CHEROKEE US 84 (0123-03-022)

Items: 103

County: CHEROKEE
Length: N/A
Highway: US 84
District: TYLER
Control Number: 0123-03-022
DBE Goal: N/A
Project: STP 2021(216)
Guaranty: N/A
Time: 295 WORKING DAYS
Engineer's Estimate: $9,385,832.00
Date: 01/08/2021 (5 years ago)
Contract Number: N/A
Type: GR,STRS,PLANING,BS RPR,SBGR WDN,ACP SURF,MBGF,PVMK
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (8)
E
Engineer's Estimate
$9,385,832.00
$7,859,265.16
Over/Under Est: -16.26% -$1,526,566.84
$8,372,538.68
Over/Under Est: -10.8% -$1,013,293.32
Amt Left: 6.53% $513,273.52
Over/Under Est: -10.63% -$998,069.82
Amt Left: 6.72% $528,497.02
Delta: -0.18% -$15,223.50
Over/Under Est: -0.97% -$91,202.33
Amt Left: 18.26% $1,435,364.51
Delta: -10.81% -$906,867.49
Over/Under Est: -0.37% -$34,763.67
Amt Left: 18.98% $1,491,803.17
Delta: -0.61% -$56,438.66
$9,615,703.53
Over/Under Est: 2.45% $229,871.53
Amt Left: 22.35% $1,756,438.37
Delta: -2.83% -$264,635.20
$11,235,214.20
Over/Under Est: 19.7% $1,849,382.20
Amt Left: 42.96% $3,375,949.04
Delta: -16.84% -$1,619,510.67
Over/Under Est: 41.37% $3,882,689.26
Amt Left: 68.83% $5,409,256.10
Delta: -18.10% -$2,033,307.06
Subcontractor Percentage Amount
A R BROTHERS CONSTRUCTION SERVICES, INC. 14.64% $1,150,596.42
R & G CONSTRUCTION, LLC 6.43% $505,350.75
REYNOLDS & KAY, LTD. 6.08% $477,843.32
J. H. ODEN CONTRACTING COMPANY 5.42% $425,972.17
ASE CONTRACTORS LLC 2.91% $228,704.62
DREWERY CONSTRUCTION COMPANY, INCORPORATED 2.41% $189,408.29
DREWERY BROS. TREE SERVICE, INC. 1.92% $150,897.89
SOUTHWEST ENVIRONMENT SERVICES LLC 1.14% $89,595.62
STATELINE CONSTRUCTION, LLC 0.99% $77,806.73
PANOLA SIGN & BARRICADE, INC. 0.42% $33,008.91
ROWC ENERGY SERVICES, LLC 0.29% $22,791.87
Total: 42.65% $3,351,976.59

Bid Items & Bid Tabulations

103 Total 0 of 103
CHEROKEE  |  US 84  |  TYLER  |  0123-03-022  |  01/08/2021  |  $9,385,832.00  |  STP 2021(216)  |  GR,STRS,PLANING,BS RPR,SBGR WDN,ACP...  |  295 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
MADDEN CONTRACTING COMPANY, LLC.
A. L. HELMCAMP, INC.
DREWERY CONSTRUCTION COMPANY, INCORPORATED
EAST TEXAS BRIDGE, INC.
LONGVIEW BRIDGE AND ROAD, LTD.
REYNOLDS & KAY, LTD.
ALTUS CONSTRUCTION LLC
F.H. PASCHEN, S.N. NIELSEN & ASSOCIATES LLC
PREPARING ROW
STA 478.310 $1,000.000 $390.000 $1,200.000 $675.000 $1,000.000 $1,100.000 $785.000 $1,472.010 $1,500.000
REMOVING CONC (DRIVEWAYS)
SY 381.000 $20.000 $20.000 $26.000 $17.000 $12.000 $20.000 $14.000 $13.010 $20.000
SUBGRADE WIDENING (ORD COMP)
STA 432.090 $250.000 $200.000 $280.000 $395.000 $375.000 $250.000 $330.000 $829.840 $2,500.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 1,287.000 $20.000 $20.000 $20.000 $30.000 $20.000 $14.000 $14.000 $38.570 $70.000
BACKFILL (TY B)
STA 466.160 $230.000 $140.000 $170.000 $210.000 $285.000 $200.000 $250.000 $177.430 $560.000
BLADING
STA 466.160 $200.000 $95.000 $200.000 $180.000 $220.000 $140.000 $25.000 $125.150 $1,500.000
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 144,995.000 $1.000 $0.650 $0.670 $0.700 $0.720 $0.700 $0.800 $0.770 $0.630
BONDED FBR MTRX SEED (TEMP)(WARM)
SY 72,497.000 $0.800 $0.610 $0.620 $0.600 $0.620 $0.640 $0.700 $0.730 $0.730
BONDED FBR MTRX SEED (TEMP)(COOL)
SY 72,497.000 $0.800 $0.600 $0.620 $0.600 $0.600 $0.650 $0.650 $0.660 $0.710
VEGETATIVE WATERING
MG 3,190.000 $10.000 $10.000 $1.000 $18.000 $4.000 $1.000 $5.000 $17.660 $41.670
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
GAL 65,814.000 $3.200 $2.600 $2.700 $2.700 $3.650 $4.000 $3.000 $2.980 $2.530
AGGR (TY-PD GR-3 OR TY-PL GR-3)
CY 1,567.000 $120.000 $125.000 $100.000 $130.000 $125.000 $160.000 $138.000 $101.270 $86.000
D-GR HMA(SQ) TY-D PG64-22
TON 1,012.000 $155.000 $118.000 $140.000 $175.000 $110.000 $105.000 $280.000 $347.390 $243.010
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 7,980.000 $55.000 $62.500 $70.000 $75.000 $78.000 $80.000 $74.000 $72.470 $71.580
PLANE ASPH CONC PAV (2 1/2")
SY 4,312.000 $2.000 $3.500 $3.000 $5.500 $2.500 $2.800 $2.750 $3.250 $5.300
PLANE ASPH CONC PAV (0"- 2 1/2")
SY 7,225.000 $2.100 $3.500 $3.000 $3.300 $2.500 $2.500 $3.500 $3.250 $5.190
TEMPORARY SPL SHORING
SF 5,607.000 $45.000 $22.500 $25.000 $20.500 $65.000 $54.000 $35.000 $35.330 $40.000
RIPRAP (CONC)(5 IN)
CY 20.500 $550.000 $550.000 $530.000 $410.000 $575.000 $750.000 $900.000 $423.340 $500.000
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 56.000 $165.000 $200.000 $100.000 $170.000 $165.000 $215.000 $220.000 $210.790 $95.000
RIPRAP (MOW STRIP)(4 IN)
CY 144.000 $500.000 $495.000 $580.000 $390.000 $475.000 $520.000 $625.000 $438.270 $550.000
RETROFIT RAIL (TY T631)
LF 2,452.000 $105.000 $41.000 $62.000 $71.500 $80.000 $85.000 $47.000 $48.280 $41.000
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 150.000 $450.000 $500.000 $500.000 $370.000 $550.000 $535.000 $510.000 $588.800 $3,500.000
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
LF 90.000 $500.000 $550.000 $550.000 $410.000 $600.000 $495.000 $500.000 $647.680 $4,000.000
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
LF 12.000 $600.000 $600.000 $600.000 $450.000 $650.000 $630.000 $665.000 $706.570 $4,000.000
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
LF 36.000 $700.000 $650.000 $650.000 $512.500 $650.000 $635.000 $505.000 $765.450 $4,000.000
CONC BOX CULV (3 FT X 2.5 FT) (EXTEND)
LF 48.000 $520.000 $500.000 $530.000 $395.000 $550.000 $470.000 $575.000 $529.920 $4,000.000
RC PIPE (CL III)(18 IN)
LF 1,696.000 $50.000 $50.000 $51.000 $39.000 $40.000 $45.000 $46.000 $44.510 $48.000
RC PIPE (CL III)(24 IN)
LF 184.000 $60.000 $70.000 $100.000 $59.000 $53.000 $58.000 $70.000 $68.280 $150.000
INLET(COMPL)(PAZD)(FG)(4FTX4FT-4FTX4FT)
EA 24.000 $6,500.000 $6,000.000 $6,000.000 $4,900.000 $6,000.000 $6,500.000 $3,200.000 $8,467.010 $6,000.000
INLET(COMPL)(PAZD)(FG)(5FTX5FT-4FTX4FT)
EA 5.000 $7,000.000 $7,800.000 $7,800.000 $6,600.000 $8,500.000 $8,400.000 $4,000.000 $11,658.330 $7,500.000
WINGWALL (FW - 0) (HW=3 FT)
EA 14.000 $6,000.000 $6,500.000 $4,500.000 $6,150.000 $4,000.000 $5,200.000 $3,500.000 $6,632.150 $5,000.000
WINGWALL (FW - 0) (HW=4 FT)
EA 9.000 $7,500.000 $8,000.000 $7,500.000 $6,800.000 $5,000.000 $6,850.000 $5,000.000 $7,191.140 $6,000.000
WINGWALL (FW - 0) (HW=5 FT)
EA 1.000 $9,000.000 $10,000.000 $9,500.000 $9,500.000 $6,000.000 $7,200.000 $7,000.000 $9,228.470 $6,500.000
WINGWALL (SW - 0) (HW=4 FT)
EA 1.000 $8,500.000 $8,000.000 $7,500.000 $12,000.000 $4,000.000 $6,500.000 $5,500.000 $12,546.290 $5,500.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 158.000 $800.000 $700.000 $800.000 $625.000 $650.000 $640.000 $800.000 $810.780 $1,200.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 2.000 $900.000 $800.000 $850.000 $780.000 $750.000 $760.000 $950.000 $1,020.990 $1,200.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 8.000 $950.000 $1,000.000 $1,000.000 $1,000.000 $975.000 $960.000 $1,000.000 $1,381.340 $1,200.000
ADJUSTING INLET (CAP)
EA 13.000 $1,400.000 $2,000.000 $1,800.000 $2,050.000 $2,000.000 $2,200.000 $1,500.000 $1,301.240 $1,500.000
CLEAN EXIST CULVERTS
EA 32.000 $1,400.000 $2,500.000 $2,200.000 $307.500 $1,000.000 $1,600.000 $1,500.000 $2,238.110 $1,850.000
REMOV STR (INLET)
EA 1.000 $800.000 $1,500.000 $1,000.000 $1,100.000 $500.000 $1,200.000 $800.000 $612.650 $800.000
REMOV STR (PIPE)
EA 66.000 $350.000 $350.000 $500.000 $170.000 $300.000 $200.000 $450.000 $466.480 $850.000
MOBILIZATION
LS 1.000 $700,000.000 $478,500.000 $470,000.000 $500,000.000 $615,000.000 $700,000.000 $733,000.000 $1,089,288.330 $1,066,058.620
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 18.000 $5,000.000 $2,000.000 $6,000.000 $15,350.000 $7,600.000 $3,500.000 $15,000.000 $17,664.140 $40,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 3,318.000 $35.000 $27.000 $29.000 $34.000 $35.000 $36.000 $30.000 $31.520 $32.450
ROCK FILTER DAMS (REMOVE)
LF 3,318.000 $8.500 $7.000 $7.500 $11.500 $12.000 $12.000 $9.000 $9.390 $6.210
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
CY 500.000 $25.000 $20.000 $15.000 $30.000 $30.000 $25.000 $12.000 $15.170 $19.960
BACKHOE WORK (EROSION & SEDMT CONT)
HR 200.000 $100.000 $100.000 $50.000 $200.000 $45.000 $250.000 $50.000 $62.800 $177.010
TEMP SEDMT CONT FENCE (INSTALL)
LF 49,490.000 $3.000 $2.250 $2.400 $2.500 $2.650 $3.150 $2.650 $2.570 $2.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 49,490.000 $1.000 $0.400 $0.450 $1.000 $1.050 $1.100 $0.700 $0.800 $0.400
TRACKHOE WORK (EROSION & SEDMT CONT)
HR 200.000 $150.000 $150.000 $80.000 $240.000 $75.000 $250.000 $85.000 $94.210 $177.010
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 1,080.000 $75.000 $66.000 $58.000 $62.000 $65.000 $90.000 $102.000 $23.550 $45.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 2,940.000 $16.000 $9.750 $11.000 $7.500 $7.000 $10.000 $21.000 $7.070 $20.000
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 1,080.000 $6.500 $15.500 $12.000 $16.000 $10.000 $8.000 $37.000 $17.660 $20.000
DRIVEWAYS (BASE)
SY 215.000 $18.000 $34.000 $30.000 $40.000 $25.000 $28.000 $30.000 $21.530 $82.220
DRIVEWAYS (CONC) (HES)
SY 356.000 $130.000 $110.000 $130.000 $95.000 $100.000 $125.000 $100.000 $95.270 $125.000
RUMBLE STRIPS (SHOULDER)
LF 91,831.000 $0.300 $0.160 $0.170 $0.160 $0.200 $0.130 $0.200 $0.120 $0.120
RUMBLE STRIPS (CENTERLINE)
LF 45,923.000 $0.600 $0.180 $0.190 $0.180 $0.200 $0.130 $0.200 $0.120 $0.120
MTL W-BEAM GD FEN (STEEL POST)
LF 1,400.000 $26.500 $20.000 $22.000 $29.000 $23.000 $30.250 $21.500 $22.170 $18.830
REMOVE METAL BEAM GUARD FENCE
LF 1,000.000 $3.500 $1.500 $2.200 $2.650 $2.750 $2.750 $1.500 $1.470 $1.250
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $2,300.000 $2,000.000 $2,600.000 $2,460.000 $2,600.000 $2,600.000 $2,200.000 $2,237.460 $1,900.000
GUARDRAIL END TREATMENT (REMOVE)
EA 8.000 $600.000 $120.000 $220.000 $300.000 $225.000 $300.000 $125.000 $129.540 $110.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 6.000 $3,465.000 $1,000.000 $900.000 $2,000.000 $2,200.000 $3,300.000 $1,100.000 $1,118.730 $950.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,760.000 $900.000 $900.000 $800.000 $1,100.000 $1,100.000 $975.000 $1,000.970 $850.000
CRASH CUSH ATTEN (INSTL)(S)(N)(70)
EA 2.000 $9,500.000 $8,500.000 $10,000.000 $9,000.000 $10,000.000 $12,000.000 $10,000.000 $9,420.870 $8,000.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 58.000 $250.000 $110.000 $245.000 $245.000 $270.000 $260.000 $126.000 $129.540 $191.930
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 10.000 $275.000 $155.000 $275.000 $285.000 $330.000 $300.000 $178.000 $182.530 $318.860
MAILBOX INSTALL-M (TWG-POST) TY 2
EA 1.000 $400.000 $245.000 $420.000 $475.000 $470.000 $495.000 $280.000 $288.510 $326.930
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 14.000 $500.000 $525.000 $420.000 $450.000 $595.000 $470.000 $600.000 $618.240 $525.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $585.000 $585.000 $520.000 $600.000 $700.000 $625.000 $670.000 $688.900 $585.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $325.000 $747.000 $610.000 $655.000 $850.000 $685.000 $855.000 $879.670 $747.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $625.000 $780.000 $580.000 $830.000 $980.000 $870.000 $890.000 $918.540 $780.000
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 1.000 $935.000 $825.000 $1,000.000 $1,050.000 $1,300.000 $1,085.000 $950.000 $971.530 $825.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 79.000 $350.000 $300.000 $240.000 $300.000 $420.000 $315.000 $345.000 $353.280 $300.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 4.000 $575.000 $425.000 $540.000 $450.000 $495.000 $475.000 $485.000 $500.480 $425.000
RELOCATE SM RD SN SUP&AM(SIGN ONLY)
EA 16.000 $500.000 $30.000 $240.000 $235.000 $210.000 $250.000 $35.000 $35.330 $30.000
REMOVE SM RD SN SUP&AM
EA 103.000 $100.000 $45.000 $90.000 $80.000 $50.000 $80.000 $50.000 $52.990 $45.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 26.000 $25.000 $13.500 $23.000 $26.000 $20.000 $16.500 $16.000 $15.900 $13.500
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 48.000 $65.000 $28.500 $45.000 $47.000 $40.000 $38.000 $33.000 $33.560 $28.500
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 24.000 $35.000 $19.500 $32.000 $26.000 $30.000 $28.000 $22.000 $22.960 $19.500
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 97,560.000 $0.250 $0.140 $0.140 $0.140 $0.170 $0.170 $0.170 $0.180 $0.150
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 177.000 $4.000 $2.500 $2.500 $2.650 $2.700 $2.750 $2.850 $7.070 $2.500
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 5,549.000 $0.200 $0.140 $0.140 $0.140 $0.170 $0.170 $0.170 $0.200 $0.150
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 65,600.000 $0.200 $0.140 $0.140 $0.140 $0.170 $0.170 $0.170 $0.180 $0.150
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 97,560.000 $2.250 $0.010 $0.010 $0.250 $0.500 $1.400 $0.750 $1.180 $1.500
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 177.000 $10.000 $0.010 $0.010 $1.750 $10.000 $8.000 $10.000 $8.240 $19.400
WK ZN PAV MRK REMOV (Y)4"(BRK)
LF 5,549.000 $1.500 $0.010 $0.010 $0.250 $0.500 $1.400 $1.100 $1.590 $1.500
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 65,600.000 $3.000 $0.010 $0.010 $0.280 $0.500 $1.420 $0.750 $1.180 $1.500
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 11,420.000 $0.750 $1.000 $0.600 $1.850 $1.500 $1.200 $1.000 $0.010 $1.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 177.000 $6.000 $2.890 $3.000 $3.000 $6.050 $6.150 $6.400 $7.070 $5.600
REFL PAV MRK TY II (W) 4" (SLD)
LF 2,400.000 $0.350 $0.120 $0.130 $0.150 $0.550 $0.550 $0.550 $0.290 $0.500
REFL PAV MRK TY II (Y) 4" (BRK)
LF 300.000 $2.250 $0.140 $0.150 $0.140 $0.550 $0.550 $0.550 $0.290 $0.500
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 97,560.000 $0.300 $0.310 $0.330 $0.350 $0.450 $0.460 $0.500 $0.420 $0.420
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 5,549.000 $0.450 $0.340 $0.360 $0.350 $0.600 $0.600 $0.600 $0.520 $0.550
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 65,600.000 $0.450 $0.310 $0.330 $0.350 $0.450 $0.460 $0.500 $0.420 $0.420
REFL PAV MRKR TY I-A
EA 66.000 $2.750 $3.000 $3.150 $3.080 $3.700 $3.750 $3.850 $4.300 $3.400
REFL PAV MRKR TY II-A-A
EA 1,763.000 $2.750 $3.000 $3.150 $3.080 $3.700 $3.750 $3.850 $4.300 $3.400
ELIM EXT PAV MRK & MRKS (4")
LF 2,700.000 $0.400 $0.600 $0.630 $0.650 $1.100 $1.100 $0.200 $0.480 $1.000
PAV SURF PREP FOR MRK (4")
LF 2,700.000 $0.200 $0.250 $0.260 $0.300 $0.540 $0.550 $1.100 $0.290 $0.500
SP MIXES SP-B PG64-22
TON 15,817.000 $100.000 $100.000 $100.000 $93.750 $105.000 $95.000 $130.000 $123.130 $96.460
SP MIXES SP-C PG70-22
TON 19,391.000 $105.000 $110.000 $103.000 $101.150 $112.000 $106.000 $111.000 $137.820 $105.570
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $100.000 $18,500.000 $10,000.000 $3,500.000 $12,000.000 $20,000.000 $6,000.000 $10,326.630 $19,125.000
TMA (STATIONARY)
DAY 100.000 $170.000 $150.000 $350.000 $125.000 $200.000 $100.000 $150.000 $176.640 $148.750
TMA (MOBILE OPERATION)
DAY 13.000 $150.000 $0.010 $100.000 $160.000 $300.000 $100.000 $80.000 $235.520 $230.000
Totals: $9,385,832.000 $7,859,265.160 $8,372,538.680 $8,387,762.180 $9,294,629.670 $9,351,068.330 $9,615,703.530 $11,235,214.222 $13,268,521.260