Show Job Controls
Bid Cobra

HARRIS SH 146 (0389-05-116)

Items: 467

County: HARRIS
Length: N/A
Highway: SH 146
District: HOUSTON
Control Number: 0389-05-116
DBE Goal: N/A
Project: NH 2018(852)
Guaranty: N/A
Time: 1549 WORKING DAYS
Engineer's Estimate: $191,581,736.10
Date: 05/02/2018 (8 years ago)
Contract Number: N/A
Type: WIDEN TO 6 LANES WITH 4 LANE EXPRESS LANES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$191,581,736.10
1
$201,835,272.64
Over/Under Est: 5.35% $10,253,536.54
Over/Under Est: 14.25% $27,304,801.51
Amt Left: 8.45% $17,051,264.97
$222,648,088.60
Over/Under Est: 16.22% $31,066,352.50
Amt Left: 10.31% $20,812,815.96
Delta: -1.72% -$3,761,550.99
Over/Under Est: 25.16% $48,197,785.11
Amt Left: 18.8% $37,944,248.57
Delta: -7.69% -$17,131,432.61
Over/Under Est: 31.23% $59,823,040.66
Amt Left: 24.56% $49,569,504.12
Delta: -4.85% -$11,625,255.55
Subcontractor Percentage Amount
RDI FOUNDATION DRILLING 5.77% $14,286,718.01
ALLSTATE SIGNAL & CONSTRUCTION, LLC 3.53% $8,740,401.14
INDUS ROAD & BRIDGE, INC. 1.91% $4,729,225.54
JOSLIN CONSTRUCTION TEXAS, LLC 1.27% $3,144,563.58
SCI MARINE ENTERPRISES, LLC 1.25% $3,095,042.90
A. H. BECK FOUNDATION CO., INC. 1.21% $2,996,001.52
FRANCO BUILDERS, INC. 0.84% $2,079,868.83
BOH BROS. CONSTRUCTION CO., L.L.C. 0.78% $1,931,306.77
GMJ PAVING CO. 0.67% $1,658,942.99
GOULD INDUSTRIES LLC 0.57% $1,411,339.56
WIMS ENVIRONMENTAL CONSTRUCTION, LTD. 0.32% $792,330.98
SOUTHERN CRUSHED CONCRETE, LLC 0.26% $643,768.92
MARTIN MARIETTA MATERIALS, INC. 0.26% $643,768.92
SOUTHWEST ROAD & SAFETY CONTRACTORS, LTD. 0.25% $619,008.58
STRUCTURAL TECHNOLOGIES, LLC 0.22% $544,727.55
SPEEDY PAVING 0.21% $519,967.21
BADGER DAYLIGHTING CORP. 0.20% $495,206.86
SCOTT DERR PAINTING CO, LLC 0.17% $420,925.83
ROADSAFE TRAFFIC SYSTEMS, INC. 0.14% $346,644.80
MAGNOLIA SERVICES INCORPORATED 0.12% $297,124.12
J & D TEX SERV, INCORPORATED 0.11% $272,363.77
RUSSELL MARINE, LLC 0.08% $198,082.75
AVILES CONSTRUCTION SERVICE, INC 0.07% $173,322.40
DELENA CONSTRUCTION SERVICES LLC 0.06% $148,562.06
MTAM CORPORATION 0.05% $123,801.72
HIGHWAY PAVEMENT SPECIALTIES, INC. 0.05% $123,801.72
HOUSTON SAWING & DRILLING 0.05% $123,801.72
ENVIRONMENTAL ALLIES, L.P. 0.04% $99,041.37
AGGREGATE TECHNOLOGIES, INC. 0.04% $99,041.37
E & R WELDING 0.04% $99,041.37
PENHALL COMPANY 0.03% $74,281.03
CHIRON COMMUNICATION SERVICES, LLC 0.03% $74,281.03
LEGACY OFFSHORE, LLC 0.03% $74,281.03
ASHTON SAWING AND DRILLING LLC 0.03% $74,281.03
EPOXY DESIGN SYSTEMS, INC. 0.02% $49,520.69
RODNEY GREEN DBA GREEN INTERNATIONAL 0.02% $49,520.69
SK CONCRETE SERVICES LLC 0.02% $49,520.69
SPECIALTY DRILLING, LLC 0.02% $49,520.69
PROFESSIONAL SERVICE INDUSTRIES, INC. 0.01% $24,760.34
CURB PLANET INC. 0.01% $24,760.34
CONSOR ENGINEERS, LLC 0.01% $24,760.34
MPIRE INDUSTRIES COMMERCIAL DIVING SERVICES LLC 0.00% $0.00
PROFESSIONAL TRAFFIC CONTROL LLC 0.00% $0.00
Total: 20.77% $51,427,232.76

Bid Items & Bid Tabulations

467 Total 0 of 467
HARRIS  |  SH 146  |  HOUSTON  |  0389-05-116  |  05/02/2018  |  $191,581,736.10  |  NH 2018(852)  |  WIDEN TO 6 LANES WITH 4 LANE EXPRESS...  |  1549 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
WEBBER, LLC
WILLIAMS BROTHERS CONSTRUCTION CO., INC.
FLUOR HEAVY CIVIL, LLC
BALFOUR BEATTY INFRASTRUCTURE, INC.
JAMES CONSTRUCTION GROUP, L.L.C.
PREPARING ROW
AC 7.000 $20,000.000 $25,000.000 $5,000.000 $22,617.480 $50,000.000 $4,435.060
PREPARING ROW
STA 238.700 $10,000.000 $950.000 $91,700.000 $13,833.660 $55,000.000 $2,586.000
REMOVING CONC (PAV)
SY 86,625.000 $6.000 $5.000 $8.000 $5.960 $8.000 $2.970
REMOVING CONC (RIPRAP)
SY 12,048.000 $3.000 $5.000 $4.000 $5.820 $8.000 $1.540
REMOVING CONC (SIDEWALKS)
SY 924.000 $12.000 $5.000 $11.000 $5.920 $8.000 $3.960
REMOVING CONC (DRIVEWAYS)
SY 5,129.000 $6.000 $5.000 $7.000 $5.740 $8.000 $3.850
REMOVING CONC (CTB)
LF 1,945.000 $6.000 $10.000 $4.000 $7.040 $10.000 $5.460
REMOVING CONC (RETAINING WALLS)
SY 187.000 $100.000 $10.000 $100.000 $46.570 $100.000 $5.460
REMOVE CONC (RAIL)
LF 406.000 $10.000 $6.500 $10.000 $17.780 $20.000 $3.280
REMOVING CONCRETE(MOW STRIP)
LF 450.000 $8.000 $5.000 $5.000 $4.110 $8.000 $6.560
REMOVE STAB BASE AND ASPH PAV (6"-20")
SY 566.000 $3.000 $2.000 $5.000 $8.080 $12.570 $11.490
REMOVING STAB BASE & ASPH PAV (4"-22")
SY 79,591.000 $3.000 $2.000 $5.000 $8.080 $3.730 $3.400
REMOV STAB BASE & ASPH PAV (4"-14")
SY 97,298.000 $4.000 $2.000 $5.000 $8.080 $2.940 $3.150
EXCAVATION (ROADWAY)
CY 116,767.000 $8.000 $4.500 $12.000 $6.610 $10.000 $8.650
EXCAVATION (CHANNEL)
CY 27,433.000 $15.000 $3.200 $11.000 $7.490 $15.000 $11.410
EMBANKMENT (FINAL)(ORD COMP)(TY A)
CY 33,491.000 $18.000 $6.000 $10.000 $10.680 $7.500 $17.270
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 215,542.000 $6.000 $3.000 $9.000 $2.380 $11.000 $26.630
EMBANK(FINAL)(DC)(TY E)(CSBE)
CY 18,480.000 $36.000 $43.000 $35.000 $90.390 $45.000 $54.400
EMB(FNL)(DC)(TYE)(CSBE)(RWALL FND IMPR
CY 6,531.000 $42.000 $50.000 $35.000 $90.390 $50.000 $54.400
EMB(FINAL)(DC)(TYE)(CSBE)(EMB FND IMPR)
CY 2,216.000 $40.000 $50.000 $35.000 $90.470 $50.000 $54.400
EROSION CONTROL COMPOST
CY 8,899.000 $20.000 $50.000 $32.000 $8.230 $32.080 $2.000
GENERAL USE COMPOST
CY 4,449.000 $40.000 $200.000 $32.000 $16.190 $37.430 $31.250
COMPOST MANUF TOPSOIL (4")
SY 76,020.000 $1.000 $0.650 $0.870 $5.900 $0.930 $0.870
BLOCK SODDING
SY 94,501.000 $3.000 $3.000 $3.500 $3.770 $3.650 $3.410
STRAW OR HAY MULCH
SY 156,301.000 $0.200 $0.140 $0.210 $0.230 $0.220 $0.210
BROADCAST SEED (PERM)(SPECIAL MIX)
SY 80,095.000 $0.250 $0.140 $0.190 $0.210 $0.200 $0.190
DRILL SEEDING (PERM)(WARM OR COOL)
SY 17,915.000 $0.180 $0.140 $0.220 $0.240 $0.240 $0.220
FERTILIZER
AC 40.000 $700.000 $700.000 $796.500 $880.730 $851.690 $796.500
VEGETATIVE WATERING
MG 4,778.000 $13.500 $15.000 $20.000 $25.600 $15.000 $23.150
IRRIGATION SYSTEM (TY I)
LS 2.000 $100,000.000 $25,000.000 $20,000.000 $26,814.520 $160,392.860 $50,000.000
LANDSCAPE EDGE
LF 3,979.000 $7.000 $10.000 $10.000 $17.700 $2.940 $14.450
PLANT BED PREP (TYPE II)
SY 80,095.000 $1.000 $1.000 $2.000 $2.150 $0.650 $2.000
FL BS (CMP IN PLC)(TYA GR1-2) (6")
SY 454.000 $20.000 $25.000 $10.000 $15.610 $20.000 $21.890
LIME TRT (EXST MATL) (6")
SY 279,888.000 $2.000 $2.250 $1.500 $2.990 $2.500 $4.640
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 3,795.000 $160.000 $155.000 $160.000 $167.320 $160.000 $191.580
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
SY 278,404.000 $6.000 $9.250 $4.000 $17.640 $8.500 $11.390
ASPHALT STAB BASE (GR 2)(PG 64)
TON 3,888.000 $70.000 $77.000 $61.000 $82.590 $75.110 $133.060
ASPHALT STAB BASE (GR 4)(PG 64)
TON 15,282.000 $60.000 $77.000 $50.000 $87.950 $75.110 $136.390
SALV,HAUL& STKPL RCL APH PV(VAR DEPTH)
SY 79,591.000 $3.000 $0.500 $2.000 $4.020 $1.000 $3.270
SALV,HAUL & STKPL RCL APH PV(10 TO 16")
SY 97,298.000 $6.000 $0.500 $2.000 $7.750 $4.280 $5.370
HMCL ACP TY-A SAC-A AC-0.6
TON 10.000 $200.000 $250.000 $125.000 $160.890 $187.310 $332.660
D-GR HMA(SQ) TY-C SAC-A PG70-22
TON 1,939.000 $80.000 $96.800 $88.000 $94.390 $94.440 $164.670
D-GR HMA(SQ) TY-D PG70-22
TON 325.000 $80.000 $110.000 $89.000 $163.030 $107.270 $196.270
CONC PVMT (CONT REINF - CRCP) (10")
SY 153,143.000 $45.000 $55.000 $40.000 $64.390 $60.000 $78.040
CONC PVMT (CONT REINF - CRCP) (13")
SY 109,608.000 $50.000 $65.000 $40.000 $79.550 $64.000 $91.000
CONC PVMT (CONT REINF)(FAST TRK)(13")
SY 35,230.000 $85.000 $90.000 $95.000 $98.560 $98.000 $117.290
STRUCT EXCAV
CY 9,042.000 $12.000 $1.000 $10.000 $8.630 $10.000 $13.610
CEM STABIL BKFL
CY 39,161.000 $45.000 $42.000 $37.500 $97.310 $50.000 $44.090
CEMENT STAB BACKFILL (INLET OR MH)
CY 2,795.000 $40.000 $42.000 $37.500 $97.310 $50.000 $44.090
CUT AND RESTORE PAV (FLEX BASE)
SY 94.000 $50.000 $100.000 $207.000 $67.760 $50.000 $13.550
TRENCH EXCAVATION PROTECTION
LF 59,646.000 $5.000 $1.000 $4.400 $16.340 $3.000 $3.310
TEMPORARY SPL SHORING
SF 57,870.000 $8.000 $2.500 $25.000 $9.560 $5.000 $2.940
PRESTR CONC PIL (16 IN SQ)
LF 61,665.000 $65.000 $59.000 $65.000 $51.050 $86.000 $111.680
DRILL SHAFT (18 IN)
LF 412.000 $60.000 $35.000 $100.000 $34.610 $36.000 $40.260
DRILL SHAFT (30 IN)
LF 3,026.000 $120.000 $93.000 $125.000 $344.200 $100.000 $110.790
DRILL SHAFT (36 IN)
LF 5,045.000 $150.000 $134.000 $150.000 $163.440 $157.000 $155.280
DRILL SHAFT (42 IN)
LF 5,678.000 $200.000 $194.000 $175.000 $198.950 $210.000 $204.270
DRILL SHAFT (48 IN)
LF 16,881.000 $200.000 $250.000 $225.000 $234.040 $260.000 $265.070
DRILL SHAFT (54 IN)
LF 5,433.000 $300.000 $322.000 $250.000 $328.730 $380.000 $338.710
DRILL SHAFT (60 IN)
LF 7,659.000 $300.000 $359.000 $325.000 $367.190 $420.000 $418.650
DRILL SHAFT (66 IN)
LF 900.000 $450.000 $451.000 $450.000 $461.560 $525.000 $507.570
DRILL SHAFT (84 IN)
LF 1,846.000 $700.000 $678.000 $650.000 $706.200 $785.000 $816.500
DRILL SHAFT (NON - REINFORCED) (12 IN)
LF 28.000 $55.000 $100.000 $120.000 $22.150 $69.500 $61.660
DRILL SHAFT (SIGN MTS) (42 IN)
LF 1,110.000 $220.000 $389.000 $200.000 $726.060 $315.440 $218.230
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 390.000 $265.000 $143.000 $225.000 $238.160 $153.890 $120.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 200.800 $225.000 $255.000 $275.000 $410.640 $274.410 $153.000
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 242.000 $350.000 $348.000 $425.000 $526.570 $374.490 $325.000
DRILL SHAFT (108 IN)
LF 2,110.000 $1,000.000 $1,115.000 $1,100.000 $1,161.620 $1,300.000 $1,361.490
DRILL SHAFT (96 IN)
LF 10,656.000 $800.000 $900.000 $900.000 $923.180 $1,025.000 $1,070.210
DRILL SHAFT (120 IN)
LF 1,334.000 $1,200.000 $1,390.000 $1,400.000 $1,428.270 $1,600.000 $1,660.570
CL A CONC (MISC)
CY 10.000 $87.000 $1,500.000 $277.000 $896.360 $1,000.000 $329.260
CL C CONC (ABUT)
CY 438.200 $1,000.000 $750.000 $800.000 $911.510 $800.000 $945.270
CL C CONC (ABUT)(HPC)
CY 25.900 $750.000 $750.000 $800.000 $1,369.280 $820.000 $981.380
CL C CONC (ABUT)(EXTEND)
CY 89.500 $1,000.000 $850.000 $2,000.000 $1,308.400 $1,000.000 $1,010.090
CL C CONC (CAP)
CY 1,319.900 $850.000 $765.000 $850.000 $888.670 $950.000 $919.930
CL C CONC (CAP)(HPC)
CY 23.800 $1,000.000 $1,000.000 $900.000 $1,506.010 $975.000 $1,208.640
CL C CONC (COLUMN)
CY 205.000 $900.000 $1,000.000 $900.000 $1,114.450 $950.000 $1,347.510
CL C CONC (COLUMN)(HPC)
CY 9,360.100 $750.000 $770.000 $900.000 $838.870 $975.000 $1,213.020
CL C CONC (FOOTING)
CY 156.000 $900.000 $790.000 $700.000 $668.700 $700.000 $748.010
CL C CONC (FOOTING)(HPC)
CY 2,352.700 $750.000 $1,102.000 $700.000 $901.060 $900.000 $979.920
CL C CONC (FOOTING)(HPC)(MASS)
CY 3,956.600 $1,750.000 $490.000 $750.000 $624.900 $500.000 $765.780
CL C CONC (SIGN COLUMN)
CY 297.920 $900.000 $1,025.000 $900.000 $1,029.890 $750.000 $1,186.950
CL C CONC (MISC)
CY 434.200 $800.000 $880.000 $700.000 $897.070 $875.000 $979.460
CL F CONC (CAP)
CY 7,483.800 $800.000 $860.000 $1,100.000 $1,111.130 $1,000.000 $1,060.230
CL F CONC (CAP)(HPC)
CY 759.600 $1,250.000 $760.000 $1,100.000 $1,015.740 $850.000 $935.060
CL F CONC (CAP)(MASS)
CY 256.000 $900.000 $650.000 $1,200.000 $1,236.380 $850.000 $886.170
CL F CONC (COLUMN)(HPC)
CY 4,858.600 $1,200.000 $865.000 $900.000 $930.720 $1,100.000 $1,469.600
CL H CONC (PT CAP)
CY 2,543.800 $1,000.000 $1,050.000 $1,100.000 $1,195.200 $1,500.000 $1,094.190
CL A CONC (CHANNEL LINING)
CY 264.000 $450.000 $315.000 $450.000 $757.010 $450.000 $376.520
CL C CONC (SIGN FOOTING)
CY 88.200 $680.000 $710.000 $1,000.000 $877.050 $900.000 $762.290
REINF CONC SLAB
SF 1,112,203.000 $12.000 $14.000 $12.000 $15.840 $13.000 $16.320
REINF CONC SLAB (EXTEND SLAB)
SF 170,554.000 $12.000 $22.000 $20.000 $23.060 $25.000 $24.930
BRIDGE SIDEWALK
SF 1,407.000 $10.000 $12.000 $12.000 $12.870 $10.000 $11.440
RETAINING WALL (MSE) (WAVE SCHEME)
SF 14,836.000 $20.000 $40.000 $50.000 $29.070 $42.000 $28.510
RETAINING WALL (MSE) (BAY AREA SCHEME)
SF 86,430.000 $20.000 $43.000 $35.000 $24.860 $48.000 $25.770
PRESTR CONC GIRDER (TX28)
LF 1,530.420 $120.000 $115.000 $90.000 $119.960 $125.000 $148.040
PRESTR CONC GIRDER (TX34)
LF 1,192.580 $120.000 $115.000 $95.000 $125.000 $130.000 $139.610
PRESTR CONC GIRDER (TX40)
LF 32,593.270 $135.000 $115.000 $100.000 $119.410 $132.000 $145.590
PRESTR CONC GIRDER (TX46)
LF 56,136.400 $115.000 $125.000 $105.000 $133.290 $135.000 $153.650
PRESTR CONC GIRDER (TX54)
LF 59,637.110 $125.000 $130.000 $110.000 $136.250 $145.000 $157.390
PRESTR CONC GIRDER (TX62)
LF 2,658.720 $150.000 $150.000 $120.000 $149.660 $155.000 $187.240
PRESTR CONC GIRDER (TX70)
LF 5,382.150 $130.000 $160.000 $150.000 $171.200 $195.000 $173.620
RIPRAP (CONC)(4 IN)
CY 939.700 $450.000 $339.370 $450.000 $651.000 $520.000 $392.070
RIPRAP (CONC)(6 IN)
CY 384.000 $420.000 $381.600 $450.000 $556.060 $500.000 $493.120
RIPRAP (CONC)(CL B)
CY 40.000 $450.000 $457.800 $450.000 $564.810 $500.000 $796.280
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 5.000 $450.000 $620.600 $450.000 $636.820 $500.000 $796.290
RIPRAP (CONC) (CL B) (4")
CY 1,579.850 $550.000 $384.650 $450.000 $647.740 $500.000 $341.550
RIPRAP (CONC)(CL B)(5 IN)
CY 7.000 $20.000 $527.570 $450.000 $596.720 $500.000 $623.060
RIPRAP (STONE PROTECTION)(18 IN)
CY 8,632.000 $125.000 $47.550 $150.000 $67.600 $200.000 $184.810
RIPRAP (MOW STRIP)(4 IN)
CY 154.000 $450.000 $507.800 $550.000 $595.410 $500.000 $695.240
STR STEEL (MISC NON - BRIDGE)
LB 672.000 $10.000 $15.000 $2.000 $15.450 $12.500 $11.140
RAIL (TY SSTR)
LF 40,497.500 $35.000 $46.000 $30.000 $46.220 $55.000 $41.800
RAIL (TY C223)
LF 5,326.000 $80.000 $126.000 $90.000 $153.160 $120.000 $87.250
RAIL (HANDRAIL)(TY A)
LF 34.000 $35.000 $80.000 $75.000 $146.670 $110.000 $85.840
RAIL (HANDRAIL)(TY F)
LF 1,778.000 $80.000 $62.000 $150.000 $45.930 $110.000 $78.460
RAIL (TY SSTR) (W/DRAIN SLOTS)
LF 26,341.000 $30.000 $47.000 $30.000 $47.670 $46.000 $41.810
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
LF 3,531.000 $95.000 $67.000 $100.000 $73.820 $75.000 $88.440
ARMOR JOINT (SEALED)
LF 2,053.060 $75.000 $57.000 $50.000 $70.340 $70.000 $72.510
CONC BOX CULV (3 FT X 2 FT)
LF 945.000 $200.000 $130.980 $180.900 $148.750 $170.000 $189.680
CONC BOX CULV (4 FT X 2 FT)
LF 369.000 $165.000 $136.660 $213.250 $166.210 $200.000 $194.940
CONC BOX CULV (4 FT X 3 FT)
LF 119.000 $175.000 $181.980 $249.950 $184.890 $220.000 $199.520
CONC BOX CULV (4 FT X 4 FT)
LF 1,885.000 $180.000 $168.920 $221.500 $200.930 $245.000 $557.070
CONC BOX CULV (5 FT X 2 FT)
LF 343.000 $200.000 $172.000 $255.200 $209.100 $250.000 $230.980
CONC BOX CULV (5 FT X 3 FT)
LF 1,236.000 $180.000 $182.170 $239.550 $220.520 $275.000 $223.150
CONC BOX CULV (5 FT X 4 FT)
LF 5,463.000 $210.000 $205.430 $293.700 $238.320 $300.000 $253.820
CONC BOX CULV (5 FT X 5 FT)
LF 6,766.000 $250.000 $220.350 $365.100 $258.010 $325.000 $270.340
CONC BOX CULV (6 FT X 3 FT)
LF 465.000 $250.000 $228.680 $286.550 $263.200 $335.000 $315.680
CONC BOX CULV (6 FT X 4 FT)
LF 3,727.000 $270.000 $240.980 $345.500 $291.920 $350.000 $310.920
CONC BOX CULV (6 FT X 5 FT)
LF 2,747.000 $325.000 $266.650 $417.800 $318.860 $375.000 $337.090
CONC BOX CULV (7 FT X 3 FT)
LF 1,347.000 $315.000 $269.610 $370.850 $323.420 $420.000 $345.650
CONC BOX CULV (7 FT X 4 FT)
LF 3,155.000 $330.000 $295.560 $438.300 $360.950 $450.000 $373.980
CONC BOX CULV (7 FT X 5 FT)
LF 1,450.000 $610.000 $313.100 $493.700 $380.780 $475.000 $394.510
CONC BOX CULV (8 FT X 5 FT)
LF 1,655.000 $270.000 $345.790 $520.250 $420.680 $525.000 $423.890
CONC BOX CULV (10 FT X 5 FT)
LF 179.000 $350.000 $555.670 $1,078.700 $579.840 $750.000 $620.930
RC PIPE (CL III)(12 IN)
LF 6.000 $330.000 $161.650 $517.500 $52.780 $80.000 $202.620
RC PIPE (CL III)(18 IN)
LF 135.000 $65.000 $83.570 $167.600 $46.370 $84.000 $225.780
RC PIPE (CL III)(24 IN)
LF 10,487.000 $60.000 $92.450 $123.200 $66.950 $90.000 $120.630
RC PIPE (CL III)(30 IN)
LF 341.000 $70.000 $80.430 $132.650 $77.010 $95.000 $153.020
RC PIPE (CL III)(36 IN)
LF 986.000 $85.000 $99.290 $143.300 $95.390 $100.000 $171.200
INLET (COMPL)(TY AAD)
EA 24.000 $5,900.000 $5,789.380 $3,612.000 $4,135.290 $4,000.000 $4,425.170
INLET (COMPL)(TY AD)
EA 100.000 $3,165.000 $4,410.570 $2,780.000 $3,365.720 $3,000.000 $3,526.720
INLET (COMPL)(TY AZ)
EA 4.000 $3,500.000 $4,366.870 $4,008.000 $3,831.860 $3,500.000 $4,070.690
INLET (COMPL)(TY AZR)
EA 13.000 $3,700.000 $5,819.380 $4,978.000 $3,976.980 $6,000.000 $5,101.400
INLET (COMPL)(TY AZR2G)
EA 28.000 $5,200.000 $6,655.820 $6,263.000 $4,874.090 $7,000.000 $5,161.510
MANH (COMPL)(TY A)
EA 22.000 $3,500.000 $3,255.760 $3,074.000 $3,493.250 $3,700.000 $3,675.570
INLET (COMPL)(CURB)(TY C)
EA 42.000 $3,250.000 $4,692.970 $3,863.000 $3,933.010 $3,900.000 $4,189.010
INLET (COMPL)(CURB)(TY C1)
EA 64.000 $3,500.000 $4,615.040 $3,772.000 $3,849.450 $3,900.000 $4,189.000
INLET (COMPL)(TY AZ2G)
EA 7.000 $5,500.000 $6,636.840 $5,914.000 $5,194.900 $5,800.000 $5,652.040
INLET (COMPL)(TY A)(SPL)
EA 8.000 $2,700.000 $3,087.650 $2,723.000 $3,312.940 $3,000.000 $3,465.250
JCT BOX (COMPL)(SPL)
EA 6.000 $40,000.000 $7,714.830 $7,749.000 $8,428.490 $9,500.000 $20,112.180
INLET (COMPL)(TY C1)(STAGE II)
EA 106.000 $3,500.000 $4,808.070 $2,546.000 $5,364.790 $4,100.000 $2,771.930
INLET (COMPL)(EXT TY C)
EA 46.000 $1,020.000 $2,737.230 $656.000 $1,836.010 $930.000 $1,183.500
MANH (COMPL)(TY M)
EA 10.000 $1,000.000 $4,145.180 $3,213.000 $8,194.260 $3,300.000 $4,445.140
INLET (COMPL) (EXT) (TY CI)
EA 57.000 $1,000.000 $3,083.030 $656.000 $1,836.410 $930.000 $1,183.500
INLET (COMPL)(TY C1)(MOD)
EA 8.000 $1,000.000 $5,157.790 $4,000.000 $4,060.530 $4,100.000 $4,338.020
HEADWALL (CH - FW - 0) (DIA= 18 IN)
EA 3.000 $4,500.000 $4,376.170 $2,500.000 $6,649.050 $1,500.000 $3,870.870
HEADWALL (CH - FW - 0) (DIA= 24 IN)
EA 7.000 $5,000.000 $4,667.910 $2,700.000 $7,752.390 $1,900.000 $3,870.860
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 1.000 $5,000.000 $5,543.150 $2,700.000 $7,754.530 $4,000.000 $3,870.880
WINGWALL (FW - 0) (HW=3 FT)
EA 4.000 $5,000.000 $3,598.180 $24,045.000 $8,743.780 $3,000.000 $18,751.980
WINGWALL (FW - 0) (HW=4 FT)
EA 1.000 $5,000.000 $5,932.140 $27,050.000 $8,743.770 $6,000.000 $19,595.880
WINGWALL (FW - 0) (HW=6 FT)
EA 3.000 $14,140.000 $8,557.840 $43,100.000 $12,040.670 $10,000.000 $24,251.610
WINGWALL (PW - 1) (HW=10 FT)
EA 1.000 $24,000.000 $28,201.980 $36,700.000 $12,041.220 $34,000.000 $25,503.120
WINGWALL (PW - 1) (HW=4 FT)
EA 1.000 $14,000.000 $11,718.410 $30,250.000 $12,041.220 $9,000.000 $15,170.090
WINGWALL (PW - 1) (HW=6 FT)
EA 1.000 $17,000.000 $12,156.030 $41,500.000 $12,041.220 $11,000.000 $15,170.090
SET (TY I) (24 IN) (4: 1) (C)
EA 1.000 $6,000.000 $1,944.960 $855.000 $1,257.020 $1,700.000 $1,417.250
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(C)
EA 2.000 $5,700.000 $5,932.140 $4,781.000 $11,202.210 $3,600.000 $5,759.490
SET (TY I)(S=3 FT)(HW= 4 FT)(6:1)(C)
EA 1.000 $7,000.000 $6,904.620 $3,083.000 $14,529.850 $3,800.000 $6,385.570
SET (TY I)(S= 5 FT)(HW= 4 FT)(6:1) (P)
EA 1.000 $7,250.000 $7,293.620 $9,042.000 $16,742.900 $6,100.000 $7,637.750
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 3.000 $800.000 $680.740 $464.000 $1,159.380 $685.000 $1,092.780
SET (TY II) (18 IN) (RCP) (6: 1) (C)
EA 1.000 $1,000.000 $1,118.350 $707.000 $1,305.370 $845.000 $1,263.240
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 2.000 $1,000.000 $972.480 $720.000 $1,326.490 $870.000 $1,287.880
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 1.000 $1,000.000 $1,264.230 $855.000 $1,437.300 $1,000.000 $1,417.250
SET (TY II) (24 IN) (RCP) (4: 1) (P)
EA 12.000 $1,300.000 $1,361.480 $855.000 $1,437.300 $1,000.000 $1,417.250
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 2.000 $1,520.000 $1,361.480 $1,184.000 $1,605.300 $1,200.000 $1,613.370
SET (TY II) (36 IN) (RCP) (6: 1) (C)
EA 4.000 $3,000.000 $3,355.060 $3,807.000 $3,656.330 $3,600.000 $4,007.830
GRATE AND FRAME (BRIDGE DRAIN)
EA 92.000 $3,750.000 $1,011.040 $4,000.000 $1,457.770 $1,200.000 $1,687.930
ADJUSTING INLET (CAP)
EA 6.000 $1,500.000 $998.780 $1,454.000 $3,848.360 $1,250.000 $1,241.280
PIPE (PVC) (SCH 40) (8 IN)
LF 6,543.000 $60.000 $41.690 $48.980 $31.750 $60.000 $77.890
REMOV STR (INLET)
EA 176.000 $650.000 $500.000 $227.000 $669.210 $600.000 $637.910
REMOV STR (MANHOLE)
EA 54.000 $680.000 $500.000 $247.000 $669.200 $700.000 $962.180
REMOV STR (SET)
EA 122.000 $700.000 $500.000 $105.000 $658.670 $350.000 $556.840
REMOV STR (HEADWALL)
EA 1.000 $1,250.000 $2,000.000 $3,700.000 $1,689.420 $1,200.000 $2,823.040
REMOV STR (PIPE)
LF 19,211.000 $17.000 $15.000 $27.700 $19.820 $15.000 $19.730
REMOV STR (BOX CULVERT)
LF 627.000 $40.000 $20.000 $57.100 $50.960 $45.000 $55.320
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 3.000 $100,000.000 $30,000.000 $30,000.000 $63,227.500 $300,000.000 $57,972.180
REMOV STR (RR TRACK)
LF 14,879.000 $40.000 $21.000 $5.000 $22.000 $30.000 $27.160
MOBILIZATION
LS 1.000 $18,000,000.000 $20,000,000.000 $24,039,440.000 $13,500,000.000 $23,000,000.000 $25,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 60.000 $20,000.000 $35,000.000 $15,000.000 $19,585.480 $10,000.000 $22,190.770
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 320.000 $30.000 $34.640 $35.000 $38.300 $45.000 $34.640
CONSTRUCTION EXITS (INSTALL) (TY 2)
SY 2,333.000 $22.000 $79.590 $30.000 $88.010 $60.000 $79.590
CONSTRUCTION EXITS (REMOVE)
SY 2,653.000 $8.000 $12.470 $8.000 $12.540 $5.000 $12.470
TEMP SEDMT CONT FENCE (INSTALL)
LF 44,809.000 $2.500 $2.460 $2.500 $2.720 $3.250 $2.460
TEMP SEDMT CONT FENCE (REMOVE)
LF 44,809.000 $0.750 $0.660 $1.000 $0.730 $0.500 $0.660
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 11,647.000 $4.500 $2.170 $5.000 $2.400 $3.000 $2.170
BIODEG EROSN CONT LOGS (REMOVE)
LF 11,647.000 $1.000 $0.460 $1.000 $0.480 $0.500 $0.460
CONSTRUCTING DETOURS
SY 882.000 $55.000 $68.290 $80.000 $76.090 $75.000 $112.460
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 15,410.000 $30.000 $8.560 $5.000 $48.300 $85.000 $88.220
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 24,870.000 $25.000 $8.980 $3.000 $56.590 $85.000 $85.710
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 740.000 $25.000 $16.180 $3.000 $54.610 $85.000 $85.710
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
LF 1,609.000 $5.000 $6.030 $3.000 $12.030 $12.000 $9.070
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
LF 200.000 $8.000 $13.010 $3.000 $12.030 $12.000 $9.130
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 9,780.000 $3.500 $2.220 $4.000 $3.580 $6.000 $9.580
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 24,208.000 $4.000 $3.550 $4.000 $3.160 $6.000 $9.430
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 1,380.000 $6.000 $9.980 $4.000 $3.160 $6.000 $9.430
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 15,410.000 $4.000 $5.360 $4.000 $4.760 $7.000 $10.200
PORT CTB (STKPL)(LOW PROF)(TY 1)
LF 26,479.000 $4.000 $4.950 $4.000 $4.350 $7.000 $8.840
PORT CTB (STKPL)(LOW PROF)(TY 2)
LF 940.000 $5.000 $11.920 $4.000 $4.360 $7.000 $8.910
PORT CTB CONNECT HARDWARE
EA 150.000 $50.000 $32.480 $100.000 $57.520 $65.000 $100.170
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 17,188.800 $40.000 $73.940 $35.000 $51.540 $65.000 $51.860
PERM CTB (SGL SLOPE) (TY 2) (42 )
LF 6,139.000 $50.000 $58.920 $35.000 $48.260 $68.000 $51.860
LANDSCAPE PAVERS
SY 14,694.000 $40.000 $45.600 $60.000 $41.130 $55.000 $88.000
CONC CURB (MONO) (TY II)
LF 65,146.000 $4.000 $7.670 $5.000 $6.700 $3.750 $2.980
CONC CURB (U-TURN)
LF 1,259.000 $35.000 $36.730 $40.000 $18.480 $40.000 $39.500
DRIVEWAYS (CONC)
SY 4,683.000 $65.000 $68.120 $65.000 $87.580 $75.000 $73.820
CONC SIDEWALKS (4")
SY 17,823.000 $45.000 $39.240 $55.000 $60.150 $60.000 $37.100
CURB RAMPS (TY 1)
EA 13.000 $1,700.000 $1,250.000 $1,700.000 $2,039.480 $2,000.000 $1,767.600
CURB RAMPS (TY 5)
EA 7.000 $2,000.000 $1,250.000 $2,200.000 $3,407.790 $2,800.000 $1,924.120
CURB RAMPS (TY 7)
EA 61.000 $1,200.000 $1,250.000 $1,200.000 $2,249.400 $2,000.000 $1,767.600
CURB RAMPS (TY 10)
EA 6.000 $2,100.000 $1,250.000 $1,500.000 $2,493.550 $2,000.000 $1,767.600
CURB RAMPS (TY 21)
EA 5.000 $2,000.000 $2,300.000 $2,600.000 $3,015.680 $2,000.000 $1,798.900
CURB RAMPS (TY 22)
EA 1.000 $3,500.000 $2,300.000 $3,100.000 $4,172.300 $2,600.000 $3,663.870
CONC MEDIAN
SY 885.000 $50.000 $61.900 $75.000 $78.110 $55.000 $80.560
MTL W-BEAM GD FEN (TIM POST)
LF 1,668.000 $20.000 $21.000 $18.500 $23.600 $19.780 $18.560
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 7.000 $1,600.000 $1,515.000 $2,004.000 $1,608.870 $1,693.750 $1,588.960
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $1,150.000 $950.000 $1,100.000 $1,072.580 $1,176.210 $1,103.450
REMOVE METAL BEAM GUARD FENCE
LF 1,878.000 $3.000 $2.000 $5.500 $4.290 $3.210 $3.010
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $2,250.000 $2,630.000 $2,795.000 $2,145.160 $2,988.650 $2,803.760
GDRAIL END TRT(INST)(WOOD POST)(TY III)
EA 2.000 $3,200.000 $2,600.000 $2,795.000 $2,574.200 $2,988.660 $2,803.760
CRASH CUSH ATTEN (INSTL)
EA 4.000 $20,000.000 $20,500.000 $19,300.000 $2,681.450 $10,000.000 $10,031.320
CRASH CUSH ATTEN (MOVE & RESET)
EA 6.000 $2,000.000 $2,280.000 $4,500.000 $2,359.680 $2,100.000 $4,514.100
CRASH CUSH ATTEN (STKPL)
EA 4.000 $1,500.000 $1,035.000 $2,000.000 $1,179.840 $500.000 $2,006.270
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $950.000 $1,035.000 $2,000.000 $965.320 $500.000 $2,006.260
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 11.000 $19,350.000 $20,500.000 $19,300.000 $19,306.450 $22,000.000 $19,360.450
MAILBOX INSTALL-S (TWG-POST) TY 1
EA 4.000 $100.000 $165.000 $400.000 $214.520 $185.000 $401.250
REMOVE RD IL ASM (BRIDGE MOUNT)
EA 29.000 $550.000 $500.000 $500.000 $655.110 $538.060 $285.000
REMOVE RD IL ASM (SHOE-BASE)
EA 5.000 $750.000 $500.000 $1,000.000 $720.170 $538.060 $285.000
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 84.000 $1,060.000 $1,139.000 $1,139.000 $935.180 $1,225.700 $895.000
IN RD IL (TY SA) 40B-10 (250W EQ) LED
EA 123.000 $3,950.000 $2,468.000 $2,468.000 $3,083.330 $2,655.870 $2,490.000
IN RD IL (TY SA) 40T-10 (250W EQ) LED
EA 29.000 $3,900.000 $2,732.000 $2,732.000 $3,666.240 $2,939.960 $3,000.000
IN RD IL (TY SP) 48S-10-10(400W EQ)LED
EA 16.000 $4,200.000 $3,763.000 $3,763.000 $4,500.100 $4,049.450 $3,770.000
IN RD IL (TY SA) 50T-10 (400W EQ) LED
EA 10.000 $3,700.000 $3,322.000 $3,322.000 $4,909.320 $3,574.880 $3,540.000
CONDT (PVC) (SCH 40) (3/4")
LF 814.000 $10.000 $9.100 $9.100 $11.060 $9.790 $5.000
CONDT (PVC) (SCH 40) (2")
LF 1,905.000 $7.000 $7.050 $7.050 $11.430 $7.590 $8.350
CONDT (PVC) (SCH 40) (3") (CONC ENCSE)
LF 18,036.000 $6.500 $7.010 $7.010 $10.410 $7.540 $8.600
CONDT (PVC) (SCH 80) (3/4")
LF 1,168.000 $10.000 $9.970 $9.970 $11.080 $10.730 $5.100
CONDT (PVC) (SCH 80) (2")
LF 109,068.000 $8.000 $6.710 $6.710 $7.600 $7.220 $9.050
CONDT (PVC) (SCH 80) (2") (BORE)
LF 4,398.000 $11.600 $10.880 $10.880 $34.170 $11.710 $12.700
CONDT (PVC) (SCH 80) (3")
LF 1,335.000 $10.400 $10.780 $10.780 $12.820 $11.600 $11.000
CONDT (PVC) (SCH 80) (3") (BORE)
LF 2,975.000 $18.000 $21.990 $21.990 $53.310 $23.660 $17.150
CONDT (PVC) (SCH 80) (4")
LF 570.000 $16.350 $14.940 $14.940 $15.130 $16.080 $13.000
CONDT (PVC) (SCH 80) (4") (BORE)
LF 205.000 $15.200 $18.710 $18.710 $38.150 $20.130 $18.100
CONDT (RM) (3/4")
LF 252.000 $12.000 $12.050 $12.050 $19.690 $12.970 $9.100
CONDT (RM) (2")
LF 1,010.000 $19.000 $18.670 $18.670 $17.320 $20.090 $26.650
CONDT (RM) (3")
LF 25,010.000 $30.000 $35.670 $31.220 $53.490 $38.390 $42.300
ELEC CONDR (NO.14) INSULATED
LF 13,835.000 $0.700 $0.800 $0.800 $0.720 $0.860 $0.620
ELEC CONDR (NO.12) BARE
LF 1,555.000 $0.880 $0.850 $0.850 $0.900 $0.910 $0.850
ELEC CONDR (NO.12) INSULATED
LF 3,110.000 $0.890 $0.950 $0.950 $1.020 $1.020 $0.900
ELEC CONDR (NO.8) BARE
LF 53,260.000 $1.000 $1.000 $1.000 $1.070 $1.080 $1.100
ELEC CONDR (NO.8) INSULATED
LF 106,917.000 $1.250 $1.000 $1.000 $1.180 $1.080 $1.150
ELEC CONDR (NO.6) BARE
LF 8,607.000 $1.150 $1.300 $1.300 $1.270 $1.400 $1.150
ELEC CONDR (NO.6) INSULATED
LF 10,604.000 $1.250 $1.300 $1.300 $1.330 $1.400 $1.300
ELEC CONDR (NO.4) BARE
LF 695.000 $1.500 $1.750 $1.750 $1.660 $1.880 $1.550
ELEC CONDR (NO.4) INSULATED
LF 1,845.000 $1.500 $1.750 $1.750 $1.710 $1.880 $1.700
ELEC CONDR (NO.3) BARE
LF 1,110.000 $1.200 $2.250 $2.250 $2.030 $2.420 $2.050
ELEC CONDR (NO.3) INSULATED
LF 3,085.000 $1.500 $2.250 $2.250 $2.040 $2.420 $2.050
ELEC CONDR (NO.2) BARE
LF 40,800.000 $2.400 $2.650 $2.650 $1.920 $2.850 $1.950
ELEC CONDR (NO.2) INSULATED
LF 163,200.000 $2.600 $2.680 $2.680 $2.100 $2.880 $3.000
TRAY CABLE (3 CONDR) (10 AWG)
LF 770.000 $2.000 $2.850 $2.850 $2.050 $3.070 $1.900
TRAY CABLE (4 CONDR) (12 AWG)
LF 6,305.000 $2.000 $2.250 $2.250 $1.860 $2.420 $2.050
GROUND BOX TY A (122311)
EA 21.000 $750.000 $625.000 $625.000 $461.750 $672.580 $535.000
GROUND BOX TY A (122311)W/APRON
EA 12.000 $700.000 $738.000 $738.000 $845.670 $980.300 $585.000
GROUND BOX TY D (162922)W/APRON
EA 56.000 $760.000 $796.000 $796.000 $862.750 $1,040.870 $640.000
TIMBER POLE (CL 2) 50 FT
EA 1.000 $2,075.000 $2,788.000 $2,788.000 $1,712.990 $3,000.230 $1,220.000
RELOCATE ELECTRICAL SERVICES
EA 1.000 $2,050.000 $2,500.000 $2,800.000 $2,482.640 $3,117.220 $2,070.000
REMOVE ELECTRICAL SERVICES
EA 3.000 $850.000 $500.000 $800.000 $268.350 $538.060 $970.000
ELC SRV TY A 120/240 060(NS)AL(E)PS(U)
EA 2.000 $33,400.000 $4,771.000 $5,271.000 $4,213.280 $5,134.180 $4,235.000
ELC SRV TY A 240/480 060(SS)SS(E)GC(U)
EA 15.000 $6,100.000 $6,249.000 $6,749.000 $5,544.370 $6,724.680 $7,965.000
ELC SRV TY A 240/480 100(SS)SS(E)GC(U)
EA 1.000 $6,000.000 $6,275.000 $6,775.000 $6,462.570 $6,752.660 $8,095.000
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
EA 4.000 $5,500.000 $5,766.000 $6,266.000 $4,326.360 $6,204.920 $3,405.000
ELC SRV TY D 120/240 060(NS)SS(N)TP(O)
EA 1.000 $7,000.000 $6,788.000 $7,288.000 $4,523.540 $7,304.710 $2,440.000
ELC SRV TY D 120/240 070(NS)SS(E)SP(O)
EA 2.000 $4,050.000 $5,705.000 $6,205.000 $3,782.220 $6,139.270 $3,405.000
ELC SRV TY D 120/240 100(NS)SS(N)SP(O)
EA 9.000 $4,840.000 $6,395.000 $6,895.000 $3,794.870 $6,881.800 $2,865.000
ALUMINUM SIGNS (TY G)
SF 180.000 $21.000 $41.000 $21.000 $21.450 $30.800 $28.800
ALUMINUM SIGNS (TY O)
SF 2,322.750 $20.000 $18.250 $18.250 $22.660 $19.510 $25.050
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 124.000 $425.000 $532.000 $560.000 $665.000 $534.640 $500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 22.000 $600.000 $427.000 $445.000 $530.930 $620.190 $580.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 55.000 $550.000 $770.000 $765.000 $963.180 $545.340 $510.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 10.000 $670.000 $1,616.000 $1,450.000 $1,651.770 $545.340 $510.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 12.000 $800.000 $648.000 $745.000 $723.990 $545.340 $510.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 5.000 $850.000 $1,000.000 $900.000 $836.610 $1,390.070 $1,300.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 19.000 $1,500.000 $1,951.500 $1,675.000 $687.520 $1,642.420 $1,539.510
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
EA 2.000 $1,500.000 $1,971.950 $1,675.000 $687.530 $1,908.680 $1,699.550
INSTALL LRSS (STRUCT STEEL)
LB 1,626.000 $5.000 $3.750 $3.740 $7.510 $6.730 $4.320
REMOVE LRSA
EA 3.000 $1,000.000 $847.310 $1,010.000 $722.310 $720.090 $761.250
INS OH SN SUP(25 FT BAL TEE)
EA 2.000 $17,000.000 $23,443.000 $23,443.000 $24,066.580 $25,067.270 $22,850.000
INS OH SN SUP(25 FT CANT)(SPAN ONLY)
EA 1.000 $7,765.000 $10,288.000 $10,288.000 $12,933.160 $11,000.820 $10,160.000
INS OH SN SUP(30 FT CANT)(SPAN ONLY)
EA 3.000 $13,875.000 $12,763.000 $12,763.000 $15,920.190 $13,647.290 $7,035.000
INS OH SN SUP(35 FT CANT)(SPAN ONLY)
EA 1.000 $10,405.000 $14,707.000 $14,707.000 $17,017.620 $15,725.990 $7,810.000
INS OH SN SUP(40 FT CANT)(SPAN ONLY)
EA 2.000 $17,125.000 $18,002.000 $18,002.000 $20,121.670 $19,249.280 $9,330.000
INS OH SN SUP(45 FT BRDG)
EA 3.000 $17,125.000 $29,711.000 $29,711.000 $32,366.460 $31,769.550 $34,705.000
INS OH SN SUP(125 FT BRDG)(SPAN ONLY)
EA 1.000 $71,920.000 $48,574.000 $48,574.000 $56,167.950 $51,939.480 $53,380.000
SIGN WALKWAY (36 IN) WITH HNDRL
LF 50.000 $150.000 $266.000 $266.000 $331.650 $284.430 $270.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 678.000 $17.000 $35.000 $10.000 $4.560 $10.690 $10.030
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 183.000 $17.000 $35.000 $10.000 $4.560 $10.690 $10.030
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 256.000 $65.000 $35.000 $10.000 $4.560 $10.690 $10.030
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 29,903.000 $0.650 $0.420 $0.420 $0.800 $0.800 $0.420
WK ZN PAV MRK REMOV (W)4"(DOT)
LF 1,330.000 $0.600 $0.420 $0.420 $1.610 $1.600 $0.420
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 85,200.000 $0.600 $0.420 $0.420 $0.800 $0.800 $0.420
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 2,915.000 $1.350 $3.000 $3.000 $1.390 $1.390 $3.010
WK ZN PAV MRK REMOV (Y)4"(DOT)
LF 289.000 $1.600 $0.420 $0.420 $1.610 $1.600 $0.420
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 91,296.000 $0.600 $0.420 $0.420 $0.800 $0.800 $0.420
WK ZN PAV MRK REMOV (Y)24"(SLD)
LF 1,303.000 $0.600 $6.000 $6.000 $6.440 $6.420 $6.030
REFL PAV MRK TY II (Y) 12" (SLD)
LF 268.000 $3.000 $8.000 $8.000 $1.070 $1.070 $8.040
PREFAB PAV MRK TY C (W) (ARROW)
EA 45.000 $225.000 $225.000 $225.000 $209.150 $208.510 $226.000
PREFAB PAV MRK TY C (W) (DBL ARROW)
EA 7.000 $450.000 $255.000 $255.000 $375.400 $374.250 $256.130
PREFAB PAV MRK TY C (W) (UTURN ARROW)
EA 4.000 $450.000 $510.000 $510.000 $429.030 $427.720 $512.270
PREFAB PAV MRK TY C (W) (U-LT ARROW)
EA 3.000 $200.000 $1,100.000 $1,100.000 $482.660 $481.180 $1,104.890
PREFAB PAV MRK TY C (W) (WORD)
EA 52.000 $285.000 $285.000 $285.000 $268.150 $267.320 $286.270
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 46.000 $36.000 $45.000 $45.000 $38.610 $38.490 $45.200
REFL PAV MRKR TY I-A
EA 33.000 $36.000 $3.000 $3.000 $7.510 $7.490 $3.010
REFL PAV MRKR TY I-C
EA 301.000 $5.000 $3.000 $3.000 $6.440 $6.420 $3.010
REFL PAV MRKR TY II-A-A
EA 37.000 $6.000 $3.500 $3.500 $7.510 $7.480 $3.520
REFL PAV MRKR TY II-C-R
EA 2,476.000 $5.000 $4.000 $4.000 $4.240 $4.220 $4.020
ELIM EXT PAV MRK & MRKS (4")
LF 289,990.000 $0.500 $0.160 $0.160 $0.320 $0.320 $0.160
ELIM EXT PAV MRK & MRKS (ARROW)
EA 1.000 $28.000 $12.000 $12.000 $37.540 $37.430 $12.050
ELIM EXT PAV MRK & MRKS (WORD)
EA 1.000 $28.000 $12.000 $12.000 $37.540 $37.430 $12.050
PAV SURF PREP FOR MRK (6")
LF 165,163.000 $0.100 $0.040 $0.040 $0.010 $0.010 $0.040
PAV SURF PREP FOR MRK (8")
LF 19,381.000 $0.100 $0.060 $0.060 $0.040 $0.040 $0.060
PAV SURF PREP FOR MRK (12")
LF 10,685.000 $0.300 $0.120 $0.120 $0.090 $0.090 $0.120
PAV SURF PREP FOR MRK (24")
LF 1,594.000 $0.300 $0.200 $0.200 $0.130 $0.130 $0.200
PAV SURF PREP FOR MRK (ARROW)
EA 46.000 $6.000 $10.000 $10.000 $3.220 $3.210 $10.040
PAV SURF PREP FOR MRK (DBL ARROW)
EA 12.000 $12.000 $12.000 $12.000 $5.360 $5.350 $12.050
PAV SURF PREP FOR MRK (UTURN ARR)
EA 4.000 $10.000 $15.000 $15.000 $5.360 $5.350 $15.070
PAV SURF PREP FOR MRK (U/LT ARROW)
EA 3.000 $10.000 $20.000 $20.000 $5.360 $5.350 $20.090
PAV SURF PREP FOR MRK (WORD)
EA 53.000 $10.000 $12.000 $12.000 $5.360 $5.350 $12.050
PAV SURF PREP FOR MRK (36")(YLD TRI)
EA 46.000 $15.000 $2.000 $2.000 $1.070 $1.070 $2.010
INSTALL HWY TRF SIG (SYSTEM)
EA 4.000 $30,320.000 $28,970.000 $28,970.000 $23,830.680 $31,175.240 $38,790.000
REMOVING TRAFFIC SIGNALS
EA 5.000 $3,445.000 $3,500.000 $5,000.000 $2,437.030 $3,766.430 $4,125.000
TEMP TRAF SIGNALS
EA 5.000 $39,000.000 $67,395.000 $67,395.000 $37,957.910 $72,525.210 $69,440.000
VEH SIG SEC (12")LED(GRN)
EA 78.000 $195.000 $235.000 $235.000 $155.840 $252.890 $177.000
VEH SIG SEC (12")LED(GRN ARW)
EA 10.000 $200.000 $235.000 $235.000 $155.840 $252.890 $177.000
VEH SIG SEC (12")LED(YEL)
EA 78.000 $195.000 $235.000 $235.000 $155.840 $252.890 $177.000
VEH SIG SEC (12")LED(YEL ARW)
EA 11.000 $200.000 $235.000 $235.000 $155.840 $252.890 $177.000
VEH SIG SEC (12")LED(RED)
EA 78.000 $195.000 $235.000 $235.000 $155.840 $252.890 $177.000
VEH SIG SEC (12")LED(RED ARW)
EA 22.000 $195.000 $235.000 $235.000 $155.840 $252.890 $177.000
PED SIG SEC (LED)(2 INDICATIONS)
EA 51.000 $300.000 $601.000 $601.000 $314.020 $646.750 $222.000
PED SIG SEC (LED)(COUNTDOWN)
EA 51.000 $450.000 $601.000 $601.000 $298.830 $646.750 $202.000
BACK PLATE (12")(3 SEC)
EA 80.000 $100.000 $75.000 $75.000 $101.270 $80.710 $115.000
BACK PLATE (12")(4 SEC)
EA 11.000 $110.000 $85.000 $85.000 $113.930 $91.470 $125.000
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
LF 10,685.000 $1.250 $1.350 $1.350 $1.160 $1.450 $1.100
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
LF 11,025.000 $1.500 $1.850 $1.850 $1.520 $1.990 $1.500
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
LF 10,670.000 $2.000 $2.050 $2.050 $1.940 $2.210 $2.000
INS TRF SIG PL AM(S)1 ARM(32')
EA 1.000 $4,990.000 $6,881.000 $6,881.000 $6,449.200 $7,404.800 $8,805.000
INS TRF SIG PL AM(S)1 ARM(32')LUM
EA 3.000 $6,725.000 $8,504.000 $8,504.000 $8,059.200 $9,151.340 $10,063.000
INS TRF SIG PL AM(S)1 ARM(36')LUM
EA 2.000 $6,500.000 $8,977.000 $8,977.000 $10,033.300 $9,660.350 $10,620.000
INS TRF SIG PL AM(S)1 ARM(40')
EA 1.000 $6,250.000 $8,084.000 $8,084.000 $8,322.070 $8,699.370 $10,225.000
INS TRF SIG PL AM(S)1 ARM(40')LUM
EA 3.000 $7,345.000 $9,835.000 $9,835.000 $10,458.500 $10,583.650 $11,400.000
INS TRF SIG PL AM(S)1 ARM(44')
EA 3.000 $6,765.000 $8,541.000 $8,541.000 $8,533.740 $9,191.150 $10,552.000
INS TRF SIG PL AM(S)1 ARM(44')LUM
EA 1.000 $8,510.000 $10,283.000 $10,283.000 $10,526.820 $11,065.760 $11,915.000
INS TRF SIG PL AM(S)1 ARM(50')LUM
EA 4.000 $15,060.000 $21,139.000 $21,139.000 $25,067.160 $22,748.130 $23,112.000
INS TRF SIG PL AM(S)1 ARM(55')LUM
EA 2.000 $15,225.000 $21,740.000 $21,740.000 $26,426.600 $23,394.880 $24,022.000
INS TRF SIG PL AM(S)1 ARM(60')LUM
EA 1.000 $14,250.000 $22,169.000 $22,169.000 $26,584.780 $23,856.530 $24,515.000
INS TRF SIG PL AM(S)2 ARM(50-32')LUM
EA 2.000 $18,800.000 $26,003.000 $26,003.000 $28,677.560 $27,982.390 $27,790.000
INS TRF SIG PL AM(S)2 ARM(50 - 40')LUM
EA 1.000 $19,385.000 $26,580.000 $26,580.000 $28,574.420 $28,603.310 $28,455.000
INS TRF SIG PL AM(S)2 ARM(50-44')LUM
EA 1.000 $15,700.000 $26,476.000 $26,476.000 $28,713.610 $28,491.400 $27,915.000
PED POLE ASSEMBLY
EA 38.000 $1,490.000 $1,750.000 $1,750.000 $2,398.290 $1,883.210 $1,500.000
PED DETECT PUSH BUTTON (APS)
EA 50.000 $690.000 $725.000 $725.000 $743.550 $780.190 $645.000
PED DETECTOR CONTROLLER UNIT
EA 5.000 $3,280.000 $2,789.000 $2,789.000 $3,094.050 $3,001.300 $4,050.000
REMOVAL OF GROUND BOXES
EA 10.000 $320.000 $100.000 $100.000 $207.270 $107.610 $238.000
FULL - WIDTH MOWING
CYC 40.000 $1,700.000 $1,990.400 $2,200.000 $2,359.680 $2,050.070 $1,184.210
LITTER REMOVAL
CYC 60.000 $1,400.000 $744.840 $2,000.000 $4,290.320 $810.230 $689.470
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
CYC 60.000 $850.000 $914.750 $2,000.000 $3,968.550 $2,078.300 $500.000
CLEANING / SWEEPING (FRONTAGE ROAD)
CYC 60.000 $800.000 $914.750 $2,000.000 $4,290.320 $2,078.300 $500.000
CLEANING / SWEEPING(ENTRANCE/EXIT RAMP)
CYC 60.000 $1,000.000 $914.750 $1,200.000 $3,968.550 $519.570 $500.000
LOOSE AGGR FOR GROUNDCOVER (TYPE I)
CY 1,086.000 $100.000 $500.000 $115.000 $160.890 $99.590 $300.000
LOOSE AGGR FOR GROUNDCOVER (TYPE II)
CY 1,060.000 $100.000 $500.000 $140.000 $107.260 $142.740 $126.000
LANDSCAPE SOIL AMENDMENT (TYPE I)
SY 80,095.000 $0.500 $10.000 $0.300 $1.070 $0.300 $0.320
LANDSCAPE SOIL AMENDMENT (TYPE II)
SY 80,095.000 $0.500 $10.000 $0.300 $1.070 $0.300 $0.300
LANDSCAPE SOIL AMENDMENT (TYPE V)
SY 80,095.000 $0.650 $2.000 $2.400 $1.080 $0.590 $1.000
WIDE FLANGE PAVEMENT TERMINALS
LF 995.000 $200.000 $398.320 $200.000 $663.090 $526.810 $479.760
TRENCH DRAIN
LF 1,657.000 $200.000 $200.360 $347.000 $268.150 $332.210 $318.280
ELECTRIC ISOLATED POST-TENSION TENDON
EA 2.000 $1,000.000 $32,332.620 $2,000.000 $1,882.550 $1,962.140 $50,000.000
FENDER SYSTEM
LS 1.000 $1,500,000.000 $3,790,930.000 $1,500,000.000 $3,688,497.890 $3,375,895.620 $4,374,681.100
FIXED DECORATIVE BOLLARDS
EA 56.000 $2,000.000 $2,135.090 $7,000.000 $1,608.870 $1,725.160 $2,765.550
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 1,320.000 $12.000 $31.880 $10.000 $91.590 $54.300 $23.720
VIVDS TEMPORARY
EA 5.000 $12,885.000 $14,992.000 $14,992.000 $16,777.220 $16,133.210 $17,420.000
FIBER OPTIC CBL (SNGLE-MODE)(6 FIBER)
LF 26,240.000 $1.500 $2.050 $2.050 $3.690 $2.210 $2.250
FIBER OPTIC CBL (SNGLE-MODE)(12 FIBER)
LF 3,400.000 $3.900 $2.230 $2.230 $2.160 $2.400 $5.200
FIBER OPTIC CBL (SNGLE-MODE)(24 FIBER)
LF 180.000 $5.000 $2.580 $2.580 $0.800 $2.780 $5.700
FIBER OPTIC CBL (SNGLE-MODE)(36 FIBER)
LF 515.000 $3.000 $3.110 $3.110 $3.670 $3.350 $4.000
FIBER OPTIC CBL (SNGLE-MODE)(144 FIBER)
LF 19,753.000 $4.500 $5.150 $5.150 $5.050 $5.540 $3.350
FIBER OPTIC SPLICE ENCLOSURE
EA 1.000 $2,500.000 $1,498.000 $1,498.000 $1,002.940 $1,612.030 $1,515.000
FIBER OPTIC PATCH PANEL (144 POSITION)
EA 4.000 $11,750.000 $2,108.000 $2,108.000 $1,245.520 $2,268.460 $5,775.000
FIBER OPTIC FUSION SPLICE
EA 428.000 $25.000 $69.810 $69.810 $33.100 $75.120 $12.700
CCTV FIELD EQUIPMENT (ANALOG)
EA 5.000 $9,795.000 $10,212.000 $10,212.000 $45,077.030 $10,989.350 $14,550.000
ITS MULTI-DUCT CND (PVC-40)(CONC ENCSE)
LF 17,686.000 $12.500 $11.090 $11.090 $14.430 $11.930 $11.300
ITS MULTI-DUCT CND (PVC-80)(BORE)
LF 1,820.000 $3.000 $31.050 $31.050 $25.880 $33.410 $22.400
ITS MULTI-DUCT CND (RMC)
LF 25,690.000 $55.000 $63.980 $60.880 $83.850 $68.850 $70.800
COMMUNICATION HUB BUILDING
EA 3.000 $15,000.000 $25,325.000 $25,325.000 $26,883.840 $28,061.680 $28,490.000
RADAR PRESENCE DETECTOR
EA 24.000 $6,650.000 $5,974.000 $5,974.000 $6,602.120 $6,428.750 $6,508.000
RADAR PRESENCE DETECTOR COMM CABLE
LF 3,000.000 $3.000 $4.250 $4.250 $2.860 $4.570 $2.950
CONDUIT (PREPARE)
LF 465.000 $1.200 $0.750 $0.750 $1.170 $0.810 $1.800
INSTALL DMS (FOUNDATION MTD CABINET)
EA 2.000 $17,315.000 $15,855.000 $15,855.000 $8,043.250 $17,061.910 $8,620.000
RADAR VEHICLE SENSING DEVICE
EA 2.000 $9,050.000 $8,249.000 $8,249.000 $9,014.190 $8,876.930 $10,012.000
CTMS RELOCATION (HUB BLDG)
EA 1.000 $13,145.000 $7,552.000 $7,552.000 $11,945.040 $8,126.870 $16,170.000
CTMS RELOCATION (ELEC CONDUCTOR CABLE)
LF 945.000 $1.000 $2.000 $2.000 $2.470 $2.150 $2.800
CTMS RELOCATION (FIBER OPTIC CABLE)
LF 1,855.000 $3.500 $6.190 $6.190 $11.690 $6.660 $1.250
CTMS RELOCATION (MVD)
EA 1.000 $7,500.000 $2,500.000 $2,500.000 $1,124.540 $2,690.300 $3,570.000
FIBER OPTIC VIDEO DATA TRANSMITTER
EA 5.000 $1,425.000 $1,750.000 $1,750.000 $1,328.140 $1,883.210 $1,565.000
FIBER OPTIC VIDEO DATA RECEIVER
EA 5.000 $1,425.000 $1,750.000 $1,750.000 $1,328.140 $1,883.210 $1,565.000
MULTIPOLYMER PAV MRK (W)(6")(SLD)
LF 60,401.000 $0.700 $0.480 $0.480 $0.700 $0.700 $0.480
MULTIPOLYMER PAV MRK (W)(6")(BRK)
LF 29,071.000 $0.700 $0.480 $0.480 $0.700 $0.700 $0.480
MULTIPOLYMER PAV MRK (W)(6")(DOT)
LF 761.000 $2.000 $0.480 $0.480 $1.340 $1.340 $0.480
MULTIPOLYMER PAV MRK (W)(8")(SLD)
LF 18,699.000 $2.500 $0.650 $0.650 $1.290 $1.070 $0.650
MULTIPOLYMER PAV MRK (W)(12")(SLD)
LF 9,496.000 $2.500 $1.500 $1.500 $2.680 $2.670 $1.510
MULTIPOLYMER PAV MRK (W)(12")(LNDP)
LF 1,189.000 $2.500 $2.000 $2.000 $2.680 $2.670 $2.010
MULTIPOLYMER PAV MRK (W)(24")(SLD)
LF 1,593.000 $6.000 $8.000 $8.000 $5.360 $5.350 $8.040
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
LF 61,115.000 $0.700 $0.480 $0.480 $0.700 $0.700 $0.480
MULTIPOLYMER PAV MRK (Y)(8")(SLD)
LF 682.000 $1.200 $0.650 $0.650 $1.290 $1.280 $0.650
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
LF 29,051.000 $0.700 $0.500 $0.500 $0.800 $0.800 $0.500
RADAR ADVANCED DETECTION DEVICE
EA 14.000 $7,100.000 $6,460.000 $6,460.000 $8,362.270 $6,951.750 $7,270.000
BBU SYSTEM (EXTERNAL BATT CABINET)
EA 6.000 $6,735.000 $6,439.000 $6,439.000 $6,519.260 $6,929.150 $8,635.000
GPS COMMUNICATIONS UNIT
EA 7.000 $770.000 $950.000 $950.000 $560.780 $1,022.320 $980.000
ITS RADIO (DUAL)(5 GHZ/5 GHZ)-I-U
EA 4.000 $2,545.000 $3,644.000 $3,644.000 $4,335.000 $3,921.390 $4,360.000
ITS POLE (30 FT)(110 MPH)
EA 2.000 $1.000 $6,342.000 $6,342.000 $8,340.830 $6,824.770 $6,873.000
ITS POLE (55 FT)(110 MPH)
EA 3.000 $14,000.000 $17,263.000 $17,263.000 $14,122.660 $18,577.090 $17,410.000
ITS POLE MNT CAB (TY 2)(CONF 1)
EA 3.000 $6,000.000 $2,758.000 $2,758.000 $6,333.200 $2,967.940 $9,145.000
ITS POLE MNT CAB (TY 3)(CONF 1)
EA 1.000 $5,725.000 $3,245.000 $3,245.000 $7,716.450 $3,492.010 $9,385.000
TMA (STATIONARY)
DAY 1,470.000 $200.000 $366.130 $100.000 $262.570 $36.760 $81.390
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
EA 33.000 $2,510.000 $2,900.000 $2,900.000 $3,041.100 $3,120.750 $3,255.000
INSTALL LED NAVIGATIONAL LIGHTS SYS
EA 1.000 $25,000.000 $255,143.000 $255,143.000 $42,266.310 $274,564.880 $114,120.000
REMOVE LED NAVIGATIONAL LIGHT SYS
EA 1.000 $2,000.000 $3,500.000 $3,500.000 $9,002.170 $3,766.430 $9,405.000
DECORATIVE MEDALLION W/ LED BACKLIGHT
EA 56.000 $750.000 $1,226.000 $5,176.000 $5,684.680 $1,803.580 $1,315.000
SANITARY SEWER (12IN) (PVC) (C900)
LF 3,558.000 $235.000 $173.000 $258.000 $107.260 $80.200 $86.550
SANITARY SEWER (18 IN) (PVC) (C900)
LF 233.000 $322.000 $223.000 $301.000 $134.070 $213.860 $124.790
MANHOLE (SAN SEWER) ( 4' DIA)
EA 8.000 $5,425.000 $13,400.000 $3,850.000 $5,362.900 $5,346.430 $5,364.520
MANHOLES (SANITARY SEWER) DROP (4' DIA)
EA 3.000 $6,150.000 $16,200.000 $2,600.000 $8,044.360 $6,415.710 $5,939.050
JCK BOR OR TUN CSNG(STL)(SAN SWR)(22IN)
LF 572.000 $725.000 $390.000 $575.000 $712.190 $240.590 $436.650
JCK BOR OR TUN CSNG(STL)(SAN SWR)(28IN)
LF 186.000 $900.000 $563.000 $1,225.000 $993.210 $267.320 $608.790
ABANDON SANITARY SEWER (10IN)
EA 2.000 $30,000.000 $11,500.000 $15,000.000 $5,362.910 $5,346.430 $1,045.130
ABANDON SANITARY SEWER (12IN)
EA 2.000 $40,000.000 $14,500.000 $15,000.000 $10,725.810 $5,346.430 $1,045.130
ABANDON SANITARY SEWER (LIFT STATION)
EA 1.000 $1,515.000 $14,600.000 $12,000.000 $10,725.810 $53,464.290 $3,873.010
AUTOMATIC AIR RELEASE VALVE W / CONC MH
EA 2.000 $8,075.000 $11,300.000 $10,000.000 $9,116.940 $16,039.290 $10,108.260
FM CONNECTION (FORCE MAIN)
EA 5.000 $3,200.000 $7,400.000 $3,800.000 $2,681.450 $2,138.570 $1,842.680
CONNECTION TO EXIST MANHOLE (SAN SWR)
EA 2.000 $2,400.000 $6,100.000 $4,550.000 $2,681.450 $2,138.570 $3,501.730
TIE EXIST SANITARY SEWER TO PROP MH
EA 4.000 $3,700.000 $5,000.000 $4,550.000 $1,287.100 $2,138.570 $1,697.100
SAN SEWER (FM)(PVC)(C900)(6 IN)(RJ)
LF 283.000 $87.000 $76.000 $55.000 $107.260 $95.170 $61.750
SAN SEWER (FM)(PVC)(C900)(10 IN)(RJ)
LF 3,957.000 $96.000 $97.000 $64.000 $128.710 $76.990 $78.440
SAN SEWER (FM)(PVC)(C900)(16 IN)(RJ)
LF 321.000 $121.000 $211.000 $250.000 $214.520 $229.900 $156.690
BY-PASS PUMPING (SANITARY SEWER)
LS 1.000 $199,500.000 $51,500.000 $50,000.000 $107,258.070 $53,464.290 $119,691.950
WATER MAIN PIPE (PVC) (6IN) (C-900)
LF 60.000 $78.000 $106.000 $105.000 $85.810 $53.460 $88.110
WATER MAIN PIPE (PVC) (8IN) (C-900)
LF 1,485.000 $92.000 $78.000 $47.000 $117.980 $48.120 $73.250
WATER MAIN PIPE (PVC) (10IN) (C-900)
LF 40.000 $97.000 $159.000 $115.000 $134.070 $213.860 $145.080
WATER MAIN PIPE (PVC) (12IN) (C-900)
LF 8,626.000 $110.000 $108.000 $82.000 $160.890 $64.160 $62.820
WTR MAIN PIPE (PVC)(RESTRAINED JT) 12IN
LF 754.000 $141.000 $118.000 $87.000 $128.710 $122.970 $77.440
JCK TUN BOR OR AUG CSG (STL) (22IN)
LF 725.000 $725.000 $306.000 $520.000 $686.450 $144.350 $461.840
FIRE HYDRANT ASSEMBLY
EA 35.000 $2,500.000 $5,600.000 $4,975.000 $4,826.610 $5,346.430 $2,853.190
REMOVING AND SALVAGING FIRE HYDRANT
EA 7.000 $503.000 $500.000 $625.000 $1,340.730 $534.640 $1,501.730
CUT AND PLUG WATER MAIN (6IN)
EA 2.000 $1,700.000 $600.000 $585.000 $1,072.580 $2,138.570 $574.370
CUT AND PLUG WATER MAIN (8IN)
EA 2.000 $1,900.000 $700.000 $675.000 $1,608.870 $2,138.570 $623.500
CUT AND PLUG WATER MAIN (10IN)
EA 1.000 $2,200.000 $900.000 $880.000 $2,145.160 $2,673.210 $1,680.070
CUT AND PLUG WATER MAIN (12IN)
EA 7.000 $3,500.000 $1,300.000 $950.000 $2,681.450 $2,673.210 $1,717.350
WET CONNECTION (2IN)
EA 1.000 $1,600.000 $700.000 $650.000 $1,072.580 $1,069.290 $2,625.890
WET CONNECTION (6IN)
EA 3.000 $2,000.000 $1,300.000 $750.000 $2,145.160 $2,138.570 $2,625.890
WET CONNECTION (8IN)
EA 2.000 $2,200.000 $1,800.000 $1,250.000 $2,359.680 $2,673.220 $2,799.550
WET CONNECTION (10IN)
EA 1.000 $2,500.000 $2,400.000 $1,250.000 $2,681.450 $2,994.000 $2,799.540
WET CONNECTION (12IN)
EA 8.000 $3,500.000 $3,000.000 $1,550.000 $3,754.030 $3,742.500 $2,926.630
Totals: $191,581,736.100 $201,835,272.661 $218,886,537.618 $222,648,088.690 $239,779,521.220 $251,404,776.881