
23.000
|
$470.000
|
$70.000
|
$800.000
|
$560.000
|
$800.000
|
$834.620
|
|
|
REMOVING AND SALVAGING FIRE HYDRANT
|
EA
|
3.000
|
$650.000
|
$1,200.000
|
$1,850.000
|
$565.000
|
$1,850.000
|
$1,930.060
|
|
|
CUT AND PLUG WATER MAIN (2IN)
|
EA
|
1.000
|
$750.000
|
$1,500.000
|
$500.000
|
$445.000
|
$500.000
|
$521.640
|
|
|
CUT AND PLUG WATER MAIN (6IN)
|
EA
|
4.000
|
$2,300.000
|
$1,500.000
|
$1,200.000
|
$572.000
|
$1,200.000
|
$1,251.930
|
|
|
CUT AND PLUG WATER MAIN (8IN)
|
EA
|
4.000
|
$2,800.000
|
$1,500.000
|
$1,300.000
|
$618.000
|
$1,300.000
|
$1,356.260
|
|
|
WET CONNECTION (2IN)
|
EA
|
1.000
|
$700.000
|
$1,200.000
|
$500.000
|
$905.000
|
$500.000
|
$521.640
|
|
|
WET CONNECTION (6IN)
|
EA
|
5.000
|
$1,400.000
|
$51.000
|
$1,300.000
|
$1,303.000
|
$1,300.000
|
$1,356.260
|
|
|
WET CONNECTION (8IN)
|
EA
|
3.000
|
$3,000.000
|
$1,000.000
|
$1,700.000
|
$1,376.000
|
$1,700.000
|
$1,773.570
|
|
|
CASING STEEL (16 IN)
|
LF
|
273.000
|
$180.000
|
$125.000
|
$250.000
|
$185.000
|
$250.000
|
$260.820
|
|
|
ADJUST FIRE HYDRANT
|
EA
|
4.000
|
$1,000.000
|
$1,300.000
|
$500.000
|
$708.000
|
$500.000
|
$521.640
|
|
Totals: |
$81,323,903.030
|
$75,955,686.000
|
$82,113,195.610
|
$88,094,607.800
|
$90,763,637.230
|
$98,654,314.902
|