ANGELINA FM 326 (3264-01-010)

Items: 81

County: ANGELINA
Length: N/A
Highway: FM 326
District: LUFKIN
Control Number: 3264-01-010
DBE Goal: N/A
Project: F 2023(012)
Guaranty: N/A
Time: 171 WORKING DAYS
Engineer's Estimate: $2,186,829.65
Date: 09/07/2022 (3 years ago)
Contract Number: N/A
Type: ROADWAY REHABILITATION/RECONSTRUCTION
Mail/Deliver Bids To: N/A
JESSE SISCO
PRAVEEN RAMANATHAN
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$2,186,829.65
Over/Under Est: 20.61% $450,644.49
Over/Under Est: 23.59% $515,845.37
Amt Left: 2.47% $65,200.88
Over/Under Est: 34.92% $763,658.65
Amt Left: 11.87% $313,014.16
Delta: -9.17% -$247,813.28
Subcontractor Percentage Amount
J & M CONTRACTING, COMPANY 26.56% $700,513.13
PINTO CONSTRUCTION CO., INC. 11.71% $308,848.22
AMERICAN REMEDIATION OPTIONS, INC. 2.83% $74,640.52
STRIPING TECHNOLOGY, L.P. 1.28% $33,759.67
PANOLA SIGN & BARRICADE, INC. 0.54% $14,242.36
DUSTROL, INC. 0.42% $11,077.39
AT STAFFING 0.00% $0.00
Total: 43.34% $1,143,081.29

Bid Items & Bid Tabulations

81 Total 0 of 81
ANGELINA  |  FM 326  |  LUFKIN  |  3264-01-010  |  09/07/2022  |  $2,186,829.65  |  F 2023(012)  |  ROADWAY REHAB/RECON  |  171 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
MOORE BROTHERS CONSTRUCTION COMPANY
DREWERY CONSTRUCTION COMPANY, INCORPORATED
STATELINE CONSTRUCTION, LLC
REMOVING CONC (DRIVEWAYS)
SY 940.000 $24.000 $24.000 $23.000 $20.000
REMOVING CONC (CURB AND GUTTER)
LF 1,240.000 $15.000 $21.000 $10.000 $17.250
REMOVING STAB BASE & ASPH PAV (0"-10")
SY 1,559.000 $10.000 $15.000 $20.000 $20.000
EXCAVATION (ROADWAY)
CY 2,132.000 $12.000 $41.550 $33.000 $23.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 1,195.000 $12.000 $42.000 $37.000 $20.000
BLADING
STA 24.140 $350.000 $1,565.000 $400.000 $200.000
BLOCK SODDING
SY 5,097.000 $5.250 $6.600 $7.000 $8.500
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 4,252.000 $0.200 $0.260 $0.220 $0.750
BROADCAST SEED (TEMP) (WARM)
SY 2,126.000 $0.200 $0.530 $0.210 $0.750
BROADCAST SEED (TEMP) (COOL)
SY 2,126.000 $0.200 $0.530 $0.190 $0.750
VEGETATIVE WATERING
MG 187.480 $25.000 $10.000 $37.000 $5.000
SOIL RETENTION BLANKETS (CL 1) (TY C)
SY 4,252.000 $2.000 $2.200 $1.600 $5.000
CEM TRT(PLNT MX) (CLN)(TYA)(GR1-2)(10")
SY 5,989.000 $35.000 $71.230 $89.000 $105.000
ASPH (RC-250)
TON 6.300 $1,800.000 $2,555.000 $1,750.000 $2,823.000
AGGR (TY E OR L, PE OR PL GR 4)
CY 131.000 $340.000 $324.000 $390.000 $375.000
AGGR (TY E OR L GR 5)
CY 43.000 $250.000 $570.000 $625.000 $450.000
ASPH (AC-15P OR CRS-2P)
TON 32.100 $1,300.000 $1,490.000 $1,250.000 $2,830.000
CEM STABIL BKFL
CY 139.000 $140.000 $227.000 $220.000 $250.000
CUT & RESTORE ASPH PAVING
SY 20.000 $115.000 $115.000 $158.000 $250.000
TRENCH EXCAVATION PROTECTION
LF 35.000 $10.000 $10.000 $5.250 $20.000
CL C CONC (COLLAR)
EA 4.000 $1,200.000 $1,100.000 $890.000 $1,500.000
RIPRAP (CONC) (CL B) (6")
CY 230.000 $500.000 $622.000 $525.000 $525.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 30.000 $200.000 $196.000 $210.000 $180.000
RAIL (HANDRAIL)(TY E)
LF 86.000 $160.000 $166.000 $150.000 $250.000
RC PIPE (CL III)(18 IN)
LF 270.000 $50.000 $60.000 $51.000 $70.000
RC PIPE (CL III)(24 IN)
LF 518.000 $98.000 $94.000 $71.000 $95.000
INLET (COMPL)(TY A)
EA 1.000 $7,000.000 $7,150.000 $6,000.000 $10,000.000
HEADWALL (CH - PW - 0) (DIA= 18 IN)
EA 1.000 $6,000.000 $4,700.000 $4,700.000 $7,850.000
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 1.000 $7,000.000 $8,250.000 $7,500.000 $10,000.000
HEADWALL (CH - PW - 0) (DIA= 48 IN)
EA 1.000 $16,000.000 $9,350.000 $10,500.000 $13,500.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 3.000 $700.000 $675.000 $675.000 $1,100.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 8.000 $750.000 $825.000 $800.000 $1,200.000
SET (TY II) (24 IN) (RCP) (3: 1) (P)
EA 1.000 $1,500.000 $1,300.000 $890.000 $1,500.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 12.000 $1,900.000 $1,425.000 $1,200.000 $1,800.000
CAST-IN-PLACE TRENCH DRAIN
LF 6.000 $600.000 $550.000 $525.000 $650.000
CLEAN EXIST CULVERTS
EA 2.000 $1,600.000 $3,250.000 $1,050.000 $2,500.000
REMOV STR (PIPE)
EA 12.000 $370.000 $330.000 $220.000 $400.000
MOBILIZATION
LS 1.000 $200,000.000 $250,000.000 $295,000.000 $225,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 16.000 $3,000.000 $1,600.000 $4,500.000 $2,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 306.000 $30.000 $38.500 $31.500 $45.000
ROCK FILTER DAMS (REMOVE)
LF 306.000 $10.000 $10.000 $12.600 $10.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 81.000 $30.000 $24.000 $31.500 $15.000
CONSTRUCTION EXITS (REMOVE)
SY 81.000 $10.000 $10.000 $13.650 $1.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,636.000 $3.000 $3.300 $4.450 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,636.000 $1.500 $1.100 $1.050 $1.500
CONC CURB & GUTTER (TY II)
LF 2,422.000 $40.000 $45.000 $23.000 $40.000
DRIVEWAYS (CONC)
SY 820.000 $95.000 $123.000 $95.000 $165.000
DRIVEWAYS (ACP)
SY 1,332.000 $35.000 $46.530 $50.000 $60.000
CONC SIDEWALKS (4")
SY 1,290.000 $75.000 $93.500 $68.000 $60.000
CURB RAMPS (TY 7)
EA 1.000 $1,500.000 $2,400.000 $3,150.000 $5,000.000
MAILBOX INSTALL-S (TIM-POST) TY 5
EA 4.000 $750.000 $550.000 $285.000 $750.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $1,000.000 $1,155.000 $1,207.500 $1,200.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 1.000 $1,200.000 $1,265.000 $1,370.250 $1,200.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 3.000 $360.000 $545.000 $449.400 $1,200.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 1.000 $600.000 $545.000 $588.000 $500.000
RELOCATE SM RD SN SUP&AM TY S80
EA 1.000 $700.000 $825.000 $900.900 $500.000
RELOCATE SM RD SN SUP&AM TY TWT
EA 5.000 $500.000 $435.000 $306.600 $500.000
REMOVE SM RD SN SUP&AM
EA 1.000 $100.000 $104.000 $340.000 $400.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 15.000 $75.000 $82.000 $85.050 $75.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 4,828.000 $0.200 $1.100 $1.050 $1.500
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 4,828.000 $0.300 $1.100 $1.050 $1.500
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 120.000 $4.000 $6.600 $6.300 $10.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 776.000 $1.000 $1.300 $2.070 $5.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 244.000 $1.000 $1.300 $2.300 $5.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 760.000 $1.100 $1.100 $1.050 $1.500
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 480.000 $0.700 $2.200 $2.100 $3.250
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 1,348.000 $0.600 $1.650 $1.600 $2.250
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 4,826.000 $0.500 $1.650 $1.600 $2.250
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 50.000 $15.000 $16.500 $15.750 $22.500
PREFAB PAV MRK TY C (W) (ARROW)
EA 6.000 $200.000 $230.000 $220.000 $400.000
PREFAB PAV MRK TY C (W) (WORD)
EA 6.000 $225.000 $285.000 $273.000 $425.000
REFL PAV MRKR TY I-C
EA 62.000 $6.000 $6.600 $6.300 $10.000
REFL PAV MRKR TY II-A-A
EA 60.000 $5.000 $6.600 $6.300 $10.000
ELIM EXT PAV MRK & MRKS (4")
LF 666.000 $0.300 $1.100 $1.050 $1.500
RELOCATE RDSD FLASH BEACON ASSEMBLY
EA 1.000 $4,000.000 $8,250.000 $7,875.000 $4,000.000
SP MIXES SP-C PG70-22
TON 3,005.000 $170.000 $142.920 $160.000 $170.000
SP MIXES SP-C SAC-A PG70-22
TON 1,269.000 $170.000 $161.370 $165.000 $185.000
TACK COAT
GAL 2,648.000 $5.000 $5.000 $4.500 $6.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 3.000 $10,000.000 $15,000.000 $15,000.000 $11,000.000
TMA (STATIONARY)
DAY 171.000 $160.000 $50.000 $185.000 $175.000
TMA (MOBILE OPERATION)
DAY 7.000 $150.000 $50.000 $160.000 $500.000
Totals: $2,186,829.650 $2,637,474.140 $2,702,675.020 $2,950,488.300