Show Job Controls
Bid Cobra

RUSK US 84 (0123-05-015)

Items: 110

County: RUSK
Length: N/A
Highway: US 84
District: TYLER
Control Number: 0123-05-015
DBE Goal: N/A
Project: F 2023(369)
Guaranty: N/A
Time: 214 WORKING DAYS
Engineer's Estimate: $11,730,694.34
Date: 01/06/2023 (3 years ago)
Contract Number: N/A
Type: ROADWAY REHABILITATION/RECONSTRUCTION WITH NO ADDE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (2)
E
Engineer's Estimate
$11,730,694.34
Over/Under Est: 9.68% $1,135,935.71
Over/Under Est: 11.86% $1,391,142.71
Amt Left: 1.98% $255,207.00
Subcontractor Percentage Amount
C&J CONTRACTORS LLC 14.30% $1,971,994.19
DREWERY BROS. TREE SERVICE, INC. 2.48% $341,996.19
SOUTHWEST ENVIRONMENT SERVICES LLC 1.35% $186,167.28
STRIPING TECHNOLOGY, L.P. 0.61% $84,120.03
A. JANE SERVICES LLC 0.47% $64,813.79
ISAACS CONSTRUCTION SERVICES LLC 0.45% $62,055.76
MORRIS COUNTY CONTRACTORS, L.L.C. 0.28% $38,612.47
PANOLA SIGN & BARRICADE, INC. 0.18% $24,822.30
SURFACE PREPARATION TECHNOLOGIES, LLC 0.15% $20,685.25
Total: 20.27% $2,795,267.26

Bid Items & Bid Tabulations

110 Total 0 of 110
RUSK  |  US 84  |  TYLER  |  0123-05-015  |  01/06/2023  |  $11,730,694.34  |  F 2023(369)  |  ROADWAY REHAB/RECON WITH NO ADDE  |  214 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DREWERY CONSTRUCTION COMPANY, INCORPORATED
LONGVIEW BRIDGE AND ROAD, LTD.
PREPARING ROW
STA 292.100 $2,500.000 $1,850.000 $4,000.000
SUBGRADE WIDENING (ORD COMP)
STA 292.100 $275.000 $465.000 $810.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 1,641.000 $35.000 $29.000 $30.000
BACKFILL (TY B)
STA 292.100 $230.000 $335.000 $255.000
BLADING
STA 292.100 $350.000 $200.000 $510.000
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 141,564.000 $1.100 $0.600 $1.000
BONDED FBR MTRX SEED (TEMP)(WARM)
SY 70,782.000 $1.100 $0.550 $0.800
BONDED FBR MTRX SEED (TEMP)(COOL)
SY 70,782.000 $1.100 $0.530 $0.800
VEGETATIVE WATERING
MG 3,114.000 $23.000 $10.000 $24.000
FL BS (CMP IN PLACE)(TYA GR1-2)(IN VEH)
CY 1,956.000 $65.000 $140.000 $110.000
REWORK BS MTL (TY C) (8") (ORD COMP)
SY 77,893.000 $3.000 $13.000 $7.300
CEMENT
TON 1,606.000 $270.000 $250.000 $318.000
CEMENT TREAT(EXIST MATL)(8")
SY 97,333.000 $5.000 $3.650 $3.000
ASPH (RC-250)
GAL 18,171.000 $7.900 $6.100 $6.000
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
GAL 76,316.000 $6.900 $4.310 $5.550
AGGR (TY-PD GR-3 OR TY-PL GR-3)
CY 1,818.000 $180.000 $187.000 $245.000
AGGR (TY-PD GR-5 OR TY-PL GR-5)
CY 727.000 $200.000 $232.000 $280.000
PLANE ASPH CONC PAV (3")
SY 77,893.000 $4.000 $4.350 $1.750
FLOWABLE BACKFILL
CY 12.000 $200.000 $315.000 $915.000
TEMPORARY SPL SHORING
SF 24,807.000 $45.000 $42.000 $30.000
CL C CONC (COLLAR)
EA 7.000 $1,600.000 $2,625.000 $1,515.000
CL E CONC (SEAL SLAB)
CY 18.000 $500.000 $472.000 $1,200.000
RIPRAP (CONC)(5 IN)
CY 40.400 $550.000 $788.000 $1,075.000
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 481.000 $185.000 $158.000 $285.000
RIPRAP (MOW STRIP)(4 IN)
CY 97.000 $600.000 $788.000 $860.000
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 18.000 $700.000 $578.000 $790.000
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
LF 66.000 $520.000 $630.000 $800.000
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
LF 12.000 $685.000 $656.000 $915.000
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
LF 30.000 $560.000 $735.000 $950.000
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
LF 20.000 $700.000 $788.000 $1,165.000
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
LF 24.000 $850.000 $893.000 $1,150.000
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
LF 50.000 $600.000 $971.000 $1,390.000
CONC BOX CULV (8 FT X 7 FT)(EXTEND)
LF 36.000 $850.000 $1,050.000 $1,610.000
CONC BOX CULV (9 FT X 9 FT)(EXTEND)
LF 28.000 $1,600.000 $1,260.000 $2,030.000
CONC BOX CULV (10 FT X 10 FT)(EXTEND)
LF 66.000 $1,200.000 $1,575.000 $1,880.000
CONC BOX CULV (12 FT X 10 FT)(EXTEND)
LF 18.000 $2,000.000 $2,100.000 $2,300.000
CONC BOX CULVERT(4 FT X 3.5 FT)(EXTEND)
LF 22.000 $550.000 $735.000 $1,080.000
CONC BOX CULV (5 FT X 6.5 FT)(EXTEND)
LF 8.000 $1,700.000 $1,050.000 $1,360.000
CONC BOX CULV (10 FT X 14 FT)(EXTEND)
LF 84.000 $2,500.000 $2,363.000 $2,040.000
RC PIPE (CL III)(18 IN)
LF 904.000 $50.000 $59.000 $55.000
RC PIPE (CL III)(24 IN)
LF 28.000 $75.000 $158.000 $154.000
RC PIPE (CL III)(30 IN)
LF 12.000 $134.000 $210.000 $195.000
WINGWALL (FW - 0) (HW=3 FT)
EA 3.000 $5,730.000 $3,675.000 $2,745.000
WINGWALL (FW - 0) (HW=4 FT)
EA 4.000 $8,000.000 $5,250.000 $4,300.000
WINGWALL (FW - 0) (HW=5 FT)
EA 5.000 $7,000.000 $7,560.000 $6,120.000
WINGWALL (FW - 0) (HW=7 FT)
EA 1.000 $9,300.000 $13,125.000 $11,800.000
WINGWALL (FW - 0) (HW=8 FT)
EA 1.000 $12,000.000 $21,000.000 $16,000.000
WINGWALL (FW - S) (HW=4 FT)
EA 3.000 $12,000.000 $5,775.000 $5,100.000
WINGWALL (FW - S) (HW=7 FT)
EA 1.000 $13,000.000 $16,800.000 $13,050.000
WINGWALL (PW - 2) (HW=10 FT)
EA 4.000 $32,000.000 $47,250.000 $36,650.000
WINGWALL (PW - 2) (HW=12 FT)
EA 2.000 $36,750.000 $77,700.000 $62,800.000
WINGWALL (PW - 2) (HW=13 FT)
EA 2.000 $45,000.000 $86,100.000 $72,900.000
WINGWALL (PW - 2) (HW=14 FT)
EA 1.000 $67,000.000 $113,400.000 $96,500.000
WINGWALL (PW - 2) (HW=16 FT)
EA 1.000 $70,000.000 $152,250.000 $125,170.000
WINGWALL (PW - 2) (HW=4 FT)
EA 1.000 $9,300.000 $10,500.000 $23,700.000
WINGWALL (PW - 2) (HW=5 FT)
EA 1.000 $12,000.000 $12,600.000 $10,715.000
WINGWALL (PW - 2) (HW=6 FT)
EA 5.000 $14,000.000 $17,850.000 $13,330.000
WINGWALL (PW - 2) (HW=7 FT)
EA 2.000 $16,000.000 $24,150.000 $19,495.000
WINGWALL (PW - 2) (HW=8 FT)
EA 6.000 $23,000.000 $31,500.000 $25,330.000
WINGWALL (PW - 2) (HW=9 FT)
EA 4.000 $22,000.000 $37,800.000 $30,185.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 78.000 $800.000 $1,050.000 $800.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 2.000 $900.000 $1,365.000 $1,315.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 1.000 $1,410.000 $3,150.000 $1,900.000
CLEAN EXIST CULVERTS
EA 31.000 $2,000.000 $2,100.000 $2,500.000
REMOV STR (PIPE)
EA 36.000 $350.000 $1,575.000 $275.000
MOBILIZATION
LS 1.000 $325,000.000 $1,100,000.000 $1,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $10,000.000 $4,000.000 $5,100.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 1,230.000 $35.000 $33.600 $42.250
ROCK FILTER DAMS (REMOVE)
LF 1,230.000 $8.500 $9.450 $11.900
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
CY 250.000 $25.000 $28.000 $50.000
BACKHOE WORK (EROSION & SEDMT CONT)
HR 150.000 $100.000 $180.000 $100.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,100.000 $4.000 $3.150 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,100.000 $1.000 $0.750 $1.000
TRACKHOE WORK (EROSION & SEDMT CONT)
HR 150.000 $125.000 $195.000 $165.000
INTERSECTIONS (ACP)
SY 1,373.000 $59.000 $45.000 $64.000
DRIVEWAYS (ACP)
SY 4,322.000 $65.000 $43.000 $62.000
TURNOUTS (ACP)
SY 443.000 $80.000 $36.000 $71.000
DRIVEWAYS (BASE)
SY 160.000 $20.000 $46.000 $58.000
RUMBLE STRIPS (SHOULDER)
LF 58,420.000 $0.300 $0.250 $0.320
RUMBLE STRIPS (CENTERLINE)
LF 29,210.000 $1.000 $0.250 $0.320
MTL W-BEAM GD FEN (TIM POST)
LF 787.500 $48.000 $24.000 $30.000
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 $3,000.000 $2,900.000 $3,700.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 17.000 $360.000 $295.000 $390.000
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 7.000 $447.000 $330.000 $440.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 36.000 $715.000 $645.000 $850.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $400.000 $920.000 $1,215.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $900.000 $1,050.000 $1,390.000
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
EA 1.000 $1,500.000 $1,240.000 $1,640.000
REMOVE SM RD SN SUP&AM
EA 46.000 $75.000 $150.000 $130.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 13.000 $35.000 $26.000 $33.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 62.000 $76.500 $68.000 $86.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 58,249.000 $0.250 $0.210 $0.300
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 109.000 $1.250 $4.200 $5.300
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 1,142.000 $0.250 $0.210 $0.300
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 53,119.000 $0.250 $0.210 $0.300
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 58,249.000 $1.500 $1.350 $1.750
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 109.000 $8.500 $25.000 $8.150
WK ZN PAV MRK REMOV (Y)4"(BRK)
LF 1,142.000 $1.250 $1.700 $1.750
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 53,119.000 $1.460 $1.300 $1.750
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 3,256.000 $0.750 $1.800 $1.100
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 109.000 $6.000 $6.300 $8.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 58,249.000 $0.300 $0.530 $0.700
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 1,143.000 $0.300 $1.050 $1.350
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 53,172.000 $0.450 $0.530 $0.700
REFL PAV MRKR TY II-A-A
EA 881.000 $2.750 $3.900 $4.900
SP MIXES SP-C SAC-A PG64-22
TON 9,994.000 $160.000 $146.000 $143.000
SP MIXES SP-C SAC-A PG70-22
TON 9,994.000 $160.000 $150.000 $152.500
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 28.000 $101.500 $210.000 $135.000
TMA (STATIONARY)
DAY 216.000 $200.000 $240.000 $330.000
TMA (MOBILE OPERATION)
DAY 10.000 $150.000 $1.000 $330.000
Totals: $11,730,694.340 $12,866,630.050 $13,121,837.050