Show Job Controls
Bid Cobra

ANGELINA SL 287 (2553-01-116)

Items: 140

County: ANGELINA
Length: 1.6980 MILES
Highway: SL 287
District: LUFKIN
Control Number: 2553-01-116
DBE Goal: 5.0%
Project: F 2B24(381)
Guaranty: $100,000.00
Time: 194 WORKING DAYS
Engineer's Estimate: $13,188,203.36
Date: 06/04/2025 (1 year ago)
Contract Number: 6253005
Type: HIGHWAY IMPROVEMENT
Project ID: A00059543
Contract Type: Federal
Project Description: ADD AUXILIARY LANES
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
JESSE SISCO
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$13,188,203.36
$11,124,511.69
Over/Under Est: -15.65% -$2,063,691.67
Over/Under Est: -9.87% -$1,301,423.31
Amt Left: 6.85% $762,268.36
Over/Under Est: -8.24% -$1,086,287.61
Amt Left: 8.79% $977,404.06
Delta: -1.81% -$215,135.70
$13,582,047.42
Over/Under Est: 2.99% $393,844.06
Amt Left: 22.09% $2,457,535.73
Delta: -12.23% -$1,480,131.67
Subcontractor Percentage Amount
THIRD COAST SERVICES LLC 4.58% $509,502.64
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. 2.44% $271,438.09
STRIPING TECHNOLOGY, L.P. 1.50% $166,867.68
SOUTHWEST ROAD & SAFETY CONTRACTORS, LTD. 1.16% $129,044.34
KITECO PROPERTY SOLUTIONS INC. 0.82% $91,221.00
COLD CREEK CONSTRUCTION, LTD 0.59% $65,634.62
DIAMOND ELITE BARRICADES, LLC 0.26% $28,923.73
A. L. HELMCAMP, INC. 0.16% $17,799.22
Total: 11.51% $1,280,431.32

Bid Items & Bid Tabulations

140 Total 0 of 140
ANGELINA  |  SL 287  |  LUFKIN  |  2553-01-116  |  06/04/2025  |  $13,188,203.36  |  F 2B24(381)  |  HWY IMPRV  |  194 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
LONGVIEW BRIDGE AND ROAD, LTD.
TEXAS MATERIALS GROUP, INC.
DREWERY CONSTRUCTION COMPANY, INCORPORATED
A. L. HELMCAMP, INC.
PREPARING ROW
STA 93.000 $1,500.000 $4,500.000 $875.000 $3,000.000 $2,350.000
REMOV CONC (RIPRAP)
SY 22.000 $65.000 $75.000 $66.000 $100.000 $75.000
REMOV CONC (DRIVEWAYS)
SY 1,899.000 $55.000 $30.000 $36.250 $38.000 $37.000
REMOV CONC (CURB & GUTTER)
LF 808.000 $30.000 $16.250 $39.000 $40.000 $40.000
REMOV CONC (RAIL)
LF 58.000 $150.000 $56.000 $145.000 $750.000 $145.000
RMV (4") TRT/UNTRT BASE & ASPH PAV
SY 30.000 $60.000 $23.000 $100.000 $100.000 $120.000
RMV (14") TRT/UNTRT BASE & ASPH PAV
SY 1,279.000 $50.000 $15.000 $26.240 $42.000 $24.000
SUBGR WIDEN (DC)
STA 151.000 $500.000 $1,750.000 $3,135.000 $2,950.000 $3,000.000
BLADING
STA 86.000 $350.000 $300.000 $743.000 $625.000 $290.000
SPEC EXCAV WORK (HYD EXCAVATOR)
HR 95.000 $175.000 $470.000 $204.000 $195.000 $200.000
BLOCK SODDING
SY 601.000 $10.000 $5.000 $5.500 $7.250 $5.500
ROLL SODDING
SY 36,188.000 $10.000 $5.000 $5.450 $6.000 $5.500
BROADCAST SEED (TEMP_WARM)
SY 36,188.000 $1.000 $0.150 $0.180 $0.250 $0.180
BROADCAST SEED (TEMP_COOL)
SY 36,188.000 $1.000 $0.150 $0.170 $0.250 $0.180
VEGETATIVE WATERING
TGL 2,183.900 $20.000 $20.000 $10.000 $10.000 $40.000
CEMENT
TON 379.000 $275.000 $300.000 $290.000 $230.000 $265.000
CEMENT TRT (SUBGRADE)(12")
SY 24,032.000 $6.000 $5.500 $8.100 $7.750 $14.000
PRIME COAT (MC-30)
GAL 4,816.000 $8.000 $6.500 $14.150 $4.000 $7.500
D-GR HMA TY-D PG 64-22 (EXEMPT)
TON 16.000 $250.000 $380.000 $700.000 $500.000 $735.000
SP MIXES SP-B PG70-22
TON 15,340.000 $195.000 $170.000 $165.250 $165.000 $165.250
SP MIXES SP-C SAC-A PG70-22
TON 11,174.000 $185.000 $180.000 $177.420 $175.000 $177.420
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 580.000 $250.000 $200.000 $179.140 $215.000 $179.140
PLANE ASPH CONC PAV(2")
SY 78,873.000 $5.000 $2.750 $3.430 $4.000 $3.500
CUT & RESTORING PAV
SY 157.000 $200.000 $230.000 $265.000 $252.000 $260.000
FLOWABLE BACKFILL
CY 10.000 $450.000 $270.000 $376.000 $360.000 $370.000
TEMPORARY SPL SHORING
SF 110.000 $70.000 $100.000 $65.000 $63.000 $65.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 69.000 $300.000 $220.000 $250.000 $201.500 $200.000
DRILL SHAFT (SIGN MTS) (48 IN)
LF 91.000 $600.000 $900.000 $1,652.000 $450.000 $900.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 140.000 $300.000 $270.000 $350.000 $202.000 $270.000
CL C CONC (COLLAR)
EA 2.000 $1,700.000 $1,200.000 $1,650.000 $1,575.000 $1,700.000
RIPRAP (CONC)(4 IN)
CY 31.300 $800.000 $550.000 $1,000.000 $1,000.000 $1,000.000
RIPRAP (MOW STRIP)(4 IN)
CY 102.000 $800.000 $675.000 $825.000 $787.500 $850.000
RIPRAP (STONE COMMON)(DRY)(24 IN)
CY 38.000 $300.000 $305.000 $295.000 $300.000 $290.000
RC PIPE (CL III)(18 IN)
LF 396.000 $100.000 $55.000 $83.000 $80.000 $83.000
RC PIPE (CL III)(24 IN)
LF 92.000 $175.000 $107.000 $120.000 $113.500 $119.000
RC PIPE (CL III)(30 IN)
LF 74.000 $275.000 $145.000 $189.000 $178.500 $188.000
RC PIPE (CL III)(36 IN)
LF 16.000 $365.000 $260.000 $220.000 $210.000 $220.000
JCTBOX(COMPL)(PJB)(4FTX4FT)
EA 1.000 $8,000.000 $7,000.000 $7,800.000 $7,476.000 $7,900.000
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 1.000 $12,000.000 $15,000.000 $16,000.000 $15,225.000 $16,000.000
HEADWALL (CH - PW - S) (DIA= 30 IN)
EA 1.000 $12,000.000 $15,000.000 $15,500.000 $14,700.000 $16,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 18.000 $1,800.000 $1,300.000 $1,050.000 $997.500 $1,100.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 2.000 $2,600.000 $1,670.000 $1,700.000 $1,627.500 $1,700.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 1.000 $3,000.000 $3,000.000 $2,850.000 $2,730.000 $2,900.000
SET (TY II) (36 IN) (RCP) (3: 1) (C)
EA 1.000 $2,500.000 $3,050.000 $2,850.000 $2,730.000 $2,900.000
SET(TY II)(24 IN)(RCP)(3:1)(P)
EA 1.000 $1,600.000 $1,950.000 $1,325.000 $1,260.000 $1,300.000
ADJUSTING INLETS
EA 2.000 $4,500.000 $1,600.000 $3,300.000 $3,150.000 $3,400.000
REMOV STR (PIPE)
EA 14.000 $1,000.000 $1,000.000 $530.000 $500.000 $530.000
MOBILIZATION
LS 1.000 $1,220,000.000 $1,000,000.000 $1,165,000.000 $1,575,000.000 $1,200,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 19.000 $15,000.000 $4,500.000 $4,500.000 $20,000.000 $40,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 6.000 $20,000.000 $21,000.000 $20,000.000 $10,000.000 $20,000.000
TMA (STATIONARY)
DAY 320.000 $250.000 $300.000 $200.000 $450.000 $350.000
TMA (MOBILE OPERATION)
DAY 72.000 $250.000 $400.000 $25.000 $550.000 $350.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 250.000 $50.000 $50.000 $43.000 $45.000 $43.000
ROCK FILTER DAMS (REMOVE)
LF 250.000 $15.000 $17.000 $11.000 $1.000 $11.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 448.000 $40.000 $47.000 $35.250 $30.000 $35.000
CONSTRUCTION EXITS (REMOVE)
SY 448.000 $15.000 $14.000 $11.000 $5.000 $11.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 8,865.000 $5.000 $5.000 $4.260 $3.750 $4.300
TEMP SEDMT CONT FENCE (REMOVE)
LF 8,865.000 $1.000 $1.100 $1.000 $0.500 $1.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 840.000 $8.000 $9.650 $8.700 $7.500 $9.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 840.000 $5.000 $1.100 $1.100 $0.500 $1.200
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 9,120.000 $100.000 $82.000 $72.000 $80.000 $120.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 280.000 $125.000 $100.000 $72.000 $80.000 $120.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 3,360.000 $15.000 $25.000 $16.500 $1.000 $45.000
PORT CTB (MOVE)(SGL SLP)(TY 2)
LF 400.000 $15.000 $42.000 $23.000 $1.000 $45.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 9,120.000 $65.000 $9.000 $26.000 $13.000 $45.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 280.000 $80.000 $25.000 $23.000 $13.000 $45.000
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 3,216.000 $100.000 $90.000 $127.520 $110.000 $158.000
PERM CTB (SGL SLOPE)(42)(MOD)
LF 40.000 $150.000 $375.000 $220.000 $210.000 $230.000
CONC CURB (MONO) (TY II)
LF 618.000 $65.000 $28.000 $53.000 $50.000 $53.000
CONC CURB & GUTTER (TY II)
LF 588.000 $85.000 $42.000 $61.000 $57.750 $61.000
DRIVEWAYS (CONC)
SY 2,054.000 $175.000 $150.000 $206.000 $198.000 $210.000
DRIVEWAYS (ACP)
SY 2,069.000 $110.000 $70.000 $66.240 $80.000 $73.000
TURNOUTS (ACP)
SY 12.000 $110.000 $555.000 $800.000 $80.000 $800.000
CONC DIRECTIONAL ISLAND
SY 1,379.000 $190.000 $130.000 $185.000 $176.000 $185.000
MTL W-BEAM GD FEN (TIM POST)
LF 100.000 $35.000 $29.000 $39.300 $33.500 $37.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $3,500.000 $3,300.000 $3,600.000 $3,800.000 $4,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 1.000 $725.000 $530.000 $1,320.000 $210.000 $1,350.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $800.000 $1,760.000 $3,520.000 $1,050.000 $3,600.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 1.000 $400.000 $200.000 $313.000 $300.000 $600.000
REMOVE RD IL ASM (TRANS-BASE)
EA 16.000 $1,000.000 $1,050.000 $860.000 $450.000 $1,100.000
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 16.000 $7,000.000 $6,300.000 $6,900.000 $4,300.000 $6,300.000
CONDT (PVC) (SCH 40) (2")
LF 3,835.000 $11.000 $6.500 $10.500 $11.250 $6.500
CONDT (PVC) (SCH 80) (2") (BORE)
LF 2,160.000 $25.000 $14.000 $34.100 $17.250 $14.000
ELEC CONDR (NO.8) BARE
LF 6,260.000 $2.300 $1.250 $2.590 $1.550 $1.500
ELEC CONDR (NO.8) INSULATED
LF 12,520.000 $2.500 $1.500 $3.300 $1.800 $1.700
GROUND BOX TY A (122311)W/APRON
EA 34.000 $1,000.000 $1,200.000 $1,625.000 $1,350.000 $1,200.000
REMOVE GROUND BOX
EA 8.000 $500.000 $350.000 $670.000 $425.000 $350.000
ALUMINUM SIGNS (TY G)
SF 398.500 $40.000 $41.000 $33.550 $28.750 $40.000
ALUMINUM SIGNS (TY O)
SF 1,369.000 $40.000 $29.000 $33.850 $23.750 $30.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 34.000 $840.000 $710.000 $733.000 $700.000 $710.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 9.000 $900.000 $814.000 $980.000 $935.000 $815.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 47.000 $1,025.000 $820.000 $760.000 $725.000 $820.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 1.000 $950.000 $950.000 $988.000 $945.000 $950.000
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 1.000 $1,500.000 $1,400.000 $1,200.000 $1,200.000 $1,400.000
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
EA 3.000 $1,500.000 $2,200.000 $1,985.000 $1,900.000 $2,200.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 20.000 $815.000 $700.000 $570.000 $550.000 $700.000
REMOVE SM RD SN SUP&AM
EA 39.000 $185.000 $121.000 $110.000 $100.000 $120.000
INSTALL LRSS (STRUCT STEEL)
LB 2,474.770 $8.000 $7.000 $8.750 $7.000 $7.000
REMOVE LRSA
EA 5.000 $800.000 $3,120.000 $1,055.000 $2,000.000 $3,200.000
INS OH SN SUP(35 FT CANT)
EA 4.000 $40,000.000 $46,000.000 $50,600.000 $37,500.000 $50,000.000
REMOVE OVERHD SIGN SUP (SIGN ONLY)
EA 2.000 $2,000.000 $1,450.000 $2,785.000 $4,500.000 $1,400.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 3.000 $50.000 $32.000 $105.000 $75.000 $50.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 7.000 $40.000 $45.000 $65.000 $100.000 $50.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 6,582.000 $1.000 $0.800 $0.610 $0.740 $0.440
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 31,324.000 $1.000 $0.800 $0.610 $0.740 $0.440
WK ZN PAV MRK NON-REMOV (W)8"(DOT)
LF 869.000 $1.000 $1.100 $0.610 $1.050 $1.100
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 6,065.000 $1.000 $0.550 $0.720 $0.530 $0.780
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
LF 1,451.000 $5.000 $2.500 $1.650 $2.360 $1.900
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 108.000 $15.000 $3.600 $3.300 $3.410 $4.300
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 6.000 $250.000 $110.000 $110.000 $105.000 $97.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 6.000 $250.000 $110.000 $110.000 $105.000 $110.000
WK ZN PAV MRK NON-REMOV(W)36"(YLD TRI)
EA 26.000 $25.000 $110.000 $22.000 $105.000 $28.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 26,629.000 $1.000 $0.800 $0.610 $0.740 $0.440
WK ZN PAV MRK REMOV (REFL) TY II-C-R
EA 332.000 $5.000 $5.500 $6.600 $5.250 $8.500
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 216.000 $15.000 $11.000 $7.150 $10.500 $11.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 2,723.000 $2.000 $2.450 $2.000 $2.000 $0.780
WK ZN PAV MRK SHT TERM RMV (W)(6")
LF 3,792.000 $2.500 $2.900 $2.500 $3.250 $2.750
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
LF 300.000 $2.000 $1.100 $1.400 $1.050 $2.300
REFL PAV MRK TY I (W)8"(LNDP)(090MIL)
LF 1,443.000 $2.000 $1.100 $1.400 $1.050 $1.550
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 5,591.000 $0.750 $1.000 $1.400 $0.950 $1.100
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
LF 3,534.000 $3.000 $4.400 $3.250 $4.200 $3.700
REFL PAV MRK TY I (Y)12"(SLD)(090MIL)
LF 170.000 $3.000 $4.400 $3.850 $4.200 $3.700
REFL PAV MRK TY I (W)6"(BRK)(090MIL)
LF 4,550.000 $0.750 $1.100 $1.050 $1.050 $0.660
REFL PAV MRK TY I (W)6"(SLD)(090MIL)
LF 22,860.000 $0.750 $0.900 $1.020 $0.840 $0.660
REFL PAV MRK TY I (Y)6"(SLD)(090MIL)
LF 23,075.000 $0.750 $0.900 $1.020 $0.840 $0.660
PREFAB PM TY C (W)(24")(SLD)
LF 686.000 $19.000 $16.000 $12.000 $15.230 $25.000
PREFAB PM TY C (W)(ARROW)
EA 15.000 $250.000 $250.000 $220.000 $231.000 $300.000
PREFAB PM TY C (W)(DBL ARROW)
EA 6.000 $300.000 $310.000 $303.000 $294.000 $550.000
PREFAB PM TY C (W)(UTURN ARROW)
EA 2.000 $350.000 $350.000 $310.000 $336.000 $500.000
PREFAB PM TY C (W)(WORD)
EA 17.000 $250.000 $280.000 $300.000 $267.750 $420.000
PREFAB PM TY C (W)(RR XING)
EA 3.000 $600.000 $715.000 $690.000 $682.500 $940.000
PREFAB PM TY C (W)(18")(YLD TRI)
EA 24.000 $55.000 $66.000 $16.500 $63.000 $60.000
PREFAB PM TY C (W)(36")(YLD TRI)
EA 26.000 $65.000 $66.000 $28.000 $63.000 $72.000
REFL PAV MRKR TY II-C-R
EA 589.000 $7.000 $5.500 $5.500 $5.250 $8.500
ELIM EXT PM & MRKS (6")
LF 27,937.000 $0.600 $0.550 $0.550 $0.530 $0.550
ELIM EXT PM & MRKS (8")
LF 2,615.000 $0.600 $0.900 $0.650 $0.790 $0.880
ELIM EXT PM & MRKS (ARROW)
EA 2.000 $100.000 $110.000 $85.000 $105.000 $193.000
ELIM EXT PM & MRKS (WORD)
EA 2.000 $100.000 $110.000 $85.000 $105.000 $193.000
UNDERSEAL COURSE
GAL 20,303.000 $12.000 $6.600 $12.710 $2.500 $12.710
BONDING COURSE
GAL 3,596.000 $6.500 $6.000 $6.000 $2.500 $6.000
Totals: $13,188,203.360 $11,124,511.690 $11,886,780.042 $12,101,915.745 $13,582,047.420
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
RAILROAD FLAGGING: RAILROAD FORCE ACCOUNT WORK (PART) $2,100.00
Total: $22,100.00