PREPARING ROW
|
STA
|
329.000
|
$1,200.000
|
$1,250.000
|
$1,500.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
42.000
|
$25.000
|
$30.500
|
$160.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
328.000
|
$400.000
|
$625.000
|
$400.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
|
CY
|
25,870.000
|
$18.000
|
$26.000
|
$16.750
|
|
|
BLADING
|
STA
|
328.000
|
$275.000
|
$350.000
|
$230.000
|
|
|
SPEC EXCAV WORK (HYD EXCAVATOR)
|
HR
|
175.000
|
$110.000
|
$63.000
|
$230.000
|
|
|
BLOCK SODDING
|
SY
|
3,352.000
|
$5.000
|
$6.000
|
$7.350
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
36,527.000
|
$0.150
|
$0.190
|
$0.160
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
36,527.000
|
$0.150
|
$0.190
|
$0.160
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
73,054.000
|
$0.550
|
$0.630
|
$0.900
|
|
|
VEGETATIVE WATERING
|
MG
|
3,001.000
|
$10.000
|
$1.000
|
$8.000
|
|
|
SPRINKLING (DUST CONTROL)
|
MG
|
1,023.000
|
$0.500
|
$1.000
|
$14.000
|
|
|
FL BS (RDWY DEL)(TY D GR 1-2 OR GR 5)
|
TON
|
9,841.000
|
$55.000
|
$53.000
|
$61.000
|
|
|
CEMENT
|
TON
|
1,836.000
|
$250.000
|
$260.000
|
$253.000
|
|
|
CEMENT TREAT(MX EXST MTL & NW BS)(12")
|
SY
|
102,300.000
|
$4.250
|
$6.500
|
$6.500
|
|
|
ASPH (RC-250)
|
TON
|
110.000
|
$1,425.000
|
$1,000.000
|
$1,130.000
|
|
|
AGGR (TY PE OR PL GR 4)
|
CY
|
758.000
|
$190.000
|
$277.000
|
$215.000
|
|
|
AGGR (TY E OR L GR 5)
|
CY
|
732.000
|
$190.000
|
$233.000
|
$230.000
|
|
|
ASPH (AC-15P OR CRS-2P)
|
TON
|
183.000
|
$1,000.000
|
$900.000
|
$1,165.000
|
|
|
CEM STABIL BKFL
|
CY
|
222.000
|
$200.000
|
$273.000
|
$275.000
|
|
|
CUT & RESTORE CONC PAVING
|
SY
|
62.000
|
$120.000
|
$151.000
|
$151.200
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
953.000
|
$7.500
|
$20.000
|
$19.950
|
|
|
TEMPORARY SPL SHORING
|
SF
|
132.000
|
$45.000
|
$23.000
|
$65.000
|
|
|
CL C CONC (COLLAR)
|
EA
|
16.000
|
$1,000.000
|
$945.000
|
$945.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
42.000
|
$200.000
|
$215.000
|
$225.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)
|
LF
|
20.000
|
$350.000
|
$787.000
|
$790.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)
|
LF
|
27.000
|
$500.000
|
$787.000
|
$787.500
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
168.000
|
$700.000
|
$1,050.000
|
$1,050.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
2,884.000
|
$50.000
|
$72.500
|
$75.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
386.000
|
$75.000
|
$99.000
|
$115.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
218.000
|
$130.000
|
$163.000
|
$173.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
22.000
|
$160.000
|
$188.000
|
$200.000
|
|
|
INLET(COMPL)(PAZD)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
2.000
|
$5,250.000
|
$6,825.000
|
$8,000.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 24 IN)
|
EA
|
1.000
|
$12,000.000
|
$6,676.000
|
$9,000.000
|
|
|
WINGWALL (FW - 0) (HW=3 FT)
|
EA
|
2.000
|
$12,000.000
|
$10,292.000
|
$11,000.000
|
|
|
WINGWALL (FW - 0) (HW=4 FT)
|
EA
|
4.000
|
$10,000.000
|
$11,087.000
|
$11,086.950
|
|
|
WINGWALL (FW - 0) (HW=8 FT)
|
EA
|
1.000
|
$19,000.000
|
$25,200.000
|
$28,000.000
|
|
|
WINGWALL (PW - 2) (HW=4 FT)
|
EA
|
2.000
|
$11,000.000
|
$14,700.000
|
$14,700.000
|
|
|
WINGWALL (PW - 2) (HW=8 FT)
|
EA
|
1.000
|
$25,000.000
|
$31,500.000
|
$31,500.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
8.000
|
$650.000
|
$840.000
|
$900.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
202.000
|
$750.000
|
$998.000
|
$1,150.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
9.000
|
$1,100.000
|
$1,260.000
|
$1,400.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$2,750.000
|
$1,470.000
|
$1,575.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
26.000
|
$1,200.000
|
$1,575.000
|
$1,725.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
6.000
|
$1,750.000
|
$2,310.000
|
$2,455.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$3,500.000
|
$2,888.000
|
$3,250.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$5,500.000
|
$6,563.000
|
$7,000.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
11.000
|
$1,410.000
|
$1,470.000
|
$1,575.000
|
|
|
REMOV STR (PIPE)
|
EA
|
111.000
|
$250.000
|
$525.000
|
$700.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$680,000.000
|
$825,000.000
|
$1,000,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
20.000
|
$1,500.000
|
$11,000.000
|
$14,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
560.000
|
$36.000
|
$38.000
|
$41.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
560.000
|
$10.000
|
$10.000
|
$13.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
224.000
|
$25.000
|
$10.000
|
$29.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
224.000
|
$11.500
|
$5.000
|
$13.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
7,992.000
|
$3.150
|
$4.000
|
$3.150
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
7,992.000
|
$0.800
|
$0.800
|
$1.050
|
|
|
DRIVEWAYS (CONC)
|
SY
|
627.000
|
$115.000
|
$159.000
|
$168.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
10,681.000
|
$45.000
|
$84.000
|
$65.000
|
|
|
TURNOUTS (SURF TREAT)
|
SY
|
1,514.000
|
$45.000
|
$49.000
|
$100.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
65,764.000
|
$0.200
|
$0.220
|
$0.180
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
32,882.000
|
$0.350
|
$0.220
|
$0.170
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
4.000
|
$550.000
|
$472.000
|
$575.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
46.000
|
$250.000
|
$157.000
|
$310.000
|
|
|
MAILBOX INSTALL-D (WC-POST) TY 3
|
EA
|
19.000
|
$250.000
|
$210.000
|
$310.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
1.000
|
$730.000
|
$651.000
|
$720.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
7.000
|
$1,000.000
|
$719.000
|
$790.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
7.000
|
$1,100.000
|
$913.000
|
$980.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
21.000
|
$455.000
|
$457.000
|
$405.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
15.000
|
$550.000
|
$504.000
|
$485.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
51.000
|
$100.000
|
$79.000
|
$175.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)SRF(BI)
|
EA
|
42.000
|
$110.000
|
$142.000
|
$95.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
65,548.000
|
$0.380
|
$0.260
|
$0.260
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
65,548.000
|
$0.600
|
$1.640
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
3,292.000
|
$0.900
|
$3.200
|
$2.600
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
85.000
|
$1.100
|
$2.100
|
$2.100
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
|
LF
|
65,616.000
|
$0.600
|
$0.860
|
$0.850
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
|
LF
|
5,791.000
|
$0.600
|
$1.000
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
|
LF
|
35,645.000
|
$0.590
|
$0.860
|
$0.850
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
15.000
|
$15.000
|
$32.000
|
$31.500
|
|
PREFAB PAV MRK TY C (Y) (24") (SLD)
|
LF
|
71.000
|
$15.000
|
$21.000
|
$21.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
680.000
|
$4.600
|
$4.250
|
$4.200
|
|
|
SP MIXES SP-C SAC-A PG70-22
|
TON
|
11,254.000
|
$140.000
|
$180.000
|
$188.000
|
|
|
BONDING COURSE
|
GAL
|
5,116.000
|
$5.000
|
$4.000
|
$5.500
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,500.000
|
$25,000.000
|
$31,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
662.000
|
$175.000
|
$235.000
|
$110.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
10.000
|
$150.000
|
$285.000
|
$50.000
|
|
Totals: |
$7,487,233.790
|
$9,734,197.560
|
$9,834,420.380
|