Show Job Controls
Bid Cobra

ANGELINA FM 841 (1157-01-018)

Items: 100

County: ANGELINA
Length: N/A
Highway: FM 841
District: LUFKIN
Control Number: 1157-01-018
DBE Goal: N/A
Project: STP 2021(345)HES
Guaranty: N/A
Time: 312 WORKING DAYS
Engineer's Estimate: $5,172,350.15
Date: 02/04/2021 (5 years ago)
Contract Number: N/A
Type: REPLACE GUARDRAIL
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (6)
E
Engineer's Estimate
$5,172,350.15
$5,264,676.90
Over/Under Est: 1.79% $92,326.75
Over/Under Est: 4.45% $230,023.03
Amt Left: 2.62% $137,696.28
Over/Under Est: 4.85% $250,866.93
Amt Left: 3.01% $158,540.18
Delta: -0.39% -$20,843.90
Over/Under Est: 4.96% $256,674.55
Amt Left: 3.12% $164,347.80
Delta: -0.11% -$5,807.62
Over/Under Est: 27.52% $1,423,626.45
Amt Left: 25.29% $1,331,299.70
Delta: -21.49% -$1,166,951.90
$7,101,761.36
Over/Under Est: 37.3% $1,929,411.21
Amt Left: 34.89% $1,837,084.46
Delta: -7.67% -$505,784.76

Bid Items & Bid Tabulations

100 Total 0 of 100
ANGELINA  |  FM 841  |  LUFKIN  |  1157-01-018  |  02/04/2021  |  $5,172,350.15  |  STP 2021(345)HES  |  REPLACE GUARDRAIL  |  312 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
A. L. HELMCAMP, INC.
PINTO CONSTRUCTION CO., INC.
DREWERY CONSTRUCTION COMPANY, INCORPORATED
LONGVIEW BRIDGE AND ROAD, LTD.
EAST TEXAS BRIDGE, INC.
ALTUS CONSTRUCTION LLC
PREPARING ROW
STA 206.000 $500.000 $850.000 $519.690 $565.000 $500.000 $800.000 $631.530
REMOVING CONC (DRIVEWAYS)
SY 1,548.000 $20.000 $13.000 $15.000 $22.500 $22.000 $15.000 $13.140
REMOVING STAB BASE AND ASPH PAV (6")
SY 392.000 $5.000 $7.200 $9.370 $8.000 $4.250 $10.000 $10.100
SUBGRADE WIDENING (ORD COMP)
STA 254.000 $300.000 $145.000 $831.040 $300.000 $275.000 $465.000 $837.700
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
CY 3,294.000 $15.000 $12.000 $16.370 $23.000 $15.000 $26.000 $28.640
BLADING
STA 254.000 $120.000 $100.000 $256.590 $130.000 $150.000 $250.000 $126.340
SPEC EXCAV WORK (HYD EXCAVATOR)
HR 100.000 $100.000 $100.000 $150.000 $195.000 $270.000 $75.000 $135.010
BLOCK SODDING
SY 4,274.000 $4.500 $5.100 $5.000 $4.900 $5.500 $6.500 $4.320
BROADCAST SEED (TEMP) (WARM)
SY 35,111.000 $0.150 $0.130 $0.120 $0.120 $0.130 $0.250 $0.140
BROADCAST SEED (TEMP) (COOL)
SY 35,111.000 $0.150 $0.130 $0.095 $0.100 $0.130 $0.250 $0.130
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 70,221.000 $0.350 $0.300 $0.320 $0.320 $0.320 $0.450 $0.450
VEGETATIVE WATERING
MG 1,484.000 $15.000 $10.000 $0.010 $25.000 $1.000 $8.000 $25.260
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 200.000 $2.500 $2.600 $1.620 $1.600 $2.750 $3.000 $1.600
SPRINKLING (DUST CONTROL)
MG 606.300 $10.000 $3.000 $0.010 $25.000 $1.000 $8.000 $17.520
FL BS (RDWY DEL) (TY A GR 1-2)
TON 37,184.000 $40.000 $40.000 $41.390 $41.000 $37.000 $55.000 $51.100
CEMENT
TON 1,265.000 $145.000 $150.000 $145.940 $150.000 $170.000 $165.000 $169.290
CEM TRT(MX EXST MTL & NEW BS)(14")
SY 58,830.000 $3.000 $3.800 $3.070 $2.950 $2.900 $3.750 $3.030
CEM TRT(PLNT MX) (CLN)(TYA)(GR1-2)(12")
SY 5,627.000 $55.000 $30.000 $55.500 $45.000 $40.000 $50.000 $104.540
ASPH (RC-250)
TON 93.000 $885.000 $940.000 $1,025.960 $750.000 $1,060.000 $900.000 $734.460
AGGR (TY-PE, E, L OR PL GR 3)
CY 508.000 $130.000 $160.000 $133.440 $134.000 $160.000 $165.000 $129.520
AGGR (TY E OR L GR 5)
CY 873.000 $100.000 $160.000 $129.110 $110.000 $175.000 $165.000 $97.330
AGGR(TY PE,TY-PL,TY-E,TY-L GR-4)(SAC-B)
CY 476.000 $122.000 $140.000 $136.380 $141.000 $160.000 $165.000 $135.250
ASPH (AC-15P, AC-10-2TR, OR CRS-2P)
TON 244.000 $670.000 $750.000 $697.940 $760.000 $865.000 $850.000 $606.270
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 100.000 $75.000 $100.000 $214.830 $127.000 $130.000 $100.000 $114.190
PLANE ASPH CONC PAV (2")
SY 4,096.000 $2.250 $3.000 $3.700 $5.000 $3.250 $5.000 $2.450
CEM STABIL BKFL
CY 32.000 $130.000 $184.000 $175.000 $180.000 $200.000 $250.000 $65.590
CUT & RESTORING PAV
SY 29.000 $140.000 $95.000 $90.000 $93.000 $130.000 $80.000 $129.970
CL C CONC (COLLAR)
EA 2.000 $750.000 $260.000 $250.000 $260.000 $1,400.000 $1,200.000 $1,312.540
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 8.000 $1,000.000 $190.000 $180.000 $185.000 $265.000 $250.000 $141.240
CONC BOX CULV (3 FT X 3 FT)
LF 36.000 $400.000 $360.000 $342.000 $355.000 $430.000 $450.000 $307.410
CONC BOX CULV (4 FT X 3 FT)
LF 8.000 $500.000 $460.000 $440.000 $455.000 $635.000 $550.000 $325.250
CONC BOX CULV (5 FT X 3 FT)
LF 16.000 $600.000 $620.000 $590.000 $610.000 $520.000 $550.000 $390.970
RC PIPE (CL III)(18 IN)
LF 4,189.000 $40.000 $37.000 $35.000 $36.000 $41.000 $43.000 $48.180
RC PIPE (CL III)(24 IN)
LF 497.000 $65.000 $57.000 $54.000 $56.000 $55.000 $62.000 $58.070
RC PIPE (CL III)(30 IN)
LF 6.000 $120.000 $116.000 $110.000 $113.000 $134.000 $80.000 $64.110
RC PIPE (CL III)(36 IN)
LF 64.000 $160.000 $136.000 $130.000 $134.000 $110.000 $110.000 $96.170
INLET(COMPL)(PAZD)(FG)(3FTX3FT-3FTX3FT)
EA 3.000 $5,200.000 $4,000.000 $3,750.000 $3,900.000 $5,000.000 $5,000.000 $4,110.480
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 2.000 $4,500.000 $4,000.000 $3,757.000 $3,900.000 $4,500.000 $5,000.000 $5,731.130
HEADWALL (CH - PW - 0) (DIA= 30 IN)
EA 1.000 $8,510.000 $5,400.000 $5,100.000 $5,300.000 $4,800.000 $9,000.000 $6,862.920
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 4.000 $5,200.000 $5,500.000 $5,200.000 $5,400.000 $5,000.000 $10,000.000 $6,823.180
WINGWALL (PW - 2) (HW=5 FT)
EA 7.000 $9,000.000 $10,000.000 $9,400.000 $9,700.000 $7,500.000 $10,000.000 $10,276.190
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 1.000 $500.000 $550.000 $526.000 $545.000 $595.000 $575.000 $899.920
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 4.000 $800.000 $580.000 $556.000 $575.000 $630.000 $600.000 $1,105.800
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 311.000 $600.000 $640.000 $600.000 $620.000 $650.000 $625.000 $1,188.620
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 2.000 $750.000 $770.000 $732.000 $755.000 $770.000 $800.000 $1,894.580
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 35.000 $900.000 $960.000 $908.000 $935.000 $975.000 $1,000.000 $2,494.530
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 3.000 $1,250.000 $1,300.000 $1,200.000 $1,250.000 $1,250.000 $1,300.000 $3,031.330
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 4.000 $2,200.000 $4,600.000 $4,400.000 $4,500.000 $4,500.000 $5,300.000 $9,867.600
REMOV STR (PIPE)
EA 163.000 $240.000 $180.000 $170.000 $175.000 $200.000 $385.000 $335.440
MOBILIZATION
LS 1.000 $433,000.000 $330,000.000 $350,000.000 $447,000.000 $275,000.000 $520,000.000 $694,678.740
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 18.000 $1,750.000 $9,600.000 $2,126.390 $1,700.000 $2,500.000 $4,000.000 $12,630.520
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 1,065.000 $30.000 $34.000 $5.000 $34.000 $35.750 $36.000 $29.830
ROCK FILTER DAMS (REMOVE)
LF 1,065.000 $10.000 $8.000 $2.000 $9.250 $8.800 $10.000 $8.890
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 290.000 $25.000 $20.000 $5.000 $28.000 $35.750 $30.000 $22.000
CONSTRUCTION EXITS (REMOVE)
SY 290.000 $7.500 $4.000 $2.000 $9.250 $8.800 $10.000 $7.500
BACKHOE WORK (EROSION & SEDMT CONT)
HR 10.000 $85.000 $85.000 $200.000 $150.000 $265.000 $75.000 $59.430
TEMP SEDMT CONT FENCE (INSTALL)
LF 5,460.000 $2.500 $3.000 $3.000 $2.600 $3.150 $2.750 $2.430
TEMP SEDMT CONT FENCE (REMOVE)
LF 5,460.000 $1.000 $0.750 $1.000 $0.850 $25.000 $1.000 $0.760
INTERSECTIONS (SURF TREAT)
SY 1,012.000 $55.000 $35.000 $18.040 $12.500 $120.000 $35.000 $16.880
DRIVEWAYS (CONC)
SY 1,648.000 $80.000 $85.000 $80.000 $82.000 $120.000 $110.000 $75.150
DRIVEWAYS (ACP)
SY 4,542.000 $35.000 $36.000 $41.300 $44.000 $34.000 $50.000 $50.840
TURNOUTS (ACP)
SY 1,514.000 $40.000 $39.000 $44.810 $72.000 $46.000 $50.000 $73.450
DRIVEWAYS (BASE)
SY 4,120.000 $30.000 $35.000 $41.300 $41.000 $35.000 $40.000 $21.730
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 13.000 $325.000 $330.000 $330.750 $325.000 $345.000 $500.000 $314.750
MAILBOX INSTALL-S (WC-POST) TY 3
EA 58.000 $175.000 $190.000 $189.000 $185.000 $200.000 $175.000 $147.020
MAILBOX INSTALL-D (WC-POST) TY 3
EA 17.000 $230.000 $210.000 $204.750 $200.000 $215.000 $300.000 $198.550
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 24.000 $500.000 $505.000 $504.000 $495.000 $525.000 $550.000 $578.100
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 7.000 $600.000 $675.000 $674.100 $660.000 $705.000 $775.000 $729.790
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 3.000 $775.000 $630.000 $627.900 $615.000 $660.000 $775.000 $838.160
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 1.000 $750.000 $850.000 $852.600 $840.000 $895.000 $1,100.000 $1,211.770
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 78.000 $325.000 $310.000 $309.750 $305.000 $325.000 $300.000 $355.930
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 14.000 $400.000 $360.000 $364.350 $360.000 $380.000 $380.000 $652.370
INSTL OM ASSM (OM-2Z)(FLX)SRF
EA 40.000 $65.000 $80.000 $78.750 $78.000 $80.000 $65.000 $125.040
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 55,831.000 $0.200 $0.230 $0.160 $0.120 $0.130 $0.140 $0.320
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 480.000 $10.000 $0.230 $0.160 $0.150 $0.170 $0.170 $0.320
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 53,549.000 $0.200 $0.230 $0.160 $0.120 $0.130 $0.140 $0.320
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 25.000 $10.000 $0.650 $1.500 $2.400 $1.200 $2.000 $1.120
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 4,682.000 $1.000 $0.650 $1.500 $1.750 $1.200 $2.000 $1.380
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 1,717.000 $1.000 $0.860 $0.890 $0.900 $0.940 $0.950 $1.260
PAVEMENT SEALER 4"
LF 342.000 $5.000 $1.100 $0.160 $1.050 $1.100 $1.100 $1.260
REF PROF PAV MRK TY I(W)4"(SLD)(090MIL)
LF 39,750.000 $0.750 $0.460 $0.790 $0.900 $0.940 $0.950 $0.760
REF PROF PAV MRK TY I(Y)4"(SLD)(090MIL)
LF 38,911.000 $0.750 $0.460 $0.790 $0.900 $0.940 $0.950 $0.760
REF PROF PAV MRK TY I(Y)4"(BRK)(090MIL)
LF 480.000 $0.750 $0.460 $0.790 $5.150 $5.500 $5.500 $1.580
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 110.000 $5.000 $0.310 $0.370 $1.050 $1.100 $1.100 $0.510
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 15,249.000 $0.250 $0.310 $0.370 $0.520 $0.550 $0.550 $0.510
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 14,982.000 $0.250 $0.310 $0.370 $0.520 $0.550 $0.550 $0.510
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 227.000 $20.000 $12.500 $12.600 $13.650 $14.500 $15.000 $17.680
PREFAB PAV MRK TY C (W) (ARROW)
EA 2.000 $220.000 $250.000 $210.000 $230.000 $250.000 $250.000 $309.450
PREFAB PAV MRK TY C (W) (WORD)
EA 2.000 $275.000 $300.000 $210.000 $360.000 $385.000 $385.000 $461.010
REFL PAV MRKR TY I-C
EA 77.000 $10.000 $3.900 $5.250 $4.100 $4.400 $4.500 $6.320
REFL PAV MRKR TY II-A-A
EA 597.000 $5.000 $3.900 $5.250 $3.600 $3.850 $4.000 $6.320
ELIM EXT PAV MRK & MRKS (ARROW)
EA 4.000 $80.000 $62.000 $210.000 $77.000 $82.000 $85.000 $315.760
PAV SURF PREP FOR MRK (4")
LF 342.000 $5.000 $0.100 $0.010 $0.550 $0.550 $0.550 $0.320
SP MIXES SP-C SAC-A PG70-22
TON 2,687.000 $85.000 $102.000 $107.860 $108.000 $115.000 $111.000 $137.610
TACK COAT
GAL 2,031.000 $2.000 $3.000 $4.000 $2.900 $3.250 $4.000 $2.920
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $5,000.000 $15,000.000 $10,000.000 $1,500.000 $8,000.000 $18,000.000 $6,315.260
PREFORMED CENTERLINE RUMBLE STRIP
LF 240.000 $3.500 $5.000 $8.930 $13.000 $13.750 $14.000 $31.580
TMA (STATIONARY)
DAY 2.000 $100.000 $750.000 $500.000 $230.000 $165.000 $500.000 $176.830
TMA (MOBILE OPERATION)
DAY 12.000 $45.000 $500.000 $100.000 $0.010 $165.000 $500.000 $315.760
SOLAR POWERED LED WARNING SIGN
EA 2.000 $6,000.000 $4,600.000 $4,515.000 $4,400.000 $4,800.000 $4,000.000 $6,315.260
Totals: $5,172,350.150 $5,264,676.900 $5,402,373.188 $5,423,217.080 $5,429,024.700 $6,595,976.600 $7,101,761.366