Show Job Controls
Bid Cobra

SHELBY US 96 (0809-02-070)

Items: 101

County: SHELBY
Length: N/A
Highway: US 96
District: LUFKIN
Control Number: 0809-02-070
DBE Goal: N/A
Project: C 809-2-70
Guaranty: N/A
Time: 320 WORKING DAYS
Engineer's Estimate: $8,514,545.80
Date: 09/07/2022 (3 years ago)
Contract Number: N/A
Type: WIDEN ROAD - ADD SHOULDERS
Mail/Deliver Bids To: N/A
RANDAL COOPER
CLEOPHA BLANTON
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$8,514,545.80
Over/Under Est: 10.35% $881,436.54
Over/Under Est: 19.14% $1,629,816.68
Amt Left: 7.96% $748,380.14
Subcontractor Percentage Amount
PINTO CONSTRUCTION CO., INC. 31.04% $2,916,512.92
A R BROTHERS CONSTRUCTION SERVICES, INC. 7.37% $692,483.90
AMERICAN REMEDIATION OPTIONS, INC. 4.08% $383,356.08
UNIVERSAL LAND CLEARING, LLC 2.42% $227,382.77
DUSTROL, INC. 1.14% $107,114.20
INTERSTATE BARRICADES & MARKINGS, INC. 1.05% $98,657.81
TEXOP CONSTRUCTION 0.86% $80,805.45
STRIPING TECHNOLOGY, L.P. 0.52% $48,859.11
PANOLA SIGN & BARRICADE, INC. 0.19% $17,852.37
WEST TEXAS ROCK RESOURCES, LLC 0.09% $8,456.38
AT STAFFING 0.00% $0.00
Total: 48.76% $4,581,480.99

Bid Items & Bid Tabulations

101 Total 0 of 101
SHELBY  |  US 96  |  LUFKIN  |  0809-02-070  |  09/07/2022  |  $8,514,545.80  |  C 809-2-70  |  WIDEN ROAD - ADD SHOULDERS  |  320 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
MOORE BROTHERS CONSTRUCTION COMPANY
DREWERY CONSTRUCTION COMPANY, INCORPORATED
PREPARING ROW
STA 206.340 $2,000.000 $1,235.000 $1,100.000
REMOVING CONC (DRIVEWAYS)
SY 1,191.000 $22.000 $19.750 $26.000
REMOVING STAB BASE & ASPH PAV (7"-12")
SY 22,321.000 $8.000 $10.300 $7.750
REMOVING STAB BASE AND ASPH PAV(0"-5")
SY 1,178.000 $3.500 $6.840 $13.000
EXCAVATION (ROADWAY)
CY 3,134.000 $10.000 $20.600 $23.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 4,555.000 $12.000 $20.500 $27.000
COMPOST MANUF TOPSOIL (4")
SY 216,464.000 $1.250 $1.550 $3.200
BLOCK SODDING
SY 1,396.000 $6.500 $6.750 $5.250
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 216,464.000 $0.400 $0.410 $0.350
CELL FBR MLCH SEED(TEMP)(WARM)
SY 108,232.000 $0.350 $0.370 $0.350
CELL FBR MLCH SEED(TEMP)(COOL)
SY 108,232.000 $0.350 $0.370 $0.350
VEGETATIVE WATERING
MG 4,355.600 $25.000 $5.000 $10.000
SOIL RETENTION BLANKETS (CL 1) (TY C)
SY 6,275.000 $1.500 $2.200 $0.750
CEM TRT(PLNT MX) (CLN)(TYA)(GR1-2)(12")
SY 18,633.000 $65.000 $69.500 $72.500
EMULS ASPH (EROSN CONT)(MS-2)
GAL 2,065.000 $4.500 $8.250 $6.000
ASPH (RC-250)
TON 19.000 $1,500.000 $1,350.000 $1,400.000
AGGR (TY-PE, E, L OR PL GR 3)
CY 876.000 $145.000 $167.000 $220.000
AGGR (TY E OR L GR 5)
CY 134.000 $266.830 $199.000 $330.000
ASPH (AC-15P OR CRS-2P)
TON 260.000 $1,100.000 $1,085.000 $1,050.000
PLANE ASPH CONC PAV (0" TO 4 1/2")
SY 978.000 $8.000 $9.250 $23.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 16.000 $300.000 $206.000 $200.000
CL C CONC (COLLAR)
EA 2.000 $1,200.000 $550.000 $832.000
RIPRAP (CONC) (CL B) (4")
CY 419.000 $500.000 $600.000 $535.000
RIPRAP (STONE TY R)(DRY)(12 IN)
CY 6.300 $1,000.000 $209.000 $263.000
RC PIPE (CL III)(18 IN)
LF 1,544.000 $60.000 $54.000 $49.000
RC PIPE (CL III)(24 IN)
LF 325.000 $120.000 $81.000 $69.000
RC PIPE (CL III)(36 IN)
LF 36.000 $250.000 $172.000 $140.000
HEADWALL (CH - FW - 0) (DIA= 24 IN)
EA 1.000 $5,500.000 $5,175.000 $4,160.000
HEADWALL (CH - PW - 0) (DIA= 18 IN)
EA 1.000 $4,500.000 $4,565.000 $4,160.000
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 1.000 $5,654.000 $5,400.000 $5,200.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 116.000 $800.000 $799.000 $728.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 20.000 $1,500.000 $1,320.000 $1,100.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 2.000 $5,000.000 $5,500.000 $4,700.000
CLEAN EXIST CULVERTS
EA 1.000 $1,000.000 $3,050.000 $1,040.000
REMOV STR (PIPE)
EA 21.000 $500.000 $235.000 $208.000
MOBILIZATION
LS 1.000 $745,000.000 $695,000.000 $550,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 15.000 $4,500.000 $3,200.000 $10,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 1,054.000 $35.000 $35.750 $35.000
ROCK FILTER DAMS (REMOVE)
LF 1,054.000 $9.000 $10.000 $10.400
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 234.000 $25.000 $24.000 $30.000
CONSTRUCTION EXITS (REMOVE)
SY 234.000 $10.000 $10.000 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 5,307.000 $3.000 $3.290 $3.350
TEMP SEDMT CONT FENCE (REMOVE)
LF 5,307.000 $1.000 $0.820 $1.040
INTERSECTIONS (ACP)
SY 663.000 $51.000 $107.330 $110.000
DRIVEWAYS (CONC)
SY 1,556.000 $90.000 $115.000 $95.000
DRIVEWAYS (ACP)
SY 8,381.000 $40.000 $56.260 $66.000
TURNOUTS (CONC)
SY 16.000 $90.000 $110.000 $130.000
TURNOUTS (ACP)
SY 134.000 $55.000 $115.460 $105.000
RUMBLE STRIPS (SHOULDER)
LF 40,970.000 $0.350 $0.250 $0.340
RUMBLE STRIPS (CENTERLINE)
LF 24,564.000 $0.450 $0.320 $0.310
MTL W-BEAM GD FEN (TIM POST)
LF 1,525.000 $26.000 $29.250 $26.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,900.000 $2,525.000 $4,200.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 10.000 $1,400.000 $1,600.000 $1,500.000
REMOVE METAL BEAM GUARD FENCE
LF 1,450.000 $3.000 $2.750 $3.120
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $250.000 $275.000 $160.000
GUARDRAIL END TREATMENT (INSTALL)
EA 10.000 $3,000.000 $3,310.000 $3,200.000
GUARDRAIL END TREATMENT (REMOVE)
EA 8.000 $275.000 $275.000 $208.000
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 1.000 $475.000 $605.000 $575.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 35.000 $250.000 $292.000 $230.000
MAILBOX INSTALL-D (WC-POST) TY 3
EA 1.000 $300.000 $292.000 $275.000
IN RD IL (TY ST) 40T-8 (250W EQ) LED
EA 2.000 $5,200.000 $7,150.000 $6,760.000
CONDT (PVC) (SCH 40) (2")
LF 377.000 $12.000 $10.000 $9.500
CONDT (PVC) (SCH 40) (2") (BORE)
LF 206.000 $27.000 $28.600 $27.040
ELEC CONDR (NO.8) BARE
LF 618.000 $4.000 $1.600 $1.500
ELEC CONDR (NO.8) INSULATED
LF 1,236.000 $4.000 $1.700 $1.650
GROUND BOX TY A (122311)W/APRON
EA 5.000 $1,200.000 $730.000 $695.000
ELC SRV TY A 120/240 060(NS)SS(E)SP(O)
EA 1.000 $9,000.000 $7,500.000 $8,320.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 4.000 $900.000 $962.000 $930.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 4.000 $850.000 $1,050.000 $1,000.000
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 1.000 $1,400.000 $1,600.000 $1,500.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 27.000 $450.000 $480.000 $455.000
REMOVE SM RD SN SUP&AM
EA 30.000 $100.000 $104.000 $100.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 6.000 $25.000 $16.500 $15.600
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 34.000 $30.000 $30.000 $26.000
INSTL OM ASSM (OM-2Z)(WFLX)SRF)SRF
EA 28.000 $90.000 $114.000 $46.800
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 992.000 $0.200 $0.440 $1.040
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 2,290.000 $0.300 $0.440 $1.040
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 28,915.000 $0.200 $0.440 $1.040
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 884.000 $1.000 $1.300 $2.500
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 2,056.000 $1.200 $1.300 $2.400
WK ZN PAV MRK SHT TERM RMV (W)(4")
LF 1,684.000 $1.400 $1.300 $1.700
WK ZN PAV MRK SHT TERM RMV (Y)(4")
LF 16,840.000 $1.200 $1.300 $1.700
REFL PAV MRK TY I (W)4"(LNDP)(090MIL)
LF 588.000 $1.500 $2.650 $1.040
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 3,378.000 $1.500 $1.400 $1.040
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 2,230.000 $0.600 $0.660 $1.040
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 42,240.000 $0.500 $0.660 $0.750
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 54,526.000 $0.300 $0.660 $0.750
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 14.000 $13.500 $11.000 $26.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 8.000 $205.000 $220.000 $220.000
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 4.000 $400.000 $440.000 $312.000
PREFAB PAV MRK TY C (W) (WORD)
EA 8.000 $325.000 $275.000 $270.400
REFL PAV MRKR TY I-C
EA 326.000 $3.500 $5.500 $3.900
REFL PAV MRKR TY II-A-A
EA 1,770.000 $3.500 $5.500 $3.900
D-GR HMA TY-B PG64-22 (EXEMPT)
TON 416.000 $116.000 $206.610 $230.000
SP MIXES SP-C PG70-22
TON 14,009.000 $115.000 $137.830 $146.650
SP MIXES SP-C SAC-A PG70-22
TON 13,278.000 $115.000 $136.480 $148.250
TACK COAT
GAL 14,187.000 $3.500 $5.000 $4.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $15,000.000 $14,000.000
TMA (STATIONARY)
DAY 278.000 $200.000 $50.000 $235.000
TMA (MOBILE OPERATION)
DAY 21.000 $250.000 $50.000 $160.000
1
SP MIXES SP-B PG64-22
TON 12,754.000 $100.000 $0.000 $0.000
Totals: $9,789,946.020 $9,395,982.340 $10,144,362.480