|
|
PREPARING ROW
|
STA
|
292.100
|
$2,500.000
|
$1,850.000
|
$4,000.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
292.100
|
$275.000
|
$465.000
|
$810.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
|
CY
|
1,641.000
|
$35.000
|
$29.000
|
$30.000
|
|
|
BACKFILL (TY B)
|
STA
|
292.100
|
$230.000
|
$335.000
|
$255.000
|
|
|
BLADING
|
STA
|
292.100
|
$350.000
|
$200.000
|
$510.000
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
141,564.000
|
$1.100
|
$0.600
|
$1.000
|
|
|
BONDED FBR MTRX SEED (TEMP)(WARM)
|
SY
|
70,782.000
|
$1.100
|
$0.550
|
$0.800
|
|
|
BONDED FBR MTRX SEED (TEMP)(COOL)
|
SY
|
70,782.000
|
$1.100
|
$0.530
|
$0.800
|
|
|
VEGETATIVE WATERING
|
MG
|
3,114.000
|
$23.000
|
$10.000
|
$24.000
|
|
|
FL BS (CMP IN PLACE)(TYA GR1-2)(IN VEH)
|
CY
|
1,956.000
|
$65.000
|
$140.000
|
$110.000
|
|
|
REWORK BS MTL (TY C) (8") (ORD COMP)
|
SY
|
77,893.000
|
$3.000
|
$13.000
|
$7.300
|
|
|
CEMENT
|
TON
|
1,606.000
|
$270.000
|
$250.000
|
$318.000
|
|
|
CEMENT TREAT(EXIST MATL)(8")
|
SY
|
97,333.000
|
$5.000
|
$3.650
|
$3.000
|
|
|
ASPH (RC-250)
|
GAL
|
18,171.000
|
$7.900
|
$6.100
|
$6.000
|
|
|
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
|
GAL
|
76,316.000
|
$6.900
|
$4.310
|
$5.550
|
|
|
AGGR (TY-PD GR-3 OR TY-PL GR-3)
|
CY
|
1,818.000
|
$180.000
|
$187.000
|
$245.000
|
|
|
AGGR (TY-PD GR-5 OR TY-PL GR-5)
|
CY
|
727.000
|
$200.000
|
$232.000
|
$280.000
|
|
|
PLANE ASPH CONC PAV (3")
|
SY
|
77,893.000
|
$4.000
|
$4.350
|
$1.750
|
|
|
FLOWABLE BACKFILL
|
CY
|
12.000
|
$200.000
|
$315.000
|
$915.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
24,807.000
|
$45.000
|
$42.000
|
$30.000
|
|
|
CL C CONC (COLLAR)
|
EA
|
7.000
|
$1,600.000
|
$2,625.000
|
$1,515.000
|
|
|
CL E CONC (SEAL SLAB)
|
CY
|
18.000
|
$500.000
|
$472.000
|
$1,200.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
40.400
|
$550.000
|
$788.000
|
$1,075.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
481.000
|
$185.000
|
$158.000
|
$285.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
97.000
|
$600.000
|
$788.000
|
$860.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
|
LF
|
18.000
|
$700.000
|
$578.000
|
$790.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
|
LF
|
66.000
|
$520.000
|
$630.000
|
$800.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
|
LF
|
12.000
|
$685.000
|
$656.000
|
$915.000
|
|
|
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
|
LF
|
30.000
|
$560.000
|
$735.000
|
$950.000
|
|
|
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
|
LF
|
20.000
|
$700.000
|
$788.000
|
$1,165.000
|
|
|
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
|
LF
|
24.000
|
$850.000
|
$893.000
|
$1,150.000
|
|
|
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
|
LF
|
50.000
|
$600.000
|
$971.000
|
$1,390.000
|
|
|
CONC BOX CULV (8 FT X 7 FT)(EXTEND)
|
LF
|
36.000
|
$850.000
|
$1,050.000
|
$1,610.000
|
|
|
CONC BOX CULV (9 FT X 9 FT)(EXTEND)
|
LF
|
28.000
|
$1,600.000
|
$1,260.000
|
$2,030.000
|
|
|
CONC BOX CULV (10 FT X 10 FT)(EXTEND)
|
LF
|
66.000
|
$1,200.000
|
$1,575.000
|
$1,880.000
|
|
|
CONC BOX CULV (12 FT X 10 FT)(EXTEND)
|
LF
|
18.000
|
$2,000.000
|
$2,100.000
|
$2,300.000
|
|
|
CONC BOX CULVERT(4 FT X 3.5 FT)(EXTEND)
|
LF
|
22.000
|
$550.000
|
$735.000
|
$1,080.000
|
|
|
CONC BOX CULV (5 FT X 6.5 FT)(EXTEND)
|
LF
|
8.000
|
$1,700.000
|
$1,050.000
|
$1,360.000
|
|
|
CONC BOX CULV (10 FT X 14 FT)(EXTEND)
|
LF
|
84.000
|
$2,500.000
|
$2,363.000
|
$2,040.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
904.000
|
$50.000
|
$59.000
|
$55.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
28.000
|
$75.000
|
$158.000
|
$154.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
12.000
|
$134.000
|
$210.000
|
$195.000
|
|
|
WINGWALL (FW - 0) (HW=3 FT)
|
EA
|
3.000
|
$5,730.000
|
$3,675.000
|
$2,745.000
|
|
|
WINGWALL (FW - 0) (HW=4 FT)
|
EA
|
4.000
|
$8,000.000
|
$5,250.000
|
$4,300.000
|
|
|
WINGWALL (FW - 0) (HW=5 FT)
|
EA
|
5.000
|
$7,000.000
|
$7,560.000
|
$6,120.000
|
|
|
WINGWALL (FW - 0) (HW=7 FT)
|
EA
|
1.000
|
$9,300.000
|
$13,125.000
|
$11,800.000
|
|
|
WINGWALL (FW - 0) (HW=8 FT)
|
EA
|
1.000
|
$12,000.000
|
$21,000.000
|
$16,000.000
|
|
|
WINGWALL (FW - S) (HW=4 FT)
|
EA
|
3.000
|
$12,000.000
|
$5,775.000
|
$5,100.000
|
|
|
WINGWALL (FW - S) (HW=7 FT)
|
EA
|
1.000
|
$13,000.000
|
$16,800.000
|
$13,050.000
|
|
|
WINGWALL (PW - 2) (HW=10 FT)
|
EA
|
4.000
|
$32,000.000
|
$47,250.000
|
$36,650.000
|
|
|
WINGWALL (PW - 2) (HW=12 FT)
|
EA
|
2.000
|
$36,750.000
|
$77,700.000
|
$62,800.000
|
|
|
WINGWALL (PW - 2) (HW=13 FT)
|
EA
|
2.000
|
$45,000.000
|
$86,100.000
|
$72,900.000
|
|
|
WINGWALL (PW - 2) (HW=14 FT)
|
EA
|
1.000
|
$67,000.000
|
$113,400.000
|
$96,500.000
|
|
|
WINGWALL (PW - 2) (HW=16 FT)
|
EA
|
1.000
|
$70,000.000
|
$152,250.000
|
$125,170.000
|
|
|
WINGWALL (PW - 2) (HW=4 FT)
|
EA
|
1.000
|
$9,300.000
|
$10,500.000
|
$23,700.000
|
|
|
WINGWALL (PW - 2) (HW=5 FT)
|
EA
|
1.000
|
$12,000.000
|
$12,600.000
|
$10,715.000
|
|
|
WINGWALL (PW - 2) (HW=6 FT)
|
EA
|
5.000
|
$14,000.000
|
$17,850.000
|
$13,330.000
|
|
|
WINGWALL (PW - 2) (HW=7 FT)
|
EA
|
2.000
|
$16,000.000
|
$24,150.000
|
$19,495.000
|
|
|
WINGWALL (PW - 2) (HW=8 FT)
|
EA
|
6.000
|
$23,000.000
|
$31,500.000
|
$25,330.000
|
|
|
WINGWALL (PW - 2) (HW=9 FT)
|
EA
|
4.000
|
$22,000.000
|
$37,800.000
|
$30,185.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
78.000
|
$800.000
|
$1,050.000
|
$800.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$900.000
|
$1,365.000
|
$1,315.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$1,410.000
|
$3,150.000
|
$1,900.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
31.000
|
$2,000.000
|
$2,100.000
|
$2,500.000
|
|
|
REMOV STR (PIPE)
|
EA
|
36.000
|
$350.000
|
$1,575.000
|
$275.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$325,000.000
|
$1,100,000.000
|
$1,000,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$10,000.000
|
$4,000.000
|
$5,100.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
1,230.000
|
$35.000
|
$33.600
|
$42.250
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,230.000
|
$8.500
|
$9.450
|
$11.900
|
|
|
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
|
CY
|
250.000
|
$25.000
|
$28.000
|
$50.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
150.000
|
$100.000
|
$180.000
|
$100.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,100.000
|
$4.000
|
$3.150
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,100.000
|
$1.000
|
$0.750
|
$1.000
|
|
|
TRACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
150.000
|
$125.000
|
$195.000
|
$165.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
1,373.000
|
$59.000
|
$45.000
|
$64.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
4,322.000
|
$65.000
|
$43.000
|
$62.000
|
|
|
TURNOUTS (ACP)
|
SY
|
443.000
|
$80.000
|
$36.000
|
$71.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
160.000
|
$20.000
|
$46.000
|
$58.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
58,420.000
|
$0.300
|
$0.250
|
$0.320
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
29,210.000
|
$1.000
|
$0.250
|
$0.320
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
787.500
|
$48.000
|
$24.000
|
$30.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
6.000
|
$3,000.000
|
$2,900.000
|
$3,700.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
17.000
|
$360.000
|
$295.000
|
$390.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 2
|
EA
|
7.000
|
$447.000
|
$330.000
|
$440.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
36.000
|
$715.000
|
$645.000
|
$850.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$400.000
|
$920.000
|
$1,215.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
$900.000
|
$1,050.000
|
$1,390.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
|
EA
|
1.000
|
$1,500.000
|
$1,240.000
|
$1,640.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
46.000
|
$75.000
|
$150.000
|
$130.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
13.000
|
$35.000
|
$26.000
|
$33.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
62.000
|
$76.500
|
$68.000
|
$86.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
58,249.000
|
$0.250
|
$0.210
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
109.000
|
$1.250
|
$4.200
|
$5.300
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
1,142.000
|
$0.250
|
$0.210
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
53,119.000
|
$0.250
|
$0.210
|
$0.300
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
58,249.000
|
$1.500
|
$1.350
|
$1.750
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
109.000
|
$8.500
|
$25.000
|
$8.150
|
|
|
WK ZN PAV MRK REMOV (Y)4"(BRK)
|
LF
|
1,142.000
|
$1.250
|
$1.700
|
$1.750
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
53,119.000
|
$1.460
|
$1.300
|
$1.750
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
3,256.000
|
$0.750
|
$1.800
|
$1.100
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
109.000
|
$6.000
|
$6.300
|
$8.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
58,249.000
|
$0.300
|
$0.530
|
$0.700
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
1,143.000
|
$0.300
|
$1.050
|
$1.350
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
53,172.000
|
$0.450
|
$0.530
|
$0.700
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
881.000
|
$2.750
|
$3.900
|
$4.900
|
|
|
SP MIXES SP-C SAC-A PG64-22
|
TON
|
9,994.000
|
$160.000
|
$146.000
|
$143.000
|
|
|
SP MIXES SP-C SAC-A PG70-22
|
TON
|
9,994.000
|
$160.000
|
$150.000
|
$152.500
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
28.000
|
$101.500
|
$210.000
|
$135.000
|
|
|
TMA (STATIONARY)
|
DAY
|
216.000
|
$200.000
|
$240.000
|
$330.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
10.000
|
$150.000
|
$1.000
|
$330.000
|
|
Totals: |
$11,730,694.340
|
$12,866,630.050
|
$13,121,837.050
|