POLK VA (0911-04-055)

Items: 41

County: POLK
Length: N/A
Highway: VA
District: LUFKIN
Control Number: 0911-04-055
DBE Goal: N/A
Project: C 911-4-55
Guaranty: N/A
Time: 96 WORKING DAYS
Engineer's Estimate: $1,549,868.00
Date: 08/06/2019 (6 years ago)
Contract Number: N/A
Type: REPAIR AND RESURFACE PAVED AREAS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (1)
E
Engineer's Estimate
$1,549,868.00
Over/Under Est: 22.55% $349,555.50

Bid Items & Bid Tabulations

41 Total 0 of 41
POLK  |  VA  |  LUFKIN  |  0911-04-055  |  08/06/2019  |  $1,549,868.00  |  C 911-4-55  |  REPAIR AND RESURF PAVED AREAS  |  96 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DREWERY CONSTRUCTION COMPANY, INCORPORATED
PREPARING ROW
STA 28.000 $5,000.000 $1,500.000
REMOVING CONC (MISC)
SY 419.000 $20.000 $20.000
EXCAVATION (ROADWAY)
CY 4,522.000 $15.000 $26.000
EXCAVATION (SPECIAL)
CY 1,836.000 $30.000 $32.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 334.000 $30.000 $50.250
FURNISHING AND PLACING TOPSOIL (4")
SY 6,683.000 $3.000 $5.000
BLOCK SODDING
SY 6,859.000 $10.000 $6.000
VEGETATIVE WATERING
MG 137.100 $30.000 $100.000
FL BS (CMP IN PLC)(TYA GR1-2) (6")
SY 5,991.000 $30.000 $40.000
LIME (QUICKLIME (DRY))
TON 96.000 $160.000 $205.000
LIME TRT (EXST MATL)(8")
SY 5,991.000 $6.000 $13.500
PRIME COAT (MC-30)
GAL 1,798.000 $5.000 $10.000
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 2,516.000 $5.000 $4.000
AGGR(TY PE,TY-PL,TY-E,TY-L GR-4)(SAC-B)
CY 55.000 $250.000 $350.000
D-GR HMA(SQ) TY-D PG64-22
TON 494.000 $200.000 $200.000
CL A CONC (MISC)
CY 821.300 $500.000 $625.000
RC PIPE (CL III)(18 IN)
LF 1,505.000 $60.000 $72.000
RC PIPE (CL IV)(12 IN)
LF 30.000 $85.000 $210.000
RC PIPE (CL IV)(18 IN)
LF 877.000 $100.000 $105.000
REMOV STR (PIPE)
EA 77.000 $350.000 $550.000
MOBILIZATION
LS 1.000 $115,000.000 $200,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $6,500.000 $12,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 30.000 $30.000 $43.000
ROCK FILTER DAMS (REMOVE)
LF 30.000 $10.000 $25.500
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 234.000 $25.000 $15.000
CONSTRUCTION EXITS (REMOVE)
SY 234.000 $10.000 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 100.000 $3.000 $6.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 100.000 $1.000 $1.500
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 720.000 $5.000 $8.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 720.000 $1.000 $1.100
CONC SIDEWALKS (4")
SY 29.000 $60.000 $300.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 1.000 $360.000 $1,500.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 3.000 $460.000 $550.000
REMOVE SM RD SN SUP&AM
EA 4.000 $90.000 $600.000
INSTL DEL ASSN (OM-2Z)(FLX)(WAP)
EA 10.000 $110.000 $200.000
RE PM TY I (ACC PRK)(WHT)(SYMBOL ONLY)
EA 1.000 $200.000 $1,500.000
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 250.000 $3.000 $2.000
TREE REMOVAL (4" - 12" DIA)
EA 2.000 $400.000 $1,000.000
TREE REMOVAL (12" - 18" DIA)
EA 10.000 $500.000 $750.000
TREE REMOVAL (18" - 24" DIA)
EA 2.000 $600.000 $1,500.000
WHEEL STOPS
EA 60.000 $300.000 $175.000
Totals: $1,549,868.000 $1,899,423.500