0937-01-027
|
HOUSTON
|
LUFKIN
|
$5,065,573
|
FM 227
|
STP 2026(660)HES
|
06/03/2026
|
04/01/2026
|
HAZARD ELIM & SAFETY
|
PINTO CONSTRUCTION CO., INC.
($4,462,648)
|
|
|
6500-38-001
|
RUSK
|
TYLER
|
$3,970,362
|
US0079
|
RMC - A00220774
|
06/03/2026
|
04/22/2026
|
MILL AND INLAY
|
EAST TEXAS BRIDGE, INC.
($4,217,863)
|
|
|
6500-39-001
|
HENDERSON
|
TYLER
|
$1,086,902
|
SH0031
|
RMC - A00220775
|
06/02/2026
|
04/22/2026
|
MILL AND INLAY
|
BIG CREEK CONSTRUCTION, LTD.
($977,218)
|
|
|
6500-40-001
|
SMITH
|
TYLER
|
$5,179,659
|
SH0110
|
RMC - A00220776
|
06/02/2026
|
04/22/2026
|
MILL AND INLAY
|
TEXAS MATERIALS GROUP, INC.
($5,091,894)
|
|
|
6500-41-001
|
GREGG
|
TYLER
|
$3,489,919
|
IH0020
|
RMC - A00220777
|
06/02/2026
|
04/27/2026
|
MILL AND INLAY
|
DREWERY CONSTRUCTION COMPANY, INCORPORATED
($2,670,044)
|
|
|
0138-06-049
|
NACOGDOCHES
|
LUFKIN
|
$3,029,651
|
US 259
|
F 2026(530)
|
05/07/2026
|
03/02/2026
|
RESURF ROADWAY
|
MADDEN CONTRACTING COMPANY, LLC.
($2,886,840)
|
|
|
0176-01-116
|
NACOGDOCHES
|
LUFKIN
|
$6,169,821
|
US 59
|
STP 2026(529)HES
|
05/07/2026
|
03/02/2026
|
HAZARD ELIM & SAFETY
|
TEXAS MATERIALS GROUP, INC.
($5,689,159)
|
|
|
2116-01-024
|
NACOGDOCHES
|
LUFKIN
|
$5,568,463
|
FM 2259
|
STP 2026(611)HES
|
05/06/2026
|
03/02/2026
|
HAZARD ELIM & SAFETY
|
DREWERY CONSTRUCTION COMPANY, INCORPORATED
($5,074,604)
|
|
|
0341-04-074
|
TYLER
|
BEAUMONT
|
$20,662,478
|
US 287
|
F 2026(497)
|
04/08/2026
|
02/02/2026
|
SURF/ROADWAY RESTOR
|
DREWERY CONSTRUCTION COMPANY, INCORPORATED
($20,919,240)
|
|
|
1388-01-010
|
RUSK
|
TYLER
|
$8,986,324
|
FM 1251
|
F 2026(471)
|
04/07/2026
|
02/02/2026
|
ROADWAY REHAB/RECON WITH NO ADDE
|
DRAKE COMPANIES LLC
($8,734,908)
|
|
|
0450-02-014
|
RUSK
|
TYLER
|
$12,659,927
|
SH 204
|
F 2026(331)
|
02/05/2026
|
12/01/2025
|
HWY IMPRV
|
PINTO CONSTRUCTION CO., INC.
($10,286,588)
|
|
|
0138-08-033
|
GREGG
|
TYLER
|
$3,513,305
|
SS 63
|
F 2026(336)
|
02/04/2026
|
12/01/2025
|
REHAB EXIST ROADWAY
|
MADDEN CONTRACTING COMPANY, LLC.
($3,172,923)
|
|
|
0176-04-088
|
POLK
|
LUFKIN
|
$11,528,512
|
US 59
|
C 176-4-88
|
02/04/2026
|
12/01/2025
|
RESURF ROADWAY
|
TEXAS MATERIALS GROUP, INC.
($8,993,704)
|
|
|
0495-03-068
|
VAN ZANDT
|
TYLER
|
$7,363,416
|
IH 20
|
F 2026(334)
|
02/04/2026
|
12/01/2025
|
REHAB EXIST ROADWAY
|
AUSTIN BRIDGE & ROAD SERVICES, LP
($6,229,536)
|
|
|
0890-05-009
|
ANDERSON
|
TYLER
|
$1,940,375
|
FM 3309
|
F 2026(218)
|
01/07/2026
|
11/01/2025
|
REHAB EXIST ROADWAY
|
BAKER & COMPANY CONSTRUCTION, LLC
($1,861,683)
|
|
|
0492-04-047
|
SMITH
|
TYLER
|
$2,636,546
|
FM 756
|
F 2026(219)
|
01/06/2026
|
11/01/2025
|
RESURF ROADWAY
|
DREWERY CONSTRUCTION COMPANY, INCORPORATED
($3,056,756)
|
|
|
2642-01-050
|
GREGG
|
TYLER
|
$9,540,392
|
SL 281
|
F 2026(182)
|
12/03/2025
|
10/01/2025
|
RESURF ROADWAY
|
EAST TEXAS BRIDGE, INC.
($12,524,243)
|
|
|
6488-62-001
|
SMITH
|
TYLER
|
$2,298,778
|
US0069
|
RMC - A00217157
|
12/02/2025
|
10/01/2025
|
MILL AND INLAY
|
BIG CREEK CONSTRUCTION, LTD.
($1,933,465)
|
|
|
2072-01-015
|
GREGG
|
TYLER
|
$3,954,370
|
FM 2204
|
F 2026(046)
|
11/06/2025
|
09/01/2025
|
SURF/ROADWAY RESTOR
|
MADDEN CONTRACTING COMPANY, LLC.
($3,494,062)
|
|
|
0176-02-128
|
ANGELINA
|
LUFKIN
|
$5,356,774
|
BU 59G
|
F 2B25(040)
|
09/05/2025
|
07/01/2025
|
RESURF ROADWAY
|
TEXAS MATERIALS GROUP, INC.
($4,646,844)
|
|
|
6488-57-001
|
WOOD
|
TYLER
|
$2,468,587
|
SH0037
|
RMC - A00217142
|
09/05/2025
|
07/09/2025
|
MILL AND INLAY
|
DREWERY CONSTRUCTION COMPANY, INCORPORATED
($1,916,266)
|
|
|
6488-58-001
|
HENDERSON
|
TYLER
|
$5,605,030
|
US0175
|
RMC - A00217143
|
09/05/2025
|
07/10/2025
|
MILL AND INLAY
|
BIG CREEK CONSTRUCTION, LTD.
($4,487,610)
|
|
|
6486-57-001
|
SHELBY
|
LUFKIN
|
$200,500
|
US0059
|
RMC - A00216379
|
08/13/2025
|
06/05/2025
|
TREE & BRUSH RMVL AND TREE TRIM
|
AUSTIN BARRICADE COMPANY, L.L.C.
($179,010)
|
|
|
6487-27-001
|
NACOGDOCHES
|
LUFKIN
|
$960,749
|
US0059
|
RMC - A00216550
|
08/13/2025
|
06/24/2025
|
MILL AND INLAY
|
TEXAS MATERIALS GROUP, INC.
($827,886)
|
|
|
2068-01-006
|
HOUSTON
|
LUFKIN
|
$11,385,717
|
FM 2076
|
C 2068-1-6
|
08/08/2025
|
06/02/2025
|
HWY IMPRV
|
DREWERY CONSTRUCTION COMPANY, INCORPORATED
($9,900,198)
|
|
|
0703-03-029
|
TYLER
|
BEAUMONT
|
$6,155,576
|
FM 256
|
STP 2025(839)HRR
|
07/02/2025
|
05/01/2025
|
HAZARD ELIM & SAFETY
|
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
($5,598,867)
|
|
|
0064-06-053
|
SABINE
|
LUFKIN
|
$17,242,219
|
US 96
|
F 2025(669)
|
07/01/2025
|
02/02/2025
|
HWY IMPRV
|
PINTO CONSTRUCTION CO., INC.
($14,650,398)
|
|
|
2553-01-116
|
ANGELINA
|
LUFKIN
|
$13,188,203
|
SL 287
|
F 2B24(381)
|
06/04/2025
|
04/01/2025
|
HWY IMPRV
|
LONGVIEW BRIDGE AND ROAD, LTD.
($11,124,512)
|
|
|
6481-96-001
|
SMITH
|
TYLER
|
$647,200
|
US0069
|
RMC - A00214608
|
05/13/2025
|
03/04/2025
|
TREE RMVL
|
SPEARHEAD CONSTRUCTION SOLUTIONS LLC
($596,875)
|
|
|
6471-49-001
|
SAN AUGUSTINE
|
LUFKIN
|
$270,802
|
SH0103
|
RMC - 647149001
|
09/11/2024
|
08/15/2024
|
TREE RMVL
|
ACE CONTRACTORS, INC.
($186,380)
|
|
|
6469-54-001
|
CHEROKEE
|
TYLER
|
$2,156,898
|
SH0135
|
RMC - 646954001
|
09/05/2024
|
07/26/2024
|
MILL AND INLAY
|
MADDEN CONTRACTING COMPANY, LLC.
($1,926,121)
|
|
|
0911-28-063
|
HOUSTON
|
LUFKIN
|
$823,652
|
VA
|
C 911-28-63
|
08/01/2024
|
03/21/2024
|
SURF/ROADWAY RESTOR
|
DREWERY CONSTRUCTION COMPANY, INCORPORATED
($1,536,462)
|
|
|
6462-63-001
|
RUSK
|
TYLER
|
$1,015,331
|
US0059
|
RMC - 646263001
|
08/01/2024
|
03/21/2024
|
TREE RMVL
|
DREWERY CONSTRUCTION COMPANY, INCORPORATED
($1,069,580)
|
|
|
6467-24-001
|
SHELBY
|
LUFKIN
|
$147,300
|
US0059
|
RMC - 646724001
|
07/24/2024
|
06/27/2024
|
TREE RMVL
|
K & R CONTRACTORS
($133,000)
|
|
|
0118-06-077
|
NACOGDOCHES
|
LUFKIN
|
$9,514,903
|
BS 21-P
|
F 2024(934)
|
06/06/2024
|
04/25/2024
|
RESURF ROADWAY
|
TEXAS MATERIALS GROUP, INC.
($10,814,631)
|
|
|
0911-39-069
|
SHELBY
|
LUFKIN
|
$703,110
|
CR
|
BR 2B23(045)
|
06/06/2024
|
04/25/2024
|
BRIDGE REPL
|
THK CONSTRUCTION LLC
($584,995)
|
|
|
2662-03-003
|
ANGELINA
|
LUFKIN
|
$3,405,139
|
FM 3124
|
STP 2B24(159)HES
|
06/06/2024
|
04/25/2024
|
HAZARD ELIM & SAFETY
|
PINTO CONSTRUCTION CO., INC.
($3,926,437)
|
|
|
0576-02-069
|
ANGELINA
|
LUFKIN
|
$11,694,246
|
FM 58
|
F 2B24(082)
|
05/03/2024
|
03/22/2024
|
ROADWAY REHAB/RECON WITH NO ADDE
|
PINTO CONSTRUCTION CO., INC.
($11,095,200)
|
|
|
6462-63-001
|
RUSK
|
TYLER
|
$991,259
|
US0059
|
RMC - 646263001
|
05/02/2024
|
08/25/2024
|
TREE RMVL
|
ICOS MANAGEMENT, LLC
($635,900)
|
|
|
6464-13-001
|
GREGG
|
TYLER
|
$189,255
|
SH0031
|
RMC - 646413001
|
04/09/2024
|
02/28/2024
|
TREE RMVL
|
LG SOLAR, LLC
($173,660)
|
|
|
6462-84-001
|
SABINE
|
LUFKIN
|
$284,750
|
SH0021
|
RMC - 646284001
|
03/20/2024
|
02/22/2024
|
TREE TRIM AND BRUSH RMVL - FY24 SABI...
|
ACE CONTRACTORS, INC.
($244,255)
|
|
|
6462-83-001
|
TRINITY
|
LUFKIN
|
$174,825
|
FM0357
|
RMC - 646283001
|
02/28/2024
|
02/05/2024
|
TREE TRIM AND BRUSH RMVL
|
FLORES TREE SERVICE LLC
($168,000)
|
|
|
6462-97-001
|
NACOGDOCHES
|
LUFKIN
|
$101,295
|
US0059
|
RMC - 646297001
|
02/28/2024
|
02/05/2024
|
TREE RMVL
|
K & R CONTRACTORS
($92,775)
|
|
|
0495-04-081
|
SMITH
|
TYLER
|
$12,538,227
|
IH 20
|
F 2024(722)
|
02/02/2024
|
12/22/2023
|
RESURF ROADWAY
|
DREWERY CONSTRUCTION COMPANY, INCORPORATED
($13,106,221)
|
|
|
0206-06-032
|
RUSK
|
TYLER
|
$6,651,780
|
US 79
|
F 2024(763)
|
02/01/2024
|
12/21/2023
|
PVMNT REPAIR, PLANING, OCST, PFC SUR...
|
REYNOLDS & KAY, LTD.
($4,925,093)
|
|
|
0118-02-036
|
HOUSTON
|
LUFKIN
|
$13,754,375
|
SH 21
|
F 2024(613)
|
01/05/2024
|
11/24/2023
|
WIDEN NON FREEWAY
|
A. L. HELMCAMP, INC.
($14,327,452)
|
|
|
0206-07-059
|
RUSK
|
TYLER
|
$4,458,301
|
US 79
|
C 206-7-59
|
01/04/2024
|
11/23/2023
|
PVMNT REPAIR, PLANING, OCST, PFC SUR...
|
MADDEN CONTRACTING COMPANY, LLC.
($3,202,957)
|
|
|
6453-97-001
|
SMITH
|
TYLER
|
$4,623,568
|
SL0323
|
RMC - 645397001
|
01/04/2024
|
11/29/2023
|
MILL AND INLAY
|
BIG CREEK CONSTRUCTION, LTD.
($4,469,287)
|
|
|
0319-01-069
|
TRINITY
|
LUFKIN
|
$7,789,761
|
US 287
|
F 2024(469)
|
12/06/2023
|
11/15/2023
|
RESURF ROADWAY
|
TEXAS MATERIALS GROUP, INC.
($9,098,259)
|
|
|
0911-08-049
|
NACOGDOCHES
|
LUFKIN
|
$2,889,458
|
CR
|
BR 2022(570)
|
12/05/2023
|
11/15/2023
|
BRIDGE REPL
|
THK CONSTRUCTION LLC
($2,041,759)
|
|
|
6444-56-001
|
ANDERSON
|
TYLER
|
$2,269,976
|
US0079
|
RMC - 644456001
|
11/02/2023
|
11/15/2023
|
MILL AND INLAY
|
MADDEN CONTRACTING COMPANY, LLC.
($2,220,152)
|
|
|
6431-18-001
|
GREGG
|
TYLER
|
$2,304,213
|
IH0020
|
RMC - 643118001
|
11/01/2023
|
11/15/2023
|
MILL AND INLAY
|
DREWERY CONSTRUCTION COMPANY, INCORPORATED
($3,321,535)
|
|
|
6440-57-001
|
VAN ZANDT
|
TYLER
|
$946,081
|
FM0773
|
RMC - 644057001
|
11/01/2023
|
11/15/2023
|
BASE FAILURE PAVMT REPAIR
|
BIG CREEK CONSTRUCTION, LTD.
($1,085,594)
|
|
|
6444-58-001
|
WOOD
|
TYLER
|
$2,642,756
|
US0080
|
RMC - 644458001
|
10/05/2023
|
11/15/2023
|
MILL AND INLAY
|
DREWERY CONSTRUCTION COMPANY, INCORPORATED
($2,900,777)
|
|
|
0920-06-037
|
NEWTON
|
BEAUMONT
|
$1,615,050
|
CR
|
BR 2023(927)
|
08/03/2023
|
11/15/2023
|
BRIDGE REPL
|
RAYFORD'S TRUCK & TRACTOR
($1,497,066)
|
|
|
0462-03-048
|
PANOLA
|
ATLANTA
|
$7,493,216
|
SH 315
|
F 2B23(017)
|
08/02/2023
|
11/15/2023
|
RESURF ROADWAY
|
MADDEN CONTRACTING COMPANY, LLC.
($5,970,136)
|
|
|
1584-01-031
|
TYLER
|
BEAUMONT
|
$12,891,431
|
FM 1745
|
F 2B23(155)
|
08/02/2023
|
11/15/2023
|
SURF/ROADWAY RESTOR
|
DREWERY CONSTRUCTION COMPANY, INCORPORATED
($19,340,199)
|
|
|
0424-10-009
|
RUSK
|
TYLER
|
$14,016,829
|
FM 3231
|
CC 424-10-9
|
06/02/2023
|
11/28/2023
|
REHAB EXIST ROADWAY
|
L. S. EQUIPMENT CO., INC.
($15,996,366)
|
|
|
0911-08-049
|
NACOGDOCHES
|
LUFKIN
|
$2,524,212
|
CR
|
BR 2022(570)
|
06/02/2023
|
11/28/2023
|
BRIDGE REPL
|
CROSS PLUS CONSTRUCTION, LLC
($2,547,392)
|
|
|
0462-01-025
|
RUSK
|
TYLER
|
$18,858,014
|
SH 315
|
F 2023(828)
|
06/01/2023
|
11/27/2023
|
RESURF ROADWAY
|
MADDEN CONTRACTING COMPANY, LLC.
($13,565,152)
|
|
|
0576-02-068
|
ANGELINA
|
LUFKIN
|
$7,487,234
|
FM 58
|
F 2023(668)
|
05/05/2023
|
11/15/2023
|
HWY IMPRV
|
A. L. HELMCAMP, INC.
($9,734,198)
|
|
|
1810-01-036
|
NACOGDOCHES
|
LUFKIN
|
$4,151,944
|
FM 1878
|
STP 2023(635)HES
|
05/05/2023
|
11/15/2023
|
HAZARD ELIM & SAFETY
|
DREWERY CONSTRUCTION COMPANY, INCORPORATED
($4,866,131)
|
|
|
2750-01-005
|
ANGELINA
|
LUFKIN
|
$1,932,663
|
FM 2680
|
STP 2023(393)HES
|
03/08/2023
|
08/21/2024
|
HAZARD ELIM & SAFETY
|
DREWERY CONSTRUCTION COMPANY, INCORPORATED
($2,660,027)
|
|
|
0191-01-094
|
SMITH
|
TYLER
|
$5,780,392
|
US 69
|
C 191-1-94
|
02/02/2023
|
11/15/2023
|
REHAB EXIST ROADWAY
|
DREWERY CONSTRUCTION COMPANY, INCORPORATED
($7,798,138)
|
|
|
0597-04-005
|
SAN AUGUSTINE
|
LUFKIN
|
$1,787,802
|
FM 2923
|
STP 2023(392)HES
|
02/02/2023
|
11/15/2023
|
HAZARD ELIM & SAFETY
|
PINTO CONSTRUCTION CO., INC.
($1,771,725)
|
|
|
0910-08-080
|
ANDERSON
|
TYLER
|
$1,057,250
|
VA
|
C 910-8-80
|
02/01/2023
|
11/15/2023
|
STATE PARK IMPRVS
|
BAKER & COMPANY CONSTRUCTION, LLC
($958,749)
|
|
|
2075-01-058
|
SMITH
|
TYLER
|
$3,764,244
|
SL 323
|
C 2075-1-58
|
02/01/2023
|
11/15/2023
|
RESURF ROADWAY
|
DREWERY CONSTRUCTION COMPANY, INCORPORATED
($4,548,987)
|
|
|
0058-04-022
|
CHEROKEE
|
TYLER
|
$2,987,393
|
SH 294
|
F 2023(372)
|
01/06/2023
|
11/15/2023
|
REHAB EXIST ROADWAY
|
MADDEN CONTRACTING COMPANY, LLC.
($3,018,318)
|
|
|
0123-05-015
|
RUSK
|
TYLER
|
$11,730,694
|
US 84
|
F 2023(369)
|
01/06/2023
|
11/15/2023
|
ROADWAY REHAB/RECON WITH NO ADDE
|
DREWERY CONSTRUCTION COMPANY, INCORPORATED
($12,866,630)
|
|
|
0176-06-016
|
POLK
|
LUFKIN
|
$8,793,589
|
BU 59-J
|
F 2023(076)
|
01/06/2023
|
11/15/2023
|
RESURF ROADWAY
|
TEXAS MATERIALS GROUP, INC.
($9,240,613)
|
|
|
0123-04-023
|
RUSK
|
TYLER
|
$3,073,701
|
US 84
|
F 2023(370)
|
01/05/2023
|
11/15/2023
|
WIDEN ROAD - ADD LANES
|
MADDEN CONTRACTING COMPANY, LLC.
($2,429,719)
|
|
|
6412-03-001
|
ANGELINA
|
LUFKIN
|
$315,690
|
US0069
|
RMC - 641203001
|
01/05/2023
|
11/15/2023
|
REHAB OF EXIST ROADWAY
|
DREWERY CONSTRUCTION COMPANY, INCORPORATED
($511,628)
|
|
|
6422-75-001
|
SAN AUGUSTINE
|
LUFKIN
|
$264,275
|
SH0103
|
RMC - 642275001
|
11/09/2022
|
11/15/2023
|
TREE & BRUSH RMVL
|
K & R CONTRACTORS
($218,700)
|
|
|
2707-01-011
|
HOUSTON
|
LUFKIN
|
$12,769,655
|
FM 2781
|
F 2023(209)
|
11/03/2022
|
11/15/2023
|
HWY IMPRV
|
A. L. HELMCAMP, INC.
($12,103,921)
|
|
|
0138-02-038
|
RUSK
|
TYLER
|
$1,402,735
|
SH 42
|
F 2022(955)
|
09/08/2022
|
11/15/2023
|
RESURF ROADWAY
|
MADDEN CONTRACTING COMPANY, LLC.
($1,527,949)
|
|
|
0138-16-005
|
GREGG
|
TYLER
|
$4,629,219
|
US 259
|
C 138-16-5
|
09/07/2022
|
11/15/2023
|
RESURF ROADWAY
|
MADDEN CONTRACTING COMPANY, LLC.
($4,533,083)
|
|
|
0809-02-070
|
SHELBY
|
LUFKIN
|
$8,514,546
|
US 96
|
C 809-2-70
|
09/07/2022
|
11/15/2023
|
WIDEN ROAD - ADD SHOULDERS
|
MOORE BROTHERS CONSTRUCTION COMPANY
($9,395,982)
|
|
|
3264-01-010
|
ANGELINA
|
LUFKIN
|
$2,186,830
|
FM 326
|
F 2023(012)
|
09/07/2022
|
11/15/2023
|
ROADWAY REHAB/RECON
|
MOORE BROTHERS CONSTRUCTION COMPANY
($2,637,474)
|
|
|
6409-97-001
|
GREGG
|
TYLER
|
$1,680,694
|
US0271
|
RMC - 640997001
|
09/07/2022
|
11/15/2023
|
MILL AND INLAY
|
TEXAS MATERIALS GROUP, INC.
($2,166,524)
|
|
|
6412-19-001
|
ANDERSON
|
TYLER
|
$4,708,983
|
US0287
|
RMC - 641219001
|
09/07/2022
|
11/15/2023
|
MILL AND INLAY
|
BIG CREEK CONSTRUCTION, LTD.
($4,990,503)
|
|
|
6410-09-001
|
PANOLA
|
ATLANTA
|
$176,650
|
US0059
|
RMC - 641009001
|
08/10/2022
|
11/15/2023
|
TREE RMVL
|
DREWERY CONSTRUCTION COMPANY, INCORPORATED
($180,264)
|
|
|
2893-01-018
|
SHELBY
|
LUFKIN
|
$1,969,884
|
FM 947
|
STP 2022(898)HES
|
08/04/2022
|
11/15/2023
|
HAZARD ELIM & SAFETY
|
PINTO CONSTRUCTION CO., INC.
($2,185,618)
|
|
|
6404-10-001
|
JASPER
|
BEAUMONT
|
$524,190
|
US0096
|
RMC - 640410001
|
06/30/2022
|
11/15/2023
|
TREE TRIM AND BRUSH RMVL
|
ACE CONTRACTORS, INC.
($449,100)
|
|
|
0920-13-036
|
TYLER
|
BEAUMONT
|
$649,658
|
CR
|
BR 1902(442)
|
06/29/2022
|
11/15/2023
|
BRIDGE REPL
|
CROSS PLUS CONSTRUCTION, LLC
($659,766)
|
|
|
3248-01-007
|
NACOGDOCHES
|
LUFKIN
|
$5,200,200
|
FM 1878
|
F 2022(494)
|
05/05/2022
|
08/31/2024
|
ROADWAY REHAB/RECON WITH NO ADDE
|
PINTO CONSTRUCTION CO., INC.
($5,498,352)
|
|
|
0911-04-089
|
POLK
|
LUFKIN
|
$436,693
|
CR
|
BR 2B20(098)
|
05/04/2022
|
08/31/2024
|
BRIDGE REPL
|
CROSS PLUS CONSTRUCTION, LLC
($458,032)
|
|
|
0911-39-063
|
SHELBY
|
LUFKIN
|
$421,441
|
CR
|
BR 2B20(125)
|
05/04/2022
|
08/31/2024
|
BRIDGE REPL
|
L. S. EQUIPMENT CO., INC.
($425,320)
|
|
|
0304-03-028
|
SABINE
|
LUFKIN
|
$1,370,334
|
SH 87
|
F 2022(186)
|
03/04/2022
|
11/15/2023
|
RESURF ROADWAY
|
MOORE BROTHERS CONSTRUCTION COMPANY
($1,686,545)
|
|
|
0919-03-060
|
HARRISON
|
ATLANTA
|
$502,641
|
CR
|
BR 2019(352)
|
03/04/2022
|
11/15/2023
|
REPLACE BRIDGE AND APPROACHES
|
THK CONSTRUCTION LLC
($481,045)
|
|
|
0920-13-034
|
TYLER
|
BEAUMONT
|
$335,545
|
CR
|
BR 2020(409)
|
03/04/2022
|
11/15/2023
|
BRIDGE REPL
|
DREWERY CONSTRUCTION COMPANY, INCORPORATED
($498,676)
|
|
|
6396-67-001
|
ANDERSON
|
TYLER
|
$376,600
|
SH0019
|
RMC - 639667001
|
03/04/2022
|
11/15/2023
|
TREE RMVL
|
ROAD SOLUTIONS L.L.C.
($352,983)
|
|
|
0910-34-035
|
HENDERSON
|
TYLER
|
$57,748
|
VA
|
C 910-34-35
|
03/03/2022
|
11/15/2023
|
STATE PARK IMPRVS
|
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
($110,625)
|
|
|
0919-13-018
|
PANOLA
|
ATLANTA
|
$450,451
|
CR
|
BR 1902(372)
|
03/03/2022
|
11/15/2023
|
BRIDGE REPL
|
RAYFORD'S TRUCK & TRACTOR
($489,998)
|
|
|
6387-88-001
|
NACOGDOCHES
|
LUFKIN
|
$115,800
|
US0059
|
RMC - 638788001
|
02/09/2022
|
11/15/2023
|
TREE RMVL
|
K & R CONTRACTORS
($86,775)
|
|
|
0910-07-078
|
GREGG
|
TYLER
|
$597,153
|
CS
|
BR 2020(894)
|
02/04/2022
|
11/15/2023
|
BRIDGE REPL
|
SOUTH TEXAS ILLUMINATION, LLC
($638,113)
|
|
|
0118-08-075
|
NACOGDOCHES
|
LUFKIN
|
$2,248,501
|
SH 21
|
BR 2022(295)
|
01/07/2022
|
11/15/2023
|
BRIDGE REPL
|
DREWERY CONSTRUCTION COMPANY, INCORPORATED
($2,490,125)
|
|
|
0910-16-147
|
SMITH
|
TYLER
|
$1,258,233
|
CS
|
BR 2020(895)
|
01/07/2022
|
11/15/2023
|
BRIDGE REPL
|
THK CONSTRUCTION LLC
($1,258,294)
|
|
|
6391-33-001
|
RUSK
|
TYLER
|
$2,391,372
|
FM0013
|
RMC - 639133001
|
01/06/2022
|
11/15/2023
|
MILL AND INLAY
|
DREWERY CONSTRUCTION COMPANY, INCORPORATED
($2,448,269)
|
|
|
2117-02-015
|
TRINITY
|
LUFKIN
|
$1,301,824
|
FM 357
|
BR 2022(101)
|
11/04/2021
|
11/15/2023
|
BRIDGE REPL
|
DREWERY CONSTRUCTION COMPANY, INCORPORATED
($1,544,163)
|
|
|
6383-17-001
|
TYLER
|
BEAUMONT
|
$791,176
|
US0190
|
RMC - 638317001
|
11/03/2021
|
11/15/2023
|
MILL AND INLAY
|
MOORE BROTHERS CONSTRUCTION COMPANY
($707,898)
|
|
|
6385-83-001
|
HOUSTON
|
LUFKIN
|
$264,550
|
US0287
|
RMC - 638583001
|
10/13/2021
|
11/15/2023
|
TREE TRIM AND BRUSH RMVL
|
CEHAND ROOFING AND CONSTRUCTION, LLC
($248,026)
|
|
|
6386-01-001
|
SABINE
|
LUFKIN
|
$279,726
|
SH0021
|
RMC - 638601001
|
10/13/2021
|
11/15/2023
|
TREE TRIM AND BRUSH RMVL
|
ACE CONTRACTORS, INC.
($247,575)
|
|
|
0059-04-049
|
SHELBY
|
LUFKIN
|
$371,989
|
SH 7
|
F 2022(127)
|
10/07/2021
|
11/15/2023
|
REPAIR ROADWAY
|
DIGG COMMERCIAL, LLC
($517,284)
|
|
|
0108-02-033
|
VAN ZANDT
|
TYLER
|
$13,424,556
|
SH 19
|
F 2021(821)
|
08/05/2021
|
11/15/2023
|
HWY IMPRV
|
BIG CREEK CONSTRUCTION, LTD.
($12,108,566)
|
|
|
0118-04-032
|
CHEROKEE
|
TYLER
|
$6,306,254
|
SH 21
|
F 2021(822)
|
08/05/2021
|
11/15/2023
|
SURF/ROADWAY RESTOR
|
A. L. HELMCAMP, INC.
($5,923,689)
|
|
|
1875-02-027
|
HOUSTON
|
LUFKIN
|
$4,806,558
|
FM 2022
|
F 2021(828)
|
08/05/2021
|
11/15/2023
|
WIDEN ROAD - ADD SHOULDERS
|
PINTO CONSTRUCTION CO., INC.
($4,532,080)
|
|
|
6379-84-001
|
SABINE
|
LUFKIN
|
$1,434,421
|
SH0087
|
RMC - 637984001
|
08/04/2021
|
11/15/2023
|
MILL AND INLAY
|
DREWERY CONSTRUCTION COMPANY, INCORPORATED
($1,417,523)
|
|
|
0499-02-031
|
NEWTON
|
BEAUMONT
|
$1,586,505
|
SH 12
|
F 2021(723)
|
07/02/2021
|
11/15/2023
|
SURF/ROADWAY RESTOR
|
DREWERY CONSTRUCTION COMPANY, INCORPORATED
($1,509,218)
|
|
|
0877-01-043
|
JASPER
|
BEAUMONT
|
$2,208,767
|
RE 255
|
F 2021(758)
|
07/01/2021
|
11/15/2023
|
SURF/ROADWAY RESTOR
|
TEXAS MATERIALS GROUP, INC.
($2,233,852)
|
|
|
0911-00-109
|
ANGELINA
|
LUFKIN
|
$4,952,509
|
VA
|
F 2021(697)
|
07/01/2021
|
11/15/2023
|
HWY IMPRV
|
A. L. HELMCAMP, INC.
($4,639,697)
|
|
|
0911-04-087
|
POLK
|
LUFKIN
|
$1,639,124
|
CR
|
BR 2B20(099)
|
07/01/2021
|
11/15/2023
|
BRIDGE REPL
|
THK CONSTRUCTION LLC
($1,594,107)
|
|
|
1409-03-020
|
SHELBY
|
LUFKIN
|
$1,222,603
|
FM 2261
|
BR 2021(582)
|
06/03/2021
|
11/15/2023
|
BRIDGE REPL
|
LONGVIEW BRIDGE AND ROAD, LTD.
($1,320,205)
|
|
|
0118-08-076
|
NACOGDOCHES
|
LUFKIN
|
$5,795,199
|
SH 21
|
BR 2021(343)
|
05/06/2021
|
11/15/2023
|
BRIDGE REPL
|
STATELINE CONSTRUCTION, LLC
($5,478,921)
|
|
|
0245-05-051
|
SMITH
|
TYLER
|
$394,396
|
SH 64
|
BR 2021(512)
|
05/06/2021
|
11/15/2023
|
BRIDGE MAINT
|
HIGHWAY 19 CONSTRUCTION LLC
($332,397)
|
|
|
0165-02-065
|
SMITH
|
TYLER
|
$12,539,380
|
US 271
|
F 2021(509)
|
05/05/2021
|
11/15/2023
|
ROADWAY REHAB/RECON WITH NO ADDE
|
MADDEN CONTRACTING COMPANY, LLC.
($12,377,401)
|
|
|
2589-01-023
|
ANGELINA
|
LUFKIN
|
$5,973,730
|
FM 2497
|
BR 2021(559)
|
05/05/2021
|
11/15/2023
|
BRIDGE REPL
|
A. L. HELMCAMP, INC.
($5,264,189)
|
|
|
0910-12-134
|
VAN ZANDT
|
TYLER
|
$1,349,295
|
CR
|
BR 2019(360)
|
03/05/2021
|
11/15/2023
|
BRIDGE REPL
|
EAST TEXAS BRIDGE, INC.
($1,247,129)
|
|
|
0920-12-044
|
JASPER
|
BEAUMONT
|
$1,753,553
|
PW
|
C 920-12-44
|
03/05/2021
|
11/15/2023
|
STATE PARK IMPRVS
|
DREWERY CONSTRUCTION COMPANY, INCORPORATED
($1,434,467)
|
|
|
0336-02-029
|
HOUSTON
|
LUFKIN
|
$1,540,181
|
SH 7
|
C 336-2-29
|
03/04/2021
|
11/15/2023
|
SURF/ROADWAY RESTOR
|
MOORE BROTHERS CONSTRUCTION COMPANY
($1,107,445)
|
|
|
0634-01-014
|
CHEROKEE
|
TYLER
|
$5,329,290
|
FM 22
|
STP 2021(318)HES
|
02/05/2021
|
11/15/2023
|
HAZARD ELIM & SAFETY
|
STATELINE CONSTRUCTION, LLC
($5,533,706)
|
|
|
6296-80-001
|
JASPER
|
BEAUMONT
|
$680,992
|
SH0062
|
RMC - 629680001
|
02/05/2021
|
11/15/2023
|
MILL & IN-LAY
|
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
($577,252)
|
|
|
0305-01-035
|
NEWTON
|
BEAUMONT
|
$1,707,126
|
SH 87
|
STP 2021(381)
|
02/04/2021
|
11/15/2023
|
SURF/ROADWAY RESTOR
|
TEXAS MATERIALS GROUP, INC.
($1,498,773)
|
|
|
1157-01-018
|
ANGELINA
|
LUFKIN
|
$5,172,350
|
FM 841
|
STP 2021(345)HES
|
02/04/2021
|
11/15/2023
|
REPLACE GUARDRAIL
|
A. L. HELMCAMP, INC.
($5,264,677)
|
|
|
0123-03-022
|
CHEROKEE
|
TYLER
|
$9,385,832
|
US 84
|
STP 2021(216)
|
01/08/2021
|
11/15/2023
|
GR,STRS,PLANING,BS RPR,SBGR WDN,ACP...
|
MADDEN CONTRACTING COMPANY, LLC.
($7,859,265)
|
|
|
1585-01-025
|
TYLER
|
BEAUMONT
|
$4,027,608
|
FM 1746
|
STP 2021(308)
|
01/07/2021
|
11/15/2023
|
SURF ROADWAY RESTOR
|
A. L. HELMCAMP, INC.
($3,877,452)
|
|
|
6348-29-001
|
TYLER
|
BEAUMONT
|
$453,390
|
FM0092
|
RMC - 634829001
|
01/07/2021
|
11/15/2023
|
MILL AND OVERLAY
|
TEXAS MATERIALS GROUP, INC.
($387,406)
|
|
|
6348-60-001
|
NEWTON
|
BEAUMONT
|
$952,769
|
FM2460
|
RMC - 634860001
|
11/05/2020
|
11/15/2023
|
OVERLAY
|
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
($878,621)
|
|
|
6368-37-001
|
SAN AUGUSTINE
|
LUFKIN
|
$268,625
|
SH0103
|
RMC - 636837001
|
10/07/2020
|
11/15/2023
|
TREE AND BRUSH RMVL & TREE TRIM
|
K & R CONTRACTORS
($222,150)
|
|
|
6370-14-001
|
HENDERSON
|
TYLER
|
$128,450
|
FM0317
|
RMC - 637014001
|
10/06/2020
|
11/15/2023
|
TREE TRIM & BRUSH RMVL
|
WESTGATE GROUP, LLC
($129,221)
|
|
|
6370-16-001
|
RUSK
|
TYLER
|
$171,640
|
US0084
|
RMC - 637016001
|
10/06/2020
|
11/15/2023
|
TREE TRIM
|
BUSHWACKERS CONTRACTING, LLC
($171,640)
|
|
|
6370-17-001
|
CHEROKEE
|
TYLER
|
$179,006
|
FM1911
|
RMC - 637017001
|
10/06/2020
|
11/15/2023
|
TREE TRIM & BRUSH RMVL
|
U.S. SAND & GRAVEL
($154,770)
|
|
|
6370-19-001
|
WOOD
|
TYLER
|
$169,789
|
FM0515
|
RMC - 637019001
|
10/06/2020
|
11/15/2023
|
TREE TRIM & BRUSH RMVL
|
EASTGATE SERVICES
($133,248)
|
|
|
6370-20-001
|
ANDERSON
|
TYLER
|
$91,502
|
FM0321
|
RMC - 637020001
|
10/06/2020
|
11/15/2023
|
TREE TRIM
|
L & M MOWING CONTRACTORS, LLC
($56,030)
|
|
|
6370-21-001
|
SMITH
|
TYLER
|
$235,190
|
FM0016
|
RMC - 637021001
|
10/06/2020
|
11/15/2023
|
TREE TRIM & BRUSH RMVL
|
U.S. SAND & GRAVEL
($166,350)
|
|
|
0597-02-022
|
SAN AUGUSTINE
|
LUFKIN
|
$5,813,261
|
FM 1277
|
STP 2B20(263)
|
10/02/2020
|
11/15/2023
|
ROADWAY REHAB
|
PINTO CONSTRUCTION CO., INC.
($5,469,057)
|
|
|
6367-58-001
|
TYLER
|
BEAUMONT
|
$1,185,300
|
US0069
|
RMC - 636758001
|
10/01/2020
|
11/15/2023
|
TREE AND BRUSH RMVL
|
BOEN LANDSCAPING & IRRIGATION, LLC
($861,500)
|
|
|
0911-28-043
|
HOUSTON
|
LUFKIN
|
$891,227
|
CR
|
BR 1602(210)
|
09/04/2020
|
11/15/2023
|
REPLACE BRIDGE AND APPROACHES
|
STATELINE CONSTRUCTION, LLC
($862,803)
|
|
|
0190-06-012
|
SMITH
|
TYLER
|
$999,888
|
US 69
|
NH 2021(033)
|
09/03/2020
|
11/15/2023
|
PLANING, PAVMT REPAIR, OCST, ACP, PV...
|
EAST TEXAS BRIDGE, INC.
($1,333,004)
|
|
|
6359-90-001
|
JASPER
|
BEAUMONT
|
$440,830
|
FM1013
|
RMC - 635990001
|
09/03/2020
|
11/15/2023
|
FLEXIBLE PAVMT STRUCT REPAIR
|
TEXAS MATERIALS GROUP, INC.
($394,674)
|
|
|
1407-01-025
|
NACOGDOCHES
|
LUFKIN
|
$6,942,023
|
FM 1275
|
STP 2B20(054)HES
|
08/06/2020
|
11/15/2023
|
WIDEN ROAD - ADD SHOULDERS
|
PINTO CONSTRUCTION CO., INC.
($6,199,551)
|
|
|
1854-01-048
|
HOUSTON
|
LUFKIN
|
$3,249,191
|
SL 304
|
C 1854-1-48
|
06/04/2020
|
11/15/2023
|
REHAB OF EXIST ROAD
|
BIG CREEK CONSTRUCTION, LTD.
($2,432,670)
|
|
|
0703-01-067
|
TYLER
|
BEAUMONT
|
$6,383,381
|
FM 92
|
STP 2020(783)
|
04/09/2020
|
11/15/2023
|
OV- OVERLAY
|
DREWERY CONSTRUCTION COMPANY, INCORPORATED
($7,554,649)
|
|
|
0191-01-092
|
SMITH
|
TYLER
|
$2,825,315
|
US 69
|
NH 2020(705)
|
04/08/2020
|
11/15/2023
|
REPAIR AND RESURF ROADWAY
|
DREWERY CONSTRUCTION COMPANY, INCORPORATED
($2,060,600)
|
|
|
0911-28-047
|
HOUSTON
|
LUFKIN
|
$2,090,203
|
CR
|
BR 1602(213)
|
04/08/2020
|
11/15/2023
|
BRIDGE REPL
|
STATELINE CONSTRUCTION, LLC
($1,895,914)
|
|
|
1584-01-029
|
TYLER
|
BEAUMONT
|
$770,254
|
FM 1745
|
BR 2020(654)
|
03/05/2020
|
11/15/2023
|
BRIDGE REPL
|
DREWERY CONSTRUCTION COMPANY, INCORPORATED
($783,916)
|
|
|
1828-01-024
|
TYLER
|
BEAUMONT
|
$1,845,662
|
FM 1943
|
BR 2020(656)
|
03/04/2020
|
11/15/2023
|
BRIDGE REPL
|
MBN ENTERPRISES LLC
($1,955,027)
|
|
|
6353-45-001
|
POLK
|
LUFKIN
|
$267,380
|
US0059
|
RMC - 635345001
|
02/12/2020
|
09/26/2024
|
TREE & BRUSH REM AND TREE TRIM
|
DREWERY CONSTRUCTION COMPANY, INCORPORATED
($222,695)
|
|
|
6349-71-001
|
RUSK
|
TYLER
|
$513,150
|
SH0042
|
RMC - 634971001
|
02/06/2020
|
11/15/2023
|
TREE RMVL
|
DREWERY CONSTRUCTION COMPANY, INCORPORATED
($489,250)
|
|
|
6333-56-001
|
JASPER
|
BEAUMONT
|
$708,962
|
US0096
|
BPM - 633356001
|
01/10/2020
|
11/15/2023
|
CLEAN/SEAL JOINTS/MISC BRIDGE REPAIR
|
DREWERY CONSTRUCTION COMPANY, INCORPORATED
($779,008)
|
|
|
6351-30-001
|
HARDIN
|
BEAUMONT
|
$1,803,141
|
BU0096F
|
RMC - 635130001
|
01/10/2020
|
11/15/2023
|
MILL & OVERLAY
|
PTSS INVESTMENTS, LLC
($1,306,780)
|
|
|
6354-56-001
|
NACOGDOCHES
|
LUFKIN
|
$137,700
|
US0059
|
RMC - 635456001
|
01/08/2020
|
11/15/2023
|
TREE RMVL
|
ACE CONTRACTORS, INC.
($109,500)
|
|
|
6342-29-001
|
NEWTON
|
BEAUMONT
|
$1,050,000
|
FM2991
|
RMC - 634229001
|
12/04/2019
|
11/15/2023
|
OVERLAY
|
DREWERY CONSTRUCTION COMPANY, INCORPORATED
($1,087,802)
|
|
|
1407-01-029
|
NACOGDOCHES
|
LUFKIN
|
$1,620,932
|
FM 1275
|
STP 2020(362)
|
12/03/2019
|
11/15/2023
|
RESURF WITH THIN OVERLAY MIXTURE
|
DREWERY CONSTRUCTION COMPANY, INCORPORATED
($1,329,188)
|
|
|
1947-02-016
|
HARDIN
|
BEAUMONT
|
$4,944,415
|
FM 1293
|
STP 2020(461)
|
12/03/2019
|
11/15/2023
|
REHAB OF EXIST ROAD
|
TEXAS MATERIALS GROUP, INC.
($5,560,806)
|
|
|
6352-18-001
|
ANGELINA
|
LUFKIN
|
$265,850
|
US0059
|
RMC - 635218001
|
11/13/2019
|
11/15/2023
|
TREE & BRUSH REM AND TREE TRIM
|
K & R CONTRACTORS
($268,350)
|
|
|
6349-62-001
|
CHEROKEE
|
TYLER
|
$135,055
|
SH0110
|
RMC - 634962001
|
11/12/2019
|
11/15/2023
|
TREE TRIM
|
TERRY ENTERPRISES
($134,125)
|
|
|
6349-63-001
|
GREGG
|
TYLER
|
$286,561
|
SL0281
|
RMC - 634963001
|
11/12/2019
|
11/15/2023
|
TREE TRIM
|
HX FARMS, INC.
($254,768)
|
|
|
6349-64-001
|
SMITH
|
TYLER
|
$177,381
|
FM2767
|
RMC - 634964001
|
11/12/2019
|
11/15/2023
|
TREE TRIM
|
NATURAL COLORS PAINTING LLC.
($170,640)
|
|
|
6349-65-001
|
ANDERSON
|
TYLER
|
$151,725
|
FM0323
|
RMC - 634965001
|
11/12/2019
|
11/15/2023
|
TREE TRIM
|
TERRY ENTERPRISES
($145,190)
|
|
|
6349-66-001
|
VAN ZANDT
|
TYLER
|
$201,300
|
FM0279
|
RMC - 634966001
|
11/12/2019
|
11/15/2023
|
TREE TRIM
|
CATOCON, INC.
($236,264)
|
|
|
6349-68-001
|
WOOD
|
TYLER
|
$130,550
|
FM0017
|
RMC - 634968001
|
11/12/2019
|
11/15/2023
|
TREE TRIM
|
GORMAN OUTDOOR, INC.
($142,550)
|
|
|
6349-70-001
|
HENDERSON
|
TYLER
|
$125,350
|
SH0031
|
RMC - 634970001
|
11/12/2019
|
11/15/2023
|
TREE TRIM
|
3 J HAYES CONTRACTING LLC
($125,350)
|
|
|
0378-03-017
|
SMITH
|
TYLER
|
$7,884,833
|
SH 135
|
STP 1902(170)
|
08/07/2019
|
11/15/2023
|
BS RPR,TRT SUBGRD,ACP,OCST,PFC SURF,...
|
DREWERY CONSTRUCTION COMPANY, INCORPORATED
($8,695,777)
|
|
|
0911-04-055
|
POLK
|
LUFKIN
|
$1,549,868
|
VA
|
C 911-4-55
|
08/06/2019
|
11/15/2023
|
REPAIR AND RESURF PAVED AREAS
|
DREWERY CONSTRUCTION COMPANY, INCORPORATED
($1,899,424)
|
|
|
0911-30-030
|
SAN AUGUSTINE
|
LUFKIN
|
$1,071,324
|
CR
|
BR 2018(430)
|
07/10/2019
|
09/27/2024
|
BRIDGE REPL
|
STATELINE CONSTRUCTION, LLC
($1,141,155)
|
|
|
0911-04-076
|
POLK
|
LUFKIN
|
$1,593,654
|
CR
|
BR 2016(774)
|
07/09/2019
|
09/27/2024
|
BRIDGE REPL
|
LONGVIEW BRIDGE AND ROAD, LTD.
($1,682,521)
|
|
|
2507-01-020
|
ANGELINA
|
LUFKIN
|
$3,873,890
|
FM 326
|
STP 1902(160)
|
07/09/2019
|
09/27/2024
|
REHAB OF EXIST ROAD
|
PINTO CONSTRUCTION CO., INC.
($3,646,857)
|
|
|
0200-03-021
|
ANGELINA
|
LUFKIN
|
$32,534,931
|
US 69
|
NH 2014(444)
|
06/05/2019
|
11/15/2023
|
GRADING, STRUCTS, BASE & SURF
|
DREWERY CONSTRUCTION COMPANY, INCORPORATED
($37,447,955)
|
|
|
1682-01-015
|
SHELBY
|
LUFKIN
|
$5,795,189
|
FM 1645
|
STP 1902(029)HES
|
06/04/2019
|
11/15/2023
|
HWY IMPRV
|
LONGVIEW BRIDGE AND ROAD, LTD.
($5,760,486)
|
|
|
0175-02-093
|
SHELBY
|
LUFKIN
|
$1,388,381
|
US 84
|
C 175-2-93
|
05/08/2019
|
11/15/2023
|
RESURF WITH THIN OVERLAY MIXTURE
|
MOORE BROTHERS CONSTRUCTION COMPANY
($1,365,032)
|
|
|
2075-02-065
|
SMITH
|
TYLER
|
$4,555,867
|
SL 323
|
NH 1902(022)
|
05/08/2019
|
11/15/2023
|
PLN,BS RPR,SUPERPV,MEMB UNDRSL,PFC O...
|
DREWERY CONSTRUCTION COMPANY, INCORPORATED
($4,993,647)
|
|
|
0247-03-032
|
PANOLA
|
ATLANTA
|
$4,684,581
|
US 79
|
STP 2019(657)HES
|
05/07/2019
|
11/15/2023
|
ACP SURF & PAV MRK
|
MADDEN CONTRACTING COMPANY, LLC.
($4,609,876)
|
|
|
0247-01-057
|
PANOLA
|
ATLANTA
|
$9,847,685
|
US 79
|
NH 2019(679)
|
04/03/2019
|
11/15/2023
|
PLANE ACP, ACP SURF, & PAV MARK
|
MADDEN CONTRACTING COMPANY, LLC.
($8,993,197)
|
|
|
0206-04-042
|
CHEROKEE
|
TYLER
|
$8,282,983
|
US 79
|
NH 2019(733)
|
04/02/2019
|
11/15/2023
|
PLN,CM TRT,BS&SURF,BR RL,MBGF,PV MK
|
MADDEN CONTRACTING COMPANY, LLC.
($8,163,209)
|
|
|
0206-07-062
|
RUSK
|
TYLER
|
$2,163,415
|
US 79
|
C 206-7-62
|
03/06/2019
|
11/15/2023
|
PLNG,BS RPR,PFC,MBGF,SUPERPV,OCST
|
FOUTSCO PAVING COMPANY, LLC
($1,940,981)
|
|
|
0336-03-071
|
ANGELINA
|
LUFKIN
|
$1,217,321
|
SH 103
|
STP 2019(635)
|
03/06/2019
|
11/15/2023
|
WIDENING PAVING FOR ADDITIONAL TURNI...
|
LONGVIEW BRIDGE AND ROAD, LTD.
($1,665,263)
|
|
|
1407-01-028
|
NACOGDOCHES
|
LUFKIN
|
$780,095
|
FM 1275
|
STP 2019(636)HES
|
03/06/2019
|
11/15/2023
|
SAFETY TREAT FIXED OBJECTS
|
A R BROTHERS CONSTRUCTION SERVICES, INC.
($718,362)
|
|
|
0910-08-068
|
ANDERSON
|
TYLER
|
$636,684
|
CR
|
BR 2015(256)
|
03/05/2019
|
11/15/2023
|
REPLACE BRIDGE AND APPROACHES
|
BAKER & REID COMPANY, LLC
($607,852)
|
|
|
6341-87-001
|
HENDERSON
|
TYLER
|
$1,142,863
|
SH0019
|
RMC - 634187001
|
03/05/2019
|
11/15/2023
|
MILL & INLAY
|
LONGVIEW BRIDGE AND ROAD, LTD.
($1,389,529)
|
|
|
0200-04-024
|
JASPER
|
BEAUMONT
|
$11,758,396
|
US 69
|
NH 2019(629)
|
02/06/2019
|
11/15/2023
|
OVERLAY EXIST ROADWAY
|
HERITAGE ASPHALT COMPANY LLC
($10,120,117)
|
|
|
2560-01-083
|
NACOGDOCHES
|
LUFKIN
|
$1,590,357
|
SL 224
|
C 2560-1-83
|
02/06/2019
|
11/15/2023
|
RESURF WITH THIN OVERLAY MIXTURE
|
DREWERY CONSTRUCTION COMPANY, INCORPORATED
($1,560,111)
|
|
|
0200-07-054
|
TYLER
|
BEAUMONT
|
$5,852,881
|
US 69
|
NH 2019(676)
|
02/05/2019
|
11/15/2023
|
MILL AND OVERLAY
|
TEXAS MATERIALS GROUP, INC.
($4,390,336)
|
|
|
2590-02-010
|
NACOGDOCHES
|
LUFKIN
|
$3,995,249
|
FM 2609
|
STP 2019(446)
|
02/05/2019
|
11/15/2023
|
RECON AND WIDEN PAVMT
|
PINTO CONSTRUCTION CO., INC.
($3,823,596)
|
|
|
6341-13-001
|
SMITH
|
TYLER
|
$3,143,855
|
SH0064
|
RMC - 634113001
|
02/05/2019
|
11/15/2023
|
MILL & INLAY
|
LONGVIEW BRIDGE AND ROAD, LTD.
($3,363,242)
|
|
|
0138-06-044
|
NACOGDOCHES
|
LUFKIN
|
$3,720,758
|
US 259
|
C 138-6-44
|
01/09/2019
|
11/15/2023
|
PLANE, OCST AND PFC
|
DREWERY CONSTRUCTION COMPANY, INCORPORATED
($3,341,270)
|
|
|
6339-33-001
|
VAN ZANDT
|
TYLER
|
$486,800
|
SH0019
|
RMC - 633933001
|
01/09/2019
|
11/15/2023
|
TREE RMVL
|
CATOCON, INC.
($359,400)
|
|
|
6339-35-001
|
WOOD
|
TYLER
|
$758,400
|
SH0037
|
RMC - 633935001
|
01/09/2019
|
11/15/2023
|
TREE RMVL
|
CATOCON, INC.
($656,928)
|
|
|
0176-05-181
|
POLK
|
LUFKIN
|
$3,683,021
|
US 59
|
C 176-5-181
|
01/08/2019
|
11/15/2023
|
PLANE, HMA & PERMEABLE FRICTION COUR...
|
MOORE BROTHERS CONSTRUCTION COMPANY
($3,604,503)
|
|
|
0246-01-034
|
RUSK
|
TYLER
|
$5,687,717
|
US 79
|
STP 2019(435)
|
01/08/2019
|
11/15/2023
|
PLAN,CAM,HARST,SUPERPV,OCST,PFC SURF...
|
MADDEN CONTRACTING COMPANY, LLC.
($5,843,498)
|
|
|
6339-34-001
|
CHEROKEE
|
TYLER
|
$680,450
|
US0069
|
RMC - 633934001
|
01/08/2019
|
11/15/2023
|
TREE RMVL
|
SG COMPANY
($661,808)
|
|
|
0064-05-061
|
SABINE
|
LUFKIN
|
$2,054,935
|
FM 1
|
STP 2019(330)HES
|
12/05/2018
|
11/15/2023
|
SAFETY TREAT FIXED OBJECTS
|
LONGVIEW BRIDGE AND ROAD, LTD.
($1,954,394)
|
|
|
0336-05-061
|
ANGELINA
|
LUFKIN
|
$1,287,979
|
SH 103
|
C 336-5-61
|
12/05/2018
|
11/15/2023
|
RESURF WITH THIN OVERLAY MIXTURE
|
MOORE BROTHERS CONSTRUCTION COMPANY
($1,098,660)
|
|
|
6312-48-001
|
JASPER
|
BEAUMONT
|
$509,843
|
FM1131
|
RMC - 631248001
|
11/06/2018
|
11/15/2023
|
REHAB EXIST ROADWAY/OVERLAY/STRIPING
|
OLDCASTLE MATERIALS TEXAS, INC.
($497,996)
|
|
|
6331-77-001
|
JASPER
|
BEAUMONT
|
$563,388
|
US0190
|
RMC - 633177001
|
11/06/2018
|
11/15/2023
|
FLEXIBLE PAVMT STRUCT REPAIR
|
OLDCASTLE MATERIALS TEXAS, INC.
($897,768)
|
|
|
0109-01-062
|
ANDERSON
|
TYLER
|
$6,226,272
|
US 287
|
STP 2019(092)
|
10/03/2018
|
11/15/2023
|
BS RPR,TRT SBGD,ACP,OCST,PFC,STRS,SI...
|
A. L. HELMCAMP, INC.
($6,180,317)
|
|
|
1389-02-011
|
GREGG
|
TYLER
|
$662,092
|
FM 1252
|
STP 2019(093)
|
10/03/2018
|
11/15/2023
|
GR,CMT TRT SBGRD,ACP,OCST,STRS,PV MK
|
REYNOLDS & KAY, LTD.
($739,231)
|
|
|
2813-01-008
|
HOUSTON
|
LUFKIN
|
$4,275,843
|
FM 2781
|
STP 2019(095)
|
10/03/2018
|
11/15/2023
|
REHAB AND WIDEN EXIST PAVMENT
|
PINTO CONSTRUCTION CO., INC.
($4,041,101)
|
|
|
6333-94-001
|
HOUSTON
|
LUFKIN
|
$1,250,786
|
US0287
|
RMC - 633394001
|
10/03/2018
|
11/15/2023
|
MILL AND INLAY
|
MOORE BROTHERS CONSTRUCTION COMPANY
($1,388,699)
|
|
|
6334-44-001
|
HARRISON
|
ATLANTA
|
$471,500
|
US0059
|
RMC - 633444001
|
10/03/2018
|
11/15/2023
|
TREE & STUMP RMVL (S)
|
T.F.R. ENTERPRISES, INC.
($454,500)
|
|
|
6334-45-001
|
UPSHUR
|
ATLANTA
|
$531,250
|
US0259
|
RMC - 633445001
|
10/03/2018
|
11/15/2023
|
TREE & STUMP RMVL (W)
|
BRYDL CONTRACTING, INC.
($494,994)
|