Bid Cobra

SABINE US 96 (0064-06-053)

Items: 142

County: SABINE
Length: 0.0000 MILES
Highway: US 96
District: LUFKIN
Control Number: 0064-06-053
DBE Goal: 3.0%
Project: F 2025(669)
Guaranty: $100,000.00
Time: 303 WORKING DAYS
Engineer's Estimate: $17,242,219.25
Date: 07/01/2025 (11 months ago) Changed
Contract Number: 7253002
Type: HIGHWAY IMPROVEMENT
Project ID: A00064919
Contract Type: Federal
Project Description: REHABILITATE EXISTING PAVEMENT AND ADD PASSING LANES; SUPER 2
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
JESSE SISCO
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$17,242,219.25
$14,650,397.62
Over/Under Est: -15.03% -$2,591,821.63
$15,672,118.61
Over/Under Est: -9.11% -$1,570,100.64
Amt Left: 6.97% $1,021,720.99
Over/Under Est: -3.85% -$664,620.50
Amt Left: 13.15% $1,927,201.13
Delta: -5.78% -$905,480.14
Over/Under Est: 3.39% $584,269.50
Amt Left: 21.68% $3,176,091.13
Delta: -7.53% -$1,248,890.00
$23,545,439.73
Over/Under Est: 36.56% $6,303,220.48
Amt Left: 60.72% $8,895,042.11
Delta: -32.08% -$5,718,950.98
Subcontractor Percentage Amount
TEXAS MATERIALS GROUP, INC. 53.11% $7,794,017.80
A R BROTHERS CONSTRUCTION SERVICES, INC. 5.85% $858,501.30
THIRD COAST SERVICES LLC 1.83% $268,556.82
COLD CREEK CONSTRUCTION, LTD 1.35% $198,115.68
AMERICAN REMEDIATION OPTIONS, INC. 1.26% $184,907.97
CAP RIVER LLC 0.74% $108,596.75
INTERSTATE BARRICADES & MARKINGS, INC. 0.66% $96,856.56
A. L. HELMCAMP, INC. 0.38% $55,765.90
PANOLA SIGN & BARRICADE, INC. 0.34% $49,895.80
DUSTROL, INC. 0.27% $39,623.14
WEST TEXAS RUMBLE STRIP LLC 0.06% $8,805.14
Total: 65.85% $9,663,642.86

Bid Items & Bid Tabulations

142 Total 0 of 142
SABINE  |  US 96  |  LUFKIN  |  0064-06-053  |  07/01/2025  |  $17,242,219.25  |  F 2025(669)  |  HWY IMPRV  |  303 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
PINTO CONSTRUCTION CO., INC.
A. L. HELMCAMP, INC.
DREWERY CONSTRUCTION COMPANY, INCORPORATED
LONGVIEW BRIDGE AND ROAD, LTD.
ISI CONTRACTING, INC.
PREPARING ROW
STA 126.890 $2,000.000 $2,205.000 $2,800.000 $1,750.000 $5,000.000 $1,787.060
REMOV CONC (DRIVEWAYS)
SY 1,568.000 $35.000 $24.150 $27.000 $28.000 $33.250 $31.520
EXCAV (ROADWAY)
CY 14,810.000 $15.000 $13.750 $13.000 $22.000 $20.000 $42.000
EXCAV (SPECIAL)
CY 2,000.000 $20.000 $12.320 $20.000 $30.000 $30.000 $45.980
EMBANK (FNL)(DC)(TY C)
CY 14,581.000 $40.000 $21.500 $24.000 $33.000 $25.000 $50.520
BLADING
STA 126.890 $300.000 $366.750 $200.000 $350.000 $250.000 $729.030
SPEC EXCAV WORK (HYD EXCAVATOR)
HR 50.000 $175.000 $131.250 $135.000 $135.000 $400.000 $160.470
BLOCK SODDING
SY 2,107.000 $8.000 $6.300 $6.000 $6.500 $8.800 $9.030
ROLL SODDING
SY 2,870.000 $10.000 $6.300 $6.000 $6.500 $8.800 $9.030
BROADCAST SEED (TEMP_WARM)
SY 51,126.000 $0.500 $0.110 $0.160 $0.150 $0.200 $0.190
BROADCAST SEED (TEMP_COOL)
SY 51,126.000 $0.500 $0.130 $0.160 $0.150 $0.200 $0.190
BOND FBR MTRX SEED (PERM)(RURAL)(CLAY)
SY 102,244.000 $1.000 $0.650 $0.600 $0.700 $0.800 $0.800
VEGETATIVE WATERING
TGL 4,098.000 $20.000 $0.010 $1.000 $25.000 $22.000 $53.440
SOIL RET BLKT(SL_STEEP_SAND_SHORT_ROLL)
SY 6,130.000 $2.000 $0.770 $2.200 $1.000 $1.100 $1.140
RDSIDE AMENITY (TRASH/RECYCLE BIN)
EA 6.000 $3,000.000 $750.000 $8,000.000 $5,500.000 $750.000 $835.940
FL BS (RDWY DEL) (TY D GR 1-2)
TON 27,609.000 $60.000 $67.160 $62.000 $66.500 $80.000 $225.000
REWORK BS MTL (TY C)(12")(ORD COMP)
SY 30,075.000 $9.000 $7.060 $2.900 $7.250 $4.000 $4.420
CEMENT
TON 1,322.000 $250.000 $242.000 $250.000 $280.000 $305.000 $271.480
CEMENT TRT (EXIST MATL & NEW BASE)(12")
SY 71,897.000 $6.000 $4.000 $4.800 $4.250 $4.000 $22.000
CEMENT TRT (SUBGRADE)(12")
SY 2,416.000 $6.000 $12.200 $6.500 $11.250 $4.500 $22.000
PRIME COAT (MC-30)
GAL 14,871.000 $8.000 $5.430 $4.800 $6.000 $7.000 $6.960
EMULS ASPH (EROSN CONT)(SS-1)
GAL 1,678.000 $8.000 $8.500 $6.000 $6.000 $6.500 $5.180
ASPH (AC-15P OR CRS-2P)
TON 215.000 $1,250.000 $1,009.630 $1,000.000 $800.000 $1,100.000 $1,294.130
AGGR (TY E OR L, PE OR PL GR 4)
CY 862.000 $225.000 $197.660 $200.000 $260.000 $240.000 $256.850
SP MIXES SP-B PG70-22
TON 24,886.000 $180.000 $155.880 $172.000 $161.250 $175.000 $152.580
SP MIXES SP-C PG70-22
TON 7,050.000 $180.000 $172.590 $184.000 $176.250 $194.000 $195.900
SP MIXES SP-C SAC-A PG76-22
TON 12,706.000 $185.000 $174.620 $178.000 $180.480 $190.000 $175.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 200.000 $275.000 $313.890 $250.000 $325.000 $350.000 $620.470
PLANE ASPH CONC PAV(0" TO 2")
SY 12,090.000 $5.000 $2.920 $3.200 $5.000 $5.000 $4.350
PLANE ASPH CONC PAV (0" TO 2-1/2")
SY 12,090.000 $6.000 $2.940 $3.200 $6.500 $5.500 $4.170
CUT & RESTORE ASPH PAVING
SY 18.000 $200.000 $193.200 $210.000 $200.000 $615.000 $482.020
CEM STABIL BKFL
CY 94.200 $300.000 $311.850 $340.000 $335.000 $350.000 $22.390
TRENCH EXCAVATION PROTECTION
LF 75.000 $50.000 $15.750 $17.000 $16.000 $15.000 $182.550
DRILL SHAFT (36 IN)
LF 18.000 $400.000 $332.770 $350.000 $575.000 $550.000 $358.090
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 144.000 $320.000 $155.730 $165.000 $285.000 $280.000 $167.590
CL C CONC (COLLAR)
EA 2.000 $5,000.000 $1,575.000 $1,700.000 $1,600.000 $2,500.000 $8,605.990
RIPRAP (CONC)(CL B)
CY 6.300 $1,000.000 $840.000 $900.000 $860.000 $1,400.000 $1,268.750
RIPRAP (CONC) (CL B) (4 IN)
CY 1.250 $1,000.000 $1,207.500 $1,600.000 $1,240.000 $1,550.000 $5,063.650
RIPRAP (STONE PROTECTION)(24 IN)
CY 52.000 $250.000 $331.800 $350.000 $340.000 $600.000 $512.330
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
LF 30.000 $1,000.000 $833.700 $880.000 $850.000 $700.000 $1,382.390
RC PIPE (CL III)(18 IN)
LF 490.000 $100.000 $76.650 $81.000 $80.000 $85.000 $232.000
RC PIPE (CL III)(24 IN)
LF 276.000 $125.000 $107.100 $113.000 $110.000 $125.000 $270.450
RC PIPE (CL III)(30 IN)
LF 102.000 $200.000 $249.900 $262.000 $255.000 $125.000 $295.020
RC PIPE (CL III)(36 IN)
LF 20.000 $250.000 $210.000 $230.000 $215.000 $300.000 $347.710
JCTBOX(COMPL)(PJB)(4FTX4FT)
EA 1.000 $8,000.000 $7,665.000 $8,000.000 $7,850.000 $7,100.000 $5,200.140
INLET(COMPL)(PAZD)(FG)(4FTX4FT-3FTX3FT)
EA 2.000 $9,000.000 $8,190.000 $8,600.000 $8,400.000 $7,500.000 $6,802.240
HEADWALL (CH - FW - 0) (DIA= 30 IN)
EA 1.000 $15,000.000 $8,715.000 $9,100.000 $10,000.000 $16,500.000 $56,850.400
HEADWALL (CH - FW - 0) (DIA= 36 IN)
EA 1.000 $20,000.000 $13,079.850 $14,000.000 $15,000.000 $16,500.000 $64,246.030
HEADWALL (CH - FW - 30) (DIA= 36 IN)
EA 1.000 $22,000.000 $9,838.500 $10,500.000 $12,500.000 $16,500.000 $86,912.400
HEADWALL (CH - PW - 0) (DIA= 30 IN)
EA 1.000 $12,000.000 $13,335.000 $14,000.000 $15,000.000 $16,500.000 $57,392.820
WINGWALL (PW - 1) (HW=8 FT)
EA 2.000 $20,000.000 $45,150.000 $47,000.000 $50,000.000 $25,000.000 $79,244.880
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 40.000 $1,300.000 $892.500 $950.000 $1,000.000 $1,025.000 $3,206.710
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 19.000 $2,000.000 $1,533.000 $1,600.000 $1,560.000 $1,900.000 $4,004.580
CLEAN EXIST CULVERTS
EA 6.000 $4,000.000 $1,995.000 $2,500.000 $2,500.000 $4,600.000 $6,547.950
REMOV STR (INLET)
EA 2.000 $750.000 $603.750 $830.000 $1,500.000 $2,500.000 $3,000.000
REMOV STR (PICNIC AREA)
EA 4.000 $7,800.000 $2,500.000 $8,400.000 $500.000 $3,500.000 $2,000.000
REMOV STR (PIPE)
EA 1.000 $1,000.000 $1,575.000 $1,700.000 $2,000.000 $2,500.000 $5,000.000
REMOV STR(DRWY CULVERT)
EA 28.000 $1,000.000 $367.500 $385.000 $400.000 $2,000.000 $91.120
MOBILIZATION
LS 1.000 $1,500,000.000 $1,000,000.000 $1,100,000.000 $1,650,000.000 $1,750,000.000 $1,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 27.000 $5,000.000 $2,050.000 $14,750.000 $9,800.000 $10,000.000 $15,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $20,000.000 $20,000.000 $10,000.000 $20,000.000 $20,000.000 $212.580
TMA (STATIONARY)
DAY 120.000 $300.000 $250.000 $300.000 $500.000 $265.000 $500.000
TMA (MOBILE OPERATION)
DAY 20.000 $300.000 $50.000 $300.000 $750.000 $350.000 $72.980
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 626.000 $45.000 $49.880 $39.000 $60.000 $65.000 $65.830
ROCK FILTER DAMS (REMOVE)
LF 626.000 $15.000 $10.500 $10.500 $5.000 $22.000 $22.180
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 312.000 $40.000 $15.000 $25.000 $100.000 $56.000 $57.670
CONSTRUCTION EXITS (REMOVE)
SY 312.000 $15.000 $7.500 $8.000 $15.000 $18.000 $18.270
TEMP SEDMT CONT FENCE (INSTALL)
LF 17,260.000 $5.000 $3.680 $4.000 $4.750 $4.000 $4.190
TEMP SEDMT CONT FENCE (REMOVE)
LF 17,260.000 $1.000 $1.050 $0.500 $1.000 $1.100 $1.150
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 45.000 $7.000 $10.500 $10.000 $25.000 $6.750 $6.900
BIODEG EROSN CONT LOGS (REMOVE)
LF 45.000 $2.000 $4.200 $1.200 $4.000 $0.600 $0.610
COLORED TEXTURED CONC (4")
SY 501.000 $130.000 $199.500 $210.000 $205.000 $100.000 $647.710
CONC CURB (TY I)
LF 361.000 $45.000 $51.450 $54.000 $53.000 $30.000 $119.680
CONC CURB (TY II)
LF 118.000 $65.000 $76.650 $80.000 $80.000 $70.000 $12.890
INTERSECTIONS (ACP)
SY 349.000 $75.000 $88.260 $110.000 $93.000 $80.000 $97.210
DRIVEWAYS (CONC)
SY 1,601.000 $200.000 $162.750 $170.000 $165.000 $140.000 $320.570
DRIVEWAYS (ACP)
SY 2,714.000 $75.000 $80.430 $100.000 $86.000 $100.000 $115.260
TURNOUTS (ACP)
SY 74.000 $75.000 $148.050 $170.000 $156.000 $200.000 $939.010
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 24,920.000 $2.000 $0.360 $0.300 $1.000 $0.600 $0.460
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
LF 668.000 $2.000 $0.390 $0.300 $1.500 $2.000 $1.600
MTL W-BEAM GD FEN (TIM POST)
LF 350.000 $35.000 $27.830 $25.000 $28.500 $30.000 $32.190
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,000.000 $2,520.000 $1,800.000 $1,775.000 $1,815.000 $2,141.180
REMOVE METAL BEAM GUARD FENCE
LF 475.000 $5.000 $2.630 $4.000 $3.250 $3.500 $4.240
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $500.000 $262.500 $340.000 $162.000 $165.000 $282.480
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,500.000 $3,150.000 $3,100.000 $3,225.000 $3,300.000 $3,681.270
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $450.000 $262.500 $340.000 $215.000 $220.000 $282.480
GATE (REMOVE)
EA 1.000 $500.000 $500.000 $600.000 $1,000.000 $400.000 $557.290
WIRE FENCE (TY C)
LF 200.000 $50.000 $50.000 $20.000 $20.000 $50.000 $29.610
GATE (TY 1)
EA 1.000 $1,500.000 $5,250.000 $1,000.000 $2,000.000 $2,500.000 $2,786.480
MAILBOX INSTALL-S (WC-POST) TY 3
EA 13.000 $250.000 $309.750 $200.000 $240.000 $250.000 $231.630
MAILBOX INSTALL-D (WC-POST) TY 3
EA 1.000 $300.000 $309.750 $250.000 $287.000 $300.000 $276.840
REMOVE RD IL ASM (TRANS-BASE)
EA 9.000 $660.000 $731.390 $160.000 $887.000 $910.000 $168.290
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 18.000 $7,000.000 $4,904.800 $5,200.000 $7,500.000 $7,600.000 $4,990.660
CONDT (PVC) (SCH 40) (2")
LF 30.000 $11.000 $17.000 $18.000 $25.000 $22.000 $17.300
CONDT (PVC) (SCH 40) (3")
LF 13.000 $20.000 $18.480 $19.000 $35.000 $32.000 $18.800
CONDT (PVC) (SCH 80) (2")
LF 1,510.000 $17.000 $17.880 $19.000 $13.000 $13.000 $18.190
CONDT (PVC) (SCH 80) (2") (BORE)
LF 1,630.000 $25.000 $25.400 $27.000 $24.250 $25.000 $25.840
CONDT (RM) (3")
LF 4.000 $50.000 $91.830 $100.000 $200.000 $165.000 $93.440
ELEC CONDR (NO.8) BARE
LF 3,320.000 $2.500 $2.390 $2.500 $2.500 $2.600 $2.440
ELEC CONDR (NO.8) INSULATED
LF 6,730.000 $2.500 $3.290 $3.500 $3.000 $3.000 $3.340
GROUND BOX TY C (162911)W/APRON
EA 7.000 $1,400.000 $1,332.260 $1,400.000 $1,750.000 $1,800.000 $1,355.580
GROUND BOX TY D (162922)W/APRON
EA 1.000 $1,800.000 $1,345.920 $1,420.000 $2,500.000 $2,000.000 $1,369.480
REMOVE ELECTRICAL SERVICES
EA 2.000 $550.000 $469.140 $500.000 $550.000 $550.000 $477.350
ELC SRV TY A 120/240 060(NS)SS(E)SP(U)
EA 2.000 $7,000.000 $7,062.840 $7,400.000 $7,500.000 $7,400.000 $7,186.480
ELC SRV TY D 120/240 100(NS)SS(E)SP(O)
EA 1.000 $8,000.000 $7,834.050 $8,200.000 $10,000.000 $10,000.000 $7,971.190
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 5.000 $840.000 $577.500 $780.000 $650.000 $670.000 $698.290
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 5.000 $875.000 $708.750 $1,000.000 $760.000 $780.000 $839.520
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 5.000 $1,125.000 $918.750 $1,200.000 $925.000 $950.000 $897.150
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $1,500.000 $1,055.250 $1,400.000 $1,500.000 $1,150.000 $1,239.520
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 1.000 $1,500.000 $1,260.000 $1,500.000 $1,750.000 $1,300.000 $1,239.520
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 33.000 $600.000 $425.250 $700.000 $455.000 $470.000 $429.370
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 3.000 $725.000 $472.500 $710.000 $525.000 $550.000 $371.970
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 1.000 $600.000 $525.000 $750.000 $750.000 $650.000 $509.610
REMOVE SM RD SN SUP&AM
EA 48.000 $150.000 $99.750 $110.000 $110.000 $110.000 $96.040
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 12.000 $32.000 $47.250 $45.000 $48.500 $50.000 $23.730
INSTL OM ASSM (OM-2Z)(WFLX)SRF(BI)
EA 12.000 $125.000 $99.750 $85.000 $182.750 $200.000 $141.250
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 25,489.000 $1.000 $0.210 $0.220 $0.220 $0.250 $0.210
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 50,978.000 $1.000 $0.210 $0.220 $0.220 $0.250 $0.210
WK ZN PAV MRK REMOV (TRAF BTN) TY W
LF 25,489.000 $5.000 $0.580 $1.100 $1.100 $1.100 $1.070
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
LF 25,489.000 $5.000 $0.580 $1.100 $1.100 $1.100 $1.070
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 39,508.000 $2.000 $0.010 $0.550 $0.750 $1.750 $2.450
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 2,549.000 $2.000 $3.150 $0.550 $1.200 $1.250 $1.930
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,274.000 $2.000 $3.150 $0.550 $1.250 $1.250 $2.450
REFL PAV MRK TY I (W)6"(DOT)(090MIL)
LF 2,492.000 $0.750 $2.630 $2.200 $2.150 $2.200 $2.140
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 585.000 $0.750 $1.840 $1.100 $2.000 $1.100 $1.070
REFL PAV MRK TY I (W)6"(BRK)(090MIL)
LF 5,262.000 $0.750 $0.650 $0.900 $1.000 $0.900 $0.850
REFL PAV MRK TY I (W)6"(SLD)(090MIL)
LF 24,964.000 $0.750 $0.650 $0.700 $0.650 $0.700 $0.640
REFL PAV MRK TY I (Y)6"(BRK)(090MIL)
LF 5,142.000 $0.750 $0.650 $0.900 $0.860 $0.900 $0.850
REFL PAV MRK TY I (Y)6"(SLD)(090MIL)
LF 25,466.000 $0.750 $0.650 $0.700 $0.650 $0.700 $0.640
PREFAB PM TY C (W)(24")(SLD)
LF 52.000 $22.000 $15.750 $15.000 $20.000 $15.500 $14.960
PREFAB PM TY C (W)(ARROW)
EA 10.000 $250.000 $210.000 $250.000 $250.000 $250.000 $240.390
PREFAB PM TY C (W)(LN REDUCT ARROW)
EA 2.000 $350.000 $367.500 $360.000 $350.000 $360.000 $347.220
PREFAB PM TY C (W)(WORD)
EA 5.000 $250.000 $236.250 $290.000 $280.000 $290.000 $277.780
REFL PAV MRKR TY I-C
EA 306.000 $7.000 $5.250 $6.000 $5.500 $5.500 $5.340
REFL PAV MRKR TY II-A-A
EA 603.000 $7.000 $5.250 $6.000 $5.500 $5.500 $5.340
BONDING COURSE
GAL 22,617.000 $6.000 $6.040 $4.500 $6.150 $5.000 $6.380
ITS POLE MNT CAB (TY 2)(CONF 2)
EA 1.000 $6,200.000 $7,967.080 $8,500.000 $9,406.250 $9,625.000 $8,106.540
ITS POLE (30 FT) (110 MPH)
EA 1.000 $12,000.000 $11,923.100 $13,000.000 $16,384.080 $16,800.000 $12,131.820
INSTALLATION OF CELLULAR MODEM
EA 1.000 $1,300.000 $1,876.600 $2,000.000 $1,343.750 $1,400.000 $1,909.450
CCTV FIELD EQUIPMENT (DIGITAL)
EA 1.000 $5,400.000 $7,609.880 $8,000.000 $8,487.130 $8,700.000 $7,743.090
CCTV MOUNT (POLE)
EA 1.000 $700.000 $191.100 $200.000 $1,397.500 $1,450.000 $194.450
INSTALLATION OF ETHERNET SWITCH
EA 1.000 $1,000.000 $1,876.600 $2,000.000 $1,032.000 $1,100.000 $1,909.450
Totals: $17,242,219.250 $14,650,397.612 $15,672,118.610 $16,577,598.750 $17,826,488.750 $23,545,439.726
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
ITS: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
Total: $20,000.00